Career Information:
Current Employer: AECOM Arabia Ltd.
Experience: 9 years
International Experience: Canada & Saudi
Arabia (Khobar, Shaybah & Jeddah)
Current Position: Project Engineer
Department: Construction/Engineering
Business Sector: Infrastructure
Languages: Arabic & English
Objectives
Seeking a challenging position in engineering and management that allows for creativity and advancement.
Education
2005 Bachelor degree in Buildings Engineering, King Faisal University, College of Architecture and
Planning, Dammam SA. Senior Project: Optimum Analysis & Design of Steel Frame Structure
Experience AECOM Arabia Limited (May 2014 – Present )
2014 Currently working as a Construction Project Engineer to work on Jeddah Stormwater Drainage Project
(JSDP). In charge of 4 km channel long includes 6 box culverts. The tasks are:
ď‚· Preparing daily & weekly progress report:
ď‚· Quantity of concrete pouring
ď‚· Number of manpower
ď‚· Number of equipments
ď‚· Supervise the construction work
ď‚· Approve RFIs form for the contractor
ď‚· Planning & scheduling for the daily activities
ď‚· Assure the safety issues on daily working site
ď‚· Developing MTO for:
ď‚· Steel Reinforcement
ď‚· Daily casted concrete
ď‚· Gravel & geotextile work
SNC-Lavalin Europe B.V. (2006 – 2014 )
2011 Assigned as a Civil/ Structural Engineer to work with Zuhair Fayez partnership in association with
SNC-Lavalin Arabia on Royal Commission Project in Jubail (Expansion of Fuel and Feedstock
Pipeline Stage 2, Jubail 2). The tasks were:
ď‚· Structural Steel design:
ď‚· Base Plate Design
ď‚· Anchor Bolt Design
ď‚· Checking Structural Steel drawings with STAAD Pro results
ď‚· Checking calculation reports for the Structures
ď‚· Concrete Foundation design
ď‚· Developing MTO for:
ď‚· Structural Steel
ď‚· Structural Concrete
ď‚· Steel Reinforcement
2010 Assigned to work as an Architectural/Civil/Structural Engineer supporting the FEED and bid
document development for the Industrial Support Facilities (ISF) for WASIT Gas Plant. The project
includes more than 50 buildings mixed between concrete and steel structure. The tasks were:
ď‚· Architectural design development
ď‚· Foundations design
ď‚· Type of buildings: (CCR, Admin. Bldg., Dining
Hall, Fire Station, Maintenance complex, MSB,
OME, PDD, Operator Shelter, Storages &
Shelters, Security Buildings, Sulfur Loading Bldg.)
ď‚· Design steel structure framing
ď‚· Design concrete structure framing
ď‚· Developing MTO for:
ď‚· Architectural
ď‚· Structural
ď‚· Civil
2008 Assigned as a Civil/ Structural Field Supervisor to manage the Civil and steel Structural
construction activities for Shaybah Central Processing Facilities (CPF). The tasks were:
ď‚· Field engineering
ď‚· Red line/As-Built Drawings
ď‚· Steel structure modifications & re-design
ď‚· Preparation Pre- Commissioning folders
ď‚· Responsible for 2 Mechanical Completion Certificate
(MCC) systems with 13 sub-systems
ď‚· Developing MTO for:
ď‚· Concrete
ď‚· Structural Steel
ď‚· Pavement
ď‚· Excavation and backfilling
ď‚· Steel rebar
2007 Assigned to SSJ Consortium as a Civil/ Structural Engineer to work on Yanbu Refinery Crude Unit
Expansion project. The tasks were:
ď‚· Developing MTO using KBase input form for:
ď‚· Beams, Columns, Foundations, Duct banks & Piping
ď‚· Foundation design
ď‚· Check drawings
Ibrahim Al-Shayea CV (Project Engineer) Up To Date December 2015
Memberships
Saudi Council of Engineering Membership (SCE)
2006 Assigned as a Civil/ Structural Engineer to work on Shaybah (CPF) project (Detail Engineering phase)
in Calgary, AB, Canada. The tasks were :
ď‚· Developing MTO for:
ď‚· Duct bank, manhole & electrical pull box
ď‚· Foundation, Excavation & Backfilling
ď‚· Foundation design
ď‚· Steel structure design
ď‚· Check drawings
Certificates & Courses ( In-house & Online )
ď‚· Advanced STAAD Pro Analysis & Design
ď‚· Introduction to STAAD Pro
ď‚· AutoCAD
ď‚· Microstation
ď‚· Introduction to Project Control
ď‚· QA/ QC Guide lines
ď‚· Introduction to Commercial Management
ď‚· Introduction to the Design / Engineering. From the Conception to the Construction
and Utilization
ď‚· From the Conception to the Construction and Utilization
ď‚· Introduction to Contracts
ď‚· Induction to HSE
 Geotechnical Overview – Field Investigation
ď‚· Induction to GIS
ď‚· Introduction to Land Surveying
ď‚· Traffic Management
ď‚· Project Quality Awareness (Royal Commission for Jubail & Yanbu)
ď‚· Matlab
ď‚· Competent in Microsoft Windows and Microsoft Office
ď‚· Saudi Council of Engineering Membership
ď‚· Project Team Management
ď‚· Project Risk Management
ď‚· From Project Manager to Principal 1 - Foundations of Management
ď‚· Developing & Managing a Project Budget
 Design of Reinforced Concrete Using the ACI Code – Introduction
 Design of Reinforced Concrete Using the ACI Code – Serviceability
ď‚· Design of Reinforced Concrete Using the ACI Code -Flexural Analysis of Beams
ď‚· Design of Reinforced Concrete Using the ACI Code - Design of Short Columns
Subject to Axial Load and Bending
ď‚· Design of Reinforced Concrete Using the ACI Code - Design of Rectangular Beams
and One-Way Slabs
ď‚· Design of Reinforced Concrete Using the ACI Code - Analysis and Design of T
Beams and Doubly Reinforced Beams
ď‚· Building Systems for Designers - Structural Systems
ď‚· Building Pathology - Members and Connections
ď‚· Basic Wind Loads ASCE 7-10
ď‚· Alternative Construction - Structural Properties
ď‚· Alternative Construction - Natural Building Codes and Regulations
ď‚· Achieving LEED Credits in New Construction Projects

Ibrahim S. Al-Shayea CV (Project Engineer)

  • 1.
    Ibrahim Al-Shayea CV(Project Engineer) Up To Date December 2015 Ibrahim Al-Shayea Mobile(STC) : +966555970831 Mobile(Mobily) : +966545738686 Email: ibssm@yahoo.com Skype: ibrahim.alshayea Career Information: Current Employer: AECOM Arabia Ltd. Experience: 9 years International Experience: Canada & Saudi Arabia (Khobar, Shaybah & Jeddah) Current Position: Project Engineer Department: Construction/Engineering Business Sector: Infrastructure Languages: Arabic & English Objectives Seeking a challenging position in engineering and management that allows for creativity and advancement. Education 2005 Bachelor degree in Buildings Engineering, King Faisal University, College of Architecture and Planning, Dammam SA. Senior Project: Optimum Analysis & Design of Steel Frame Structure Experience AECOM Arabia Limited (May 2014 – Present ) 2014 Currently working as a Construction Project Engineer to work on Jeddah Stormwater Drainage Project (JSDP). In charge of 4 km channel long includes 6 box culverts. The tasks are:  Preparing daily & weekly progress report:  Quantity of concrete pouring  Number of manpower  Number of equipments  Supervise the construction work  Approve RFIs form for the contractor  Planning & scheduling for the daily activities  Assure the safety issues on daily working site  Developing MTO for:  Steel Reinforcement  Daily casted concrete  Gravel & geotextile work SNC-Lavalin Europe B.V. (2006 – 2014 ) 2011 Assigned as a Civil/ Structural Engineer to work with Zuhair Fayez partnership in association with SNC-Lavalin Arabia on Royal Commission Project in Jubail (Expansion of Fuel and Feedstock Pipeline Stage 2, Jubail 2). The tasks were:  Structural Steel design:  Base Plate Design  Anchor Bolt Design  Checking Structural Steel drawings with STAAD Pro results  Checking calculation reports for the Structures  Concrete Foundation design  Developing MTO for:  Structural Steel  Structural Concrete  Steel Reinforcement 2010 Assigned to work as an Architectural/Civil/Structural Engineer supporting the FEED and bid document development for the Industrial Support Facilities (ISF) for WASIT Gas Plant. The project includes more than 50 buildings mixed between concrete and steel structure. The tasks were:  Architectural design development  Foundations design  Type of buildings: (CCR, Admin. Bldg., Dining Hall, Fire Station, Maintenance complex, MSB, OME, PDD, Operator Shelter, Storages & Shelters, Security Buildings, Sulfur Loading Bldg.)  Design steel structure framing  Design concrete structure framing  Developing MTO for:  Architectural  Structural  Civil 2008 Assigned as a Civil/ Structural Field Supervisor to manage the Civil and steel Structural construction activities for Shaybah Central Processing Facilities (CPF). The tasks were:  Field engineering  Red line/As-Built Drawings  Steel structure modifications & re-design  Preparation Pre- Commissioning folders  Responsible for 2 Mechanical Completion Certificate (MCC) systems with 13 sub-systems  Developing MTO for:  Concrete  Structural Steel  Pavement  Excavation and backfilling  Steel rebar 2007 Assigned to SSJ Consortium as a Civil/ Structural Engineer to work on Yanbu Refinery Crude Unit Expansion project. The tasks were:  Developing MTO using KBase input form for:  Beams, Columns, Foundations, Duct banks & Piping  Foundation design  Check drawings
  • 2.
    Ibrahim Al-Shayea CV(Project Engineer) Up To Date December 2015 Memberships Saudi Council of Engineering Membership (SCE) 2006 Assigned as a Civil/ Structural Engineer to work on Shaybah (CPF) project (Detail Engineering phase) in Calgary, AB, Canada. The tasks were :  Developing MTO for:  Duct bank, manhole & electrical pull box  Foundation, Excavation & Backfilling  Foundation design  Steel structure design  Check drawings Certificates & Courses ( In-house & Online )  Advanced STAAD Pro Analysis & Design  Introduction to STAAD Pro  AutoCAD  Microstation  Introduction to Project Control  QA/ QC Guide lines  Introduction to Commercial Management  Introduction to the Design / Engineering. From the Conception to the Construction and Utilization  From the Conception to the Construction and Utilization  Introduction to Contracts  Induction to HSE  Geotechnical Overview – Field Investigation  Induction to GIS  Introduction to Land Surveying  Traffic Management  Project Quality Awareness (Royal Commission for Jubail & Yanbu)  Matlab  Competent in Microsoft Windows and Microsoft Office  Saudi Council of Engineering Membership  Project Team Management  Project Risk Management  From Project Manager to Principal 1 - Foundations of Management  Developing & Managing a Project Budget  Design of Reinforced Concrete Using the ACI Code – Introduction  Design of Reinforced Concrete Using the ACI Code – Serviceability  Design of Reinforced Concrete Using the ACI Code -Flexural Analysis of Beams  Design of Reinforced Concrete Using the ACI Code - Design of Short Columns Subject to Axial Load and Bending  Design of Reinforced Concrete Using the ACI Code - Design of Rectangular Beams and One-Way Slabs  Design of Reinforced Concrete Using the ACI Code - Analysis and Design of T Beams and Doubly Reinforced Beams  Building Systems for Designers - Structural Systems  Building Pathology - Members and Connections  Basic Wind Loads ASCE 7-10  Alternative Construction - Structural Properties  Alternative Construction - Natural Building Codes and Regulations  Achieving LEED Credits in New Construction Projects