SlideShare a Scribd company logo
Dinesha , German, Victor,
Suganeya
HOTEL LOUISIANA
Design Procedure
 Loads
 Risa
 Slab
 Beams
 Strirrup
 Columns
 Deflection and drift
Building’s Front Frame
Building overview
Building’s Side Frame
Building overview
Design Assumptions
 Fs = 2/3fy
 All the floors behave the same
 Analyzed only B1, B2, B3, G2, G3, G5, and G6
 Wind load was assumed to be only in one
direction
 Columns came to different size than assumed.
Load Calculations
Load Calculations
Design loads on Risa software
Calculations done by RISA
Software
Slab Calculations
Our different calculations for slab were for:
• Top floor (Roof)
• Mid floors
The following figure are the moment
coefficients for service moment
calculations for the slabs.
Slab Design
Beams and Stirrup
Moment Diagram
Reinforcement Bars
 Equations used
 1.2D + 1.6L
 1.2D + 1W + 1L + 0.5S
 0.9D + 1W
 1.4D Beams/Girders Selected Moment (k.ft)
ROOF
5TH
FLOOR
GROUND
FLOOR
B-1 225 377 428
B-3 374 505 583
G-1 291 382 385
G-2 261 378 376
G-5 498 658 568
G-6 429 561 560
B-2 562 604 604
Reinforcement Bars
 #8 and #10 bars are used in our design
Beams/Girders Selected Bars
ROOF 5TH FLOOR GROUND FLOOR
B-1 5 #8 7 #8 8#8
B-3 7 #8 6 #10 7 #10
G-1 6 #8 7 #8 8 #8
G-2 3 #10 7 #8 7 #8
G-5 6 #10 8#10 7 #10
G-6 9 #8 7 #10 7 #10
B-2 7 #10 7#10 7 #10
Reinforcement Bars
 Depth of compression block < 7.5in
 Ɛt > 0.005 = Tension controlled
 Sactual < Smaximum = Minimized cracking
Shear forces
Stirrups
 Bars used was either #3 or #4
 Spacing varied by beam
 Shear forces obtained from Risa
 Math cad made it simple to find spacing
Stirrups spacing for Hotel
Stirrups for G-5 and G-6
Member Vu (kips) Vn required Vn actual
max
spacing Spacing Stirrups
top floor51 (G5)
10th 76 101.333 102.89
11 10
#4@10
top floor52 (G6)
10th 59 78.667 79.295
11 10
#3@10
mid floor71 (G5) 5th 62 82.667 86.597 11 8 #3@8
mid floor72 (G6) 5th 64 85.333 86.597 11 8 #3@8
bottom floor 91 (G5) 66.341 88.455 91.812 11 7 #3@7
bottom floor 92 (G6) 67.85 90.467 91.812 11 7 #3@7
Math Cad Calculation sample
An example of how stirrups were
found.
Columns
Axial force
Moments
Columns Design
Drift and Deflections
Beam Deflection
We did not calculate
deflection Because we meet
ACI requirements for beams
If we plug our values in table
9.3.1.1 we are ok according to
the code.
Maximum deflection limitation from ACI code : l/360 = 1.13 inch
Deflection of Hotel Louisiana = 0.36 inch
Drift
Same goes for drift, we found
Maximum drift limitation from ACI code : h/400 = 3.795 inch
Max Drift of Hotel Louisiana = 1.1 inch
Maximum drift limitation from ACI code :
h/400 = 3.795 inch
Max Drift of Hotel Louisiana = 1.1 inch
Conclussion
 Hotel Louisiana meets ACI requirements.
 Could have gone more cost effective design.
Thank you!
Questions?

More Related Content

What's hot

Internal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental ConceptsInternal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental Concepts
Hassan Raza
 
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE
 
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel Scheduling
Allan Leyte
 
002 - CDR CMS
002 - CDR CMS002 - CDR CMS
002 - CDR CMS
Fidel Karim
 
Tranmission Break
Tranmission BreakTranmission Break
Tranmission Break
Irwan Limanto
 
Cee311(14)
Cee311(14)Cee311(14)
Cee311(14)
apudgr8
 
Cee 311(4)
Cee 311(4)Cee 311(4)
Cee 311(4)
apudgr8
 
DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)
Ron Gilmore
 
knight-Layout1
knight-Layout1knight-Layout1
knight-Layout1
Kristopher Thorpe
 
2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides
Hashan Mendis
 
any angle lower plate-Layout1
any angle lower plate-Layout1any angle lower plate-Layout1
any angle lower plate-Layout1
Kristopher Thorpe
 
Rotations
RotationsRotations
Rotations
bwlomas
 
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALCRail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Institution of Lighting Professionals
 
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE
 
003 - CMS KG
003 - CMS KG003 - CMS KG
003 - CMS KG
Fidel Karim
 
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcsWorked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
ClearCalcs
 
R W V23
R W V23R W V23
10.01.03.083
10.01.03.08310.01.03.083
10.01.03.083
Saif Abdullah
 

What's hot (18)

Internal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental ConceptsInternal Combustion Engine Fundamental Concepts
Internal Combustion Engine Fundamental Concepts
 
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
 
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel Scheduling
 
002 - CDR CMS
002 - CDR CMS002 - CDR CMS
002 - CDR CMS
 
Tranmission Break
Tranmission BreakTranmission Break
Tranmission Break
 
Cee311(14)
Cee311(14)Cee311(14)
Cee311(14)
 
Cee 311(4)
Cee 311(4)Cee 311(4)
Cee 311(4)
 
DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)DT350 Portfolio (Gilmore)
DT350 Portfolio (Gilmore)
 
knight-Layout1
knight-Layout1knight-Layout1
knight-Layout1
 
2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides2016 optimisation of front wing ground clearance - ppt slides
2016 optimisation of front wing ground clearance - ppt slides
 
any angle lower plate-Layout1
any angle lower plate-Layout1any angle lower plate-Layout1
any angle lower plate-Layout1
 
Rotations
RotationsRotations
Rotations
 
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALCRail Alliance Event on 25/02/15: Lighting Column Specification - ALC
Rail Alliance Event on 25/02/15: Lighting Column Specification - ALC
 
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
WIND LOADING ON LIGHTING STEEL COLUMN - EN 40-3-1:2013
 
003 - CMS KG
003 - CMS KG003 - CMS KG
003 - CMS KG
 
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcsWorked examples - Wind webinar to AS1170.2 - ClearCalcs
Worked examples - Wind webinar to AS1170.2 - ClearCalcs
 
R W V23
R W V23R W V23
R W V23
 
10.01.03.083
10.01.03.08310.01.03.083
10.01.03.083
 

Viewers also liked

Renovia Apartment Case study 7-15
Renovia Apartment Case study  7-15Renovia Apartment Case study  7-15
Renovia Apartment Case study 7-15
Brian Johnson
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
Binay Shrestha
 
Concrete Restoration
Concrete RestorationConcrete Restoration
Concrete Restoration
Amy Lin
 
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Facility Masters
 
building services
building servicesbuilding services
building services
Erlina Bunga
 
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
SchoolDude
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
Rohit Bisht
 
STAAD PRO
STAAD PRO STAAD PRO
staad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structurestaad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structure
Chaitanya Raval
 
Prof. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English EditionProf. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English Edition
University of Tikrit
 
Promoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanesPromoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanes
Bejoy Alduse
 
Maintenance work
Maintenance workMaintenance work
Maintenance work
E-one K Rizuwan
 
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Association for Project Management
 
Ferrouscementhouse 2
Ferrouscementhouse 2Ferrouscementhouse 2
Ferrouscementhouse 2
poreddy jeevanreddy
 
High rise construction
High rise constructionHigh rise construction
High rise construction
akkshay jawlekar
 
Staad. pro tuto
Staad. pro tutoStaad. pro tuto
Staad. pro tuto
Ramil Artates
 
Steel Jacketed Rc Column
Steel Jacketed Rc ColumnSteel Jacketed Rc Column
Steel Jacketed Rc Column
Mahmoud Sayed Ahmed
 
flexural behaviour of ferrocement
flexural behaviour of ferrocementflexural behaviour of ferrocement
flexural behaviour of ferrocement
swapna porandla
 
Practical project risk assessment, Simon White
Practical project risk assessment, Simon WhitePractical project risk assessment, Simon White
Practical project risk assessment, Simon White
Association for Project Management
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
kabul university
 

Viewers also liked (20)

Renovia Apartment Case study 7-15
Renovia Apartment Case study  7-15Renovia Apartment Case study  7-15
Renovia Apartment Case study 7-15
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
 
Concrete Restoration
Concrete RestorationConcrete Restoration
Concrete Restoration
 
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
Preventive Maintenance: Tips to Reduce Facility Costs and Breakdowns
 
building services
building servicesbuilding services
building services
 
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
Start & Maintain an Energy Management Plan: It Makes Good Sense (from ASBO MD...
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
STAAD PRO
STAAD PRO STAAD PRO
STAAD PRO
 
staad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structurestaad pro v8i ss6 analysis and design of r.c.c. structure
staad pro v8i ss6 analysis and design of r.c.c. structure
 
Prof. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English EditionProf. Dr. Aziz I. Abdulla C.V., English Edition
Prof. Dr. Aziz I. Abdulla C.V., English Edition
 
Promoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanesPromoting preventive mitigation of buildings against hurricanes
Promoting preventive mitigation of buildings against hurricanes
 
Maintenance work
Maintenance workMaintenance work
Maintenance work
 
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
 
Ferrouscementhouse 2
Ferrouscementhouse 2Ferrouscementhouse 2
Ferrouscementhouse 2
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
Staad. pro tuto
Staad. pro tutoStaad. pro tuto
Staad. pro tuto
 
Steel Jacketed Rc Column
Steel Jacketed Rc ColumnSteel Jacketed Rc Column
Steel Jacketed Rc Column
 
flexural behaviour of ferrocement
flexural behaviour of ferrocementflexural behaviour of ferrocement
flexural behaviour of ferrocement
 
Practical project risk assessment, Simon White
Practical project risk assessment, Simon WhitePractical project risk assessment, Simon White
Practical project risk assessment, Simon White
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
 

Similar to Project 4 - Pre cast concrete 10 storey Building design

Camber design
Camber designCamber design
Camber design
Sushil Dhungana
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)
sufiyan shaikh
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
ssuser2c4126
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
 
Design Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion BellowDesign Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion Bellow
IRJET Journal
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
Tafara13
 
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
IRJET Journal
 
Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2
stan gad
 
Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation
Kundan Kumar
 
Design of a Gear Reducer for a Tractor
Design of a Gear Reducer for a TractorDesign of a Gear Reducer for a Tractor
Design of a Gear Reducer for a Tractor
fodork6
 
One way
One wayOne way
One way
Assem Diab
 
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
Chandrasekaran A
 
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
ArjunanChandrasekara
 
Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)
Sudhakaran Sudhakaran.R(KCT)
 
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic ZonesIRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET Journal
 
gp2_2.pptx
gp2_2.pptxgp2_2.pptx
gp2_2.pptx
GoneJustin
 
CNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical SectorCNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical Sector
IJERA Editor
 
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATIONINTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
jay sinha
 
RSS-Section
RSS-SectionRSS-Section
RSS-Section
Michael Zhang
 

Similar to Project 4 - Pre cast concrete 10 storey Building design (20)

Camber design
Camber designCamber design
Camber design
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
 
Design Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion BellowDesign Assessment and Parametric Study of Expansion Bellow
Design Assessment and Parametric Study of Expansion Bellow
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
 
Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2Tower smart tower_detailing_tips_series_2
Tower smart tower_detailing_tips_series_2
 
Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation Die design optimization and die stress analysis of control arm by simulation
Die design optimization and die stress analysis of control arm by simulation
 
Design of a Gear Reducer for a Tractor
Design of a Gear Reducer for a TractorDesign of a Gear Reducer for a Tractor
Design of a Gear Reducer for a Tractor
 
One way
One wayOne way
One way
 
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
 
22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf22.sesmic analysis of building.pdf
22.sesmic analysis of building.pdf
 
Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)Development of mathematical using doe to analyse the ang (1)
Development of mathematical using doe to analyse the ang (1)
 
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic ZonesIRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
IRJET- Analysis and Design of High-Rise RC Structure in Different Seismic Zones
 
gp2_2.pptx
gp2_2.pptxgp2_2.pptx
gp2_2.pptx
 
CNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical SectorCNC Machining of Face Cam on a Cylindrical Sector
CNC Machining of Face Cam on a Cylindrical Sector
 
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATIONINTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
INTRODUCTION TO STRUCUTRAL DESIGN RCC PRESENTATION
 
RSS-Section
RSS-SectionRSS-Section
RSS-Section
 

Project 4 - Pre cast concrete 10 storey Building design