DISTQIBUTION TRANSFORMER COMPANY LIMIETED (DTCL)


       PRODUCTION OPERATION
           MANAGEMENT




                     NewGate India
            Hyderabad, Andhra Pradesh- 500038

                  Website: www.newgate.in
                  Email: contact@newgate.in
                       Slideshare URL :
           http://www.slideshare.net/newgateindia
Introduction
DTCL(Distribution Transformer Company Limited)is a
 Company manufacturing Transformers for Power Sectors.




Owing to Financial Crisis,channelised their efforts to tap the
 Export Market.



Previously manufactured only Single Phase Transformers but
 later expanded to Distribution Transformers.
Issues Faced by Engineering
Department

Customer Specifications varying widely owing
 to Company going Global.

Longer Lead times to meet new Specifications.

Rejection at the last moment due to Quality
 Issues.
List of Activities Given
Activity no.                    Description
     1            Processing and circulation of customer order
     2                 Preparation of customer drawings
     3                  Customer drawings to marketing
     4                Checking and forwarding to customer
     5                  Getting approval from customer
     6               Preparation of manufacturing drawings
     7            Issuing manufacturing drawings to planning
     8             Issue from planning to other departments
     9                  Material procurement-prototype
    10            Processing tools required for manufacturing
    11                      Manufacturing- prototype
    12              Material processing-final order execution
    13                Manufacturing-final order execution
    14         Organizing customer inspection through marketing
    16                              Dispatch
Activities Includes
Activity no.                     Description
     1            Processing and circulation of customer order
     2                 Preparation of customer drawings
     3                  Customer drawings to marketing
     4                Checking and forwarding to customer
     5                  Getting approval from customer
    5’                        Customer comments
     6               Preparation of manufacturing drawings
     7            Issuing manufacturing drawings to planning
     8             Issue from planning to other departments
    8’                              Revision
     9                  Material procurement-prototype
    10            Processing tools required for manufacturing
    11                      Manufacturing- prototype
    12              Material processing-final order execution
    13                Manufacturing-final order execution
    14         Organizing customer inspection through marketing
    16                              Dispatch
Time of activities
                                                                 Domestic            Export
Activity no.                   Description                    Order-1 Order-2 Order-1 Order-2
     1         Processing and circulation of customer order      2       2       3       3
     2              Preparation of customer drawings             30     18       13     16
     3               Customer drawings to marketing              2       3       1       1
     4             Checking and forwarding to customer           2       1       3       3
     5               Getting approval from customer             447     98      396     93
    05’                    Customer comments
     6            Preparation of manufacturing drawings        400     120     400      23
     7         Issuing manufacturing drawings to planning       2       3       17      1
     8          Issue from planning to other departments        1       2       2       1
    08’                          Revision
     9              Material procurement-prototype
    10         Processing tools required for manufacturing     603     228     486      167
    11                  Manufacturing- prototype
    12          Material processing-final order execution      341     160      36       5
    13            Manufacturing-final order execution
                 Organizing customer inspection through
    14
                                marketing
    16                           Dispatch                       8      130      18      15

                                     Time in days
Assumptions
                                                                 Domestic            Export
Activity no.                   Description                    Order-1 Order-2 Order-1 Order-2
     1         Processing and circulation of customer order      2       2       3       3
     2              Preparation of customer drawings             30     18       13     16
     3               Customer drawings to marketing              2       3       1       1
     4             Checking and forwarding to customer           2       1       3       3
     5               Getting approval from customer             447     98      396     93
    05’                    Customer comments
     6            Preparation of manufacturing drawings        400     120     400      23
     7         Issuing manufacturing drawings to planning       2       3       17      1
     8          Issue from planning to other departments        1       2       2       1
    08’                          Revision
     9              Material procurement-prototype
    10         Processing tools required for manufacturing     603     228     486      167
    11                  Manufacturing- prototype
    12          Material processing-final order execution      341     160      36       5
    13            Manufacturing-final order execution
                 Organizing customer inspection through
    14
                                marketing
    16                           Dispatch                       8      130      18      15

                                     Time in days
Assumptions
                                                                 Domestic            Export
Activity no.                   Description                    Order-1 Order-2 Order-1 Order-2
     1         Processing and circulation of customer order      2       2       3       3
     2              Preparation of customer drawings            30      18      13      16
     3              Customer drawings to marketing              2       3       1        1
     4            Checking and forwarding to customer           2       1       3        3
     5               Getting approval from customer            447      98     396      93
    05’                   Customer comments                     3       3        3      3
     6           Preparation of manufacturing drawings         400     120     400      23
     7         Issuing manufacturing drawings to planning       2       3       17       1
     8          Issue from planning to other departments        1       2       2        1
    08’                         Revision                        2        2      2        2
     9              Material procurement-prototype
    10         Processing tools required for manufacturing     603     228     486      167
    11                  Manufacturing- prototype
    12          Material processing-final order execution      341     160      36       5
    13            Manufacturing-final order execution
                 Organizing customer inspection through
    14
                                marketing
                                                                 3      3       3        3
    16                          Dispatch                        8      130      18      15
Flow Chart Sequence
Processing and     Customer       Drawing to                          Customer
                                                    Checking
  circulation       Drawing       marketing                           Approval

        01            02               03                  04                 05
                                  Manufacturing
                                    Drawing
                                                   06
                                                                               05’

                                    Material                         Customer
                                  Requirement
                                                   09                comments



                                    Details of
                                                   10
                                    material
     16
                                                                               07
                                                   11
   Dispatch                                                           Issuing
                                  Tools and dies
                                                                      Drawing

             14        13              12                 08’                 08

                                       Material                    Distributing to
  Inspection      Manufacturing                         Revision
                                      Processing                   Departments
Calculating Average
                                                               Domestic                 Export
Activity no.                   Description                    Order-1   Order-2 Order-1 Order-2
     1         Processing and circulation of customer order      2         2       3       3
     2              Preparation of customer drawings             30       18       13     16
     3               Customer drawings to marketing              2         3       1       1
     4             Checking and forwarding to customer           2         1       3       3
     5               Getting approval from customer             447       98      396     93
    05’                    Customer comments                    3         3        3        3
     6            Preparation of manufacturing drawings        400        120     400       23
     7         Issuing manufacturing drawings to planning       2          3       17       1
     8          Issue from planning to other departments        1          2       2        1
    08’                          Revision                       2          2      2         2
    9               Material procurement-prototype
    10         Processing tools required for manufacturing     603        228     486      167
    11                  Manufacturing- prototype
    12          Material processing-final order execution      341        160     36        5
    13            Manufacturing-final order execution
                 Organizing customer inspection through
    14
                                marketing
                                                                 3        3       3         3
    16                           Dispatch                       8         130     18        15



                             Time in days
                                                          Calculating Average of order 1 & 2
Average                                Time in days

                                                                  Domestic      Export
Activity no.                     Description
                                                                  Average      Average
     1           Processing and circulation of customer order         2            3
     2                Preparation of customer drawings               24          14.5
     3                 Customer drawings to marketing               2.5            1
     4               Checking and forwarding to customer            1.5            3
     5                 Getting approval from customer              272.5        244.5
    05’                      Customer comments                        3            3
     6              Preparation of manufacturing drawings           260         211.5
     7            Issuing manufacturing drawings to planning        2.5            9
     8             Issue from planning to other departments         1.5           1.5
    08’                            Revision                           2            2
     9                 Material procurement-prototype
    10            Processing tools required for manufacturing      415.5        326.5
    11                    Manufacturing- prototype
    12             Material processing-final order execution       250.5            20.5
    13               Manufacturing-final order execution
    14         Organizing customer inspection through marketing      3               3
    16                             Dispatch                         69              16.5
Question1:
Develop a network representation of the execution
Of an order for distribution transformers at DTCL.
Question1:
Develop a network representation of the execution
of an order for distribution transformers at DTCL.


Answer 1:
             Nodal Network

           PERT             AON
PERT CHART
     02   03    04         05             05’


01              06
                                           D1
                                                     D1


                 09
                           10        11          07



                                                     08



                                                     08’



                                                     12

                      16        14              13
AON CHART

02   03   04          05             05’




01              06




                     09         10              11   07




                                                     08



                                                     08’


           16              14              13        12
Question 2:
1. Use the network and develop time estimates for
   execution of the order.
2. What are the key activities that require better
   managerial control.
Question 2:
1. Use the network and develop time estimates for
   execution of the order.
2. What are the key activities that require better
   managerial control.


Answer 2:
• Calculate critical path time ( Domestic & Export)
• Identify the critical activities ( Domestic & Export)
For

Domestic Order
PERT CHART: Domestic Order
                                                                       3
     02        03     04             05                 05’


         24    2.5    1.5
01                                   272.5               D1
     2                 06                         05                              0
                                                                           D1
                     260                                      0

                       09                                                        2.5
                                      10           11                   07



                             415.5                                         08
                                                                  1.5


                                                                  2        08’

                                                        250.5
                             69              3                             12

                            16               14                       13
PERT CHART: Domestic Order
         02          03        04             05                05’


             24      2.5       1.5            272.5             3
01                                                                                       0
                                06                               D1
         2                                                                         D1
                              260                                     0

                                09                                                       2.5
                                              10           11                   07



        Critical Path:                415.5                                        08
                                                                          1.5
      01-> 02-> 03->04->06
     ->10->07->08->08’->12-
          >-13->14->16                                                    2        08’

                                                                250.5
                                      69              3                            12

                                     16               14                      13
Answer 2: Domestic Order
Total Lead time = Time taken by critical path
               = Tp (01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16)

Total Lead time = 1034 days

 The key activities that require better managerial control are:
   01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16

• This activities can be crashed
• Time associated with each of this critical activity can be optimized.


Slacks
• 05:Real Float = 403 days,
• 05 & 05’ :Real Float = 400
For

Export Order
PERT CHART: Export Order
                                                                         3
     02      03      04                05                 05’


     14.5    1            3
01                                     244.5               D1
     3                06                            05                             0
                                                                             D1
                  211.5                                         0

                          09                                                       9
                                        10           11                   07



                               326.5                                         08
                                                                    1.5


                                                                    2        08’

                                                           20.5
                               16.5            3                             12

                              16               14                       13
PERT CHART: Export Order
                                                                                     3
         02          03          04                05                 05’


          14.5       1                3
01                                                 244.5               D1
         3                        06                            05                             0
                                                                                         D1
                              211.5                                         0

                                      09                                                       9
                                                    10           11                   07



        Critical Path:                     326.5                                         08
                                                                                1.5
      01-> 02-> 03->04->06
     ->10->07->08->08’->12-
          >-13->14->16                                                          2        08’

                                                                       20.5
                                           16.5            3                             12

                                          16               14                       13
Answer 2: Export Order
Total Lead time = Time taken by critical path
               = Tp (01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16)

Total Lead time = 612 days

 The key activities that require better managerial control are:
   01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16

• This activities can be crashed
• Time associated with each of this critical activity can be optimized.


Slacks
• 05: Real float = 294 days,
• 05 & 05’: Real Float = 290 days,
Question 3:
1. Can you identify activities that require immediate
   attention. In order to reduce execution time.
2. How can DTCL organize the manufacture of
   transformers so that there will be a significant
   reduction in execution lead time.
Question 3:
1. Can you identify activities that require immediate
   attention in order to reduce execution time.
2. How can DTCL organize the manufacture of
   transformers so that there will be a significant
   reduction in execution lead time.

Answer 3:
1. Draw AON chart. Group activities to work stations. The works station
   having the most balanced delay ( very high or very low time) compared
   to other work station needs to be given first attention.

2. Then reararnge the activities and group them to work stations and try
   reducing the balanced delay.
Flow Chart Sequence
Processing and           Customer       Drawing to                          Customer
                                                          Checking
  circulation             Drawing       marketing                           Approval

        01                  02               03                  04                 05
                                        Manufacturing
                                          Drawing
                                                         06
 W1            Engineer Drawing                                                      05’

  W2              Marketing Dept          Material
                                                         09
                                                                           Customer
                                        Requirement                        comments
  W3             Production Dept
                                          Details of
                                                         10
                                          material
     16
                                                                                     07
                                                         11
   Dispatch                                                                 Issuing
                                        Tools and dies
                                                                            Drawing

             14              13              12                 08’                 08

                                             Material                    Distributing to
  Inspection            Manufacturing                         Revision
                                            Processing                   Departments
For

Domestic Order
AON: Domestic Order
     24      2.5       1.5             272.5                 3

02          03         04              05                  05’




     2                                260
01                               06

                                                                                   2.5


W1        Engineer Drawing            09              10               11         07



 W2        Marketing Dept                           415.5
                                                                            1.5   08

 W3       Production Dept
                                                                            2
                                            3                                     08’
                            69                                   250.5

                            16                 14                 13              12
AON: Domestic Order
                    W1                   W2                   W3
                                      04,05,05',         08,08',09,10,11
Activities      01,02,03,06,07
                                        14,16                ,12,13
                  2+24+2.5           1.5+272.5+3         1.5+2+415.5
  Time            +260+2.5              +3+69              +250.5
Total Time      291 days            349 days             669.5 days
Total Processing Time
Tp = 291 + 349 + 669.5
Tp = 1309.5 days

Cycle time
CL= Max ( T1,T2,T3) = Max( 291,249,669.5)
CL = 669.5 days

Balance Delay
Bd = ( n CL - Tp ) X 100 =   (3 X 669.5 – 1309 ) X 100
          n CL                   3 X 669.5
Bd = 34.82%
Rearranging Flow Chart Sequence
Processing and           Customer       Drawing to                          Customer
                                                          Checking
  circulation             Drawing       marketing                           Approval

        01                  02               03                  04                 05
                                        Manufacturing
 W1            Engineer Drawing
                                          Drawing
                                                         06
                                                                                     05’
 W2              Marketing Dept           Material                         Customer
                                        Requirement
                                                         09                comments
 W3            Production Dept
                Procurement
 W4                 Dept                  Details of
                                                         10
                                          material
     16
                                                                                     07
                                                         11
   Dispatch                                                                 Issuing
                                        Tools and dies
                                                                            Drawing

             14              13              12                 08’                 08

                                             Material                    Distributing to
  Inspection            Manufacturing                         Revision
                                            Processing                   Departments
Rerranging AON: Domestic Order
     24       2.5         1.5           272.5                 3

02           03             04          05                  05’




     2                                 260
01                                06

                                                                                    2.5

W1        Engineer Drawing
                                       09              10               11         07


W2         Marketing Dept
                                                     415.5
                                                                             1.5   08
W3        Production Dept

            Procurement
W4              Dept
                                                                             2
                                                                                   08’
                             69              3                    250.5

                             16                 14                 13              12
Rearranging AON: Domestic Order
                  W1               W2                 W3              W4
                                04,05,05',
Activities 01,02,03,06,07         14,16
                                                  08,08',12,13      09,10,11
                2+24+2.5       1.5+272.5+3            1.5+2
  Time          +260+2.5          +3+69              +250.5
                                                                      415.5

  Total
                291 days        349 days           254 days      415.5 days
  Time
Total Processing Time
Tp = 291 + 349 + 254 + 415.5
Tp = 1309.5 days                                              Balanced Delay
Cycle time                                                      reduced by
CL= Max ( T1,T2,T3,T4) = Max( 291,249,254,415.5)                  39%
CL = 415.5 days
Balance Delay
Bd = ( n CL - Tp ) X 100 =     (3 X 415.5 – 1309 ) X 100
          n CL                     3 X 415.5
Bd = 21.23%
Answer 3: Domestic Order
 1. The activities that require immediate attention is the
    procurement as it takes 415.5 days.
 2. It can be done by proper vendor management
         •    By ensuring delivery on time
         •    Properly forecasting the expected demand
         •    Adopting practices to reduce time on logistics
         •    Better inventory management of raw materials with proper
              defined reorder level.



 Keep 4 works stations

                  W1              W2              W3             W4
               01,02,03,06     04,05,05',
 Activities        ,07           14,16
                                              08,08',12,13     09,10,11
For

Export Order
AON: Export Order
     14.5      1         3               244.5                 3

02            03         04               05                 05’




      3                                 211.5
01                                 06

                                                                                      9


W1          Engineer Drawing            09              10                11         07



 W2          Marketing Dept                           326.5
                                                                               1.5   08

 W3         Production Dept
                                                                               2
                                                3                                    08’
                              16.5                                 20.5

                              16                 14                 13               12
AON: Export Order
                    W1                   W2                  W3
                                   04,05,05',    08,08',09,10,11
Activities      01,02,03,06,07
                                     14,16           ,12,13
   Time       3+14.5+1+211.5+9 3+244.5+3+3+16.5 1.5+2+326.5+20.5
Total Time      239 days            270 days              350.5 days

Total Processing Time
Tp = 239 + 270 + 350.5
Tp = 859.5 days

Cycle time
CL= Max ( T1,T2,T3) = Max(239,270.350.5)
CL = 350.5 days

Balance Delay
Bd = ( n CL - Tp ) X 100 =   (3 X 350.5 – 859.5 ) X 100
          n CL                   3 X 350.5
Bd = 18.26%
Rearranging AON: Export Order
     14.5      1           3              244.5                 3

02            03           04              05                 05’




      3                                  211.5
01                                  06

                                                                                       9

               Engineer
W1             Drawing
                                         09              10                11         07



W2          Marketing Dept
                                                       326.5
                                                                                1.5   08
W3          Production Dept

             Procurement                                                        2
W4               Dept          16.5              3                  20.5
                                                                                      08’


                               16                 14                 13               12
Rearranging AON: Export Order
                 W1             W2               W3                 W4
                            04,05,05',
Activities 01,02,03,06,07     14,16
                                             08,08',12,13        09,10,11
           3+14.5+1+211.5 3+244.5+3+3+1
  Time           +9            6.5
                                             1.5+2+326.5            20.5

  Total
  Time      239 days 270 days 330 days                         20.5 days
Total Processing Time
Tp = 239 + 270 + 330 + 20.5
Tp = 859.5 days                                           Balanced Delay
Cycle time                                                 increased by
CL= Max ( T1,T2,T3,T4) = Max(239,270,330,20.5)                91%
CL = 330 days
Balance Delay
Bd = ( n CL - Tp ) X 100 =     (3 X 330 – 859.5 ) X 100
          n CL                    3 X 330.5
Bd = 34.88 %
Answer 3: Export Order
 1. The activities that require immediate attention is the
    production as it takes 350.5 days.
 2. It can be done by proper optimizing the process
      •   By avoiding abnormal wastage
      •   Reducing the error or failure rates
      •   Finding optimal product mix stratigies
      •   Maintaining a constant lead time and safety stock



 Keep 3 works stations

                    W1                W2                 W3
                                    04,05,05',      08,08',09,10,11
 Activities    01,02,03,06,07
                                      14,16             ,12,13
Thank You

Questions Please????

More Related Content

What's hot

material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costsmairemic
 
Chapter 6 project management
Chapter 6 project managementChapter 6 project management
Chapter 6 project managementShadina Shah
 
Project planning-and-control
Project planning-and-controlProject planning-and-control
Project planning-and-controlJatindra Malik
 
Critical Path Ppt
Critical Path PptCritical Path Ppt
Critical Path PptJeff Hilton
 
Facility & Layout Design Case Study
Facility & Layout Design Case StudyFacility & Layout Design Case Study
Facility & Layout Design Case StudyNilam Kabra
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
Project controls
Project controlsProject controls
Project controlsAshok Kumar
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2Anand Bobade
 
9.2 Estimate Activity Resources
9.2 Estimate Activity Resources9.2 Estimate Activity Resources
9.2 Estimate Activity ResourcesDavidMcLachlan1
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project Ahmad Maharma, PMP,RMP
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource PlanningBiswajit Ghosh
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"Abhishek Shah
 
05. Project And Organizational Structure
05. Project And Organizational Structure05. Project And Organizational Structure
05. Project And Organizational StructureBhuWan Khadka
 
Manchester United Soccer Club
Manchester United Soccer ClubManchester United Soccer Club
Manchester United Soccer Clubreeza fazily
 
Pmbok 4th edition chapter 4 - Project Integration Management
Pmbok 4th edition   chapter 4 - Project Integration Management Pmbok 4th edition   chapter 4 - Project Integration Management
Pmbok 4th edition chapter 4 - Project Integration Management Ahmad Maharma, PMP,RMP
 

What's hot (20)

material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
Claims
ClaimsClaims
Claims
 
Chapter 6 project management
Chapter 6 project managementChapter 6 project management
Chapter 6 project management
 
Project planning-and-control
Project planning-and-controlProject planning-and-control
Project planning-and-control
 
Critical Path Ppt
Critical Path PptCritical Path Ppt
Critical Path Ppt
 
Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Project
 
Facility & Layout Design Case Study
Facility & Layout Design Case StudyFacility & Layout Design Case Study
Facility & Layout Design Case Study
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Project controls
Project controlsProject controls
Project controls
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
9.2 Estimate Activity Resources
9.2 Estimate Activity Resources9.2 Estimate Activity Resources
9.2 Estimate Activity Resources
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
05. Project And Organizational Structure
05. Project And Organizational Structure05. Project And Organizational Structure
05. Project And Organizational Structure
 
Manchester United Soccer Club
Manchester United Soccer ClubManchester United Soccer Club
Manchester United Soccer Club
 
Pmbok 4th edition chapter 4 - Project Integration Management
Pmbok 4th edition   chapter 4 - Project Integration Management Pmbok 4th edition   chapter 4 - Project Integration Management
Pmbok 4th edition chapter 4 - Project Integration Management
 

Viewers also liked

Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Presentation on scheduling
Presentation on schedulingPresentation on scheduling
Presentation on schedulingGunjan Lal
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencingAkanksha Gupta
 
Scheduling Presentation
Scheduling PresentationScheduling Presentation
Scheduling Presentationcessig721
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation schedulingKamal Subedi
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Schedulingsenthil.G
 
Boost your revenues by 31% by auto-assigning with FarEye
Boost your revenues by 31% by auto-assigning with FarEyeBoost your revenues by 31% by auto-assigning with FarEye
Boost your revenues by 31% by auto-assigning with FarEyeFarEye
 
Opt case study
Opt case studyOpt case study
Opt case study9537405544
 
Volkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR ForumVolkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR ForumClayton Timms
 
Drupal case study: ABC Dig Music
Drupal case study: ABC Dig MusicDrupal case study: ABC Dig Music
Drupal case study: ABC Dig MusicDavid Peterson
 
Downfall of micromax
Downfall of micromaxDownfall of micromax
Downfall of micromaxKshitij Gupta
 
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...sarkermu
 
Panel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case StudyPanel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case StudyCompusense Inc.
 
ClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical ServicesClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical ServicesClickSoftware
 

Viewers also liked (20)

scheduling
schedulingscheduling
scheduling
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Presentation on scheduling
Presentation on schedulingPresentation on scheduling
Presentation on scheduling
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Scheduling Presentation
Scheduling PresentationScheduling Presentation
Scheduling Presentation
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Process scheduling
Process schedulingProcess scheduling
Process scheduling
 
Boost your revenues by 31% by auto-assigning with FarEye
Boost your revenues by 31% by auto-assigning with FarEyeBoost your revenues by 31% by auto-assigning with FarEye
Boost your revenues by 31% by auto-assigning with FarEye
 
Opt case study
Opt case studyOpt case study
Opt case study
 
Volkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR ForumVolkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR Forum
 
Drupal case study: ABC Dig Music
Drupal case study: ABC Dig MusicDrupal case study: ABC Dig Music
Drupal case study: ABC Dig Music
 
Downfall of micromax
Downfall of micromaxDownfall of micromax
Downfall of micromax
 
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
 
Uber Operations - 2012 Capabilities Presentation
Uber Operations - 2012 Capabilities PresentationUber Operations - 2012 Capabilities Presentation
Uber Operations - 2012 Capabilities Presentation
 
Panel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case StudyPanel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case Study
 
Uber Operations | Capabilities Presentation 2015
Uber Operations | Capabilities Presentation 2015Uber Operations | Capabilities Presentation 2015
Uber Operations | Capabilities Presentation 2015
 
ClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical ServicesClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical Services
 

Similar to Production operation management-scheduling PPT

SAP SD Study material
SAP SD Study material SAP SD Study material
SAP SD Study material Harsha Halyal
 
Handbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter WatermeyerHandbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter WatermeyerVeerender Putta
 
Design Practive Manual
Design Practive ManualDesign Practive Manual
Design Practive ManualRojinMoghadam
 
Oskar Manufacturing Companies
Oskar Manufacturing CompaniesOskar Manufacturing Companies
Oskar Manufacturing CompaniesRaghav Agarwal
 
Board Games - Wingo Games
Board Games - Wingo GamesBoard Games - Wingo Games
Board Games - Wingo Gameswingo games
 
Refer Part 2 - Digital manufacturing Part 1
Refer Part 2 - Digital manufacturing Part 1Refer Part 2 - Digital manufacturing Part 1
Refer Part 2 - Digital manufacturing Part 1SBM Polytechnic
 
Project 2 Client Binder-2
Project 2 Client Binder-2Project 2 Client Binder-2
Project 2 Client Binder-2Sean Campbell
 
Learning Investments: Making Workforce Future Ready
Learning Investments: Making Workforce Future ReadyLearning Investments: Making Workforce Future Ready
Learning Investments: Making Workforce Future ReadyNational HRD Network
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution ProcessC K Vishwakarma
 
Mohamed Elhosni PFE Report
Mohamed Elhosni PFE ReportMohamed Elhosni PFE Report
Mohamed Elhosni PFE ReportMohamed HOSNI
 
Software proposal sample_project_3-_complex_saa_s_application_by_swproposal_com
Software proposal sample_project_3-_complex_saa_s_application_by_swproposal_comSoftware proposal sample_project_3-_complex_saa_s_application_by_swproposal_com
Software proposal sample_project_3-_complex_saa_s_application_by_swproposal_comOleg Zhuravlev
 
Ashwin J-resume
Ashwin J-resumeAshwin J-resume
Ashwin J-resumeAshwin J
 
QM.02._Goods Receipts for PO
QM.02._Goods Receipts for POQM.02._Goods Receipts for PO
QM.02._Goods Receipts for PORonen Madar
 

Similar to Production operation management-scheduling PPT (20)

Sap pp dinakar skype himbuj
Sap pp  dinakar skype himbujSap pp  dinakar skype himbuj
Sap pp dinakar skype himbuj
 
EPC hand book.pdf
EPC hand book.pdfEPC hand book.pdf
EPC hand book.pdf
 
63556309 sap
63556309 sap63556309 sap
63556309 sap
 
SAP SD Study material
SAP SD Study material SAP SD Study material
SAP SD Study material
 
63556309 sap
63556309 sap63556309 sap
63556309 sap
 
Handbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter WatermeyerHandbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter Watermeyer
 
Design Practive Manual
Design Practive ManualDesign Practive Manual
Design Practive Manual
 
Product dossier touchbase automation
Product dossier touchbase automationProduct dossier touchbase automation
Product dossier touchbase automation
 
Oskar Manufacturing Companies
Oskar Manufacturing CompaniesOskar Manufacturing Companies
Oskar Manufacturing Companies
 
Article final ivan f
Article final ivan fArticle final ivan f
Article final ivan f
 
Board Games - Wingo Games
Board Games - Wingo GamesBoard Games - Wingo Games
Board Games - Wingo Games
 
Refer Part 2 - Digital manufacturing Part 1
Refer Part 2 - Digital manufacturing Part 1Refer Part 2 - Digital manufacturing Part 1
Refer Part 2 - Digital manufacturing Part 1
 
Project 2 Client Binder-2
Project 2 Client Binder-2Project 2 Client Binder-2
Project 2 Client Binder-2
 
Learning Investments: Making Workforce Future Ready
Learning Investments: Making Workforce Future ReadyLearning Investments: Making Workforce Future Ready
Learning Investments: Making Workforce Future Ready
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
Mohamed Elhosni PFE Report
Mohamed Elhosni PFE ReportMohamed Elhosni PFE Report
Mohamed Elhosni PFE Report
 
Software proposal sample_project_3-_complex_saa_s_application_by_swproposal_com
Software proposal sample_project_3-_complex_saa_s_application_by_swproposal_comSoftware proposal sample_project_3-_complex_saa_s_application_by_swproposal_com
Software proposal sample_project_3-_complex_saa_s_application_by_swproposal_com
 
DreamIt
DreamItDreamIt
DreamIt
 
Ashwin J-resume
Ashwin J-resumeAshwin J-resume
Ashwin J-resume
 
QM.02._Goods Receipts for PO
QM.02._Goods Receipts for POQM.02._Goods Receipts for PO
QM.02._Goods Receipts for PO
 

More from NewGate India

Newgate india 2013 sociometrics
Newgate india 2013  sociometricsNewgate india 2013  sociometrics
Newgate india 2013 sociometricsNewGate India
 
Business proposal coffee shop in Canada
Business proposal coffee shop in CanadaBusiness proposal coffee shop in Canada
Business proposal coffee shop in CanadaNewGate India
 
Contagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeContagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeNewGate India
 
E-Procurement System
E-Procurement SystemE-Procurement System
E-Procurement SystemNewGate India
 
Social media statistics statistics
Social media statistics statisticsSocial media statistics statistics
Social media statistics statisticsNewGate India
 
Newgate Youtube statistics statistics
Newgate Youtube  statistics statisticsNewgate Youtube  statistics statistics
Newgate Youtube statistics statisticsNewGate India
 
Contagion effect of greece debt crisis
Contagion effect of greece debt crisisContagion effect of greece debt crisis
Contagion effect of greece debt crisisNewGate India
 
Case study on SM Tech-ppt
Case study on SM Tech-pptCase study on SM Tech-ppt
Case study on SM Tech-pptNewGate India
 
Telecom market research
Telecom market researchTelecom market research
Telecom market researchNewGate India
 
Risk management Report
Risk management ReportRisk management Report
Risk management ReportNewGate India
 
Quality control report
Quality control reportQuality control report
Quality control reportNewGate India
 
Market Research Report
Market Research ReportMarket Research Report
Market Research ReportNewGate India
 
Market research report
Market research reportMarket research report
Market research reportNewGate India
 
Market feasibility test
Market feasibility testMarket feasibility test
Market feasibility testNewGate India
 
Report on Dasborad & scorecard
Report on Dasborad & scorecardReport on Dasborad & scorecard
Report on Dasborad & scorecardNewGate India
 
Politics in organization-PPT
Politics in organization-PPTPolitics in organization-PPT
Politics in organization-PPTNewGate India
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysisNewGate India
 
Case study on communications
Case study  on  communicationsCase study  on  communications
Case study on communicationsNewGate India
 

More from NewGate India (20)

Newgate india 2013 sociometrics
Newgate india 2013  sociometricsNewgate india 2013  sociometrics
Newgate india 2013 sociometrics
 
Business proposal coffee shop in Canada
Business proposal coffee shop in CanadaBusiness proposal coffee shop in Canada
Business proposal coffee shop in Canada
 
Consumer Demand
Consumer DemandConsumer Demand
Consumer Demand
 
Contagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeContagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europe
 
E-Procurement System
E-Procurement SystemE-Procurement System
E-Procurement System
 
Social media statistics statistics
Social media statistics statisticsSocial media statistics statistics
Social media statistics statistics
 
Newgate Youtube statistics statistics
Newgate Youtube  statistics statisticsNewgate Youtube  statistics statistics
Newgate Youtube statistics statistics
 
Contagion effect of greece debt crisis
Contagion effect of greece debt crisisContagion effect of greece debt crisis
Contagion effect of greece debt crisis
 
Case study on SM Tech-ppt
Case study on SM Tech-pptCase study on SM Tech-ppt
Case study on SM Tech-ppt
 
Research ppt
Research pptResearch ppt
Research ppt
 
Telecom market research
Telecom market researchTelecom market research
Telecom market research
 
Risk management Report
Risk management ReportRisk management Report
Risk management Report
 
Quality control report
Quality control reportQuality control report
Quality control report
 
Market Research Report
Market Research ReportMarket Research Report
Market Research Report
 
Market research report
Market research reportMarket research report
Market research report
 
Market feasibility test
Market feasibility testMarket feasibility test
Market feasibility test
 
Report on Dasborad & scorecard
Report on Dasborad & scorecardReport on Dasborad & scorecard
Report on Dasborad & scorecard
 
Politics in organization-PPT
Politics in organization-PPTPolitics in organization-PPT
Politics in organization-PPT
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysis
 
Case study on communications
Case study  on  communicationsCase study  on  communications
Case study on communications
 

Recently uploaded

RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Recently uploaded (20)

KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Production operation management-scheduling PPT

  • 1. DISTQIBUTION TRANSFORMER COMPANY LIMIETED (DTCL) PRODUCTION OPERATION MANAGEMENT NewGate India Hyderabad, Andhra Pradesh- 500038 Website: www.newgate.in Email: contact@newgate.in Slideshare URL : http://www.slideshare.net/newgateindia
  • 2. Introduction DTCL(Distribution Transformer Company Limited)is a Company manufacturing Transformers for Power Sectors. Owing to Financial Crisis,channelised their efforts to tap the Export Market. Previously manufactured only Single Phase Transformers but later expanded to Distribution Transformers.
  • 3. Issues Faced by Engineering Department Customer Specifications varying widely owing to Company going Global. Longer Lead times to meet new Specifications. Rejection at the last moment due to Quality Issues.
  • 4. List of Activities Given Activity no. Description 1 Processing and circulation of customer order 2 Preparation of customer drawings 3 Customer drawings to marketing 4 Checking and forwarding to customer 5 Getting approval from customer 6 Preparation of manufacturing drawings 7 Issuing manufacturing drawings to planning 8 Issue from planning to other departments 9 Material procurement-prototype 10 Processing tools required for manufacturing 11 Manufacturing- prototype 12 Material processing-final order execution 13 Manufacturing-final order execution 14 Organizing customer inspection through marketing 16 Dispatch
  • 5. Activities Includes Activity no. Description 1 Processing and circulation of customer order 2 Preparation of customer drawings 3 Customer drawings to marketing 4 Checking and forwarding to customer 5 Getting approval from customer 5’ Customer comments 6 Preparation of manufacturing drawings 7 Issuing manufacturing drawings to planning 8 Issue from planning to other departments 8’ Revision 9 Material procurement-prototype 10 Processing tools required for manufacturing 11 Manufacturing- prototype 12 Material processing-final order execution 13 Manufacturing-final order execution 14 Organizing customer inspection through marketing 16 Dispatch
  • 6. Time of activities Domestic Export Activity no. Description Order-1 Order-2 Order-1 Order-2 1 Processing and circulation of customer order 2 2 3 3 2 Preparation of customer drawings 30 18 13 16 3 Customer drawings to marketing 2 3 1 1 4 Checking and forwarding to customer 2 1 3 3 5 Getting approval from customer 447 98 396 93 05’ Customer comments 6 Preparation of manufacturing drawings 400 120 400 23 7 Issuing manufacturing drawings to planning 2 3 17 1 8 Issue from planning to other departments 1 2 2 1 08’ Revision 9 Material procurement-prototype 10 Processing tools required for manufacturing 603 228 486 167 11 Manufacturing- prototype 12 Material processing-final order execution 341 160 36 5 13 Manufacturing-final order execution Organizing customer inspection through 14 marketing 16 Dispatch 8 130 18 15 Time in days
  • 7. Assumptions Domestic Export Activity no. Description Order-1 Order-2 Order-1 Order-2 1 Processing and circulation of customer order 2 2 3 3 2 Preparation of customer drawings 30 18 13 16 3 Customer drawings to marketing 2 3 1 1 4 Checking and forwarding to customer 2 1 3 3 5 Getting approval from customer 447 98 396 93 05’ Customer comments 6 Preparation of manufacturing drawings 400 120 400 23 7 Issuing manufacturing drawings to planning 2 3 17 1 8 Issue from planning to other departments 1 2 2 1 08’ Revision 9 Material procurement-prototype 10 Processing tools required for manufacturing 603 228 486 167 11 Manufacturing- prototype 12 Material processing-final order execution 341 160 36 5 13 Manufacturing-final order execution Organizing customer inspection through 14 marketing 16 Dispatch 8 130 18 15 Time in days
  • 8. Assumptions Domestic Export Activity no. Description Order-1 Order-2 Order-1 Order-2 1 Processing and circulation of customer order 2 2 3 3 2 Preparation of customer drawings 30 18 13 16 3 Customer drawings to marketing 2 3 1 1 4 Checking and forwarding to customer 2 1 3 3 5 Getting approval from customer 447 98 396 93 05’ Customer comments 3 3 3 3 6 Preparation of manufacturing drawings 400 120 400 23 7 Issuing manufacturing drawings to planning 2 3 17 1 8 Issue from planning to other departments 1 2 2 1 08’ Revision 2 2 2 2 9 Material procurement-prototype 10 Processing tools required for manufacturing 603 228 486 167 11 Manufacturing- prototype 12 Material processing-final order execution 341 160 36 5 13 Manufacturing-final order execution Organizing customer inspection through 14 marketing 3 3 3 3 16 Dispatch 8 130 18 15
  • 9. Flow Chart Sequence Processing and Customer Drawing to Customer Checking circulation Drawing marketing Approval 01 02 03 04 05 Manufacturing Drawing 06 05’ Material Customer Requirement 09 comments Details of 10 material 16 07 11 Dispatch Issuing Tools and dies Drawing 14 13 12 08’ 08 Material Distributing to Inspection Manufacturing Revision Processing Departments
  • 10. Calculating Average Domestic Export Activity no. Description Order-1 Order-2 Order-1 Order-2 1 Processing and circulation of customer order 2 2 3 3 2 Preparation of customer drawings 30 18 13 16 3 Customer drawings to marketing 2 3 1 1 4 Checking and forwarding to customer 2 1 3 3 5 Getting approval from customer 447 98 396 93 05’ Customer comments 3 3 3 3 6 Preparation of manufacturing drawings 400 120 400 23 7 Issuing manufacturing drawings to planning 2 3 17 1 8 Issue from planning to other departments 1 2 2 1 08’ Revision 2 2 2 2 9 Material procurement-prototype 10 Processing tools required for manufacturing 603 228 486 167 11 Manufacturing- prototype 12 Material processing-final order execution 341 160 36 5 13 Manufacturing-final order execution Organizing customer inspection through 14 marketing 3 3 3 3 16 Dispatch 8 130 18 15 Time in days Calculating Average of order 1 & 2
  • 11. Average Time in days Domestic Export Activity no. Description Average Average 1 Processing and circulation of customer order 2 3 2 Preparation of customer drawings 24 14.5 3 Customer drawings to marketing 2.5 1 4 Checking and forwarding to customer 1.5 3 5 Getting approval from customer 272.5 244.5 05’ Customer comments 3 3 6 Preparation of manufacturing drawings 260 211.5 7 Issuing manufacturing drawings to planning 2.5 9 8 Issue from planning to other departments 1.5 1.5 08’ Revision 2 2 9 Material procurement-prototype 10 Processing tools required for manufacturing 415.5 326.5 11 Manufacturing- prototype 12 Material processing-final order execution 250.5 20.5 13 Manufacturing-final order execution 14 Organizing customer inspection through marketing 3 3 16 Dispatch 69 16.5
  • 12. Question1: Develop a network representation of the execution Of an order for distribution transformers at DTCL.
  • 13. Question1: Develop a network representation of the execution of an order for distribution transformers at DTCL. Answer 1: Nodal Network PERT AON
  • 14. PERT CHART 02 03 04 05 05’ 01 06 D1 D1 09 10 11 07 08 08’ 12 16 14 13
  • 15. AON CHART 02 03 04 05 05’ 01 06 09 10 11 07 08 08’ 16 14 13 12
  • 16. Question 2: 1. Use the network and develop time estimates for execution of the order. 2. What are the key activities that require better managerial control.
  • 17. Question 2: 1. Use the network and develop time estimates for execution of the order. 2. What are the key activities that require better managerial control. Answer 2: • Calculate critical path time ( Domestic & Export) • Identify the critical activities ( Domestic & Export)
  • 19. PERT CHART: Domestic Order 3 02 03 04 05 05’ 24 2.5 1.5 01 272.5 D1 2 06 05 0 D1 260 0 09 2.5 10 11 07 415.5 08 1.5 2 08’ 250.5 69 3 12 16 14 13
  • 20. PERT CHART: Domestic Order 02 03 04 05 05’ 24 2.5 1.5 272.5 3 01 0 06 D1 2 D1 260 0 09 2.5 10 11 07 Critical Path: 415.5 08 1.5 01-> 02-> 03->04->06 ->10->07->08->08’->12- >-13->14->16 2 08’ 250.5 69 3 12 16 14 13
  • 21. Answer 2: Domestic Order Total Lead time = Time taken by critical path = Tp (01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16) Total Lead time = 1034 days The key activities that require better managerial control are: 01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16 • This activities can be crashed • Time associated with each of this critical activity can be optimized. Slacks • 05:Real Float = 403 days, • 05 & 05’ :Real Float = 400
  • 23. PERT CHART: Export Order 3 02 03 04 05 05’ 14.5 1 3 01 244.5 D1 3 06 05 0 D1 211.5 0 09 9 10 11 07 326.5 08 1.5 2 08’ 20.5 16.5 3 12 16 14 13
  • 24. PERT CHART: Export Order 3 02 03 04 05 05’ 14.5 1 3 01 244.5 D1 3 06 05 0 D1 211.5 0 09 9 10 11 07 Critical Path: 326.5 08 1.5 01-> 02-> 03->04->06 ->10->07->08->08’->12- >-13->14->16 2 08’ 20.5 16.5 3 12 16 14 13
  • 25. Answer 2: Export Order Total Lead time = Time taken by critical path = Tp (01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16) Total Lead time = 612 days The key activities that require better managerial control are: 01,02,03,04,06,09,10,11,7,8,8’,12,13,14,16 • This activities can be crashed • Time associated with each of this critical activity can be optimized. Slacks • 05: Real float = 294 days, • 05 & 05’: Real Float = 290 days,
  • 26. Question 3: 1. Can you identify activities that require immediate attention. In order to reduce execution time. 2. How can DTCL organize the manufacture of transformers so that there will be a significant reduction in execution lead time.
  • 27. Question 3: 1. Can you identify activities that require immediate attention in order to reduce execution time. 2. How can DTCL organize the manufacture of transformers so that there will be a significant reduction in execution lead time. Answer 3: 1. Draw AON chart. Group activities to work stations. The works station having the most balanced delay ( very high or very low time) compared to other work station needs to be given first attention. 2. Then reararnge the activities and group them to work stations and try reducing the balanced delay.
  • 28. Flow Chart Sequence Processing and Customer Drawing to Customer Checking circulation Drawing marketing Approval 01 02 03 04 05 Manufacturing Drawing 06 W1 Engineer Drawing 05’ W2 Marketing Dept Material 09 Customer Requirement comments W3 Production Dept Details of 10 material 16 07 11 Dispatch Issuing Tools and dies Drawing 14 13 12 08’ 08 Material Distributing to Inspection Manufacturing Revision Processing Departments
  • 30. AON: Domestic Order 24 2.5 1.5 272.5 3 02 03 04 05 05’ 2 260 01 06 2.5 W1 Engineer Drawing 09 10 11 07 W2 Marketing Dept 415.5 1.5 08 W3 Production Dept 2 3 08’ 69 250.5 16 14 13 12
  • 31. AON: Domestic Order W1 W2 W3 04,05,05', 08,08',09,10,11 Activities 01,02,03,06,07 14,16 ,12,13 2+24+2.5 1.5+272.5+3 1.5+2+415.5 Time +260+2.5 +3+69 +250.5 Total Time 291 days 349 days 669.5 days Total Processing Time Tp = 291 + 349 + 669.5 Tp = 1309.5 days Cycle time CL= Max ( T1,T2,T3) = Max( 291,249,669.5) CL = 669.5 days Balance Delay Bd = ( n CL - Tp ) X 100 = (3 X 669.5 – 1309 ) X 100 n CL 3 X 669.5 Bd = 34.82%
  • 32. Rearranging Flow Chart Sequence Processing and Customer Drawing to Customer Checking circulation Drawing marketing Approval 01 02 03 04 05 Manufacturing W1 Engineer Drawing Drawing 06 05’ W2 Marketing Dept Material Customer Requirement 09 comments W3 Production Dept Procurement W4 Dept Details of 10 material 16 07 11 Dispatch Issuing Tools and dies Drawing 14 13 12 08’ 08 Material Distributing to Inspection Manufacturing Revision Processing Departments
  • 33. Rerranging AON: Domestic Order 24 2.5 1.5 272.5 3 02 03 04 05 05’ 2 260 01 06 2.5 W1 Engineer Drawing 09 10 11 07 W2 Marketing Dept 415.5 1.5 08 W3 Production Dept Procurement W4 Dept 2 08’ 69 3 250.5 16 14 13 12
  • 34. Rearranging AON: Domestic Order W1 W2 W3 W4 04,05,05', Activities 01,02,03,06,07 14,16 08,08',12,13 09,10,11 2+24+2.5 1.5+272.5+3 1.5+2 Time +260+2.5 +3+69 +250.5 415.5 Total 291 days 349 days 254 days 415.5 days Time Total Processing Time Tp = 291 + 349 + 254 + 415.5 Tp = 1309.5 days Balanced Delay Cycle time reduced by CL= Max ( T1,T2,T3,T4) = Max( 291,249,254,415.5) 39% CL = 415.5 days Balance Delay Bd = ( n CL - Tp ) X 100 = (3 X 415.5 – 1309 ) X 100 n CL 3 X 415.5 Bd = 21.23%
  • 35. Answer 3: Domestic Order 1. The activities that require immediate attention is the procurement as it takes 415.5 days. 2. It can be done by proper vendor management • By ensuring delivery on time • Properly forecasting the expected demand • Adopting practices to reduce time on logistics • Better inventory management of raw materials with proper defined reorder level. Keep 4 works stations W1 W2 W3 W4 01,02,03,06 04,05,05', Activities ,07 14,16 08,08',12,13 09,10,11
  • 37. AON: Export Order 14.5 1 3 244.5 3 02 03 04 05 05’ 3 211.5 01 06 9 W1 Engineer Drawing 09 10 11 07 W2 Marketing Dept 326.5 1.5 08 W3 Production Dept 2 3 08’ 16.5 20.5 16 14 13 12
  • 38. AON: Export Order W1 W2 W3 04,05,05', 08,08',09,10,11 Activities 01,02,03,06,07 14,16 ,12,13 Time 3+14.5+1+211.5+9 3+244.5+3+3+16.5 1.5+2+326.5+20.5 Total Time 239 days 270 days 350.5 days Total Processing Time Tp = 239 + 270 + 350.5 Tp = 859.5 days Cycle time CL= Max ( T1,T2,T3) = Max(239,270.350.5) CL = 350.5 days Balance Delay Bd = ( n CL - Tp ) X 100 = (3 X 350.5 – 859.5 ) X 100 n CL 3 X 350.5 Bd = 18.26%
  • 39. Rearranging AON: Export Order 14.5 1 3 244.5 3 02 03 04 05 05’ 3 211.5 01 06 9 Engineer W1 Drawing 09 10 11 07 W2 Marketing Dept 326.5 1.5 08 W3 Production Dept Procurement 2 W4 Dept 16.5 3 20.5 08’ 16 14 13 12
  • 40. Rearranging AON: Export Order W1 W2 W3 W4 04,05,05', Activities 01,02,03,06,07 14,16 08,08',12,13 09,10,11 3+14.5+1+211.5 3+244.5+3+3+1 Time +9 6.5 1.5+2+326.5 20.5 Total Time 239 days 270 days 330 days 20.5 days Total Processing Time Tp = 239 + 270 + 330 + 20.5 Tp = 859.5 days Balanced Delay Cycle time increased by CL= Max ( T1,T2,T3,T4) = Max(239,270,330,20.5) 91% CL = 330 days Balance Delay Bd = ( n CL - Tp ) X 100 = (3 X 330 – 859.5 ) X 100 n CL 3 X 330.5 Bd = 34.88 %
  • 41. Answer 3: Export Order 1. The activities that require immediate attention is the production as it takes 350.5 days. 2. It can be done by proper optimizing the process • By avoiding abnormal wastage • Reducing the error or failure rates • Finding optimal product mix stratigies • Maintaining a constant lead time and safety stock Keep 3 works stations W1 W2 W3 04,05,05', 08,08',09,10,11 Activities 01,02,03,06,07 14,16 ,12,13