“Leadership on BPM ideas, methods and results in Brazil”
A Framework for a BPM Center A Framework for a BPM Center ofof
ExcellenceExcellencece e cece e ce
Leonardo Leonardo ProcessDaysProcessDays –– July26th 2010July26th 2010
Leandro JesusLeandro Jesus
ManagingManaging PartnerPartner  ELO Group ELO GroupManagingManaging PartnerPartner, ELO Group, ELO Group
AboutAbout the speakerthe speaker
Leandro Jesus, MSc.
• Managing Partner ELO Group consultingManaging Partner ELO Group consulting
• Auxiliary Professor Federal University of Rio 
de Janeiro
• Vice‐President ‐ Association of Business 
Process Management Professionals 
(ABPMP) Chapter Brazil;
• Curriculum vitae: 
h // li k di /i /l d jhttp://www.linkedin.com/in/leandrojesus
• E‐mail: leandro.jesus@elogroup.com.br
© ELO Group all rights reserved.
22
About ELO Group
 ELO Group is a Brazilian consulting enterprise focused in Business Process 
Management and Governance, Risk and Compliance solutions. g , p
 Founded in COPPE’s Technological and Industrial Cluster, at Federal 
University of Rio de Janeiro, one of the most advanced Research and 
Development Centers in Latin America. 
 Counts on a group of professionals with solid Academic Formation and 
experiences through relevant Academic Institutions in Brazil   USA and experiences through relevant Academic Institutions in Brazil , USA and 
Europe
 International Cooperation with BPTrends, Queensland University ofInternational Cooperation with BPTrends, Queensland University of
Technology and Leonardo Consulting
 Organizer of the Brazilian International BPM Seminar
© ELO Group all rights reserved.
33
Our Clients Portfolio
Conselho da Justiça 
Federal
© ELO Group all rights reserved.
44
Our Values
 Strong academic links, allowing ELO Group to bring to the market the state of the 
art in management solutions and best practices;
 Focus on collaborative development of customized organizational solutions;
 Always strive for solutions that are innovative, long lasting and that leverage 
organization performance;
 Constant know‐how transfer to our clients;
 Internal work logic focused on dynamic specialization among professionals with 
high specialization in different knowledge areas;
 Ethics, agility and adaptability throughout the service provisioning cycle;
 Learning and continuous improvement
© ELO Group all rights reserved.
 Learning and continuous improvement.
55
Food for thought…
What people usually ask us about BPM CoEs:
• Where should a Center of Excellence be placed within the 
organization? Whom it should report to?
• Which are the responsibilities that should be centralizedp
into a BPM CoE and which responsibilities can remain
decentralized?
• How do these responsibilities change over time?
• How to evaluate a a BPM CoE’s effectiveness?How to evaluate a a BPM CoE s effectiveness?
© ELO Group all rights reserved.
66
INTRODUCTION CHALLENGES FACINGINTRODUCTION: CHALLENGES FACING
MODERN ORGANIZATIONS
BPM GOVERNANCE AND THE NEED FOR A
CENTER OF EXCELLENCE
BPM CENTER OF EXCELLENCE MAIN
CHARACTERISTICS
BPM CoE FRAMEWORK – HISTORY AND
GENERAL VIEW
BEYOND BPM CoE – OTHER ROLES AND
RESPONSIBILITIESRESPONSIBILITIES
The old way to manage…
Organizations are facing the 21st century environment but still 
adopt management practices that were built considering the 
20th century.
Previous organizational focus:
S l• Scale
• Efficiency
i h d l• Hierarchy and control
© ELO Group all rights reserved
88
... and some implications
© ELO Group all rights reserved.
Source: Compliance Week, December, 2006
99
Rules are changing...
 Most demanding customersg
 Global competition
 Focus on individuals, knowledge and innovation Focus on individuals, knowledge and innovation
 Greater complexity and uncertainty (risk) in operations
 Need for more flexibility and agility
© ELO Group all rights reserved.
 Need for more flexibility and agility
 Intensive use of IT in business 1010
New Paradigm for the 21st Century
Old organization’s paradigm Emergent organization’s paradigm
STABILITY DYNAMISM
FLEXIBILITY
CENTRALIZATION COOPERATIONCENTRALIZATION COOPERATION
CONTROL AUTONOMY
COMMODITIES 
AND PROPERTY
SERVICES
AND EXPERIENCES
© ELO Group all rights reserved.
AND PROPERTY AND EXPERIENCES
1111
New Paradigm for the 21st Century
© ELO Group all rights reserved.
Source: http://www.slideshare.net/reynolds/web-20-business-models-
presentation
Be prepared to changes…
© ELO Group all rights reserved.
1313
... And treat them appropriately
According to McMinsey’s survey, only a third of respondents 
said their organizations have had success in making changes  
with greater impact! (McKinsey, 2008);
Researches shows that 82% of organizations are developing 
some form of change initiative, that 70% of these initiatives fail
and 68% of these organizations don’t evaluate the success of 
these initiatives (Kottler, Harvard Business Review …);
Most of strategies haven’t failed because they were poorly 
conceived, but because they were poorly implemented (Norton 
& Kaplan).
© ELO Group all rights reserved.
1414
How do you transform
an organization ?...
BETTERBETTER
ATITUDES &
COMPETENCES
BETTER
INTERFACES,
ALIGNMENTS
ACCOUNTABILITIES
BETTER
SYSTEMS
“SIMPLER” &
INNOVATIVE
SERVICES
BETTER
SERVICES
CONTRACTS
& PARTNERS
BETTER
CONTROL &
VISIBILITY
BETTER
POLICIES,
BUSINESS
RULES &
STANDARDS
BETTER
EQUIPMENTS &
INFRA-STRUCTURE
© ELO Group all rights reserved
STANDARDS INFRA STRUCTURE
1515
Which areas provide
these transformations ?
BETTERBETTER
ATITUDES &
COMPETENCES
BETTER
INTERFACES,
ALIGNMENTS
ACCOUNTABILITIES
Human Human ResourcesResources &&
CommunicationCommunication
StrategyStrategy
BETTER
SYSTEMS
“SIMPLER” &
INNOVATIVE
SERVICES
InformationInformation
TechnologyTechnology
CustomerCustomer &&
ProductProduct
ManagementManagement
BETTER
SERVICES
gygy
ContractContract IT & IT & RiskRisk
ManagementManagement
CONTRACTS
& PARTNERS
BETTER
CONTROL &
VISIBILITY
ContractContract
ManagementManagement
IT & IT & RiskRisk
ManagementManagement
BETTER
POLICIES,
BUSINESS
RULES &
STANDARDS
BETTER
EQUIPMENTS &
INFRA-STRUCTURE
ComplianceCompliance &&
Standards Standards 
AssetsAssets
ManagementManagement
© ELO Group all rights reserved
STANDARDS INFRA STRUCTURE
1616
So... why do you need business
process management ?
If business process management:
Doesn’t develop systems (except for BPMSs)Doesn t develop systems (except for BPMSs)
Doesn’t manage competences
D ’   i  Doesn’t review contracts
Doesn’t design new products
Doesn’t create dashboards
Doesn’t project layout
If h t HR IT Ri k
p j y
If we have mature HR, IT, Risk
Management, process do we really
need Business Process Management ??
© ELO Group all rights reserved
1717
Think again...
What’s the big issue ?
BETTER
1) 1) ProvideProvide educationeducation oror
2) 2) IdentifyIdentify keykey competencescompetences
BETTER
ATITUDES &
COMPETENCES
BETTER
INTERFACES,
ALIGMENTS
ACCOUNTABILITIES
2) 2) IdentifyIdentify keykey competencescompetences
ThatThat enhaceenhace thethe impactimpact
OfOf business business resultsresults
BETTER
SYSTEMS
“SIMPLER” &
INNOVATIVE
SERVICES
1) 1) DevelopDevelop systemsystem
oror 2) 2) UnderstandUnderstand
BusinessBusiness
BETTER
SERVICES
requirementsrequirements
1) 1) CreateCreate dashboarddashboard
oror 2) Design 2) Design MetricsMetrics
CONTRACTS
& PARTNERS
BETTER
CONTROL &
VISIBILITY
) g) g
andand controlscontrols toto
effectiveeffective SupportSupport
decisiondecision makingmaking
1) 1) InstitutionalizeInstitutionalize andand
BETTER
POLICIES,
BUSINESS
RULES &
STANDARDS
BETTER
EQUIPMENTS &
INFRA-STRUCTURE
1) 1) InstitutionalizeInstitutionalize andand
Formalize businessFormalize business
GuidelinesGuidelines, , oror 2) Debate2) Debate
andand reachreach agreementagreement withwith
© ELO Group all rights reserved
STANDARDS INFRA STRUCTURE
business business areasareas aboutabout rulesrules
1818
Organizations need better Transformation
Capability to convert good ideas into process
redesign and implementation
1) 1) ProvideProvide educationeducation oror
2) 2) IdentifyIdentify keykey competencescompetences2) 2) IdentifyIdentify keykey competencescompetences
ThatThat enhaceenhace thethe impactimpact
OfOf business business resultsresults
1) 1) DevelopDevelop systemsystem
oror 2) 2) UnderstandUnderstand
BusinessBusiness
requirementsrequirements
1) 1) CreateCreate dashboarddashboard
oror 2) Design 2) Design MetricsMetrics) g) g
andand controlscontrols toto
effectiveeffective SupportSupport
decisiondecision makingmaking
1) 1) InstitutionalizeInstitutionalize andand1) 1) InstitutionalizeInstitutionalize andand
Formalize businessFormalize business
GuidelinesGuidelines, , oror 2) Debate2) Debate
andand reachreach agreementagreement withwith
© ELO Group all rights reserved
business business areasareas aboutabout rulesrules
1919
What about your BPM approach? Is
it Transformation Oriented?
© ELO Group all rights reserved
A traditional BPM approach
Several BPM techniques used today were Several BPM techniques used today were 
designed for the “old paradigm”
© ELO Group all rights reserved
2121
Objective of traditional BPM approaches
Aumento da
fi bilid d
Reduce variability
and increase
bilit confiabilidade
organizacional
reability
Foco Comum
Avanço no
desempenho
organizacional
Improve
performanceMudança da
Expectativa do
Consumidor
performance
around the current
paradigm!
© ELO Group all rights reserved
Desempenho
Esperado
Desempenho
Atual
p g
2222
What we currently see
Organizations are investing in many BPM 
initiatives but many of them lack a clear focus
Many times results are not reached. When 
they are, they are not clearly communicated
BPM initiatives with different purposes are 
conducted in an isolated way inside an 
g i tiorganization
S ti  BPM     di i li   till l k    Sometimes BPM as a discipline still lacks a 
natural home and official identity
© ELO Group all rights reserved.
2323
The focus of BPM application should move pp
towards the transformation of the 
organization through the implementation oforganization through the implementation of
significant improvements and sustainable
changeschanges
© ELO Group all rights reserved
2424
Some challenges for an effective 
transformation based on BPM
Understand processes as relevant assets to be 
managed
Create a BPM identity and disseminate its benefits 
Gain sponsorship on BPM initiatives
Create alignment among transformation efforts
 l hDemonstrate results with BPM initiatives!
© ELO Group all rights reserved
2525
INTRODUCTION CHALLENGES FACINGINTRODUCTION: CHALLENGES FACING
MODERN ORGANIZATIONS
BPM GOVERNANCE AND THE NEED FOR A
CENTER OF EXCELLENCE
BPM CENTER OF EXCELLENCE MAIN
CHARACTERISTICS
BPM CoE FRAMEWORK – HISTORY AND
GENERAL VIEW
BEYOND BPM CoE – OTHER ROLES AND
RESPONSIBILITIESRESPONSIBILITIES
BPM Governance
BPM Governance relates to the definition and enforcement 
of guidelines and rules that drive activities and decisions g
along the process lifecycle, as well as the consequent 
definition of responsibilities and accountabilities for BPM 
i j d l lactions on project and program management level
Effective BPM Governance has to reinforce the strategic 
alignment among process management activities and 
business priorities, clearly define and enforce the 
accountabilities of each involved stakeholder and avoid 
redundancies related to BPM initiativesredundancies related to BPM initiatives.
© ELO Group all rights reserved
2727
Many focus for BPM initiatives and
lack of convergence
© ELO Group all rights reserved
Source:
BPTrends, 2010
Need for BPM Governance
New
Organizational
Context
Organizations
BPM  initiatives
evolution
BPM ProblemsProblems BPM ProblemsProblems
BPM Governance
© ELO Group all rights reserved.
Source: Barros, 2009
2929
Elements related to BPM Governance
1. Roles and 
Responsibilities
2. Standards 4. Services3. Structure
GOVERNANCE
MODEL
6. Objectives
5. Control
Mechanisms
7. Evaluation and
Reward Mechanisms
© ELO Group all rights reserved.
Source: Barros, 2009
3030
INTRODUCTION CHALLENGES FACINGINTRODUCTION: CHALLENGES FACING
MODERN ORGANIZATIONS
BPM GOVERNANCE AND THE NEED FOR A
CENTER OF EXCELLENCE
BPM CENTER OF EXCELLENCE MAIN
CHARACTERISTICS
BPM CoE FRAMEWORK – HISTORY AND
GENERAL VIEW
BEYOND BPM CoE – OTHER ROLES AND
RESPONSIBILITIES
© ELO Group all rights reserved.
RESPONSIBILITIES
Need for a BPM Need for a BPM CoECoE
A BPM Center of Excellence is an important organizational p g
mechanism that has been widely adopted by enterprises 
aiming at institutionalizing BPM initiatives and perpetuating its 
benefits throughout the organization in a more centralized 
approach.
© ELO Group all rights reserved.
3232
Need for a BPM CoE
Research with 91 national organizations found that many 
(49%) do not have yet a formal as the “owner of the BPM 
initiatives”, for example a Process Office
Source:  ELO Group & iProcess , 2009
Similar research shows that only 20% among the largest 
gl b l  i  d   t    h BPM G  Thi  global companies do not possess such BPM Group. This 
shows the establishment of BPM Groups as a global trend.
Source:  BPTrends, 2008
© ELO Group all rights reserved.
Some NomenclaturesSome Nomenclatures
Process Office
BPM Center of Excellence
Process Team
BPM GroupBPM Group
BPM Support Officepp
Etc.
© ELO Group all rights reserved.
3434
Location of a BPM CoE
© ELO Group all rights reserved.
Source: BPTrends, 2010
3535
Typical rolesTypical roles
1. Internal Consulting: 1. Internal Consulting: 
• Performs (or provides support to) BPM services within the 
organizationorganization
2. Knowledge Provider:
• Assures process knowledge dissemination and reinforces a 
process‐oriented culture within the organization
3. Standards Guardian:
• Assures process management standards are being followed Assures process management standards are being followed 
throughout the organization
© ELO Group all rights reserved.
3636
Detailing some typical rolesDetailing some typical roles
Guardian of the process management methodologies (standards, 
rules, performance measures, etc…);, p , );
Management of BPM projects activities (modeling, analysis, 
improvements implementation, evaluation of results);p p , );
Training on business process management best practices;
Consolidation of records &documentation  evaluation and Consolidation of records &documentation, evaluation and 
dissemination of best practice and lessons learned;
Support process owners to monitor and evaluate processes;Support process owners to monitor and evaluate processes;
Delivering on the dialogue process between process owners and 
senior managementsenior management.
© ELO Group all rights reserved.
3737
Previous list of Previous list of BPM servicesBPM services
© ELO Group all rights reserved.
Source: Rosemann, 2008
3838
Results Results ‐‐ EvidenceEvidence
© ELO Group all rights reserved.
3939
INTRODUCTION CHALLENGES FACINGINTRODUCTION: CHALLENGES FACING
MODERN ORGANIZATIONS
BPM GOVERNANCE AND THE NEED FOR A
CENTER OF EXCELLENCE
BPM CENTER OF EXCELLENCE MAIN
CHARACTERISTICS
BPM CoE FRAMEWORK – HISTORY AND
GENERAL VIEW
BEYOND BPM CoE – OTHER ROLES AND
RESPONSIBILITIES
© ELO Group all rights reserved.
RESPONSIBILITIES
Introduction
With the objective of bringing a structured and detailed 
reference, ELO Group has developed a Framework for the 
Operation of a BPM CoE. 
This reference framework is based in a wide theoretical e 
practical research. Best practices from several references and 
case studies were combined, generating this rich instrument 
in order to support organizations in implementing and 
ti g   BPM C Eoperating a BPM CoE.
© ELO Group all rights reserved
41414141
BPM Services and Internal Processes
Management Process
Main Services
Complementary
ServicesServices
BPM technologies
Support processespp p
© ELO Group all rights reserved.
4242
Internal Processes
Management Processes: The set of processes related to the 
management of a BPM Center of Excellence internal activities. It 
includes the translation of strategic and operational demands into includes the translation of strategic and operational demands into 
BPM services, the analysis, configuration and monitoring of BPM 
services; the evaluation of results generated by BPM services and the 
communication and dissemination of BPM culture throughout the 
organization.
Support Processes: The set of processes that supports the operation 
of the Center of Excellence  It includes the creation and maintenance of the Center of Excellence. It includes the creation and maintenance 
of methods for all activities within the process lifecycle, establishment 
of BPM related roles and responsibilities, administration of the BPM 
f l d f h hservices portfolio, administration of BPM human resources, charging 
and funding. 
© ELO Group all rights reserved.
4343
BPM Services
Main Services: These services are central to the implementation of the 
BPM approach and are the usual responsibilities of a BPM Center of 
Excellence  This set includes services like process modeling  process Excellence. This set includes services like process modeling, process 
improvement and design, process change management, process 
performance management and process management 
education/training.
Complementary Services: Services that may not be the direct 
responsibilities of a BPM Center of Excellence, but are still related to 
the BPM discipline and its methods and tools  This set of services the BPM discipline and its methods and tools. This set of services 
includes for example process auditing, risk and internal control 
management, process forensics, systems design, etc.
© ELO Group all rights reserved.
4444
BPM CoE’s Capabilities Evolution
3. Strategic
Alignment and
BPM culture
2. Creation of
convergence
among BPM
initiativesinitiatives
1. Difusion of
BPM concepts
and benefits
© ELO Group all rights reserved.
4545
BPM BPM CoE’sCoE’s CapabilitiesCapabilities EvolutionEvolution
 The definition of processes and services associated with each
stage was built from two surveys of BPM initiatives
undertaken by ELO Group with over 150 organizations,
and revised with Prof. Michael Rosemann;
 It is recommended the adoption of this Framework and
customization for each organization The specificity of eachcustomization for each organization. The specificity of each
organization as well as its history of initiatives is crucial to define
the optimal portfolio of processes and services to be offered by
the Office over timethe Office over time.
© ELO Group all rights reserved.
4646
Capabilities for a BPM CoE (1/3)
© ELO Group all rights reserved.
4747
MANAGEMENT PROCESSESMANAGEMENT PROCESSES
MP07MP07 BPM CultureBPM CultureMP07MP07 BPM CultureBPM Culture
DisseminationDisseminationDisseminationDissemination
COMPLEMENTARY SERVICESCOMPLEMENTARY SERVICES
MAIN SERVICESMAIN SERVICES
MS01MS01 Process ArchitectureProcess Architecture
MaintenanceMaintenance
MS02MS02 Process ModelingProcess Modeling
(As(As--is)is)
CS01CS01 Lean & Six SigmaLean & Six Sigma
Oriented ImprovementOriented Improvement
(As(As is)is)
MS03MS03 ProcessProcess ImprovementImprovement
(To(To--be)be)
MS04MS04 ProcessProcessMS04MS04 ProcessProcess
DocumentationDocumentation
MS05MS05 Process ChangeProcess Change
ManagementManagement
SP01SP01
AdministrationAdministration ofof
M d l R iM d l R i
SP01SP01
AdministrationAdministration ofof
M d l R iM d l R i
SP02SP02 AdministrationAdministration
ofof BPM RolesBPM Roles andand
R ibilitiR ibiliti
SP02SP02 AdministrationAdministration
ofof BPM RolesBPM Roles andand
R ibilitiR ibiliti
SUPPORTING PROCESSESSUPPORTING PROCESSES
Models RepositoryModels RepositoryModels RepositoryModels Repository ResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities
48
Stage 1 Processes and Services
Code Name Type Description
MS01 Process
Architecture
Maintenance
Main
Service
Definition and/or updating of the organization's value chain and
business process architecture that illustrate its mission, vision
and main attributions. Dissemination of process-based vision
th o gho t the o gani ationthroughout the organization
MS02 Process
Modeling (AS
IS)
Main
Service
Modeling and/or updating of the way work is performed. Models
usually include activities and events, responsibilities, related
systems and documents and are displayed in notations like
BPMN EPC IDEF It can also include identification ofBPMN, EPC, IDEF. It can also include identification of
improvement opportunities.
MS03 Process
Improvement
(TO BE)
Main
Service
Redesign of existing processes based on the analysis of
improvement opportunities and prioritization of identified
solutions. It can also refer to the design of a new process.
MS04 Process
Documentation
Main
Service
Creation and/or updating of procedures and manuals that detail
processes models and can serve as a basis for work execution.
MS05 Process Change
Management
Main
Service
Definition of an action plan to incorporate improvements in
existing processes Tracking of action plan's status intermediateManagement Service existing processes. Tracking of action plan s status, intermediate
results and difficulties.
CS01 Lean & Six
Sigma Oriented
Improvement
Complem.
Service
Improvement initiative focused on process efficiency and
productivity increases, mainly based on Lean & Six Sigma
techniques.
SP01 Models
Repository
Administration
Support
Process
Creation and/or maintenance of BPM methodologies e modeling
notation. Administration of models repository (backups, acess
control etc.)
SP02 Administration Support Definition and/or updating of information related to each of the
© ELO Group all rights reserved.
SP02 Administration
of BPM Roles
and
Responsibilities
Support
Process
Definition and/or updating of information related to each of the
BPM roles and responsibilities (process owners, analysts,
specialists, sponsors etc.), according to the organization's
process management model.
Capabilities for a BPM CoE (2/3)
© ELO Group all rights reserved.
5050
MANAGEMENT PROCESSESMANAGEMENT PROCESSES
MP07MP07 BPM CultureBPM CultureMP07MP07 BPM CultureBPM Culture
MP04MP04 BPMBPM ServicesServices
ProgrammingProgramming
MP04MP04 BPMBPM ServicesServices
ProgrammingProgramming
MP05MP05 BPM ServicesBPM Services
MonitoringMonitoring
MP05MP05 BPM ServicesBPM Services
MonitoringMonitoring
DisseminationDisseminationDisseminationDissemination
COMPLEMENTARY SERVICESCOMPLEMENTARY SERVICES
MAIN SERVICESMAIN SERVICES
MS01MS01 Process ArchitectureProcess Architecture
MaintenanceMaintenance
MS01MS01 Process ArchitectureProcess Architecture
MaintenanceMaintenance
MS02MS02 Process ModelingProcess Modeling
(As(As--is)is)
MS02MS02 Process ModelingProcess Modeling
(As(As--is)is)
CS01CS01 LeanLean && SixSix SigmaSigma
OrientedOriented ImprovementImprovement
MS06MS06 Process PerformanceProcess Performance
MeasurementMeasurement
MS07MS07 Process ManagementProcess Management
Training and EducationTraining and Education
CS02CS02 ReferenceReference ModelsModels
ImplementationImplementation
CS06CS06 Process AuditingProcess Auditing
CS07CS07 RiskRisk andand InternalInternal
ControlControl ManagementManagement(As(As is)is)(As(As is)is)
MS03MS03 ProcessProcess ImprovementImprovement
(To(To--be)be)
MS03MS03 ProcessProcess ImprovementImprovement
(To(To--be)be)
MS04MS04 ProcessProcessMS04MS04 ProcessProcess
Training and EducationTraining and Education
MS08MS08 Process ComplianceProcess Compliance
CS03CS03 SystemsSystems
SpecificationSpecification
CS08CS08 CompetenciesCompetencies
ManagementManagement
CS09CS09 Management ofManagement ofMS04MS04 ProcessProcess
DocumentationDocumentation
MS04MS04 ProcessProcess
DocumentationDocumentation
MS05MS05 Process ChangeProcess Change
ManagementManagement
MS05MS05 Process ChangeProcess Change
ManagementManagement
CS04CS04 ProcessProcess AutomationAutomation
CS09CS09 Management ofManagement of
improvement projectsimprovement projects
SP01SP01 AdministrationAdministration
ofof ModelsModels RepositoryRepository
SP01SP01 AdministrationAdministration
ofof ModelsModels RepositoryRepository
SP02SP02 AdministrationAdministration
ofof BPM RolesBPM Roles andand
R ibilitiR ibiliti
SP02SP02 AdministrationAdministration
ofof BPM RolesBPM Roles andand
R ibilitiR ibiliti
SUPPORTING PROCESSESSUPPORTING PROCESSES
SP04SP04 AdministrationAdministration
ofof BPMBPM HumanHuman
RR
SP04SP04 AdministrationAdministration
ofof BPMBPM HumanHuman
RR
SP03SP03 AdministrationAdministration
ofof BPMBPM ServicesServices
P tf liP tf li
SP03SP03 AdministrationAdministration
ofof BPMBPM ServicesServices
P tf liP tf li
p yp yp yp y
ResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities ResourcesResourcesResourcesResourcesPortfolioPortfolioPortfolioPortfolio
51
Stage 2 Processes and Services
Code Name Type Description
MP04 BPM Services
Programming
Mgmt.
Process
Prioritization and programming of all BPM services being offered
according to availability of personnel in Center of Excellence.
Definition of responsibilities and targets of each initiativeDefinition of responsibilities and targets of each initiative.
MP05 BPM Services
Monitoring
Mgmt.
Process
Monitoring of all BPM services that are being performed and
related controls (time, scope, quality, resources etc.)
MS06 P M i D fi iti f t t f b iMS06 Process
Performance
Measurement
Main
Service
Definition of a structure of business process measures.
Measurement, monitoring and reporting of process performance.
Establishment and tracking of actions to improve performance.
MS07 Process Main Employees' training and education on BPM concepts methodsMS07 Process
Management
Education and
Training
Main
Service
Employees training and education on BPM concepts, methods
and tools.
MS08 Process Main Periodic process checking. Verification of the adherence of the
Compliance Service
p g
process models to reality.
CS02 Reference
Models
Implementation
Complem.
Service
Planning, adoption and maintenance of reference models like
ISO9001, SCOR, ITIL, VRM etc., focused on performance
impromevents and/or achieving certifications.Implementation impromevents and/or achieving certifications.
CS03 Systems
Specification
Complem.
Service
Definition of requirements to support software development that
can optimize process execution
CS04 Process Complem Implementation of systems that could automate work
© ELO Group all rights reserved.
CS04 Process
Automation
Complem.
Service
Implementation of systems that could automate work.
5252
Stage 2 Processes and Services
CS03 Systems
Specification
Complem.
Service
Definition of requirements to support software development that
can optimize process execution
CS04 Process
Automation
Complem.
Service
Implementation of systems that could automate work.
CS06 Process Auditing Complem.
Service
Definition and execution of internal auditing tests to evaluate
adherence of business processes.
CS07 Risk and
Internal Control
Management
Complem.
Service
Analysis of operational risks in processes and defintion of internal
controls to mitigate risks.
CS08 C i C l D fi i i d l i f i d i fCS08 Competencies
Management
Complem.
Service
Definition and evaluation of required competencies for process
execution. Establishment of training plans, HR selection and
relocation.
CS09 Management of Complem. Management of major organizational projects that involve
improvement
projects
Service process improvement efforts (linkage between a PMO and a
BPM Center of Excellence)
SP03 Administration
of BPM Service
P tf li
Support
Process
Updating of informations related to BPM services like:
responsibilities, methods and tools involved, periodicity of
ti tPortfolio execution etc.
SP04 Administration
of BPM Human
Resources
Support
Process
Definition and updating of profiles, roles, competencies and
division of labor of the BPM Center of Excellence team.
© ELO Group all rights reserved.
5353
Capabilities for a BPM CoE (3/3)
© ELO Group all rights reserved.
5454
MANAGEMENT PROCESSESMANAGEMENT PROCESSES
MP03MP03 BPM ServicesBPM Services
DevelopmentDevelopment
PlannigPlannig
MP03MP03 BPM ServicesBPM Services
DevelopmentDevelopment
PlannigPlannig
MP04MP04 BPMBPM ServicesServices
ProgrammingProgramming
MP04MP04 BPMBPM ServicesServices
ProgrammingProgramming
MP05MP05 BPM ServicesBPM Services
MonitoringMonitoring
MP05MP05 BPM ServicesBPM Services
MonitoringMonitoring
MP06MP06 BPMBPM ResultsResults
EvaluationEvaluation
MP06MP06 BPMBPM ResultsResults
EvaluationEvaluation
MP01MP01 StrategyStrategy
TranslationTranslation intointo
ProcessesProcesses
MP01MP01 StrategyStrategy
TranslationTranslation intointo
ProcessesProcesses
MP07MP07 BPM CultureBPM CultureMP07MP07 BPM CultureBPM Culture
MP02MP02 BPM DemandsBPM Demands
IdentificationIdentification
MP02MP02 BPM DemandsBPM Demands
IdentificationIdentification
DisseminationDisseminationDisseminationDissemination
IdentificationIdentification
and Analysisand Analysis
IdentificationIdentification
and Analysisand Analysis
COMPLEMENTARY SERVICESCOMPLEMENTARY SERVICES
MAIN SERVICESMAIN SERVICES
MS01MS01 Process ArchitectureProcess Architecture
MaintenanceMaintenance
MS01MS01 Process ArchitectureProcess Architecture
MaintenanceMaintenance
MS06MS06 Process PerformanceProcess Performance
MeasurementMeasurement
MS06MS06 Process PerformanceProcess Performance
MeasurementMeasurement
MS02MS02 Process ModelingProcess Modeling
(As(As--is)is)
MS02MS02 Process ModelingProcess Modeling
(As(As--is)is)
MS07MS07 Process ManagementProcess Management
Training and EducationTraining and Education
MS07MS07 Process ManagementProcess Management
Training and EducationTraining and Education
CS01CS01 LeanLean && SixSix SigmaSigma
OrientedOriented ImprovementImprovement
CS02CS02 ReferenceReference ModelsModels
ImplementationImplementation
CS06CS06 ProcessProcess AuditingAuditing
CS07CS07 RiskRisk andand InternalInternal
ControlControl ManagementManagement(As(As is)is)(As(As is)is) Training and EducationTraining and EducationTraining and EducationTraining and Education
MS03MS03 ProcessProcess ImprovementImprovement
(To(To--be)be)
MS03MS03 ProcessProcess ImprovementImprovement
(To(To--be)be)
MS08MS08 Process ComplianceProcess ComplianceMS08MS08 Process ComplianceProcess Compliance
MS04MS04 ProcessProcessMS04MS04 ProcessProcess MS09MS09 Process MaturityProcess Maturity
CS03CS03 SystemsSystems
SpecificationSpecification
CS08CS08 CompetenciesCompetencies
ManagementManagement
CS09CS09 Management ofManagement ofMS04MS04 ProcessProcess
DocumentationDocumentation
MS04MS04 ProcessProcess
DocumentationDocumentation
MS09MS09 Process MaturityProcess Maturity
ManagementManagement
MS05MS05 Process ChangeProcess Change
ManagementManagement
MS05MS05 Process ChangeProcess Change
ManagementManagement
MS10MS10 ProcessProcess
Benchmarking &InnovationBenchmarking &Innovation
CS04CS04 ProcessProcess AutomationAutomation
CS05CS05 BusinessBusiness RulesRules
ManagementManagement
CS10CS10 Process CostProcess Cost
ManagementManagement
CS09CS09 Management ofManagement of
improvement projectsimprovement projects
SP01SP01 AdministrationAdministration
ofof ModelsModels
R itR it
SP01SP01 AdministrationAdministration
ofof ModelsModels
R itR it
SP04SP04 AdministrationAdministration
ofof BPMBPM HumanHuman
RR
SP04SP04 AdministrationAdministration
ofof BPMBPM HumanHuman
RR
SP02SP02 AdministrationAdministration
ofof BPM RolesBPM Roles andand
R ibilitiR ibiliti
SP02SP02 AdministrationAdministration
ofof BPM RolesBPM Roles andand
R ibilitiR ibiliti
SP03SP03 AdministrationAdministration
ofof BPMBPM ServicesServices
P tf liP tf li
SP03SP03 AdministrationAdministration
ofof BPMBPM ServicesServices
P tf liP tf li
SP05SP05 AdministrationAdministration
ofof BPM BudgetBPM Budget
SP05SP05 AdministrationAdministration
ofof BPM BudgetBPM Budget
SUPPORTING PROCESSESSUPPORTING PROCESSES
RepositoryRepositoryRepositoryRepository ResourcesResourcesResourcesResourcesResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities PortfolioPortfolioPortfolioPortfolio
gggg
55
Stage 3 Processes and Services
Code Name Type Description
MP01 Strategy
Translation into
Processes
Mgmt.
Process
Organizational strategy analysis. Definition of how business
process could be improved to support achievement of strategic
objectives. Identification of new BPM services needed.
MP02 BPM Demands
Identification
and Analysis
Mgmt.
Process
Identification, analysis and priorization of day-by-day operational
demands for BPM services.
MP03 BPM Services Mgmt. Planning of the evolution of BPM Services Porfolio, matching new
Evolution
Planning
g
Process
g g
organizational needs (demand) and BPM CoE’s readiness to
provide new services (capability).
MP06 BPM Results
Evaluation
Mgmt.
Process
Evaluation of tangible and intangible results related to BPM
services. Determination of ROI.
MP07 BPM Culture
Dissemination
Mgmt.
Process
Dissemination of actions in course, results obtained and success
cases. It can include presentations to areas, BPM events,
intranet informations and management reports.
MS09 Process Main Process maturity evaluation, based on existing maturity models.
Maturity
Management
Service
MS10 Process
Benchmarking
and Innovation
Main
Service
Benchmarking and dissemination of internal and external best
practices related to process execution.
and Innovation
CS05 Business Rules
Management
Complem.
Service
Definition and/or updating of business rules of an existing
process, detailing their characteristics and specific conditions.
CS10 Process Cost
Management
Complem.
Service
Analysis and optimization of cost structure of an existing
process, mainly using ABC techniques. Identification of cost
© ELO Group all rights reserved.
g p , y g q
reduction opportunities.
SP05 Administration
of BPM Budget
Support
Process
Budgeting and charging for the cost structure of the BPM Center
of Excellence. Pricing of BPM services.
Reference Framework for a BPM CoE
v1.0
MP03 BPM Services
D l t
MP04 BPM Services MP05 BPM Services
MP06 BPM Results
Evaluation
MP01 Strategy
Translation into
Processes
MANAGEMENT PROCESSES
Development
Plannig
MP04 BPM Services
Programming
MP05 BPM Services
Monitoring
MP07 BPM Culture
Dissemination
MP02 BPM Demands
Identification
and Analysis
COMPLEMENTARY SERVICES
MS01 Process Architecture
Maintenance
MS06 Process Performance
Measurement
MAIN SERVICES
CS01 Lean & Six Sigma
Oriented Improvement
CS06 Process Auditing
MS02 Process Modeling
(As-is)
MS07 Process Management
Training and Education
MS03 Process Improvement
(T b )
MS08 Process Compliance
CS02 Reference Models
Implementation
CS03 Systems Specification
CS07 Risk and Internal
Control Management
CS08 Competencies
Management(To-be)
p
MS04 Process
Documentation
MS09 Process Maturity
Management
P Ch P
y p
CS04 Process Automation
Management
CS09 Management of
improvement projects
SUPPORTING PROCESSES
MS05 Process Change
Management
MS10 Process
Benchmarking &Innovation
CS05 Business Rules
Management
CS10 Process Cost
Management
© ELO Group all rights reserved. 5757
SP01
Administration of
Models Repository
SP04
Administration of
BPM Human
Resources
SP02
Administration of
BPM Roles and
Responsibilities
SP03
Administration of
BPM Services
Portfolio
SP05
Administration of
BPM Budget
Some questions to be answered
1. How to determine responsibilities and accountabilities for 
BPM actions?
2. Where should the BPM Center of Excellence be located?  
3. How to determine tasks, profiles and competences for BPM 3. How to determine tasks, profiles and competences for BPM 
CoE’s internal team?
4 How to assure alignment between Process Office and4. How to assure alignment between Process Office and
Project Office?
© ELO Group all rights reserved.
5858
RACI Chart
© ELO Group all rights reserved.
5959
Some typical profiles
CoE
CoE
CoE
Global and Centralized Local and Centralized
CoE
CoE
CoEProess
Leader
Process
Leader
Proces
Leader
© ELO Group all rights reserved.
Global and Decentralized Multiple CoE’s
Example of a BPM Internal Structure
Process OfficeProcess Office
Support and 
Maintenance
BPM Projects
BPM 
Consultant
Process 
Architect
Quality 
Assurance
Project 
Manager
Process 
Analyst
Instructor
DB 
Administrator
Business 
Improvement 
Advisor
© ELO Group all rights reserved.
Source: based on Jeston & Nelis, 20086161
Roles and responsibilitiesRoles and responsibilities
Support and Maintenance – Dedicated Resources:
Sh ld b i l d i i l j h ff• Should not be involved on organizational projects. They can offer 
consulting, coaching, training and quality assurance services to Project 
Teams. They also monitor and document lessons learned, BPM projects y , p j
performance and process governance.
Projects –Pool of Shared Resources:
• Pool of resources that can be used into BPM projects  Chief Process  • Pool of resources that can be used into BPM projects. Chief Process  
Officer should allocate those resources appropriately
© ELO Group all rights reserved.
6262
Roles and responsibilities Roles and responsibilities –– Support and MaintenanceSupport and Maintenance
1. BPM Consultant
• Specialist that discuss with business areas opportunities for improvements.
2. Process Architect:
• Assures process architecture is updated and being followed.p p g
3. Coach/Quality Assurance:
• Provides coaching to BPM project teams. Do not perfom the work, only provides Provides coaching to BPM project teams. Do not perfom the work, only provides 
guidelines. Also responsible for projects quality control.
4. Instructor:
• Provides BPM training to the whole organization.
5. DB Administrator:
• Revise process models, assuring modeling notation and patterns are being folowed. 
Administer process repository.
© ELO Group all rights reserved.
6363
Roles and responsibilities Roles and responsibilities –– ProjectsProjects
1. Project Managers
• Responsible for all routine management of BPM projects
2. Business Improvement Advisors:
• Identify opportunities for improvementsy pp p
• Discuss and facilitate implementation of new ideas, decreasing resistance to change
• Develop business cases and business impact analysisp p y
3. Process Analysts:
• Model and document the process (As Is & To Be)Model and document the process (As Is & To Be)
• Define metrics and calculate process costs.
• Evaluate the skills of people involved in processEvaluate the skills of people involved in process
• Evaluate the process performance
© ELO Group all rights reserved.
6464
Process Prioritization based on Strategic Drivers
Analysis of Competitive Drivers
© ELO Group all rights reserved.
6565
Linkage with Project Office – types
of projects
Impact
A ti Pl
izational
Formalized
organizational
projects
Action Plans
(small and
informal
projects)
Orngan
Regular
i t
Action Plans
(small and
improvements
(
informal
projects)
© ELO Group all rights reserved.
Time to implement
6666
Linkage with Project Office – types
of projects
Project Management Process
Initiation Planning Execution Control Closure
ar
v.
Initiation Planning Execution Control Closure
Regula
improv
Action
Plans
ectsProje
© ELO Group all rights reserved.67 6767
Linkage with Project Office – types
of projects
Involved areas
Type of
transformation
Business
Area
BPM
Office
PMO
Regular
Area Office
improv.
Action Plans
Formalized
projects
© ELO Group all rights reserved.68 6868
INTRODUCTION CHALLENGES FACINGINTRODUCTION: CHALLENGES FACING
MODERN ORGANIZATIONS
BPM GOVERNANCE AND THE NEED FOR A
CENTER OF EXCELLENCE
BPM CENTER OF EXCELLENCE MAIN
CHARACTERISTICS
BPM CoE FRAMEWORK – HISTORY AND
GENERAL VIEW
BEYOND BPM CoE – OTHER ROLES AND
RESPONSIBILITIES
© ELO Group all rights reserved.
RESPONSIBILITIES
But… Setting up a BPM CoE
is just the first stepp
All managers need to participateAll managers need to participate
in processes management
somehow. This is not something
restricted to the Processrestricted to the Process
Office’s role.
© ELO Group all rights reserved.
7070
Example of a BPM Governance Structure
Process
Vision, Strategy, 
Budget, Resources
Roadmaps, 
Project Plans
Process 
Committee
g ,
Roadmaps, 
Project Plans
j
Collaborative Process
Models, KPIs
Guidelines, Standards, 
Process
Office 
ProcessOwner
, ,
Best Practices, Training
Technical Artifacts
Process
Specification
Process
Implementation
Project Manager
© ELO Group all rights reserved.
7171 Source: based on Korhonen, 2007
Example of a BPM Governance Structure
Process
Office
Process Council
Chief Process
Officer
Process
Owner1
Process
Owner2
Process
Owner3
Process
Manager 1
Process
Manager 2
PRocess
ManagerNManager  1 Manager  2 Manager N
Maintenance
and Support
BPM Projects
© ELO Group all rights reserved.
Source: based on Jeston & Nelis, 20087272
Management by Process evolution over time
© ELO Group all rights reserved.
Source: COPPE/UFRJ, 2007
7373
Governance Evolution over time
We acknowledge that Governance Structure evolutes over 
time   as BPM becomes more mature into the organization   time , as BPM becomes more mature into the organization.  
BPM services varies from organization to organization, and 
therefore the BPM Center of Excellence may not always 
di tl   t   i   i   directly execute main services.  
Instead, the CoE may support a decentralized execution of 
services by process owners and other areas. Still, this 
category of services remains central for the 
implementation of a process‐oriented management 
approach
© ELO Group all rights reserved.
approach
7474
Decentralization Path
Centralized 
Model
Decentralized 
Model
’ i hi k b h d i dIt’s important to think about the desired governance 
structure over time (“Blue Sky Vision”). It will certainly 
changes the Center of Excellence’s scope andchanges the Center of Excellence s scope and 
attributions
© ELO Group all rights reserved.
7575
7575
Governance Evolution over time ‐ example
© ELO Group all rights reserved.
7676
Final Points - Some Statistics
Publication of 10 papers about the frameworks
Application of the framework at 15 organizationsApplication of the framework at 15 organizations
Courses for more than 150 people about the 
f kframework
© ELO Group all rights reserved. 7777
7777
Learning Points
Emphasizing and splitting BPM CoE’s main services at:
1 Process Improvement Projects1. Process Improvement Projects
2. Day‐by‐day process management
Reinforcing the idea of BPM Planning Processes linked 
to Corporate Strategy
Representing the “Managing Process” process with a 
lifecycle approach, showing “how to” implement BPM g
CoE’s services more effectively
© ELO Group all rights reserved. 7878
7878
Current Research – Ideas
on Improving theon Improving the
Framework
© ELO Group all rights reserved.
BUSINESS STRATEGY
© ELO Group all rights reserved. PROCESS EXECUTION
BUSINESS STRATEGY
PROJECT BASED
WELL DEFINED SCOPES
STRONG INVOLVEMENT OF BPM OFFICE
INVOLVES MULTIPLE AREAS
PROCESS IMPROVEMENT PROJECT
INVOLVES MULTIPLE AREAS
 SIGNFICANT COSTS
TRANSFORMATION INTENSIVE
Performance
PROCESS IMPROVEMENT PROJECT
Tempo
Breakthrough
Improvement
PROCESS REDESIGNED IMPLEMENTED WITHIN
NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC
© ELO Group all rights reserved. PROCESS EXECUTION
BUSINESS STRATEGY
ON GOING BASED
OPEN SCOPE
LIGHTLY DEPENDENT OF BPM OFFICE
INVOLVES FEW AREAS
PROJECT BASED
WELL DEFINED SCOPES
STRONG INVOLVEMENT OF BPM OFFICE
INVOLVES MULTIPLE AREAS
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
INVOLVES FEW AREAS
 INCREMENTAL COST
CONTINOUS IMPROVEMENT ORIENTED
INVOLVES MULTIPLE AREAS
 SIGNFICANT COSTS
TRANSFORMATION INTENSIVE
PerformancePerformance
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
Contínuous
Improvment TempoTempo
p
Breakthrough
Improvement
PROCESS VISIBILITY &
CONTINUOUS IMPROVEMENT
PROCESS REDESIGNED IMPLEMENTED WITHIN
NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC
© ELO Group all rights reserved. PROCESS EXECUTION
BUSINESS STRATEGYANNUAL BASED PROCESS PLANNING ALIGNED WITH BUSINESS STRATEGY
PROJECT PORTFOLIO COMPOSITION AND PRIORITIZATION
HIGH SINERGY WITH OTHER SUPPORT INITIATIVES
 COMMUNICATION OF BPM ACTIVITIES AND RESULTS ACHIEVED
BPM STRATEGY
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
PerformancePerformance
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
Contínuous
Improvment TempoTempo
p
Breakthrough
Improvement
PROCESS VISIBILITY &
CONTINUOUS IMPROVEMENT
PROCESS REDESIGNED IMPLEMENTED WITHIN
NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC
© ELO Group all rights reserved. PROCESS EXECUTION
What’s missing?
© ELO Group all rights reserved.
BUSINESS STRATEGYANNUAL BASED PROCESS PLANNING ALIGNED WITH BUSINESS STRATEGY
PROJECT PORTFOLIO COMPOSITION AND PRIORITIZATION
HIGH SINERGY WITH OTHER SUPPORT INITIATIVES
 COMMUNICATION OF BPM ACTIVITIES AND RESULTS ACHIEVED
BPM STRATEGY
DAY TO DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
BPM Maturity
&
PerformancePerformance
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT&
Governance
Contínuous
Improvment TempoTempo
BUSINESS
TRANSFORMATION
ACCOUNTABILITIES
 BUSINESSp ov e t
Breakthrough
Improvement
 BUSINESS
TRANSFORMATION
CAPABILITY
EVOLUTION
PROCESS VISIBILITY &
CONTINUOUS IMPROVEMENT
PROCESS REDESIGNED IMPLEMENTED WITHIN
NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC
© ELO Group all rights reserved. PROCESS EXECUTION
BUSINESS STRATEGY
Strategic
Planning
BPM Project
Portfolio
BPM
Consolidadted
Results
BUSINESS STRATEGY
BPM STRATEGY
P01 Strategy
Translation into
Processos
P02 Run Process
Satisfaction
Survey
P03 BPM Project
Portfolio
Generation
P04 BPM Project
Planning &
Budgetig
P05 BPM Project
Portfolio
Management
P06 BPM Results
& Culture
Dissemination
BPM STRATEGY
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
BPM Maturity
&
BPM Demands BPM Project Plan
BPM
Process
Results
Process
Operational
Goals
M01 BPM
Maturity and
PerformancePerformance
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT&
Governance
Maturity and
Governance
Contínuous
Improvment TempoTempo
p
Breakthrough
Improvement
PROCESS VISIBILITY &
CONTINUOUS IMPROVEMENT
PROCESS REDESIGNED IMPLEMENTED WITHIN
NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC
© ELO Group all rights reserved. PROCESS EXECUTION
BUSINESS STRATEGY
Strategic
Planning
BPM Project
Portfolio
BPM
Consolidadted
Results
BUSINESS STRATEGY
BPM STRATEGY
P01 Strategy
Translation into
Processos
P02 Run Process
Satisfaction
Survey
P03 BPM Project
Portfolio
Generation
P04 BPM Project
Planning &
Budgetig
P05 BPM Project
Portfolio
Management
P06 BPM Results
& Culture
Dissemination
BPM STRATEGY
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
BPM Maturity
&
BPM Demands BPM Project Plan
BPM
Process
Results
Process
Operational
Goals
M01 BPM
Maturity and
BPM Project Plan
BPM
Process
Results
EXECUTE BPM PROJECTS
M01 BPM
Maturity and
PerformancePerformance
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT&
Governance
Maturity and
Governance
E01 Process Vision
E02 Process
Performance
EXECUTE BPM PROJECTSMaturity and
Governance
Contínuous
Improvment TempoTempo
E02 Process
Understanding (AS IS)
E03 Gains & Improvement
Analysis
Tempo
p
Breakthrough
Improvement
E04 Process Redesing &
Preparare Implantation
E05 Implement Redesigned
Process & Roll Out
Breakthrough
Improvement
Controls
(RISK MAN.)
New Competences
(HR MAN.)
New Systemns
(IT MAN.)
Policies & Standards
(COMPLIANCE MAN)
Organizational
Structure Redesign
© ELO Group all rights reserved. PROCESS EXECUTION
BUSINESS STRATEGY
Strategic
Planning
BPM Project
Portfolio
BPM
Consolidadted
Results
BUSINESS STRATEGY
BPM STRATEGY
P01 Strategy
Translation into
Processos
P02 Run Process
Satisfaction
Survey
P03 BPM Project
Portfolio
Generation
P04 BPM Project
Planning &
Budgetig
P05 BPM Project
Portfolio
Management
P06 BPM Results
& Culture
Dissemination
BPM STRATEGY
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT
BPM Demands BPM Project Plan
BPM
Process
Results
Process
Operational
Goals
M01 BPM
Maturity and
BPM Project Plan
BPM
Process
Results
EXECUTE BPM PROJECTS
M01 BPM
Maturity and
BPM Demands
Process
Operational
Goals
DAY-TO-DAY PROCESS MANAGEMENT
M01 BPM
Maturity and
PerformancePerformance
DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECTMaturity and
Governance
E01 Process Vision
E02 Process
Performance
EXECUTE BPM PROJECTSMaturity and
Governance
D02 Process Learning
Performance
DAY TO DAY PROCESS MANAGEMENT Maturity and
Governance
Contínuous
Improvment TempoTempo
E02 Process
Understanding (AS IS)
E03 Gains & Improvement
Analysis
Tempo
Continuous
Improvment
g
Tempo
p
Breakthrough
Improvement
E04 Process Redesing &
Preparare Implantation
E05 Implement Redesigned
Process & Roll Out
Breakthrough
ImprovementD03 Implement Continuos
Improvement and
D01 Performance, Risks &
Compliance Monitoring
Controls
(RISK MAN.)
New Competences
(HR MAN.)
New Systemns
(IT MAN.)
Policies & Standards
(COMPLIANCE MAN)
Organizational
Structure Redesign
Continous
Improvement
Risk & Non conformities
(AUDITING)
Performance Value
& Ocurrences
Process
Visibility
© ELO Group all rights reserved. PROCESS EXECUTION
Strategic
Planning
BPM Project
Portfolio
BPM
Consolidadted
Results
BUSINESS STRATEGY
P01 Strategy
Translation into
Processos
P02 Run Process
Satisfaction
Survey
P03 BPM Project
Portfolio
Generation
P04 BPM Project
Planning &
Budgetig
P05 BPM Project
Portfolio
Management
P06 BPM Results
& Culture
Dissemination
Results
BPM STRATEGY
Processos Survey Generation Budgetig Management Dissemination
BPM Demands BPM Project Plan
BPM
Process
Results
Process
Operational
Goals
M01 BPM
E01 Process Vision PerformancePerformance
DAY-TO-DAY PROCESS MANAGEMENT EXECUTE BPM PROJECTS
M01 BPM
Maturity and
Governance
Continuous
Improvment
E02 Process
Understanding (AS IS)
E03 Gains & Improvement
Analysis
D02 Process Learning
TempoTempo
Improvment
E04 Process Redesing &
Preparare Implantation
E05 Implement Redesigned
Process & Roll Out
D03 Implement Continuos
Improvement and
D01 Performance, Risks &
Compliance Monitoring
p
Breakthrough
Improvement
Controls
(RISK MAN.)
Continous
Improvement
Risk & Non conformities
(AUDITING)
Performance Value
& Ocurrences
New Competences
(HR MAN.)
New Systemns
(IT MAN.)
Policies & Standards
(COMPLIANCE MAN)
Process
Visibility
Organizational
Structure Redesign
© ELO Group all rights reserved. PROCESS EXECUTION
Practical Application and
Case StudiesCase Studies
© ELO Group all rights reserved.
“Leadership on BPM ideas, methods and results in Brazil”
ThanksThanksThanksThanks
leandro.jesus@elogroup.com.brleandro.jesus@elogroup.com.br
www.elogroup.com.brwww.elogroup.com.br

[Process Day 2011] A ELO Group – Apresentação no Process Day

  • 1.
    “Leadership on BPM ideas, methodsand results in Brazil” A Framework for a BPM Center A Framework for a BPM Center ofof ExcellenceExcellencece e cece e ce Leonardo Leonardo ProcessDaysProcessDays –– July26th 2010July26th 2010 Leandro JesusLeandro Jesus ManagingManaging PartnerPartner  ELO Group ELO GroupManagingManaging PartnerPartner, ELO Group, ELO Group
  • 2.
    AboutAbout the speakerthe speaker Leandro Jesus, MSc. • ManagingPartner ELO Group consultingManaging Partner ELO Group consulting • Auxiliary Professor Federal University of Rio  de Janeiro • Vice‐President ‐ Association of Business  Process Management Professionals  (ABPMP) Chapter Brazil; • Curriculum vitae:  h // li k di /i /l d jhttp://www.linkedin.com/in/leandrojesus • E‐mail: leandro.jesus@elogroup.com.br © ELO Group all rights reserved. 22
  • 3.
    About ELO Group ELO Group is a Brazilian consulting enterprise focused in Business Process  Management and Governance, Risk and Compliance solutions. g , p  Founded in COPPE’s Technological and Industrial Cluster, at Federal  University of Rio de Janeiro, one of the most advanced Research and  Development Centers in Latin America.   Counts on a group of professionals with solid Academic Formation and  experiences through relevant Academic Institutions in Brazil   USA and experiences through relevant Academic Institutions in Brazil , USA and  Europe  International Cooperation with BPTrends, Queensland University ofInternational Cooperation with BPTrends, Queensland University of Technology and Leonardo Consulting  Organizer of the Brazilian International BPM Seminar © ELO Group all rights reserved. 33
  • 4.
  • 5.
    Our Values  Strong academic links, allowing ELO Group to bring to the market the state of the  art in management solutions and best practices; Focus on collaborative development of customized organizational solutions;  Always strive for solutions that are innovative, long lasting and that leverage  organization performance;  Constant know‐how transfer to our clients;  Internal work logic focused on dynamic specialization among professionals with  high specialization in different knowledge areas;  Ethics, agility and adaptability throughout the service provisioning cycle;  Learning and continuous improvement © ELO Group all rights reserved.  Learning and continuous improvement. 55
  • 6.
    Food for thought… What people usually ask us about BPM CoEs: •Where should a Center of Excellence be placed within the  organization? Whom it should report to? • Which are the responsibilities that should be centralizedp into a BPM CoE and which responsibilities can remain decentralized? • How do these responsibilities change over time? • How to evaluate a a BPM CoE’s effectiveness?How to evaluate a a BPM CoE s effectiveness? © ELO Group all rights reserved. 66
  • 7.
    INTRODUCTION CHALLENGES FACINGINTRODUCTION:CHALLENGES FACING MODERN ORGANIZATIONS BPM GOVERNANCE AND THE NEED FOR A CENTER OF EXCELLENCE BPM CENTER OF EXCELLENCE MAIN CHARACTERISTICS BPM CoE FRAMEWORK – HISTORY AND GENERAL VIEW BEYOND BPM CoE – OTHER ROLES AND RESPONSIBILITIESRESPONSIBILITIES
  • 8.
    The old wayto manage… Organizations are facing the 21st century environment but still  adopt management practices that were built considering the  20th century. Previous organizational focus: S l• Scale • Efficiency i h d l• Hierarchy and control © ELO Group all rights reserved 88
  • 9.
    ... and someimplications © ELO Group all rights reserved. Source: Compliance Week, December, 2006 99
  • 10.
    Rules are changing... Most demanding customersg  Global competition  Focus on individuals, knowledge and innovation Focus on individuals, knowledge and innovation  Greater complexity and uncertainty (risk) in operations  Need for more flexibility and agility © ELO Group all rights reserved.  Need for more flexibility and agility  Intensive use of IT in business 1010
  • 11.
    New Paradigm for the 21st Century Old organization’sparadigm Emergent organization’s paradigm STABILITY DYNAMISM FLEXIBILITY CENTRALIZATION COOPERATIONCENTRALIZATION COOPERATION CONTROL AUTONOMY COMMODITIES  AND PROPERTY SERVICES AND EXPERIENCES © ELO Group all rights reserved. AND PROPERTY AND EXPERIENCES 1111
  • 12.
    New Paradigm forthe 21st Century © ELO Group all rights reserved. Source: http://www.slideshare.net/reynolds/web-20-business-models- presentation
  • 13.
  • 14.
    ... And treat themappropriately According to McMinsey’s survey, only a third of respondents  said their organizations have had success in making changes   with greater impact! (McKinsey, 2008); Researches shows that 82% of organizations are developing  some form of change initiative, that 70% of these initiatives fail and 68% of these organizations don’t evaluate the success of  these initiatives (Kottler, Harvard Business Review …); Most of strategies haven’t failed because they were poorly  conceived, but because they were poorly implemented (Norton  & Kaplan). © ELO Group all rights reserved. 1414
  • 15.
    How do youtransform an organization ?... BETTERBETTER ATITUDES & COMPETENCES BETTER INTERFACES, ALIGNMENTS ACCOUNTABILITIES BETTER SYSTEMS “SIMPLER” & INNOVATIVE SERVICES BETTER SERVICES CONTRACTS & PARTNERS BETTER CONTROL & VISIBILITY BETTER POLICIES, BUSINESS RULES & STANDARDS BETTER EQUIPMENTS & INFRA-STRUCTURE © ELO Group all rights reserved STANDARDS INFRA STRUCTURE 1515
  • 16.
    Which areas provide thesetransformations ? BETTERBETTER ATITUDES & COMPETENCES BETTER INTERFACES, ALIGNMENTS ACCOUNTABILITIES Human Human ResourcesResources && CommunicationCommunication StrategyStrategy BETTER SYSTEMS “SIMPLER” & INNOVATIVE SERVICES InformationInformation TechnologyTechnology CustomerCustomer && ProductProduct ManagementManagement BETTER SERVICES gygy ContractContract IT & IT & RiskRisk ManagementManagement CONTRACTS & PARTNERS BETTER CONTROL & VISIBILITY ContractContract ManagementManagement IT & IT & RiskRisk ManagementManagement BETTER POLICIES, BUSINESS RULES & STANDARDS BETTER EQUIPMENTS & INFRA-STRUCTURE ComplianceCompliance && Standards Standards  AssetsAssets ManagementManagement © ELO Group all rights reserved STANDARDS INFRA STRUCTURE 1616
  • 17.
    So... why doyou need business process management ? If business process management: Doesn’t develop systems (except for BPMSs)Doesn t develop systems (except for BPMSs) Doesn’t manage competences D ’   i  Doesn’t review contracts Doesn’t design new products Doesn’t create dashboards Doesn’t project layout If h t HR IT Ri k p j y If we have mature HR, IT, Risk Management, process do we really need Business Process Management ?? © ELO Group all rights reserved 1717
  • 18.
    Think again... What’s thebig issue ? BETTER 1) 1) ProvideProvide educationeducation oror 2) 2) IdentifyIdentify keykey competencescompetences BETTER ATITUDES & COMPETENCES BETTER INTERFACES, ALIGMENTS ACCOUNTABILITIES 2) 2) IdentifyIdentify keykey competencescompetences ThatThat enhaceenhace thethe impactimpact OfOf business business resultsresults BETTER SYSTEMS “SIMPLER” & INNOVATIVE SERVICES 1) 1) DevelopDevelop systemsystem oror 2) 2) UnderstandUnderstand BusinessBusiness BETTER SERVICES requirementsrequirements 1) 1) CreateCreate dashboarddashboard oror 2) Design 2) Design MetricsMetrics CONTRACTS & PARTNERS BETTER CONTROL & VISIBILITY ) g) g andand controlscontrols toto effectiveeffective SupportSupport decisiondecision makingmaking 1) 1) InstitutionalizeInstitutionalize andand BETTER POLICIES, BUSINESS RULES & STANDARDS BETTER EQUIPMENTS & INFRA-STRUCTURE 1) 1) InstitutionalizeInstitutionalize andand Formalize businessFormalize business GuidelinesGuidelines, , oror 2) Debate2) Debate andand reachreach agreementagreement withwith © ELO Group all rights reserved STANDARDS INFRA STRUCTURE business business areasareas aboutabout rulesrules 1818
  • 19.
    Organizations need betterTransformation Capability to convert good ideas into process redesign and implementation 1) 1) ProvideProvide educationeducation oror 2) 2) IdentifyIdentify keykey competencescompetences2) 2) IdentifyIdentify keykey competencescompetences ThatThat enhaceenhace thethe impactimpact OfOf business business resultsresults 1) 1) DevelopDevelop systemsystem oror 2) 2) UnderstandUnderstand BusinessBusiness requirementsrequirements 1) 1) CreateCreate dashboarddashboard oror 2) Design 2) Design MetricsMetrics) g) g andand controlscontrols toto effectiveeffective SupportSupport decisiondecision makingmaking 1) 1) InstitutionalizeInstitutionalize andand1) 1) InstitutionalizeInstitutionalize andand Formalize businessFormalize business GuidelinesGuidelines, , oror 2) Debate2) Debate andand reachreach agreementagreement withwith © ELO Group all rights reserved business business areasareas aboutabout rulesrules 1919
  • 20.
    What about yourBPM approach? Is it Transformation Oriented? © ELO Group all rights reserved
  • 21.
  • 22.
    Objective of traditionalBPM approaches Aumento da fi bilid d Reduce variability and increase bilit confiabilidade organizacional reability Foco Comum Avanço no desempenho organizacional Improve performanceMudança da Expectativa do Consumidor performance around the current paradigm! © ELO Group all rights reserved Desempenho Esperado Desempenho Atual p g 2222
  • 23.
    What we currentlysee Organizations are investing in many BPM  initiatives but many of them lack a clear focus Many times results are not reached. When  they are, they are not clearly communicated BPM initiatives with different purposes are  conducted in an isolated way inside an  g i tiorganization S ti  BPM     di i li   till l k    Sometimes BPM as a discipline still lacks a  natural home and official identity © ELO Group all rights reserved. 2323
  • 24.
    The focus of BPM application shouldmove pp towards the transformation of the  organization through the implementation oforganization through the implementation of significant improvements and sustainable changeschanges © ELO Group all rights reserved 2424
  • 25.
  • 26.
    INTRODUCTION CHALLENGES FACINGINTRODUCTION:CHALLENGES FACING MODERN ORGANIZATIONS BPM GOVERNANCE AND THE NEED FOR A CENTER OF EXCELLENCE BPM CENTER OF EXCELLENCE MAIN CHARACTERISTICS BPM CoE FRAMEWORK – HISTORY AND GENERAL VIEW BEYOND BPM CoE – OTHER ROLES AND RESPONSIBILITIESRESPONSIBILITIES
  • 27.
    BPM Governance BPM Governance relates to the definition and enforcement  of guidelines and rules that drive activities and decisions g along the process lifecycle, as well as the consequent  definition of responsibilities and accountabilities for BPM  i jd l lactions on project and program management level Effective BPM Governance has to reinforce the strategic  alignment among process management activities and  business priorities, clearly define and enforce the  accountabilities of each involved stakeholder and avoid  redundancies related to BPM initiativesredundancies related to BPM initiatives. © ELO Group all rights reserved 2727
  • 28.
    Many focus forBPM initiatives and lack of convergence © ELO Group all rights reserved Source: BPTrends, 2010
  • 29.
    Need for BPMGovernance New Organizational Context Organizations BPM  initiatives evolution BPM ProblemsProblems BPM ProblemsProblems BPM Governance © ELO Group all rights reserved. Source: Barros, 2009 2929
  • 30.
    Elements related toBPM Governance 1. Roles and  Responsibilities 2. Standards 4. Services3. Structure GOVERNANCE MODEL 6. Objectives 5. Control Mechanisms 7. Evaluation and Reward Mechanisms © ELO Group all rights reserved. Source: Barros, 2009 3030
  • 31.
    INTRODUCTION CHALLENGES FACINGINTRODUCTION:CHALLENGES FACING MODERN ORGANIZATIONS BPM GOVERNANCE AND THE NEED FOR A CENTER OF EXCELLENCE BPM CENTER OF EXCELLENCE MAIN CHARACTERISTICS BPM CoE FRAMEWORK – HISTORY AND GENERAL VIEW BEYOND BPM CoE – OTHER ROLES AND RESPONSIBILITIES © ELO Group all rights reserved. RESPONSIBILITIES
  • 32.
  • 33.
    Need for a BPM CoE Research with 91 national organizations found that many  (49%) do not have yet a formal as the “owner of the BPM  initiatives”, for example a Process Office Source:  ELO Group & iProcess , 2009 Similar research shows that only 20% among the largest  gl b l i  d   t    h BPM G  Thi  global companies do not possess such BPM Group. This  shows the establishment of BPM Groups as a global trend. Source:  BPTrends, 2008 © ELO Group all rights reserved.
  • 34.
  • 35.
  • 36.
    Typical rolesTypical roles 1. Internal Consulting: 1. Internal Consulting:  •Performs (or provides support to) BPM services within the  organizationorganization 2. Knowledge Provider: • Assures process knowledge dissemination and reinforces a  process‐oriented culture within the organization 3. Standards Guardian: • Assures process management standards are being followed Assures process management standards are being followed  throughout the organization © ELO Group all rights reserved. 3636
  • 37.
    Detailing some typical rolesDetailing some typical roles Guardian of the process management methodologies (standards,  rules, performance measures, etc…);, p ,); Management of BPM projects activities (modeling, analysis,  improvements implementation, evaluation of results);p p , ); Training on business process management best practices; Consolidation of records &documentation  evaluation and Consolidation of records &documentation, evaluation and  dissemination of best practice and lessons learned; Support process owners to monitor and evaluate processes;Support process owners to monitor and evaluate processes; Delivering on the dialogue process between process owners and  senior managementsenior management. © ELO Group all rights reserved. 3737
  • 38.
  • 39.
  • 40.
    INTRODUCTION CHALLENGES FACINGINTRODUCTION:CHALLENGES FACING MODERN ORGANIZATIONS BPM GOVERNANCE AND THE NEED FOR A CENTER OF EXCELLENCE BPM CENTER OF EXCELLENCE MAIN CHARACTERISTICS BPM CoE FRAMEWORK – HISTORY AND GENERAL VIEW BEYOND BPM CoE – OTHER ROLES AND RESPONSIBILITIES © ELO Group all rights reserved. RESPONSIBILITIES
  • 41.
  • 42.
    BPM Services and Internal Processes Management Process Main Services Complementary ServicesServices BPMtechnologies Support processespp p © ELO Group all rights reserved. 4242
  • 43.
    Internal Processes Management Processes: The set of processes related to the  management of a BPM Center of Excellence internal activities. It  includes the translation of strategic and operational demands into includes the translation of strategic and operational demands into  BPM services, the analysis, configuration and monitoring of BPM  services; the evaluation of results generated by BPM services and the  communication and dissemination of BPM culture throughout the  organization. Support Processes: The set of processes that supports the operation  of the Center of Excellence  It includes the creation and maintenance of the Center of Excellence. It includes the creation and maintenance  of methods for all activities within the process lifecycle, establishment  of BPM related roles and responsibilities, administration of the BPM  f ld f h hservices portfolio, administration of BPM human resources, charging  and funding.  © ELO Group all rights reserved. 4343
  • 44.
    BPM Services Main Services: These services are central to the implementation of the  BPM approach and are the usual responsibilities of a BPM Center of  Excellence  This set includes services like process modeling  process Excellence. This set includes services like process modeling, process  improvement and design, process change management, process  performance management and process management  education/training. Complementary Services: Services that may not be the direct  responsibilities of a BPM Center of Excellence, but are still related to  the BPM discipline and its methods and tools This set of services the BPM discipline and its methods and tools. This set of services  includes for example process auditing, risk and internal control  management, process forensics, systems design, etc. © ELO Group all rights reserved. 4444
  • 45.
    BPM CoE’s Capabilities Evolution 3. Strategic Alignmentand BPM culture 2. Creation of convergence among BPM initiativesinitiatives 1. Difusion of BPM concepts and benefits © ELO Group all rights reserved. 4545
  • 46.
    BPM BPM CoE’sCoE’s CapabilitiesCapabilities EvolutionEvolution The definition of processes and services associated with each stage was built from two surveys of BPM initiatives undertaken by ELO Group with over 150 organizations, and revised with Prof. Michael Rosemann;  It is recommended the adoption of this Framework and customization for each organization The specificity of eachcustomization for each organization. The specificity of each organization as well as its history of initiatives is crucial to define the optimal portfolio of processes and services to be offered by the Office over timethe Office over time. © ELO Group all rights reserved. 4646
  • 47.
    Capabilities for aBPM CoE (1/3) © ELO Group all rights reserved. 4747
  • 48.
    MANAGEMENT PROCESSESMANAGEMENT PROCESSES MP07MP07BPM CultureBPM CultureMP07MP07 BPM CultureBPM Culture DisseminationDisseminationDisseminationDissemination COMPLEMENTARY SERVICESCOMPLEMENTARY SERVICES MAIN SERVICESMAIN SERVICES MS01MS01 Process ArchitectureProcess Architecture MaintenanceMaintenance MS02MS02 Process ModelingProcess Modeling (As(As--is)is) CS01CS01 Lean & Six SigmaLean & Six Sigma Oriented ImprovementOriented Improvement (As(As is)is) MS03MS03 ProcessProcess ImprovementImprovement (To(To--be)be) MS04MS04 ProcessProcessMS04MS04 ProcessProcess DocumentationDocumentation MS05MS05 Process ChangeProcess Change ManagementManagement SP01SP01 AdministrationAdministration ofof M d l R iM d l R i SP01SP01 AdministrationAdministration ofof M d l R iM d l R i SP02SP02 AdministrationAdministration ofof BPM RolesBPM Roles andand R ibilitiR ibiliti SP02SP02 AdministrationAdministration ofof BPM RolesBPM Roles andand R ibilitiR ibiliti SUPPORTING PROCESSESSUPPORTING PROCESSES Models RepositoryModels RepositoryModels RepositoryModels Repository ResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities 48
  • 49.
    Stage 1 Processes and Services Code Name TypeDescription MS01 Process Architecture Maintenance Main Service Definition and/or updating of the organization's value chain and business process architecture that illustrate its mission, vision and main attributions. Dissemination of process-based vision th o gho t the o gani ationthroughout the organization MS02 Process Modeling (AS IS) Main Service Modeling and/or updating of the way work is performed. Models usually include activities and events, responsibilities, related systems and documents and are displayed in notations like BPMN EPC IDEF It can also include identification ofBPMN, EPC, IDEF. It can also include identification of improvement opportunities. MS03 Process Improvement (TO BE) Main Service Redesign of existing processes based on the analysis of improvement opportunities and prioritization of identified solutions. It can also refer to the design of a new process. MS04 Process Documentation Main Service Creation and/or updating of procedures and manuals that detail processes models and can serve as a basis for work execution. MS05 Process Change Management Main Service Definition of an action plan to incorporate improvements in existing processes Tracking of action plan's status intermediateManagement Service existing processes. Tracking of action plan s status, intermediate results and difficulties. CS01 Lean & Six Sigma Oriented Improvement Complem. Service Improvement initiative focused on process efficiency and productivity increases, mainly based on Lean & Six Sigma techniques. SP01 Models Repository Administration Support Process Creation and/or maintenance of BPM methodologies e modeling notation. Administration of models repository (backups, acess control etc.) SP02 Administration Support Definition and/or updating of information related to each of the © ELO Group all rights reserved. SP02 Administration of BPM Roles and Responsibilities Support Process Definition and/or updating of information related to each of the BPM roles and responsibilities (process owners, analysts, specialists, sponsors etc.), according to the organization's process management model.
  • 50.
    Capabilities for aBPM CoE (2/3) © ELO Group all rights reserved. 5050
  • 51.
    MANAGEMENT PROCESSESMANAGEMENT PROCESSES MP07MP07BPM CultureBPM CultureMP07MP07 BPM CultureBPM Culture MP04MP04 BPMBPM ServicesServices ProgrammingProgramming MP04MP04 BPMBPM ServicesServices ProgrammingProgramming MP05MP05 BPM ServicesBPM Services MonitoringMonitoring MP05MP05 BPM ServicesBPM Services MonitoringMonitoring DisseminationDisseminationDisseminationDissemination COMPLEMENTARY SERVICESCOMPLEMENTARY SERVICES MAIN SERVICESMAIN SERVICES MS01MS01 Process ArchitectureProcess Architecture MaintenanceMaintenance MS01MS01 Process ArchitectureProcess Architecture MaintenanceMaintenance MS02MS02 Process ModelingProcess Modeling (As(As--is)is) MS02MS02 Process ModelingProcess Modeling (As(As--is)is) CS01CS01 LeanLean && SixSix SigmaSigma OrientedOriented ImprovementImprovement MS06MS06 Process PerformanceProcess Performance MeasurementMeasurement MS07MS07 Process ManagementProcess Management Training and EducationTraining and Education CS02CS02 ReferenceReference ModelsModels ImplementationImplementation CS06CS06 Process AuditingProcess Auditing CS07CS07 RiskRisk andand InternalInternal ControlControl ManagementManagement(As(As is)is)(As(As is)is) MS03MS03 ProcessProcess ImprovementImprovement (To(To--be)be) MS03MS03 ProcessProcess ImprovementImprovement (To(To--be)be) MS04MS04 ProcessProcessMS04MS04 ProcessProcess Training and EducationTraining and Education MS08MS08 Process ComplianceProcess Compliance CS03CS03 SystemsSystems SpecificationSpecification CS08CS08 CompetenciesCompetencies ManagementManagement CS09CS09 Management ofManagement ofMS04MS04 ProcessProcess DocumentationDocumentation MS04MS04 ProcessProcess DocumentationDocumentation MS05MS05 Process ChangeProcess Change ManagementManagement MS05MS05 Process ChangeProcess Change ManagementManagement CS04CS04 ProcessProcess AutomationAutomation CS09CS09 Management ofManagement of improvement projectsimprovement projects SP01SP01 AdministrationAdministration ofof ModelsModels RepositoryRepository SP01SP01 AdministrationAdministration ofof ModelsModels RepositoryRepository SP02SP02 AdministrationAdministration ofof BPM RolesBPM Roles andand R ibilitiR ibiliti SP02SP02 AdministrationAdministration ofof BPM RolesBPM Roles andand R ibilitiR ibiliti SUPPORTING PROCESSESSUPPORTING PROCESSES SP04SP04 AdministrationAdministration ofof BPMBPM HumanHuman RR SP04SP04 AdministrationAdministration ofof BPMBPM HumanHuman RR SP03SP03 AdministrationAdministration ofof BPMBPM ServicesServices P tf liP tf li SP03SP03 AdministrationAdministration ofof BPMBPM ServicesServices P tf liP tf li p yp yp yp y ResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities ResourcesResourcesResourcesResourcesPortfolioPortfolioPortfolioPortfolio 51
  • 52.
    Stage 2 Processes and Services Code Name TypeDescription MP04 BPM Services Programming Mgmt. Process Prioritization and programming of all BPM services being offered according to availability of personnel in Center of Excellence. Definition of responsibilities and targets of each initiativeDefinition of responsibilities and targets of each initiative. MP05 BPM Services Monitoring Mgmt. Process Monitoring of all BPM services that are being performed and related controls (time, scope, quality, resources etc.) MS06 P M i D fi iti f t t f b iMS06 Process Performance Measurement Main Service Definition of a structure of business process measures. Measurement, monitoring and reporting of process performance. Establishment and tracking of actions to improve performance. MS07 Process Main Employees' training and education on BPM concepts methodsMS07 Process Management Education and Training Main Service Employees training and education on BPM concepts, methods and tools. MS08 Process Main Periodic process checking. Verification of the adherence of the Compliance Service p g process models to reality. CS02 Reference Models Implementation Complem. Service Planning, adoption and maintenance of reference models like ISO9001, SCOR, ITIL, VRM etc., focused on performance impromevents and/or achieving certifications.Implementation impromevents and/or achieving certifications. CS03 Systems Specification Complem. Service Definition of requirements to support software development that can optimize process execution CS04 Process Complem Implementation of systems that could automate work © ELO Group all rights reserved. CS04 Process Automation Complem. Service Implementation of systems that could automate work. 5252
  • 53.
    Stage 2 Processes and Services CS03 Systems Specification Complem. Service Definition ofrequirements to support software development that can optimize process execution CS04 Process Automation Complem. Service Implementation of systems that could automate work. CS06 Process Auditing Complem. Service Definition and execution of internal auditing tests to evaluate adherence of business processes. CS07 Risk and Internal Control Management Complem. Service Analysis of operational risks in processes and defintion of internal controls to mitigate risks. CS08 C i C l D fi i i d l i f i d i fCS08 Competencies Management Complem. Service Definition and evaluation of required competencies for process execution. Establishment of training plans, HR selection and relocation. CS09 Management of Complem. Management of major organizational projects that involve improvement projects Service process improvement efforts (linkage between a PMO and a BPM Center of Excellence) SP03 Administration of BPM Service P tf li Support Process Updating of informations related to BPM services like: responsibilities, methods and tools involved, periodicity of ti tPortfolio execution etc. SP04 Administration of BPM Human Resources Support Process Definition and updating of profiles, roles, competencies and division of labor of the BPM Center of Excellence team. © ELO Group all rights reserved. 5353
  • 54.
    Capabilities for aBPM CoE (3/3) © ELO Group all rights reserved. 5454
  • 55.
    MANAGEMENT PROCESSESMANAGEMENT PROCESSES MP03MP03BPM ServicesBPM Services DevelopmentDevelopment PlannigPlannig MP03MP03 BPM ServicesBPM Services DevelopmentDevelopment PlannigPlannig MP04MP04 BPMBPM ServicesServices ProgrammingProgramming MP04MP04 BPMBPM ServicesServices ProgrammingProgramming MP05MP05 BPM ServicesBPM Services MonitoringMonitoring MP05MP05 BPM ServicesBPM Services MonitoringMonitoring MP06MP06 BPMBPM ResultsResults EvaluationEvaluation MP06MP06 BPMBPM ResultsResults EvaluationEvaluation MP01MP01 StrategyStrategy TranslationTranslation intointo ProcessesProcesses MP01MP01 StrategyStrategy TranslationTranslation intointo ProcessesProcesses MP07MP07 BPM CultureBPM CultureMP07MP07 BPM CultureBPM Culture MP02MP02 BPM DemandsBPM Demands IdentificationIdentification MP02MP02 BPM DemandsBPM Demands IdentificationIdentification DisseminationDisseminationDisseminationDissemination IdentificationIdentification and Analysisand Analysis IdentificationIdentification and Analysisand Analysis COMPLEMENTARY SERVICESCOMPLEMENTARY SERVICES MAIN SERVICESMAIN SERVICES MS01MS01 Process ArchitectureProcess Architecture MaintenanceMaintenance MS01MS01 Process ArchitectureProcess Architecture MaintenanceMaintenance MS06MS06 Process PerformanceProcess Performance MeasurementMeasurement MS06MS06 Process PerformanceProcess Performance MeasurementMeasurement MS02MS02 Process ModelingProcess Modeling (As(As--is)is) MS02MS02 Process ModelingProcess Modeling (As(As--is)is) MS07MS07 Process ManagementProcess Management Training and EducationTraining and Education MS07MS07 Process ManagementProcess Management Training and EducationTraining and Education CS01CS01 LeanLean && SixSix SigmaSigma OrientedOriented ImprovementImprovement CS02CS02 ReferenceReference ModelsModels ImplementationImplementation CS06CS06 ProcessProcess AuditingAuditing CS07CS07 RiskRisk andand InternalInternal ControlControl ManagementManagement(As(As is)is)(As(As is)is) Training and EducationTraining and EducationTraining and EducationTraining and Education MS03MS03 ProcessProcess ImprovementImprovement (To(To--be)be) MS03MS03 ProcessProcess ImprovementImprovement (To(To--be)be) MS08MS08 Process ComplianceProcess ComplianceMS08MS08 Process ComplianceProcess Compliance MS04MS04 ProcessProcessMS04MS04 ProcessProcess MS09MS09 Process MaturityProcess Maturity CS03CS03 SystemsSystems SpecificationSpecification CS08CS08 CompetenciesCompetencies ManagementManagement CS09CS09 Management ofManagement ofMS04MS04 ProcessProcess DocumentationDocumentation MS04MS04 ProcessProcess DocumentationDocumentation MS09MS09 Process MaturityProcess Maturity ManagementManagement MS05MS05 Process ChangeProcess Change ManagementManagement MS05MS05 Process ChangeProcess Change ManagementManagement MS10MS10 ProcessProcess Benchmarking &InnovationBenchmarking &Innovation CS04CS04 ProcessProcess AutomationAutomation CS05CS05 BusinessBusiness RulesRules ManagementManagement CS10CS10 Process CostProcess Cost ManagementManagement CS09CS09 Management ofManagement of improvement projectsimprovement projects SP01SP01 AdministrationAdministration ofof ModelsModels R itR it SP01SP01 AdministrationAdministration ofof ModelsModels R itR it SP04SP04 AdministrationAdministration ofof BPMBPM HumanHuman RR SP04SP04 AdministrationAdministration ofof BPMBPM HumanHuman RR SP02SP02 AdministrationAdministration ofof BPM RolesBPM Roles andand R ibilitiR ibiliti SP02SP02 AdministrationAdministration ofof BPM RolesBPM Roles andand R ibilitiR ibiliti SP03SP03 AdministrationAdministration ofof BPMBPM ServicesServices P tf liP tf li SP03SP03 AdministrationAdministration ofof BPMBPM ServicesServices P tf liP tf li SP05SP05 AdministrationAdministration ofof BPM BudgetBPM Budget SP05SP05 AdministrationAdministration ofof BPM BudgetBPM Budget SUPPORTING PROCESSESSUPPORTING PROCESSES RepositoryRepositoryRepositoryRepository ResourcesResourcesResourcesResourcesResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities PortfolioPortfolioPortfolioPortfolio gggg 55
  • 56.
    Stage 3 Processes and Services Code Name TypeDescription MP01 Strategy Translation into Processes Mgmt. Process Organizational strategy analysis. Definition of how business process could be improved to support achievement of strategic objectives. Identification of new BPM services needed. MP02 BPM Demands Identification and Analysis Mgmt. Process Identification, analysis and priorization of day-by-day operational demands for BPM services. MP03 BPM Services Mgmt. Planning of the evolution of BPM Services Porfolio, matching new Evolution Planning g Process g g organizational needs (demand) and BPM CoE’s readiness to provide new services (capability). MP06 BPM Results Evaluation Mgmt. Process Evaluation of tangible and intangible results related to BPM services. Determination of ROI. MP07 BPM Culture Dissemination Mgmt. Process Dissemination of actions in course, results obtained and success cases. It can include presentations to areas, BPM events, intranet informations and management reports. MS09 Process Main Process maturity evaluation, based on existing maturity models. Maturity Management Service MS10 Process Benchmarking and Innovation Main Service Benchmarking and dissemination of internal and external best practices related to process execution. and Innovation CS05 Business Rules Management Complem. Service Definition and/or updating of business rules of an existing process, detailing their characteristics and specific conditions. CS10 Process Cost Management Complem. Service Analysis and optimization of cost structure of an existing process, mainly using ABC techniques. Identification of cost © ELO Group all rights reserved. g p , y g q reduction opportunities. SP05 Administration of BPM Budget Support Process Budgeting and charging for the cost structure of the BPM Center of Excellence. Pricing of BPM services.
  • 57.
    Reference Framework fora BPM CoE v1.0 MP03 BPM Services D l t MP04 BPM Services MP05 BPM Services MP06 BPM Results Evaluation MP01 Strategy Translation into Processes MANAGEMENT PROCESSES Development Plannig MP04 BPM Services Programming MP05 BPM Services Monitoring MP07 BPM Culture Dissemination MP02 BPM Demands Identification and Analysis COMPLEMENTARY SERVICES MS01 Process Architecture Maintenance MS06 Process Performance Measurement MAIN SERVICES CS01 Lean & Six Sigma Oriented Improvement CS06 Process Auditing MS02 Process Modeling (As-is) MS07 Process Management Training and Education MS03 Process Improvement (T b ) MS08 Process Compliance CS02 Reference Models Implementation CS03 Systems Specification CS07 Risk and Internal Control Management CS08 Competencies Management(To-be) p MS04 Process Documentation MS09 Process Maturity Management P Ch P y p CS04 Process Automation Management CS09 Management of improvement projects SUPPORTING PROCESSES MS05 Process Change Management MS10 Process Benchmarking &Innovation CS05 Business Rules Management CS10 Process Cost Management © ELO Group all rights reserved. 5757 SP01 Administration of Models Repository SP04 Administration of BPM Human Resources SP02 Administration of BPM Roles and Responsibilities SP03 Administration of BPM Services Portfolio SP05 Administration of BPM Budget
  • 58.
    Some questions to be answered 1. How to determine responsibilitiesand accountabilities for  BPM actions? 2. Where should the BPM Center of Excellence be located?   3. How to determine tasks, profiles and competences for BPM 3. How to determine tasks, profiles and competences for BPM  CoE’s internal team? 4 How to assure alignment between Process Office and4. How to assure alignment between Process Office and Project Office? © ELO Group all rights reserved. 5858
  • 59.
  • 60.
    Some typical profiles CoE CoE CoE Global and Centralized Local andCentralized CoE CoE CoEProess Leader Process Leader Proces Leader © ELO Group all rights reserved. Global and Decentralized Multiple CoE’s
  • 61.
  • 62.
    Roles and responsibilitiesRoles and responsibilities Support and Maintenance – Dedicated Resources: Sh ldb i l d i i l j h ff• Should not be involved on organizational projects. They can offer  consulting, coaching, training and quality assurance services to Project  Teams. They also monitor and document lessons learned, BPM projects y , p j performance and process governance. Projects –Pool of Shared Resources: • Pool of resources that can be used into BPM projects  Chief Process  • Pool of resources that can be used into BPM projects. Chief Process   Officer should allocate those resources appropriately © ELO Group all rights reserved. 6262
  • 63.
    Roles and responsibilities Roles and responsibilities –– Support and MaintenanceSupport and Maintenance 1. BPM Consultant •Specialist that discuss with business areas opportunities for improvements. 2. Process Architect: • Assures process architecture is updated and being followed.p p g 3. Coach/Quality Assurance: • Provides coaching to BPM project teams. Do not perfom the work, only provides Provides coaching to BPM project teams. Do not perfom the work, only provides  guidelines. Also responsible for projects quality control. 4. Instructor: • Provides BPM training to the whole organization. 5. DB Administrator: • Revise process models, assuring modeling notation and patterns are being folowed.  Administer process repository. © ELO Group all rights reserved. 6363
  • 64.
    Roles and responsibilities Roles and responsibilities –– ProjectsProjects 1. Project Managers •Responsible for all routine management of BPM projects 2. Business Improvement Advisors: • Identify opportunities for improvementsy pp p • Discuss and facilitate implementation of new ideas, decreasing resistance to change • Develop business cases and business impact analysisp p y 3. Process Analysts: • Model and document the process (As Is & To Be)Model and document the process (As Is & To Be) • Define metrics and calculate process costs. • Evaluate the skills of people involved in processEvaluate the skills of people involved in process • Evaluate the process performance © ELO Group all rights reserved. 6464
  • 65.
    Process Prioritization basedon Strategic Drivers Analysis of Competitive Drivers © ELO Group all rights reserved. 6565
  • 66.
    Linkage with ProjectOffice – types of projects Impact A ti Pl izational Formalized organizational projects Action Plans (small and informal projects) Orngan Regular i t Action Plans (small and improvements ( informal projects) © ELO Group all rights reserved. Time to implement 6666
  • 67.
    Linkage with ProjectOffice – types of projects Project Management Process Initiation Planning Execution Control Closure ar v. Initiation Planning Execution Control Closure Regula improv Action Plans ectsProje © ELO Group all rights reserved.67 6767
  • 68.
    Linkage with ProjectOffice – types of projects Involved areas Type of transformation Business Area BPM Office PMO Regular Area Office improv. Action Plans Formalized projects © ELO Group all rights reserved.68 6868
  • 69.
    INTRODUCTION CHALLENGES FACINGINTRODUCTION:CHALLENGES FACING MODERN ORGANIZATIONS BPM GOVERNANCE AND THE NEED FOR A CENTER OF EXCELLENCE BPM CENTER OF EXCELLENCE MAIN CHARACTERISTICS BPM CoE FRAMEWORK – HISTORY AND GENERAL VIEW BEYOND BPM CoE – OTHER ROLES AND RESPONSIBILITIES © ELO Group all rights reserved. RESPONSIBILITIES
  • 70.
    But… Setting up a BPM CoE is just the first stepp Allmanagers need to participateAll managers need to participate in processes management somehow. This is not something restricted to the Processrestricted to the Process Office’s role. © ELO Group all rights reserved. 7070
  • 71.
    Example of a BPM Governance Structure Process Vision, Strategy,  Budget, Resources Roadmaps,  Project Plans Process  Committee g , Roadmaps,  Project Plans j Collaborative Process Models, KPIs Guidelines, Standards,  Process Office  ProcessOwner ,, Best Practices, Training Technical Artifacts Process Specification Process Implementation Project Manager © ELO Group all rights reserved. 7171 Source: based on Korhonen, 2007
  • 72.
    Example of a BPM Governance Structure Process Office Process Council Chief Process Officer Process Owner1 Process Owner2 Process Owner3 Process Manager 1 Process Manager2 PRocess ManagerNManager  1 Manager  2 Manager N Maintenance and Support BPM Projects © ELO Group all rights reserved. Source: based on Jeston & Nelis, 20087272
  • 73.
  • 74.
    Governance Evolution over time We acknowledge that Governance Structure evolutes over  time   as BPM becomes more mature into the organization   time , as BPM becomes more mature into the organization.   BPM services varies from organization to organization, and  therefore the BPM Center of Excellence may not always  ditl   t   i   i   directly execute main services.   Instead, the CoE may support a decentralized execution of  services by process owners and other areas. Still, this  category of services remains central for the  implementation of a process‐oriented management  approach © ELO Group all rights reserved. approach 7474
  • 75.
    Decentralization Path Centralized  Model Decentralized  Model ’ i hik b h d i dIt’s important to think about the desired governance  structure over time (“Blue Sky Vision”). It will certainly  changes the Center of Excellence’s scope andchanges the Center of Excellence s scope and  attributions © ELO Group all rights reserved. 7575 7575
  • 76.
    Governance Evolution over time ‐example © ELO Group all rights reserved. 7676
  • 77.
    Final Points -Some Statistics Publication of 10 papers about the frameworks Application of the framework at 15 organizationsApplication of the framework at 15 organizations Courses for more than 150 people about the  f kframework © ELO Group all rights reserved. 7777 7777
  • 78.
    Learning Points Emphasizing and splitting BPM CoE’s main services at: 1Process Improvement Projects1. Process Improvement Projects 2. Day‐by‐day process management Reinforcing the idea of BPM Planning Processes linked  to Corporate Strategy Representing the “Managing Process” process with a  lifecycle approach, showing “how to” implement BPM g CoE’s services more effectively © ELO Group all rights reserved. 7878 7878
  • 79.
    Current Research –Ideas on Improving theon Improving the Framework © ELO Group all rights reserved.
  • 80.
  • 81.
    BUSINESS STRATEGY PROJECT BASED WELLDEFINED SCOPES STRONG INVOLVEMENT OF BPM OFFICE INVOLVES MULTIPLE AREAS PROCESS IMPROVEMENT PROJECT INVOLVES MULTIPLE AREAS  SIGNFICANT COSTS TRANSFORMATION INTENSIVE Performance PROCESS IMPROVEMENT PROJECT Tempo Breakthrough Improvement PROCESS REDESIGNED IMPLEMENTED WITHIN NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC © ELO Group all rights reserved. PROCESS EXECUTION
  • 82.
    BUSINESS STRATEGY ON GOINGBASED OPEN SCOPE LIGHTLY DEPENDENT OF BPM OFFICE INVOLVES FEW AREAS PROJECT BASED WELL DEFINED SCOPES STRONG INVOLVEMENT OF BPM OFFICE INVOLVES MULTIPLE AREAS DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT INVOLVES FEW AREAS  INCREMENTAL COST CONTINOUS IMPROVEMENT ORIENTED INVOLVES MULTIPLE AREAS  SIGNFICANT COSTS TRANSFORMATION INTENSIVE PerformancePerformance DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT Contínuous Improvment TempoTempo p Breakthrough Improvement PROCESS VISIBILITY & CONTINUOUS IMPROVEMENT PROCESS REDESIGNED IMPLEMENTED WITHIN NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC © ELO Group all rights reserved. PROCESS EXECUTION
  • 83.
    BUSINESS STRATEGYANNUAL BASEDPROCESS PLANNING ALIGNED WITH BUSINESS STRATEGY PROJECT PORTFOLIO COMPOSITION AND PRIORITIZATION HIGH SINERGY WITH OTHER SUPPORT INITIATIVES  COMMUNICATION OF BPM ACTIVITIES AND RESULTS ACHIEVED BPM STRATEGY DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT PerformancePerformance DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT Contínuous Improvment TempoTempo p Breakthrough Improvement PROCESS VISIBILITY & CONTINUOUS IMPROVEMENT PROCESS REDESIGNED IMPLEMENTED WITHIN NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC © ELO Group all rights reserved. PROCESS EXECUTION
  • 84.
  • 85.
    BUSINESS STRATEGYANNUAL BASEDPROCESS PLANNING ALIGNED WITH BUSINESS STRATEGY PROJECT PORTFOLIO COMPOSITION AND PRIORITIZATION HIGH SINERGY WITH OTHER SUPPORT INITIATIVES  COMMUNICATION OF BPM ACTIVITIES AND RESULTS ACHIEVED BPM STRATEGY DAY TO DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT BPM Maturity & PerformancePerformance DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT& Governance Contínuous Improvment TempoTempo BUSINESS TRANSFORMATION ACCOUNTABILITIES  BUSINESSp ov e t Breakthrough Improvement  BUSINESS TRANSFORMATION CAPABILITY EVOLUTION PROCESS VISIBILITY & CONTINUOUS IMPROVEMENT PROCESS REDESIGNED IMPLEMENTED WITHIN NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC © ELO Group all rights reserved. PROCESS EXECUTION
  • 86.
    BUSINESS STRATEGY Strategic Planning BPM Project Portfolio BPM Consolidadted Results BUSINESSSTRATEGY BPM STRATEGY P01 Strategy Translation into Processos P02 Run Process Satisfaction Survey P03 BPM Project Portfolio Generation P04 BPM Project Planning & Budgetig P05 BPM Project Portfolio Management P06 BPM Results & Culture Dissemination BPM STRATEGY DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT BPM Maturity & BPM Demands BPM Project Plan BPM Process Results Process Operational Goals M01 BPM Maturity and PerformancePerformance DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT& Governance Maturity and Governance Contínuous Improvment TempoTempo p Breakthrough Improvement PROCESS VISIBILITY & CONTINUOUS IMPROVEMENT PROCESS REDESIGNED IMPLEMENTED WITHIN NEWS SYSTEMS, COMPETENCES, CONTRACTS, ETC © ELO Group all rights reserved. PROCESS EXECUTION
  • 87.
    BUSINESS STRATEGY Strategic Planning BPM Project Portfolio BPM Consolidadted Results BUSINESSSTRATEGY BPM STRATEGY P01 Strategy Translation into Processos P02 Run Process Satisfaction Survey P03 BPM Project Portfolio Generation P04 BPM Project Planning & Budgetig P05 BPM Project Portfolio Management P06 BPM Results & Culture Dissemination BPM STRATEGY DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT BPM Maturity & BPM Demands BPM Project Plan BPM Process Results Process Operational Goals M01 BPM Maturity and BPM Project Plan BPM Process Results EXECUTE BPM PROJECTS M01 BPM Maturity and PerformancePerformance DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT& Governance Maturity and Governance E01 Process Vision E02 Process Performance EXECUTE BPM PROJECTSMaturity and Governance Contínuous Improvment TempoTempo E02 Process Understanding (AS IS) E03 Gains & Improvement Analysis Tempo p Breakthrough Improvement E04 Process Redesing & Preparare Implantation E05 Implement Redesigned Process & Roll Out Breakthrough Improvement Controls (RISK MAN.) New Competences (HR MAN.) New Systemns (IT MAN.) Policies & Standards (COMPLIANCE MAN) Organizational Structure Redesign © ELO Group all rights reserved. PROCESS EXECUTION
  • 88.
    BUSINESS STRATEGY Strategic Planning BPM Project Portfolio BPM Consolidadted Results BUSINESSSTRATEGY BPM STRATEGY P01 Strategy Translation into Processos P02 Run Process Satisfaction Survey P03 BPM Project Portfolio Generation P04 BPM Project Planning & Budgetig P05 BPM Project Portfolio Management P06 BPM Results & Culture Dissemination BPM STRATEGY DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECT BPM Demands BPM Project Plan BPM Process Results Process Operational Goals M01 BPM Maturity and BPM Project Plan BPM Process Results EXECUTE BPM PROJECTS M01 BPM Maturity and BPM Demands Process Operational Goals DAY-TO-DAY PROCESS MANAGEMENT M01 BPM Maturity and PerformancePerformance DAY-TO-DAY PROCESS MANAGEMENT PROCESS IMPROVEMENT PROJECTMaturity and Governance E01 Process Vision E02 Process Performance EXECUTE BPM PROJECTSMaturity and Governance D02 Process Learning Performance DAY TO DAY PROCESS MANAGEMENT Maturity and Governance Contínuous Improvment TempoTempo E02 Process Understanding (AS IS) E03 Gains & Improvement Analysis Tempo Continuous Improvment g Tempo p Breakthrough Improvement E04 Process Redesing & Preparare Implantation E05 Implement Redesigned Process & Roll Out Breakthrough ImprovementD03 Implement Continuos Improvement and D01 Performance, Risks & Compliance Monitoring Controls (RISK MAN.) New Competences (HR MAN.) New Systemns (IT MAN.) Policies & Standards (COMPLIANCE MAN) Organizational Structure Redesign Continous Improvement Risk & Non conformities (AUDITING) Performance Value & Ocurrences Process Visibility © ELO Group all rights reserved. PROCESS EXECUTION
  • 89.
    Strategic Planning BPM Project Portfolio BPM Consolidadted Results BUSINESS STRATEGY P01Strategy Translation into Processos P02 Run Process Satisfaction Survey P03 BPM Project Portfolio Generation P04 BPM Project Planning & Budgetig P05 BPM Project Portfolio Management P06 BPM Results & Culture Dissemination Results BPM STRATEGY Processos Survey Generation Budgetig Management Dissemination BPM Demands BPM Project Plan BPM Process Results Process Operational Goals M01 BPM E01 Process Vision PerformancePerformance DAY-TO-DAY PROCESS MANAGEMENT EXECUTE BPM PROJECTS M01 BPM Maturity and Governance Continuous Improvment E02 Process Understanding (AS IS) E03 Gains & Improvement Analysis D02 Process Learning TempoTempo Improvment E04 Process Redesing & Preparare Implantation E05 Implement Redesigned Process & Roll Out D03 Implement Continuos Improvement and D01 Performance, Risks & Compliance Monitoring p Breakthrough Improvement Controls (RISK MAN.) Continous Improvement Risk & Non conformities (AUDITING) Performance Value & Ocurrences New Competences (HR MAN.) New Systemns (IT MAN.) Policies & Standards (COMPLIANCE MAN) Process Visibility Organizational Structure Redesign © ELO Group all rights reserved. PROCESS EXECUTION
  • 90.
    Practical Application and CaseStudiesCase Studies © ELO Group all rights reserved.
  • 91.
    “Leadership on BPM ideas, methodsand results in Brazil” ThanksThanksThanksThanks leandro.jesus@elogroup.com.brleandro.jesus@elogroup.com.br www.elogroup.com.brwww.elogroup.com.br