MADHU SAGARSHEET NO.
CASE STUDY OF : PRESTIGE TECH PARK III
CONTEXTUAL STUDY 1
GEOGRAPHIC LOCATION • It caters to all the requirements of the IT-
industry.
• The design evolved to form three
independent towers sited around a central
landscaped court that coalesce with the
surrounding natural scape.
• Dictated by the market dynamics and I.T
space absorption trends, the towers have
been designed with unobstructed floor
plates with segregated core areas ensuring
efficient and functional work spaces.
• In contrast to a typical monolithic
appearance, the towers are differentiated,
allowing the building’s form and detailing
to be legible.
• Architect – R. S. P. Architects, Bangalore.
 LOCATION : Sarjapur – Marathahalli Outer Ring
Road, Bangalore
 DEVELOPMENT TYPE : IT Park
 DEVELOPMENT SIZE : 33445 – 35303 m2 .
 Prestige Tech Park III is located along the "IT
Corridor" on Sarjapur – Marathahalli Outer Ring
Road, Bangalore.
 With the region being dedicated to the IT and
corporate sector, the location of the 8.15 acre project
site is an apt proposition.
PRESTIGE TECH PARK III
2BV14AT028
V SEM – B.ARCH
B. V. B. C. E. T.
MADHU SAGAR – 2BV14AT028SHEET NO.
CASE STUDY OF : PRESTIGE TECH PARK III
MASTER PLAN AND DESIGN FEATURES 2
• The development is designed to comply with
National Building Codes (NBC) and standards.
• FLOOR LOADING - 400 Kg/sqm with
designated areas strengthened to 1,000
Kg/sqm.
• FLOOR TO FLOOR - 4.05 m
• FLOOR SCREEDING - Average 65 mm thick
IPS flooring shall be provided in all office
areas
• COLUMN GRID - 10.8 m X 10.8 m c/c.
• POWER - The development has a 66KV sub
station which receives power supply from
dual feeders.
• POWER BACK UP - 100 % power back up
through DG Sets.
• HVAC - The development is designed to
have centralized air conditioning system
through a combination of Air cooled chillers &
water cooled chillers designed to provide an
ambient temperature of 22 deg C +/- 2 deg C.
• SEWERAGE SYSTEM - The development shall
have an underground Sewage treatment plant
and the treated water shall be used for
cooling, landscaping and flushing purposes.
• FIRE FIGHTING AND SUPPRESSION SYSTEM -
As per local fire regulations, comprising of
sprinkler system, fire hydrants, hose reels, fire
alarm system for common areas, smoke
detectors for common areas.
• FAÇADE - Building façade shall be a
combination of Double Glazing, ACP, stone
cladding and masonry with plastering and
textured paint.
• TOILET FINISHES
oFlooring – Vitrified Tiles.
oDadoing – Combination of Ceramic Tile
oCeiling – Metallic Grid False Ceiling
• COMMON AREA FINISHES
oLobbies – Granite / Artificial Marble
oMain Staircase – Kotah Stone / Granite
• RAINWATER HARVESTING - Provision for the
same has been made as per MOEF clearance.
• There are 3 buildings for work spaces.
• There is one MLCP.
• There is a common basement to all three buildings.
• GROUND COVERAGE
o VALENCE – 3382 m2
o VELOCITY – 3149 m2
oVECTOR – 3149 m2 .
o MLCP – 3382 m2 .
•BUILT : OPEN – 50:50
• ENTRY/EXIT TO BASEMENT – 4
• 900 cars can be accommodated in MLCP.
• The office spaces can be modified as per the
occupant.
• Every floor may have a pantry or a cafeteria as
wished by the occupant.
• More than one floor can be rented by the same
company.
MASTER PLAN OF PRESTIGE TECH PARK III
• Approximately, at least 300 people can be
accommodated per floor.
• Area per person – 7.4 m2 per person.
• There are 30 luxurious villas that are
exclusively available.
• There also is a hotel called 24 TECH HOTEL.
BUILT AREA
OPEN
1. ORGANIZATIONAL PRINCIPAL
•CLUSTERED ORGANIZATION
•3 buildings for work spaces and 1 MLCP clustered in the
site.
2. BUILT MASS STRATEGY
•SINGLE BUILDING MASS
3. PUBLIC PRIVATE DISTRIBUTION
•LAYERED WITH GRADATION FROM PUBLIC TO PRIVATE.
•The entry to the campus is semi-public. Not everyone can
visit. Only the staff and people with permission can enter.
•In the office buildings, only the ground floor is accessible
as common space or lobby for staff as well as visitors.
•In each floor, as per the company that rents it, there
again is a segregation of spaces as private, semi-private
and semi-public within the occupants.
4. ACCESS / APPROACH (PEDESTRIAN)
•MULTIPLE ACCESS, CLEARLY DEFINED.
5. VEHICULAR ENTRY AND CIRCULATION
•SAME ENTRY AND EXIT.
•COMBINED WITH PEDESTRIAN.
•One main entry/exit. And 2 other entry/exit.
MAIN
ENTRY
VEHICULAR ENTRY / EXIT
ENTRY TO BASEMENT
TRANSFORMER YARD
2BV14AT028
V SEM – B.ARCH
B. V. B. C. E. T.
MADHU SAGAR – 2BV14AT028SHEET NO.
CASE STUDY OF : PRESTIGE TECH PARK III
PLANNING 3
VERTICAL
CIRCULATION
LIFTS
STAIRS
TOILETS LADIES
GENTS
ELECTRICAL ROOM
D.G. ROOM
SERVICE LIFT
OFFICE SPACE
PASSIVE SPACE
GROUND FLOOR FLOORS 1 - 7 8th FLOOR 9th FLOOR TERRACE
VECTORANDVELOCITYVALENCE
GROUND FLOOR 1st FLOOR FLOORS – 2, 3, 5, 6, 8, 9 and 11 FLOORS – 4, 7 and 10 TERRACE FLOOR
MLCP
2BV14AT028
V SEM – B.ARCH
B. V. B. C. E. T.

Prestige tech park III

  • 1.
    MADHU SAGARSHEET NO. CASESTUDY OF : PRESTIGE TECH PARK III CONTEXTUAL STUDY 1 GEOGRAPHIC LOCATION • It caters to all the requirements of the IT- industry. • The design evolved to form three independent towers sited around a central landscaped court that coalesce with the surrounding natural scape. • Dictated by the market dynamics and I.T space absorption trends, the towers have been designed with unobstructed floor plates with segregated core areas ensuring efficient and functional work spaces. • In contrast to a typical monolithic appearance, the towers are differentiated, allowing the building’s form and detailing to be legible. • Architect – R. S. P. Architects, Bangalore.  LOCATION : Sarjapur – Marathahalli Outer Ring Road, Bangalore  DEVELOPMENT TYPE : IT Park  DEVELOPMENT SIZE : 33445 – 35303 m2 .  Prestige Tech Park III is located along the "IT Corridor" on Sarjapur – Marathahalli Outer Ring Road, Bangalore.  With the region being dedicated to the IT and corporate sector, the location of the 8.15 acre project site is an apt proposition. PRESTIGE TECH PARK III 2BV14AT028 V SEM – B.ARCH B. V. B. C. E. T.
  • 2.
    MADHU SAGAR –2BV14AT028SHEET NO. CASE STUDY OF : PRESTIGE TECH PARK III MASTER PLAN AND DESIGN FEATURES 2 • The development is designed to comply with National Building Codes (NBC) and standards. • FLOOR LOADING - 400 Kg/sqm with designated areas strengthened to 1,000 Kg/sqm. • FLOOR TO FLOOR - 4.05 m • FLOOR SCREEDING - Average 65 mm thick IPS flooring shall be provided in all office areas • COLUMN GRID - 10.8 m X 10.8 m c/c. • POWER - The development has a 66KV sub station which receives power supply from dual feeders. • POWER BACK UP - 100 % power back up through DG Sets. • HVAC - The development is designed to have centralized air conditioning system through a combination of Air cooled chillers & water cooled chillers designed to provide an ambient temperature of 22 deg C +/- 2 deg C. • SEWERAGE SYSTEM - The development shall have an underground Sewage treatment plant and the treated water shall be used for cooling, landscaping and flushing purposes. • FIRE FIGHTING AND SUPPRESSION SYSTEM - As per local fire regulations, comprising of sprinkler system, fire hydrants, hose reels, fire alarm system for common areas, smoke detectors for common areas. • FAÇADE - Building façade shall be a combination of Double Glazing, ACP, stone cladding and masonry with plastering and textured paint. • TOILET FINISHES oFlooring – Vitrified Tiles. oDadoing – Combination of Ceramic Tile oCeiling – Metallic Grid False Ceiling • COMMON AREA FINISHES oLobbies – Granite / Artificial Marble oMain Staircase – Kotah Stone / Granite • RAINWATER HARVESTING - Provision for the same has been made as per MOEF clearance. • There are 3 buildings for work spaces. • There is one MLCP. • There is a common basement to all three buildings. • GROUND COVERAGE o VALENCE – 3382 m2 o VELOCITY – 3149 m2 oVECTOR – 3149 m2 . o MLCP – 3382 m2 . •BUILT : OPEN – 50:50 • ENTRY/EXIT TO BASEMENT – 4 • 900 cars can be accommodated in MLCP. • The office spaces can be modified as per the occupant. • Every floor may have a pantry or a cafeteria as wished by the occupant. • More than one floor can be rented by the same company. MASTER PLAN OF PRESTIGE TECH PARK III • Approximately, at least 300 people can be accommodated per floor. • Area per person – 7.4 m2 per person. • There are 30 luxurious villas that are exclusively available. • There also is a hotel called 24 TECH HOTEL. BUILT AREA OPEN 1. ORGANIZATIONAL PRINCIPAL •CLUSTERED ORGANIZATION •3 buildings for work spaces and 1 MLCP clustered in the site. 2. BUILT MASS STRATEGY •SINGLE BUILDING MASS 3. PUBLIC PRIVATE DISTRIBUTION •LAYERED WITH GRADATION FROM PUBLIC TO PRIVATE. •The entry to the campus is semi-public. Not everyone can visit. Only the staff and people with permission can enter. •In the office buildings, only the ground floor is accessible as common space or lobby for staff as well as visitors. •In each floor, as per the company that rents it, there again is a segregation of spaces as private, semi-private and semi-public within the occupants. 4. ACCESS / APPROACH (PEDESTRIAN) •MULTIPLE ACCESS, CLEARLY DEFINED. 5. VEHICULAR ENTRY AND CIRCULATION •SAME ENTRY AND EXIT. •COMBINED WITH PEDESTRIAN. •One main entry/exit. And 2 other entry/exit. MAIN ENTRY VEHICULAR ENTRY / EXIT ENTRY TO BASEMENT TRANSFORMER YARD 2BV14AT028 V SEM – B.ARCH B. V. B. C. E. T.
  • 3.
    MADHU SAGAR –2BV14AT028SHEET NO. CASE STUDY OF : PRESTIGE TECH PARK III PLANNING 3 VERTICAL CIRCULATION LIFTS STAIRS TOILETS LADIES GENTS ELECTRICAL ROOM D.G. ROOM SERVICE LIFT OFFICE SPACE PASSIVE SPACE GROUND FLOOR FLOORS 1 - 7 8th FLOOR 9th FLOOR TERRACE VECTORANDVELOCITYVALENCE GROUND FLOOR 1st FLOOR FLOORS – 2, 3, 5, 6, 8, 9 and 11 FLOORS – 4, 7 and 10 TERRACE FLOOR MLCP 2BV14AT028 V SEM – B.ARCH B. V. B. C. E. T.