Within the global economy, and in line with the dominant trend of rapid change, the ability to
independently satisfy the energy demand plays an important role in planning the future of any country.
Ministry of Energy of Serbia sent in early 2013.. Public invitation to potential investors for the
implementation of 317 small hydro sites. Local governments have offered possible sites in their territory.
 Company IDEAL ENERGY, Ltd. , according to the results of the public call, given the opportunity to
convert SHP "Vršuma" in the municipality of Tutin
Renewable Energy
Description of project
Within the framework design phase of the project documentation completed the following activities:
 Made the identification of the requirements for locating individual objects (water intake, pipeline route,
building mechanical systems, etc..) Future hydropower.
 Data were collected on the available infrastructure: car, electric, etc..,To provide an indication of the
necessary future infrastructure.
 Were carried out surveys of the general area of future hydropower.
 Were carried out hydrological analysis of water flows and certain relevant hydrological parameters on the
basis of:
data from hydrological and meteorological stations RHMZ Serbia.
Were performed comparative hydrological measurements at water flow
The adopted technical solution SHPPs Vršuma the derivation plant, which consists of the following
facilities:
water intake of settling,
pipelines under pressure,
powerhouse and
drains turbines.
Technical details of the SHPPs:
 Medium flow Qsr 0.37 m3 / s
 Installed flow SQinst 0.56 m3 / s
 elevation above water 845.5 m
 tailwater elevation 784.0 m
 decline in gross power 61.5 m
 Net decrease in Q inst 56.2 m
 Pipeline diameter 0.55 m
 Pipeline length 1 141 m
 TypeTurbines Francis and banks
 Inatalisana power 180 +60 kW
The adopted technical solution of sHPP
SHPPs Vršuma is located in the municipality of Tutin, which is electricity
supplied by ED Tutin. Powerhouse small hydro is about 300 m from the existing 10
kV transmission line.
The analysis to come to a socket SHP Vršuma was at 10 kV busbars in TC 10/0, 4
kV "Carina" maximum power that can be connected to a 259.5 kVA
Analysis of conditions and possibilities for connection
to the electric system of sHPP
(Water) intake structure
(Water) intake structure
To collect water envisages the construction of "lateral" of engagement with
the settling of the chainage approximately 1280 m, measured from the
confluence of the rivers in the river Ibar. Sizing intake structures is performed
so that it enables the abstraction of the planned amount of water of 0.55 m3 /
s. Water intake structure is designed to settling on the left bank of the river.
The total length of the building is 21 meters. Technical solutions, construction
of a water intake structures consisting of the following parts:
• lateral intake,
• precipitators
• Drain cleaning area upstream of the barrier layers,
• overflow work procedures,
• equipment intake
Location powerhouse is planned on the right bank of the river, "River", just above
the mouth of the river Ibar. Power house SHPPs "Vršuma" is designed according to
the technological and functional requirements so that it can be placed into two
units. It is also within the building provided the space to be used for access to the
plant, assembly and disassembly of equipment and maintenance.
Power house
Economic and financial analysis of feasibility of the construction of small HPPs
Length of pipeline 1 141 m
Average annual flowQsr.god. 0,37 m3/s
gross head Hbr 61,5 m
The net decrease Hn=0,9×Hbr 55,35 m
diameter of the pipeline 485 mm
installed flow Qi=1,5×(Qsr.god-Qb,min) 0,5 m3/s
Turbine Efficiency 88,00 %
Generator Efficiency 96,00 %
Transformer Efficiency 99,00 %
P-The
oretical power at the water course
0,227 [MW]
tk [h] -Annual operation time at maximum power 4200 [h]
E [GWh] Annual generation of electric energy 0,953 E [GWh]
Annual income-gross 118 135,98 eur.
Annual income-Neto 106 322,38 eur.
Conclusion
Value of investment 643 104,78
Production HA 200+80 kW 953,00 [MWh]
Annual income 118 135,98 eur.
Investment recovery time-Manufacture of decreased by 20% 6,80 god
Investment recovery time-The expected production 5,44 god
Investment recovery time-production increased by 10% 4,95 god
Specific indicators of profitability
The unit price of equipment for power 1 392,20 eur/kW
Unit Price by power 2 308,90 eur/kW
The investment ratio for equipment 0,379 eur/kWh
The total investment ratio 0,675 eur/kWh

More Related Content

Similar to Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptx

Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in india
Saikat Ghosh
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
Anil Venkata Nag Kothur
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
Shadab Khan
 
Small hydropower potentials
Small hydropower potentialsSmall hydropower potentials
Small hydropower potentials
Dogara Bashir
 
Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015Ivaylo Velikov
 
SMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTSMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANT
vikaspanch
 
Hydropower
HydropowerHydropower
Hydropower
Divya Vishnoi
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
Rubnawaz Bhatti
 
Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...
iosrjce
 
C012611420
C012611420C012611420
C012611420
IOSR Journals
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Aniket Raj
 
Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,
PANEM SRINIVASULU
 
Detail Feasibility Study Of Wind Power Water Lifting Project in Mustang,Nepal
Detail Feasibility Study Of Wind Power Water Lifting  Project in Mustang,NepalDetail Feasibility Study Of Wind Power Water Lifting  Project in Mustang,Nepal
Detail Feasibility Study Of Wind Power Water Lifting Project in Mustang,Nepal
Bimal Gyawali
 
Ev35854858
Ev35854858Ev35854858
Ev35854858
IJERA Editor
 
Design and fabrication of hydro electric power
Design and fabrication of hydro electric powerDesign and fabrication of hydro electric power
Design and fabrication of hydro electric power
kannan42
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
Pratik Diyora
 
Hydro Power In Pakistan
Hydro Power In PakistanHydro Power In Pakistan
Hydro Power In PakistanFarooq Saeed
 

Similar to Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptx (20)

Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in india
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
Project abstract
Project abstractProject abstract
Project abstract
 
Small hydropower potentials
Small hydropower potentialsSmall hydropower potentials
Small hydropower potentials
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015
 
SMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTSMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANT
 
Hydropower
HydropowerHydropower
Hydropower
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...
 
C012611420
C012611420C012611420
C012611420
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
 
Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,
 
Detail Feasibility Study Of Wind Power Water Lifting Project in Mustang,Nepal
Detail Feasibility Study Of Wind Power Water Lifting  Project in Mustang,NepalDetail Feasibility Study Of Wind Power Water Lifting  Project in Mustang,Nepal
Detail Feasibility Study Of Wind Power Water Lifting Project in Mustang,Nepal
 
Ev35854858
Ev35854858Ev35854858
Ev35854858
 
Design and fabrication of hydro electric power
Design and fabrication of hydro electric powerDesign and fabrication of hydro electric power
Design and fabrication of hydro electric power
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
 
Hydro Power In Pakistan
Hydro Power In PakistanHydro Power In Pakistan
Hydro Power In Pakistan
 

More from NamikHadziibrahimovi2

TRETMAN OTPADNE VODE MILANOVIC.ppt
TRETMAN OTPADNE VODE MILANOVIC.pptTRETMAN OTPADNE VODE MILANOVIC.ppt
TRETMAN OTPADNE VODE MILANOVIC.ppt
NamikHadziibrahimovi2
 
HSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..pptHSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
NamikHadziibrahimovi2
 
Hidroelektrane.ppt
Hidroelektrane.pptHidroelektrane.ppt
Hidroelektrane.ppt
NamikHadziibrahimovi2
 
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptxPresentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
NamikHadziibrahimovi2
 
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptxPresentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
NamikHadziibrahimovi2
 
PBS_Prezentace_HR_BiH_2015_06_AJ.pptx
PBS_Prezentace_HR_BiH_2015_06_AJ.pptxPBS_Prezentace_HR_BiH_2015_06_AJ.pptx
PBS_Prezentace_HR_BiH_2015_06_AJ.pptx
NamikHadziibrahimovi2
 

More from NamikHadziibrahimovi2 (6)

TRETMAN OTPADNE VODE MILANOVIC.ppt
TRETMAN OTPADNE VODE MILANOVIC.pptTRETMAN OTPADNE VODE MILANOVIC.ppt
TRETMAN OTPADNE VODE MILANOVIC.ppt
 
HSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..pptHSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
 
Hidroelektrane.ppt
Hidroelektrane.pptHidroelektrane.ppt
Hidroelektrane.ppt
 
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptxPresentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
 
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptxPresentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
 
PBS_Prezentace_HR_BiH_2015_06_AJ.pptx
PBS_Prezentace_HR_BiH_2015_06_AJ.pptxPBS_Prezentace_HR_BiH_2015_06_AJ.pptx
PBS_Prezentace_HR_BiH_2015_06_AJ.pptx
 

Recently uploaded

ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 

Recently uploaded (20)

ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 

Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptx

  • 1. sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan- Investor: IDEAL ENERGY, d.o.o. Owner: Ismet Dedeić Executive Director: Deniz Dedeić, dipl. ecc.
  • 2. Within the global economy, and in line with the dominant trend of rapid change, the ability to independently satisfy the energy demand plays an important role in planning the future of any country. Ministry of Energy of Serbia sent in early 2013.. Public invitation to potential investors for the implementation of 317 small hydro sites. Local governments have offered possible sites in their territory.  Company IDEAL ENERGY, Ltd. , according to the results of the public call, given the opportunity to convert SHP "Vršuma" in the municipality of Tutin Renewable Energy Description of project Within the framework design phase of the project documentation completed the following activities:  Made the identification of the requirements for locating individual objects (water intake, pipeline route, building mechanical systems, etc..) Future hydropower.  Data were collected on the available infrastructure: car, electric, etc..,To provide an indication of the necessary future infrastructure.  Were carried out surveys of the general area of future hydropower.  Were carried out hydrological analysis of water flows and certain relevant hydrological parameters on the basis of: data from hydrological and meteorological stations RHMZ Serbia. Were performed comparative hydrological measurements at water flow
  • 3. The adopted technical solution SHPPs Vršuma the derivation plant, which consists of the following facilities: water intake of settling, pipelines under pressure, powerhouse and drains turbines. Technical details of the SHPPs:  Medium flow Qsr 0.37 m3 / s  Installed flow SQinst 0.56 m3 / s  elevation above water 845.5 m  tailwater elevation 784.0 m  decline in gross power 61.5 m  Net decrease in Q inst 56.2 m  Pipeline diameter 0.55 m  Pipeline length 1 141 m  TypeTurbines Francis and banks  Inatalisana power 180 +60 kW The adopted technical solution of sHPP
  • 4. SHPPs Vršuma is located in the municipality of Tutin, which is electricity supplied by ED Tutin. Powerhouse small hydro is about 300 m from the existing 10 kV transmission line. The analysis to come to a socket SHP Vršuma was at 10 kV busbars in TC 10/0, 4 kV "Carina" maximum power that can be connected to a 259.5 kVA Analysis of conditions and possibilities for connection to the electric system of sHPP
  • 5. (Water) intake structure (Water) intake structure To collect water envisages the construction of "lateral" of engagement with the settling of the chainage approximately 1280 m, measured from the confluence of the rivers in the river Ibar. Sizing intake structures is performed so that it enables the abstraction of the planned amount of water of 0.55 m3 / s. Water intake structure is designed to settling on the left bank of the river. The total length of the building is 21 meters. Technical solutions, construction of a water intake structures consisting of the following parts: • lateral intake, • precipitators • Drain cleaning area upstream of the barrier layers, • overflow work procedures, • equipment intake
  • 6. Location powerhouse is planned on the right bank of the river, "River", just above the mouth of the river Ibar. Power house SHPPs "Vršuma" is designed according to the technological and functional requirements so that it can be placed into two units. It is also within the building provided the space to be used for access to the plant, assembly and disassembly of equipment and maintenance. Power house
  • 7. Economic and financial analysis of feasibility of the construction of small HPPs Length of pipeline 1 141 m Average annual flowQsr.god. 0,37 m3/s gross head Hbr 61,5 m The net decrease Hn=0,9×Hbr 55,35 m diameter of the pipeline 485 mm installed flow Qi=1,5×(Qsr.god-Qb,min) 0,5 m3/s Turbine Efficiency 88,00 % Generator Efficiency 96,00 % Transformer Efficiency 99,00 % P-The oretical power at the water course 0,227 [MW] tk [h] -Annual operation time at maximum power 4200 [h] E [GWh] Annual generation of electric energy 0,953 E [GWh] Annual income-gross 118 135,98 eur. Annual income-Neto 106 322,38 eur. Conclusion Value of investment 643 104,78 Production HA 200+80 kW 953,00 [MWh] Annual income 118 135,98 eur. Investment recovery time-Manufacture of decreased by 20% 6,80 god Investment recovery time-The expected production 5,44 god Investment recovery time-production increased by 10% 4,95 god Specific indicators of profitability The unit price of equipment for power 1 392,20 eur/kW Unit Price by power 2 308,90 eur/kW The investment ratio for equipment 0,379 eur/kWh The total investment ratio 0,675 eur/kWh