1) The document presents a business plan for the sHPP VRŠUMA small hydropower plant project in Serbia. It discusses Serbia's invitation for potential investors to develop 317 small hydropower sites. 2) It describes the technical details and specifications of the sHPP VRŠUMA project, which would have an installed capacity of 180kW. Key project components include an intake structure, underground pipeline, and powerhouse. 3) An economic analysis finds the project would have annual generation of 0.953 GWh, annual income of 118,135.98 euros, and an investment payback period of 4.95 to 6.8 years depending on production assumptions. The analysis