The document summarizes the closing ceremony of a Safety Month celebration held in November 2012 for the Munger Rail Cum Road Bridge Project. It describes various events that took place during the ceremony such as flag hoisting, safety pledges, speeches, quiz competitions, demonstrations of fire drills and first aid, health checkups, inspections of work areas, and a safety drama. Prizes were distributed and certificates of appreciation were given to contractors for their cooperation in developing safety culture at the project site.
This presentation will give you an overview of safety
management system, importance of safety, incident, accident and near miss, Hazards and Risk assessment , Risk Matrix, Risk controls and Mitigation Plan.
This presentation will give you an overview of safety
management system, importance of safety, incident, accident and near miss, Hazards and Risk assessment , Risk Matrix, Risk controls and Mitigation Plan.
What is JSA?
A Job Safety Analysis is a task-oriented risk assessment used to review the hazards associated with a particular work task, and to verify that adequate safeguards are in place to control those hazards.
JSAs are known by a variety of terms, including Job Hazard Analysis (JHA), Job Risk Assessment (JRA), Task Risk Assessment (TRA), Safe Job Analysis (SJA).
Job Safety Analysis and its Implementation
INVOLVE employees in the development
KEEP written JSA short and simple
ILLUSTRATE safe practices
ASSIGN responsibility of JSA
TRAIN all employees and supervisors
EXPLAIN the use of JSA to employees
IMPLEMENT safe work practices
REVIEW JSA when equipment or process changes or new information becomes available regarding potential hazards associated with the job.
PREVENT WORK-RELATED INJURIES
Behavior-based safety is based on the theory that most accidents at workplaces can be prevented with the right behavioral analysis and training. Minor errors and oversights are often left unreported and thus can lead to major accidents if the causes for the incidents are not addressed.
Improve employee safety with our presentation on Behavior-Based Safety:
http://www.presentationload.com/behavior-based-safety-powerpoint-template.html
The BBS approach examines which behaviors and organizational circumstances led to accidents. By knowing this, you can inform employees about safe behavior at the workplace and implement Behavior-Based Safety in your company.
This template not only contains images with background information on occupational safety, but also a series of graphs with statistics and figures on the subject as well as a useful icons toolbox.
What is JSA?
A Job Safety Analysis is a task-oriented risk assessment used to review the hazards associated with a particular work task, and to verify that adequate safeguards are in place to control those hazards.
JSAs are known by a variety of terms, including Job Hazard Analysis (JHA), Job Risk Assessment (JRA), Task Risk Assessment (TRA), Safe Job Analysis (SJA).
Job Safety Analysis and its Implementation
INVOLVE employees in the development
KEEP written JSA short and simple
ILLUSTRATE safe practices
ASSIGN responsibility of JSA
TRAIN all employees and supervisors
EXPLAIN the use of JSA to employees
IMPLEMENT safe work practices
REVIEW JSA when equipment or process changes or new information becomes available regarding potential hazards associated with the job.
PREVENT WORK-RELATED INJURIES
Behavior-based safety is based on the theory that most accidents at workplaces can be prevented with the right behavioral analysis and training. Minor errors and oversights are often left unreported and thus can lead to major accidents if the causes for the incidents are not addressed.
Improve employee safety with our presentation on Behavior-Based Safety:
http://www.presentationload.com/behavior-based-safety-powerpoint-template.html
The BBS approach examines which behaviors and organizational circumstances led to accidents. By knowing this, you can inform employees about safe behavior at the workplace and implement Behavior-Based Safety in your company.
This template not only contains images with background information on occupational safety, but also a series of graphs with statistics and figures on the subject as well as a useful icons toolbox.
Construction of 260+440+25 Span Heavy Motor Vehicle Class 18R two lane loading Dobra Chanthi Suspension bridge Over Tehri Dam Reservoir i District Tehri Garhwal, Uttarakhand
Construction of 440 meter Heavy motor vehicle Dobra Chanthi Suspension bridge project over Tehri Dam reservoir in Distt Tehri Garhwal, Uttarakhand, India
Presentation on steel, fabrication & erection Munger Ganga BridgeAshish Kumar Yadav
Presentation on Steel Fabrication work and Erection of girder by Cantilever erection method.
One of the largest bridge in India (Bridge Length 3.690 Km)
Similar Bridge 1. Patna- Sonpur (Digha Bridge) across the river Ganga, Bihar
2. Bogibeel across river Brahmaputra in Assam
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
What is the TDS Return Filing Due Date for FY 2024-25.pdf
Presentation for safety month celebration 2012
1. News Paper Cutting(Hindi & Urdu) of Safety Month Closing
Ceremony
News Paper Cutting(Hindi & Urdu) of
Safety Month Closing Ceremony
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
2. • safety
Flag Hoisting By Our Chief Guest Mr.
A.K Shrangarya (Chief Engineer East
Central Railway)
Inauguration Ceremony
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Safety Pledge By Mr. R.P Kausher
(Dy. Chief Engineer, East Central
3. Welcome Speech By Mr R.K.P.
Singh
( Safety I/C 8802,Munger Site)
Brief Description Of All Activities To
Be Held During The Safety Month
Celebration Nov-2012
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Inauguration Ceremony
4. Safety Speech By Our Chief Guest
Mr. A.K Shrangarya
(Chief Engineer East Central Railway)
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Inauguration Ceremony
5. Mr S.K Behera And Mr G.K.Patnaiak Explaining The Slection
Process For Housekeeping Team
Selection Process for House
Keeping Team
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
6. Mr. S.K.Behera Explaining The
Rules Of The Quiz
Competitions
Mr S.Chakrabarty
JudgeDeclaring The Quiz
Results With Mr. R.K.P Singh.
Quiz program
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
7. Mr. R.P. Kausher (Dy. Chief EC
Railway)was The Quiz Master For The
Supervisory Group
Mr R.K.P Singh Coordinating The Quiz
Program For Supervisory Group
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Quiz Programme
8. Mr.R.K.Singh(Erection Incharge) is
Leading for the House keeping
inspection at Fabrication and Sand
Blasting Site
House Keeping Inspection
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Mr Sivaji Saw is leading for House
Keeping inspection For Erection
Site
9. Fire Mock Drill Organized As
Per The Schedule
Rescue Team Extinguishing
The Fire
Fire Mock Drill
SAFETY MONTH CELEBRATION , NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
10. CPR By Mr. G.K Patanaiak Safety Officer To The Victim
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Fire Mock Drill
11. Our Compounder Mr.Raj Babu is
giving the First Aid Treatment to the
Victim at Our Occupational Health
Centre
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Fire Mock Drill
Victim sent By
Ambulance
12. Head Count Confirmation By Mr. Chetan
Chouhan Admin At Assembly Point
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Fire Mock Drill
13. Health Check Up By
DR. M.M.Singh(MBBS)
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Health Checkup
14. Colony And Mess Inspection Team
Mess and Colony Inspection
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
15. LPG Cylinder inspected during the Mess inspection.
Inspector Testing The Quality Of Food also.
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Mess and Colony Inspection
16. Actors are getting makeup for their respective characters
Make-up Room
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
17. Welcome Speech And Introduction Of Guests By
Mr. R.K.P Singh Safety Incharge
Closing Ceremony
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
18. Safety Pledge By Mr Mr R.K.Singh D.G.M BBJ With All
Staff & Workers
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Closing Ceremony
19. Safety Speech by Chief Guest
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Closing Ceremony
Bouquet Given to our Chief Guest
By Our Acting Project Incharge
Mr.P.K.Das Gupta GIL
20. Safety speech By Mr.
R.K.Singh DGM BBJ Client
Closing Ceremony
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Bouquet Given to our Guest By
Our Acting Project Incharge
Mr.P.K.Das Gupta GIL
21. Safety Speech By Mr P.K. Dasgupta Project Incharge
GIL and Mr R.S.Yadav GM P&R
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Closing Ceremony
22. Safety Speech By Mr R.K.Singh (Erection Incharge) and
Mr S.Chakraborthy (GIL)
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Closing Ceremony
23. Safety Drama Scene:-Brahma
Deo ,Yamraj Ji& ChandraGupt
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Safety Drama at Closing Ceremony
Drama Scene:-Worker is working at
Height and Yamraj Ji Pushed him but
he was alive due to Safety Belt
24. Safety Officer is giving Toolbox Talk
before Starting Work
Yamraj is standing behind the
workers who is working at Height
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Safety Drama at Closing Ceremony
25. Yamraj Tried To Take Life Of
The Worker But Failed
Yamraj giving the reasons of
failure to Brahma Deo. The Reason
was Good Safety Arrangement at
Munger Site
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Safety Drama at Closing Ceremony
26. Brahma Deo Thanked The Safety Team Of MRRB Of GIL
Lead By MR R.K.P Singh Safety Incharge
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Safety Drama at Closing Ceremony
27. Mr G.N.S David G.M (GIL) And Mr R.S Yadav Giving The Prizes For Various Activities.
Note:-Total 140 Prizes given by Gammon and all S/C as Sun Infra.Sattar,Subedar,Amol
Chaudhary ,Das group given Prizes Total No.475 to their all workers due to they are
motivated by Gammon Safety Department
Prize Distribution
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
28. Certificate of appreciation given by GAMMON to the
sub contractors for their valuable co operation towards
developing a good safety culture at our 8802,Site
Certificate of appreciation
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
29. Dy Chief Railway visiting the exhibition of
safety posters, slogans, songs, etc. He was
very impressed with our Safety Full Month
Workers are seeing the exhibition
Exhibition of Safety
Posters,Slogan,Speech & Song
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
30. Vote Of thanks By Mr S.K.
Behera
Sweet Distribution And Vote Of Thanks
SAFETY MONTH CELEBRATION NOVEMBER,2012
8802-MUNGER RAIL CUM ROAD BRIDGE PROJECT
Printed Sweets Distribution
Pocket