The document outlines India's Digital Vision or Smart Vision India program called Digital India. The key points are:
1) Digital India is a large national program projected to cost $17 billion with the goal of transforming India into a digitally empowered society and knowledge economy.
2) The program will focus on three main areas - developing digital infrastructure as a utility, improving governance and services, and digitally empowering citizens.
3) It involves numerous initiatives such as expanding broadband and mobile connectivity, increasing access to public internet, re-engineering government services, expanding e-education and e-health services, and promoting digital literacy.
Content :
》Digital India Meaning
》Importance
》Scope
》Main Sectors
》Results
》Conclusion
Presentation on Digital India programme launched by Government of India, by Susheel Kumar Tiwari student of Dept. Of Business Management in Hemvati Nandan Bahuguna Garhwal University.
Digital India is a campaign launched by the Government of India to ensure the Government's services are made available to citizens electronically by improved online infrastructure and by increasing Internet connectivity or by making the country digitally empowered in the field of technology.
Digital India is a campaign launched by the Government of India to ensure that Government services are made available to citizens electronically by improved online infrastructure and by increasing Internet connectivity or by making the country digitally empowered in the field of technology.
If you want any information regarding digital india then you can get it from here.
<a> Mera Digital India</a>
Content :
》Digital India Meaning
》Importance
》Scope
》Main Sectors
》Results
》Conclusion
Presentation on Digital India programme launched by Government of India, by Susheel Kumar Tiwari student of Dept. Of Business Management in Hemvati Nandan Bahuguna Garhwal University.
Digital India is a campaign launched by the Government of India to ensure the Government's services are made available to citizens electronically by improved online infrastructure and by increasing Internet connectivity or by making the country digitally empowered in the field of technology.
Digital India is a campaign launched by the Government of India to ensure that Government services are made available to citizens electronically by improved online infrastructure and by increasing Internet connectivity or by making the country digitally empowered in the field of technology.
If you want any information regarding digital india then you can get it from here.
<a> Mera Digital India</a>
What is Digital India ?
Visions of Digital India
Pillars of Digital India
Digital India Initiatives
Infrastructure
Services
Empowerment
Estimate cost and Impacts
SWOT Analysis
Achievements
Challenges faced
Measures to check the problem
Conclusion
Digital India - Govt of India's flagship program for digital empowerment of I...Amit Ranjan
Digital India is the Indian Government's flagship program aimed at transforming India into a digitally empowered society and knowledge economy.
Source : https://negp.gov.in/pdfs/DigitalIndia.pdf
With the launch of Digital India Program, the Indian Govt. aims to transform India into digitally empowered economy. The govt. seeks to integrate technology with everyday life of the citizen. This program intends to provide customized content through affordable internet access in local language across the country.
Digital India program is a Modi Government initiative that aims to offer a one-stop shop for government services would use the mobile phone as the backbone of its delivery mechanism.
Digital India - What It Means For Your Brand's Digital Marketing StrategyFutuready Media
The young India today considers high speed internet as a core utility, a plethora of choices as a necessity and speed and ease as must-haves.
This presentation highlights insights about numbers and the scale to assist you set the digital strategy for your brand.
E governance service delivery an assessment of community information centre p...Sudesh Sood
Paper presented at theRaja Rammohun Roy Library Foundation(RRRLF)-sponsored two day National Seminar on Public Libraries as community Information Centres,organised by the Punjab Library Association(Regd.) and Department of LIS ,Pbi. Univ. Patiala on 21-22"May'2012
It is the basic concept of the digital india.. its all about what the digital india is.. about its 9 pillars its challenges its impact and its methadology..
What is Digital India ?
Visions of Digital India
Pillars of Digital India
Digital India Initiatives
Infrastructure
Services
Empowerment
Estimate cost and Impacts
SWOT Analysis
Achievements
Challenges faced
Measures to check the problem
Conclusion
Digital India - Govt of India's flagship program for digital empowerment of I...Amit Ranjan
Digital India is the Indian Government's flagship program aimed at transforming India into a digitally empowered society and knowledge economy.
Source : https://negp.gov.in/pdfs/DigitalIndia.pdf
With the launch of Digital India Program, the Indian Govt. aims to transform India into digitally empowered economy. The govt. seeks to integrate technology with everyday life of the citizen. This program intends to provide customized content through affordable internet access in local language across the country.
Digital India program is a Modi Government initiative that aims to offer a one-stop shop for government services would use the mobile phone as the backbone of its delivery mechanism.
Digital India - What It Means For Your Brand's Digital Marketing StrategyFutuready Media
The young India today considers high speed internet as a core utility, a plethora of choices as a necessity and speed and ease as must-haves.
This presentation highlights insights about numbers and the scale to assist you set the digital strategy for your brand.
E governance service delivery an assessment of community information centre p...Sudesh Sood
Paper presented at theRaja Rammohun Roy Library Foundation(RRRLF)-sponsored two day National Seminar on Public Libraries as community Information Centres,organised by the Punjab Library Association(Regd.) and Department of LIS ,Pbi. Univ. Patiala on 21-22"May'2012
It is the basic concept of the digital india.. its all about what the digital india is.. about its 9 pillars its challenges its impact and its methadology..
A programme to transform India into digital empowered society and knowledge economy.The Digital India vision provides the intensified impetus for further momentum and progress for e-Governance and would promote inclusive growth that covers electronic services, products, devices, manufacturing and job opportunities.
E governance and digital india by col inderjit singhInderjeet Singh
E-Governance in India, a major initiative under the ‘National e-Governance Plan’ (NeGP) of the Department of Electronics and Information Technology (DeitY), Ministry of Communications and Information Technology, Government of India, was approved in 2006 and it is the backbone of ‘Digital India’ vision.
E-Governance is about Government’s interaction with government, it’s way of conducting business with companies and delivering services to its citizens by leveraging Information and Communication Technology (ICT) enabled strategies for ensuring transparency, efficiency, and accountability in the process which is not only faster but also more personalized and can be accessed 24 hours a day, seven days a week. It also entails integrating services across different governmental agencies in order to reduce cost structures, simplify interaction and improve overall service delivery in real time.
Digital India – the dream project of the government and a blessing for the citizens, could help in
connecting the dots of various projects, past and present, to bring India to a global platform. It will help in
moving with the universal trends of digital innovation and create positive impact in the lives of people - rural
and urban, young and old.” In this article we discussed key features, impact and challenges of Digital India
programme.
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...Mahesh Chandra Manav
India Plan all National Road Highways should with all require Amenities for the person Journey by Roads In India under NHAI.
This should be offer all infra Facilities involve Safety Comfort ,Entertainment and Refreshment with Stay for Passengers and Heavy Fleet Transportation Truck and Bus Drivers.
NHAI should install all Lighting and Traffic Gadgets along with Fast Telecom Networks for person feel Comfort and Safety across the Highways.
Building Infra Residential ,Commercial , Hotels, Hospitals , Highway Police and Rescue Centre Warehouse , Vehicles Fuel Refueling Pumps ,Electric Vehicle Charging , Parking for Passenger and Heavy Fleet Transport Truck Drivers ,Refreshments , Vehicle Repair Workshops, .
Smart Power Generation with High Energy Power Storage battery Unit and Smart Power Distribution 24X7.
Very Prospective Business Opportunity and High Return Long-term Investments for Industries.
link Vue System Offer Design Engineering Supply and Installation by Professional.
Electrical Safety , Networking LAN ,Optical Fiber ,Wireless and GSM Solutions, Building Automation , Smart Data Loggers, Protocol Convertors, CCTV .Fire Alarm Systems, Access Controls Systems, Security Systems, Parking Management Systems, Audio Visuals, PA Systems, Smart Toll Managements, EPABX, PIDS Fencing , Weather Monitoring Station ,Variable Messages Moving Display , Video Walls, Electric Vehicle Charging Stations. to know more plz visit www.linkvuesystem.com
Mahesh Chandra Manav M-9811247237 manav.chandra@linkvuesystem.com
you can visit my profile and comments
Building Automation,Networking & Communication Presentation by LVS 2022.pdfMahesh Chandra Manav
Link Vue System Offering Technical and Genuine support to all Customers also Introducing of New Technologies upgradation knowledge of customer while preparing Tenders for New and Modernization of Old facilities .
We are into OEM for Networking Products LAN ,Fiber Optics and Wireless with GSM Solutions. Electrical Connectors ,PLUG Sockets and Electric Vehicles Cable Harness, We are also distributor of Surge Protection and System Integrators of Building ,Automation , Smart Data Loggers, Protocol Convertors, Protocol to FO Convertors, CCTV , Fire Alarm , Access Controls, Security Systems, Audio Visuals ,PA Systems , EPABX ,Parking Managements and Enterprises Solutions with PIDS Fencing.
Latest We Introduce DRONE Survey and Monitoring Services, Weather Monitoring Station and Electric Vehicle Charging Unit for AC and DC Charging of Electric Vehicles 3KW-360KW.
We are into Design Engineering Selection of Right and Genuine Components as per application and Environment demand with Installation by Professionals.
to know more plz visit our webpage www.linkvuesystem.com
Mahesh Chandra Manav HOD M-9811247237 manav.chandra@linkvuesystem.com
you can visit my profile and comments
Indian railway&metro rail,others electrical safety first periortyMahesh Chandra Manav
India is growing Rail Transportation Infra Connecting Maximum Possible Land Connectivity Long route and Suburban Daily Passenger Travelling with in Cities Like State Connectivity ,City Local Travelling speed 70KMP to 200KMP and Fast Bullet Trains.
These Infra is Full of Metal Jungle From Track ,Structures,Cables and Rolling Stocks.
These Track may be Ground ,Elevated ,Under Ground and Long Tunnels now introducing some route below River .
To Operate Railways Infra Traction Power ,Power for Building Infra and Various Equipment's require .
Power Demand for Railways Network from Grid ,Self Power Solar Generation ,High Energy Battery Storage Systems and Others
Water Supply for Equipment Washing ,Public Drinking and other use ,Disposal Of Waters now connected through Automation.
The Whole System Connected Power ,Signal ,Data ,Telecom ,Traffic Routes ,Safety&Building Automation Like CCTV .Fire Alarm,Access Control , Audio Visuals, Public Address ,Telecom (Exchange ,Base Station Towers ,Wireless Network Towers ,Safety , Real Time Passenger Information Moving Displays, Platform Screen Door ,Lifts and Escalators,Ticketing &Fare Collections ,Entry and Exit of Passenger Inside Station Buildings.
Electrical Safety is very important roles to performance of Equipment's Operators ,Human surrounding from Electrical Hazards.
Earthing&connectivity of all Equipment's to discharge any kind of over voltages&Surges Due to Internal&External Like Lightning follow NBC2016 /RDSO Electrical/RDSO S&T Latest Technical Documents.
We connect Power to various Equipment's&also Signal , Telecom ,Other Data Cables& Cable route from Indoor to Outdoor from Track , Control Rooms, Station Buildings &Substation via Power Transformers consider directly or indirectly these all are Interconnected and high Chances of Surge and Over-voltage enter into our System from Power Sources or via Data or Communication Ports to safe system maximum Low Voltages Signal ,Data or communication now change to Fiber Connectivity this help to protect our System from any surge from Data Port.
Railway Technical Documents is very much up to marks but in Tender BID Selection of Components, Installation the involve TEAM Compromise with Contractors after taking Favor Directly or Indirectly &these Contractor Do Fraud mental using Substandard from supply up to installation Just for 3%-5% whole project is smash&High Value Damage occur when system fail&also public inconvenience due to Train Delay ,Stop&Cancel Route.Fire Accidents
Earthing ,Lightning&Surge Protection is not a BOQ it's Design ,Engineering&Calculation ,With Selection of Components &Installation .
Plz go through Presentation to now more about us visit webpage www.linkvuesystem.com
LinkVue System is Technical Pool of Engineers Offering Design ,Engineering ,Calculation Supply with Installation Support.
Maintenance Free Earthing
Lightning Protection Systems
Surge Protection Device
Contact M-9811247237 manav.chandra@linkvuesystem.com
National green building code 2021 india kaya kool hey hum by link vue systemMahesh Chandra Manav
National Building CODE 2021 by Bureau of Energy Efficiency
(Ministry of Power, Government of India to ensure Utilization of Power by Building and Infra with use of Automation Help Monitor , Controls and Networking to easy and freedom to know and control their Electrical and Electronics using Mobile/TAB if they are away from their Facilities.
To Support Carbon Free Green Environment Installation of Solar PV Power and High Energy Battery Storage establish Electrical Vehicle Charging in every Large Building and Housing Society Compulsory with ensure 25% free and Reserve Parking for Electric Vehicles .
Rating for Green Building Start from Power Supply Incomer Transformers, Low Voltage Power Distribution Controls Panels and Supply to all Building ,Flats using Power Distribution Junction BOX installation of Surge Protection and RCD with Load and Application base type of MCB's.
For Networking maximum installation and Laying of Fiber Cable and Turn to Electrical when enter into premises Indoor ,this help to protection for Surge threat any because of Lighting Discharge and may be chance to enter into System by Power Line or through Communication Cables.
Maximum Product which we use in our Building should be 5 Start Rating (Energy Efficient Products) along with possible to Connect to IBMS.
The Circular issued by Ministry of Power and Bureau of Energy Efficiency to CPWD/PWD/Project Engineering Division Center and State with advise to Architects ,Electrical, MEP Consultants to implements without fail these Advise for all upcoming new Buildings Infra for Government and Large Private Infra Project , Metro Station Building , Depot ,Railway Station Building , Hospitals,Universities, Airports Infra along with who want to have Green Building and Star Rating for Buildings.
Plz go through presentation
to know more about us visit webpage www.linkvuesystem.com
Link Vue System Offer Components , Design , Engineering Selection of Right and Genuine Products , Supply of BOQ extend support for Installation.
Smart Data Logger , RTU's ,Protocol Converter BACNet .Modbus RTU, MODbus TCIP, Ethernet , Lon-works , IEC61850.
Networking LAN,Fiber ,Wireless , GSM Solution
Protocol to Fiber Optic Converter
CCTV ,Fire Alarm,Access Controls,Security Systems
Building Electrical Free Connectors
Industrial Plug Sockets EV Connectors and Harness
EV Charger 3 KW-300 KW AC /DC Public Chargers
Plz send for Web presentation /Inquiry Mail to manav.chandra@linkvuesystem.com M-9811247237
We are witness globally weather is changing due to development and destroy nature by Industries and Infrastructure Demand.
Lightning strike to ground can not be stop but this can be control and discharge to ground safely using best and latest practice document for Installation of Lightning Protection available Follow IEC62305 Conventional and Advance Effective ESE Type Lightning Protection NFC17-102 .
Now Days in India Many disaster happened more than 100 People Died due to Lightning and national Figure reported Human Loss 5000 or More and 1000 Cr. Value Assets burn partial of fully.
Lightning Early Warning is Responsibility of Every Government along with mandatory of Installation Lightning Protection under Electrical Safety .
Every Structure or Shed which is use for Public , other purpose Like Highways, Road ,Public Park , Museum should be protected from Lightning with Effective Earthing to discharge safely to ground.
Earthing and Surge Protection is very important under Electrical Safety to protect assets and Human Life for any kind of threat due to Lightning and Other Surges Reason Over Voltage or Transients.
Worldwide its duty of Engineering while design and Installation of any Projects for Building Infra, Industries and Public Transports Electrical Safety for any Power Supply to Equipment's will consider as priority and do Design ,Engineering ,Selection of Earthing ,Lightning and Surge Protection as per application and environment condition not a Similar BOQ for all Equipment's.
They should also give proper instruction for installation and Maintenance procedure to ensure long life and Safety of Human and sustainability of Equipment Life with performance .
Our Electrical and Fire Safety departments should aware latest National Electric Code follow and instruct all the Industries to follow same and ensure periodical maintenance by these people for safety of human Life and Valuable assets.
All The Leading Insurance Companies who do Insurance under cover Fire and other Damage of Equipment's due to power should aware Electrical Safety Law and ask report from customer before accept any Insurance or issuing Policy otherwise they may have bear huge loss plz refer USA and other forward Company report loss due to Lightning and Electrical Short Circuit.
Plz go through presentation
Link Vue System Offering Design ,Engineering ,Selection of Genuine and Right Components , Supply and extending support for Installation .
want to know more about us plz visit webpage www.linkvuesystem.com
Call M- 9811247237 manav.chandra@linkvuesystem.com
Mahesh Chandra Manav
Now India is Implementing with Preference and Priority A Green Carbon Free Silent Road Transportation Electric Vehicle and Charging Infrastructure. To Charge These Vehicle we need more power and Separate Power Infrastructure to ensure Stable and Clean Power System with support 24X7 only possible with addition Solar PV Power Plant and High Energy Storage Power System adoption and Implements where demand is more that 1MW.
Our Broad Band and Telecom Signal should be Strong Signal and Fast response as and when require by System.
Ministry Of Urban Infra , Railways, Power , National Highway and Road Infra already advise all State and Central to offer Charging Facilities as per demand in the Market 3KM Radius Public Charging and 25KM Both side of Highways Electric Vehicle Charging Station for Charging 2/3/4 Wheeler Vehicle along with Passenger Buses and Heavy Fleet Electric Vehicles.
This Can be Charging Station or with Restaurant in Highways power demand may be 2.00MW-4.00MW .
Plz Find Attach latest presentation EV Charging Infra from Linkvue System Pvt Ltd Kindly go through .visit www.linkvuesystem.com
We are into Manufacturing , Supply ,Design ,Engineering ,Selection of Genuine and Right Products with supervision support for Installation .
Electrical Safety Earthing ,Lightning and Surge Protection
Net Working Solution LAN ,Fiber ,Wireless and GSM Solutions
Automation and Data Logger RTU's
Protocol Convertor and FO Convertors
CCTV .Fire Alarm ,Access Controls, Security Systems
Fencing PIDS
Industrial PLUG Socket IP 68 Out door up to 400 Amps
Electric Vehicle Charging Connectors and Harness
Solar MC4 Connectors with and Without Fuses
Plz Contact M-9811247237 Mahesh Chandra Manav
manav.chandra@linkvuesystem.com.
Power Demand ,Power Generation ,Transmission and Distribution of Power to Consumers is increasing Day 2 Day because of Technologies and Equipment's Turn from Mechanical to Automation for more productivity.
We all are facing nature problem Climate Change , Pollutions in Environment and Noise Pollution this in effecting Human and other life health and witness of new Diseases(VIRUS) .
Human Stamina and Patience are losing because we started more depend on gadgets and not doing physical work due to automation in Home , outside and Industrial operations..
Now in the Global started to think Assessment and Implementation to protect Nature along with Developments.
Power Generation now with Renewable Process and Supporting with High Energy Battery Storage is preference by countries along with Implementation of Pollution and Noise Free Electric Vehicle Road Transportation .
High Energy Storage System is supporting Grid Health and Other power generation to storage of power when demand is less than Generation and Support Grid when their is heavy Load on grid.
Our Electrical Equipment's now with more efficient and maximum output ,Consumption of Power is less than 40% due to Automation and Advance Technologies.
Plz go through our presentation by Link Vue System Pvt Ltd and visit www.linkvuesystem.com
We are into Manufacturing , Supply ,Design ,Engineering ,Selection of Genuine and Right Products with supervision support for Installation .
Electrical Safety Earthing ,Lightning and Surge Protection
Net Working Solution LAN ,Fiber ,Wireless and GSM Solutions
Automation and Data Logger RTU's
Protocol Convertor and FO Convertors
CCTV .Fire Alarm ,Access Controls, Security Systems
Fencing PIDS
Industrial PLUG Socket IP 68 Out door up to 400 Amps
Electric Vehicle Charging Connectors and Harness
Solar MC4 Connectors with and Without Fuses
Plz Contact M-9811247237 Mahesh Chandra Manav
manav.chandra@linkvuesystem.com
Solar PV Power Project India and International Companies Kindly go through Important and Helpful Topic.
Solar PV Power Generation is Preference Now Days by any Country for Investment in Power Generation it's Economical and Silent Green Carbon Free Power Generation System.
Installation of Solar PV Panel is Possible Pole Mounted ,Roof Top Mounted Residential and Industrial , Ground Mounted ,Canal TOP also Water Floating .
Many Solar PV Power Developers is Accepting Very Low Tariff and due to this EPC Companies ,Solar PV Panels, Invertors and Balance Of Plants Equipment's Supply ,Design ,Engineering and Installation have to work with very Low Margin.
The Maintenance of These Plant Costing is Total Depend Selection Of Component Quality ,Design ,Engineering and Professional Approach for Installation otherwise Developer will lose Revenue because of Failure or Low Generation this incurred high cost for Maintenance.
Earthing Design for Total Plant AC and DC Array , Lightning Protection (Threat Cloud Charge Strike) and Installation of Surge Protection with DC Cable and MC4 Connectors are ignorance part in projects Later Face big Problem many time lead Fire Accidents.
Selection OF Solar PV Panels Structure and Design also very important many failure showing Selection Structure Quality and Poor Installation .
Another Challenge is Cleaning of PV Panels and Monitoring of Large Installed Solar PV Panels now days recommendation Robotics Dry Cleaning of PV Panels and Inspection through DRONE .
Solar PV Plant Size is very Large and maintained by less Staff very Difficult to Control Tree Passing and Steel /Damage by un Identify Person so Industries recommend to do Installation CCTV with Day Nigh Monitoring , Fencing of Plant (PIDS), Security System added Fire Alarm and Access Controls Systems.
Networking of Solar PV Power Plant using Fiber Optics and Wireless Infra and Extending Data ,Monitoring of plant Local and Central Level .
Link Vue System Experience to Offer Design ,Engineering ,Selection of Genuine and Right Components, Supply Support for Installation and AMC if customer require .
Electrical Safety Maintenance Free Earthing , ESE Type Lightning Protection ,Surge Protection ,Industrial Out Door Plug Sockets.
LED Street Light , CCTV Camera, Fire Alarm ,Access Controls, Security Systems, PIDS .
High Energy Battery Storage Systems
MC4 Connectors with and Without Fuse ,DC Fuse 1500V-1800 V, Current 30 Amps.
Plz go through and give feedback ,Inquiry , time for Web Presentation.
useful for Solar PV Power Plant Developer, EPC and Electrical Contractors.
MNRE /SECI/NTPC/NHPC/State Renewable Departments/Smart City/Ministry of Power/REC Ltd/BHEL/CEL/REIL/RECML
Private Solar Power Leading EPC Companies.
Visit our Website www.linkvuesystem.com
Call M-9811247237 Mahesh Chandra Manav
manav.chandra@linkvuesystem.com
Electrical Failure ,Short Circuit Reason Cables and TerminationMahesh Chandra Manav
Wire is a piece of metal that is used to carry electric current, while on the other hand, cable contain number of wires inside a plastic or rubber casing which is used to carry electric signals. Copper, aluminium, plastics and alloys are the materials which are used to make these wires and cables.
When ever we are doing Selection of Cables for Power ,Data ,Communication and Networking ,Think Twice about Application ,Environment, Routing ,Indoor and out door along with Connectors(Terminal Blocks, Plug Socket , Glands, Conduit and Junction Box .
Earthing of Equipment's or Metal compulsory for all when we are routing , ELV to avoid Noise Transmission or Cross Talk of Signals.
LinkVue System Offer Freedom Connectors (Termination) for all kind of Cable Installation along with Junction BOX as per Industries ,Environment Demands.
These product as carrying all International Standard .
We are also undertaking Design ,Engineering , System Integration as advise by customer with supporting of their Customize requirements.
Electric Vehicle Plug ,Socket Cable Harness GBT ,CHEDMO, CCS
Solar PV Power Plant MC 4 Connectors with and Without DC FUSE
We request kindly go through our product range if you have some special need for Bulk Production or Project Requirement we are capable to offer.
Plz Send your inquiry , invite us for web meeting
Mahesh Chandra Manav M-9811247237 manav.chandra@linkvuesystem.com
High speed electric sky pods for passenger and cargo presentation by link vueMahesh Chandra Manav
India is Witness and adopting High Speed, Comfort with Safety Surface and SKY High Transportation Like Bullet Train ,Hyper Loop(Capsule Type) POD Taxi Ground and Sky Elevated this will help us to reduce Time for Journey .
Technology and Science ,Innovation and Successful Trail and Safety Certification all to gather many time High Investor who are in capable to take Risk in the Business.
India Still no a Rich and capable to do Such risky investment always looking for international Partner .
We have recent 4 Year Experience for Project on paper Hyper Loop ,and POD TAXI which is not shown any development .
Plz Find Picture of SKY High SPEED POD Passenger Taxi Trail Run for 2.4 KM also planning for Cargo .
Link Vue System Continues in process to gather latest technology updating and Share to our valued Customers.
You can Invite us for Following for Design , Engineering , Selection of Genuine and Right Components which meet Technical and Economical ,Supply along with Installation Support.
Electrical Safety
Earthing ,Lightning ,Surge Protection , Industrial Plug Socket , Building Electrical Internal Wiring Free Joint Connectors, Socket for Power ,Data and Communication.
Networking LAN, Fiber and Wireless
Building Automation ,Data Logger , Protocol Convertor
CCTV ,Fire Alarm ,Access Controls, Security Systems ,PIDS
Solar PV Power Plant , High Energy Battery Storage Systems, Electric Vehicle Charging Infra.
You can send Inquiry ,Web meeting manav.chandra@linkvuesystem.com
M-9811247237
Mahesh Chandra Manav HOD
Link Vue System Pvt Ltd
India/Australia
India is now Exceeding Demand of Power adopting more and More Value Addition Equipment's and Building and Other Infrastructure Like Road Transportation Electric Vehicles 2/3/4 and Heavy Fleet Transportation .
These requirement demand More Power ,Clean and Un-trip Power ,Decentralize of Power Distribution also taking care Environment Pollution Free Solar PV Power ,Wind Power and High Energy Storage Battery Systems .
We have to develop separate Power Distribution EV Charging Infrastructure as per Government promotion and Subsidy for EV Charging Utilization of Power Demand .
We should also do installation Power Transformer supply 800V-1000V AC along with Panels and Battery Storage in all Commercial Charging Station in Highways and Parking Place because power demand will be more than 2 MW if Consider Buses, Car and Other Fleet Transportation .
Our Telecom Infra should be more Strengthen to support these network to help to monitor and Payment Gateway.
Diesel Generators are already BAN in India for Commercial Activities only allow in emergency place like Hospitals and advisory issued to adopt High Energy Power Storage System which can be delivery power in absence of grid for longer duration as per storage of Power and easy to charge when grid is available with lower tariff.
We all have to use maximum Electronic Gadgets help to reduce your working staff and easy to protect , Monitoring ,Control and Access Remotely .
Installation of Networking ,CCTV ,Fire Alarm ,Access Control and other Security System is become mandatory along with Electrical Safety (Earthing .Lightning and Surge Protection).
We have to ensure Cable Installation , Routing and Jointing as per recommendation and monitor periodical with lodge history work done in record.
Maximum Failure Reported found Negligence and Over Sight and Temporary action to resolve problem in break down by Maintenance TEAM.
We have also complaint with all power distribution companies who's duty to ensure 24X7 Power to consumers in the Building and Other infra Dilute major Safety and playing with Human Lives witness many accidents .
Every Fire accidents in Buildings reported Short Circuit how this will be possible when we design all this consideration in the Projects .
This is only increasing Load with out considering safety and Building encroachments extending building near by HT Power Cables mounted on Poles for Power Distribution.
Link Vue System having experience in Electrical Safety ,Automation, Building Automation , Networking, CCTV, Fire Alarm ,Access Control ,Security Systems, PIDS , Industrial Plug and Sockets and Free Electrical Connectors for Building Wiring.
Plz send inquiry , contact us for webinar presentation.
Mahesh Chandra Manav M-9811247237 manav.chandra@linkvuesystem.com
Intelligence, Communicate Controls and Monitors your Building Gadgets as you want with use Smart and Efficient Devices which all can connect through Physical Cables for Power, Signal and Data Cables .
Worldwide many leading protocol Data Loggers and I/0's Digital and Analogue Field Products.
BACANET, MODBUS-TCIP ,MODBUS RTU and IEC61850 are most popular and demanding by Industries.
Use of Smart Energy Efficiency product and Incorporation of Solar PV Power Generation Plant , High Energy Battery Storage , Water Treatment Plant, Electric Vehicle Charging Infrastructure ,Networking now most important demand by Customer's.
Electrical Safety is very important which is not only ensuring of performing Electrical Equipment's Healthy also protection human from Electrical Shocks may be lead to death.
Surge Protection mandatory and advise to use all Power Incomer in the Buildings and before entry any into Flats .
All Data ,Communication and Monitoring Device and Other if we use Copper Cable recommended Surge Protection if Cable are entering into premises from outside or Routing any High Voltage Cables .
We can reduce effect or hit any Surge to our communication and Networking if we consider to install Fiber Optics and change to Electrical Signal when enter into premises.
Another Major Threat is Lightning due to Cloud Discharge High Voltage and High Current and they Lightning Protection which we install top of the Building allow to discharge this Current Design ,Selection of Components and Installation as per IEC 62035 Conventional or NFC17-102 Advance Lighting Protection Systems.
Link Vue System offering Products ,Design , Supply and Installation extending up to AMC .
Electrical Safety
Networking
Building Automation
CCTV
Fire Alarm Systems
Access Control Systems
Security Systems
Solar PV Power Plant
High Energy Battery Storage System
Electric Vehicle Charging Infra
Industrial Freedom Plug and Socket IP 68 outdoor up to 400Amps
Building Internal Electrical Wiring Connectors Replacement of Tape Joint and Poor Termination .
All Building Power and Data Plug Sockets as per International Standard.
We request all Architect, Electrical Consultants, OEM Automation, EPC Companies, Electrical Contractors ,Interior Decorators, EV Charging Manufacturer , Solar EPC also High Energy Storage Battery Manufacturer, We also Request Smart City Project's, Municipal Corporation ,Police , Hospitals , PWD.CPWD ,Government Project Planning , Metro Rail Projects ,Airport Infra Project ,Power Distribution Companies for send their inquiries by email or contact .
Mahesh Chandra Manav HOD M-9811247237
manav.chandra@linkvuesystem.com
Safe you and your team from corona virus 2021 by link vue systemMahesh Chandra Manav
Corona Virus is now changing many variants and world wide our Scientist is working very Sincerely to come out medicine which will be effective to kill Corona Virus but before that they have given us to protect from corona and every country trying to have this protection for their person as per priority.
We have received guide line under Covid Using Mask ,Social Distancing , Sanitize(Wash) our Hand .
Every responsible person when they will be out personal and official should not forget to follow.
In India our Government and Citizen taken this as lightly and invited again result Impose LOCK Down ,many People Lost their Earning and Loving Family members and our medical Facilities Collapse many hospital took advantage looted patient even very bad handling of dead body by Government and not did proper crimination .
Now many of state is in process to Lift Lockdown and our Industries and Office will be open for employees our request all the Industries plz don't dilute COVID Guide line use Thermal Camera with Face and Temperature Detective Software for Office Employees and visiting guest to safe guard your staff from Corona Patient.
World wide we already witness of Economical Loss and people lost their JOB if don't follow COVID guide line our situation will worst .
Employers and Employees both should be follow guide line with responsibilities ,Fever Check every employees who is attending office before entry and Exit from Office.
When we return to our home from out side plz ensure safety of your Family member to protect from Corona.
What for you are waiting we all are warrior and know how to come over from problems and ensure any reason no LOCKDOWN condition arise again.
SO Work Hard ,SMILE Please no Body want DULL or Stress Face Surrounding .
Your One Beautiful SMILE Face will Change Environment from STRESS to WELLNESS.
COME and JOIN US World is Waiting and Welcome you all Again.
You all are very Important be SAFE and keep other SAFE Surrounding
KYONKI TUZHME RAB DHIKTA HEY YAARA MEIN KAYA KAROON
India is in verge of utilization of Carbon Free A Silent ROAD Public Transportation Passenger BUS by Ministry of Road Transportation from MINI Bus up to High Capacity Passenger Bus for Local and Urban TRIP.
This is help India to Build Healthy Environment ,Low Operation Cost to support our duty to utilize as much possible .
Indian Government has advised all department and Industries give priority to Electric Vehicle .
for Vehicle Charging Infrastructure for Electric we have to develop microgrid Solar PV , High Energy Battery Storage and 11KV/33KV Distribution Power Substation , Networking to online Monitoring of Charging for Vehicles.
Many of OEM for Buses also offering Battery Swapping Options apart from Charging of Vehicles.
This is require professional approach Training to BUS Driver Concerned Team Handling Charging and Safety Aspect to handle High Power System .
The Person Having Heart Problem ,Installation of Pace Makers should not be near to Charging Station any given time .
CCTV ,Fire Alarm ,Access Controls ,SCADA , Protocol Convertor IEC62305 , Monitoring ,Communication and Networking is very important where Number Of Charging is more .
The Bus Operators Public Transportation apart from Depot they has to offer Charging in route with in city for urban Government is Installation on Road and Highways every 25KM both side on Roads with Facility Like Hotels and Other Refreshments.
Link Vue System Offer Electrical Safety Earthing ,Surge Protection ,Lightning Protection ,
Networking LAN Fiber and Wireless
Automation for Monitoring ,Controls and Billing Gateways
Protocol Convertors, RTU's with I/0's
CCTV ,Fire Alarm ,Access Controls
High Energy Battery Storage System
Industrial and EV Plug and Sockets up to 400Amps and IP68 Condition
Solar MC4 Connectors with and without FUSE 1800VDC /30Amps
Freedom Connectors for LV Cables Wire Joints
Plz Write or Contact us Mahesh Chandra Manav M-9811247237
manav.chandra@linkvuesystem.com
We are already losing our people due to corona&other disease which is not in our control&many time we are enable to pay for medical help .
World is already suffering Economical , Food ,Medical&many more problems&every body is struggling for survival .
Cross Border,BorderProblem,PowerGame,Hate People,Fight with insurgents inside Country&use for Terrorisms,Provoke for WAR all these world in mean of Destroyer .
WAR is not a Solution Only Less Work for Piece, Kill People is not a answer let work to save each Life as possible .
IF we all united understand each other dialogue with each other discuss instead of Silence no believe on snatching,start believe to help&support each Other's.
The People who fight they always think for Hiding Place but if you open your Hand&Mind take people on believe you are well-wisher you are more protective&no body break that shield.
This Problem is only when we think for ourself only use power to control other's not giving other people right for leaving unnecessary claim and Border between Two Person Two Country .
but Understand Human BODY and Organs are same for all who lives in earth accept genders to balance and complete reason for Life.
Help and Connect people
NO ISERIAL NO Philippine only HUMANITY WIN
LETS STAY to Gather Stay with Humanity
India National Policy for Electric Vehicle and Road and Highway Electric Vehicle Charging Infra is already published .
Our Government Announce Attractive Subsidy for Customers OEM and also who are into Electric Vehicle Charging and Supporting Infrastructure.
They have advised Govt Agencies who are into Power Generation , Transmission and Distribution , Oil and Gas Distribution Infra Companies to invest&Support Electric Vehicle Charging Infrastructures .
Maximum State has issued&Implementing EV Policy by Smart City ,Municipal Corporation ,Road Transportation&other Public Fleet.
Demand of Power Supply will be High as per EV Charger Installation &Separate Transformer 600V should be installed on Public Charging for 4Wheeler and Buses.
Solar PV Power ,High Energy Battery Storage&Wind Power will be benefit on Highways .
Link Vue System can offer Support for products ,Supply&Installation Electrical Safety (Earthing,Surge Protection). Automation ,Networking , Connectors ,Cables&High Energy Power Storage Systems.
Write or Contact : Mahesh Chandra Manav M-9811247237 manav.chandra@linkvuesystem.com
Inviting OEM of Electric Vehicles, Battery Bank , Electric Vehicle Charging ,EPC Companies and Other Govt&Private involving EV Infra projects .
EV Ka Jamana Hey Environment ko Bachana Hey
India great intiative a carbon free silent road transportaion electric vehicleMahesh Chandra Manav
We are now realize Clean Air (Oxygen) is very important for each breath to ensure life of earth.
Like Other Industries releasing Pollution and Carbon due to production but for Transportation may be we can stop these Pollution by using Electric Vehicle on Road.
But the same time we have to understand and ready to build infra for Additional Power in Demand for Charging of these Vehicles.
It will be only possible when we develop power in Local Integrate with Battery Energy Storage and Supply Clean Power and Untrip Power to full Fill demand of Power for Vehicle Charging Infra.
Industry has to select Connector both side from Vehicle and Vehicle Charging should be same .
Link Vue System is professional Company Supporting Technical and Product Demand as trade or Installation Partner .
We invite to join us for Nation Agenda to reduce Carbon in Air and Increase of Oxygen in AIR.
We Offer Electrical Safety Earthing&Surge Protection ,Cable and Connectors (up to400Amps IP 68 )for Electric Vehicle , Networking Lan ,Fiber and Wireless,Automation &Connectivity of Building Commination connectivity up to distribution Substation .
We Request to Electric Vehicle&Battery Manufacturer, Vehicle Charging OEM, Installation Partner , Power Plant Solar Roof Top ,High Energy Batter Storage to Contact us
We are Witness of Success&Failure of Industries and Equipment's when we compromise their Connectivity(Interface PLUG & Socket)
Environment Condition,Rating ,Proper Wire Size and Define Industrial Standards.
Our Main Segment Focus Data Centre ,Office , Factories , Electrical Equipment's, Industrial Equipment's Motors, Pumps , Robotics and Mobility Equipment's, Lifts and Escalators ,Wind Power,Power Plants,
Sugar Plants,Cement Plants, Chemical ,Process and Hazards Plants,
These Plug and Sockets and Suitable for Indoor and outdoor up to IP68 Conditions.
Power Source AC 2.00Amps up to 400 Amps also DC Power up to 250Amps.
We also Offering Connectors ,Patch Cords for Data and Communication Cables .
We are also Introduce Multi Connection PLUG and Sockets for Institutional Purpose Like Hospitals, Universities, Hotels, Shopping Malls, Product Displays, Railway Station Building , Airport Infra and Various Public Utilities .
Building Electrical Internal Cable Wiring for Joints and Branches we are offering Hazel free Connectors simple to operate wire Size 1.50Sqmm -10.00Sqmm Cables.
We are having Special Junction BOX as per customer demand in engineering plastic&metal products for Indoor&Out door up to IP68 Conditions.
These Product and Complying with All International Standards.
Platform touch voltage protection membrane system and other railways buildin...Mahesh Chandra Manav
We are now experience witness of Metro Rails Project in India &travelling by Metro RIDERS increasing&this is another comforts shorts distance travelling for Official&Personal Trip.
Electrical Safety&Lots of Building Automaton&Networking involve to ensure Fast ,Smooth&Hassall Free Travelling for Passenger Like Automation of Ticket&Smart Card,Lifts&Escalators, Message Display ,Public Announcement ,Free Wi-fi , CCTV,Fire Alarm, Access Controls, Security Systems, Platform Screen Door. LED Lighting , Air Ventilation&Conditioning, Publicity&Refreshment Counters Now Offering Shuttles Road Transportation Electric Vehicles&Electric Vehicle Charging Infra.
Power for Traction&Building form Substation 33KV to 25KV for Traction&11KV for Building Power is established with Support Solar PV &High Energy Storage Battery System to Untrip Power 24X7.
Electrical Safety is very essential&Mandatory as per NBC2016 which take care of 440V AC Power running to power each and every equipment's. Earthing for Buildings, Traffic, Signal &Telecom design as per IEEE80 ,IS3043&Touch &Step Potential Voltage should be with in Limit for Safety of Person Operating Metro also for Metro Rider against Direct or Indirect shock.
Lightning&Surge Protection for all Power Data&Communication Write us LinkVue System Pvt Ltd
India is great Country and we may Second Largest in Population is this World .
We are witness in history Like More Social and Ethical behavior and very easy to lure by people all Political Parties Taken advantages on us After Independence thrown lots of Fauls promise and impose Tax and Duties as per their wish and looted our Hard Earn money from Treasure.
Now we are going to be witness largest Crime and Huge loss of Humanity.
Court Warn but our Present Govt ignored
Basic Medicine and requirement like oxygen now because Night Mare.
Now we are going to Largest JOB less Citizen as compare to any Forward country .
Kasme Wade paya wafa sir Jumle ki Baaten hein Baton ka kaya Yeh hey MODI aur Presnt Govt Ka mantra.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
1. Presentation Merging with Technologies July 2017
INDIA DIGITAL VISION/SMART VISION INDIA
INFRASTRUCTURE
POWER GENERARTION THERMAL/HYDEL/SOLAR
TELECOM(FIXED/WIRELESS/BROAD BAND)
e GOVERNENCE
EDUCATION and ENTERTAINMENT
AGRICULTURE
ELECTRONIC MEDIA
MEDICAL
Disaster Management
VOICE and DATA Management
2. ViSiOn DiGiTaL InDiA
Digital India is a Programme to prepare India for a knowledge future.
Prime Minsiter of India has laid emphasis on National e- governance
pla a d has ga e it’s appro al for Digital I dia – A programme to
transform India into digital empowered society and knowledge economy.
Digital India is an ambitious programme of Government of India
projected at Rs 1,13,000 crores. This will be for preparing the India for
the knowledge based transformation and delivering good governance to
citizens by synchronized and co-ordinated engagement with both Central
Government and State Government.
Programme has been envisaged by Department of Electronics and
Information Technology (DeitY) and will impact ministry of
Communications & IT, ministry of rural development, ministry of human
resource development, ministry of health and others.
3. Programme Under Digital India
• Infrastructure as a utility to every citizen:
High speed internet shall be made available in all gram panchayats; Cradle to grave digital identity; Mobile and Bank
account would enable participation in digital and financial space at individual level; Easy access to common service
centre within their locality; Shareable private space on a public cloud; and Safe and secure cyber space in the country.
• Infrastructure as a utility to every citizen:
High speed internet shall be made available in all gram panchayats; Cradle to grave digital identity; Mobile and Bank
account would enable participation in digital and financial space at individual level; Easy access to common service
centre within their locality; Shareable private space on a public cloud; and Safe and secure cyber space in the country.
• Governance and Services on Demand:
Single window access to all persons by seamlessly integrating departments or jurisdictions; availability of government
services in online and mobile platforms; All citizen entitlements to be available on the Cloud to ensure easy access;
Government services to be digitally transformed for improving ease of doing business; Making financial transactions
above a threshold, electronic and cashless; and Leveraging GIS for decision support systems and development.
• Digital empowerment of citizens:
Universal digital literacy; All digital resources universally accessible; All government documents/certificates to be
available on the Cloud; Availability of digital resources/services in Indian languages; Collaborative digital platforms for
participative governance; Portability of all entitlements for individuals through the cloud.
• Ministries/Departments in the central or state governments. Requirements of funds for individual project(s) for Digital
India will be worked out by respective nodal ministries/departments but according to government estimate it will cost
Rs 113,000 crore. To implement this the government is planning to strengthen National Informatics Center (NIC) by
restructuring it to support all central government departments and state governments. Positions of chief information
officers (CIO) would be created in at least 10 key ministries
4. 9 ACTION
Broadband Highways
• Laying of national optical fibre network (NOFN) in all 2.5 lakh gram panchayats in the country will happen in a phased
manner.
Universal Access to Mobile connectivity
• Ensuring mobile access in around 44,000 uncovered villages in the country and government is taking steps to ensure
that all villages are covered through mobile connectivity by 2018.
Public Internet access
• To expand the coverage of common services center (CSC) from 1.35 lakhs to 1.5 lakhs, i.e. one in every panchayat.
e-Governance
• Business process re-engineeering will be undertaken to improve processes and service delivery. Services will be
integrated with UIDAI, payment gateway and mobile platform.
e-Kranti
• e-Kranti focuses on electronic delivery of services whether it is education, health, agriculture, justice and financial
inclusion.
Global Information
• The focus will be on online hosting of data and proactive engagement through social media and web based platforms
like MyGov.
Electronics Manufacturing
• Focus is on set tob boxes, VSAT, mobile, consumer electronics, medical electronics, smart energy meters, smart cards
and micro ATMs.
IT Training for Jobs
• The government is planning to train one crore students from small towns and villages for IT sector.
Early Harvest Programmes
• The government is planning to deploy Aadhaar Enabled Biometric Attendance System in all central government offices
located at Delhi. A web based application software system will enable online recording of attendance and its viewing
by the concerned stakeholders.
5. Vision of Digital India
Centered on 3 Key Areas
• Digital Infrastructure as a Utility to Every
Citizen
• Governance & Services on Demand
• Digital Empowerment of Citizens
6. Vision Area 1: Infrastructure as a Utility to Every Citizen
• High speed internet as a core utility
• Cradle to grave digital identity -unique, lifelong,
online, authenticable
• Mobile phone & Bank account enabling
participation in digital & financial space
• Easy access to a Common Service Centre
• Shareable private space on a public cloud
• Safe and secure Cyber-space
7. • Seamlessly integrated across departments or
jurisdictions
• Services available in real time from online &mobile
platform
• All citizen entitlements to be available on the cloud
• Services digitally transformed for improving Ease of
Doing Business
• Making financial transactions electronic & cashless
• Leveraging GIS for decision support systems &
development
Vision Area 2: Governance & Services On Demand
8. • Universal Digital Literacy
• Universally accessible digital resources
• All documents/ certificates to be available on cloud
• Availability of digital resources / services in Indian
languages
• Collaborative digital platforms for participative
governance
• Portability of all entitlements through cloud
Vision Area 3: Digital Empowerment of Citizens
9. Pillar 1. Broadband Highways
• Coverage: 250,000 GP
• Timeline: December 2016
• CAPEX: Rs 32,000 Cr
• Nodal Dept: DoT
Broadband for all
Rural
•Virtual Network Operators for service
delivery.
•Mandate communication infrastructure
in new urban development and
buildings.
Broadband for all
Urban
• Coverage: Nationwide
• Timeline: March 2017
• Cost: Rs 15,686 Cr
• Nodal Dept: DeitY
National
Information
Infrastructure
1yr: 50,000 GP
2yr: 100,000 GP
3yr: 100,000 GP
Changes in Rules
to facilitate.
Integration of
SWAN, NKN,
NOFN. To be
implemented in 2
years
10. Pillar 2. Universal Access to Mobile connectivity
• Coverage: Remaining
uncovered villages (~
42,300 villages)
• Timeline: FY 2014-18
• Cost: Rs 16,000 Cr
• Nodal Dept: DoT
Universal Access to
mobile
connectivity
Ongoing Programme
Increased network
penetration &
coverage of gaps
11. Pillar 3. Public Internet Access Programme – National Rural Internet Mission
•Coverage: 2,50,000 villages (now 130,000)
•Timeline: 3 Years - March 2017
•Cost: Rs 4750 Cr
•Nodal Agency: DeitY
CSCs –
made viable, multi-
functional end-
points for service
delivery
•Coverage: 1,50,000 Post Offices
•Timeline: 2 Years
•Nodal Agency: D/o Posts
Post Offices
to become
Multi-Service
Centres
Ongoing
Programme
Reach of Govt.
services to all
GPs
This should be
long term vision
for POs
12. Government Business Process Re-engineering using IT to improve
transactions
• Form Simplification, reduction
• Online applications and tracking, Interface between departments
• Use of online repositories e.g. school certificates, voter ID cards, etc.
• Integration of services and platforms – UIDAI, Payment Gateway, Mobile
Platform, EDI
Electronic Databases – all databases and information to be electronic, not
manual
Workflow automation inside government
Public Grievance Redressal - using IT to automate, respond, analyse
data to identify and resolve persistent problems – largely process
improvements
To be implemented across government - critical for transformation.
Pillar 4. e-Governance: Reforming Government through Technology
13. Pillar 5. eKranti - Electronic Delivery of Services
Technology for Education – e-Education
• All Schools connected with broadband
• Free wifi in all schools (250,000)
• Digital Literacy program
• MOOCs – develop pilot Massive Online
Open Courses
Technology for Health – e-Healthcare
• Online medical consultation
• Online medical records
• Online medicine supply
• Pan-India exchange for patient information
• Pilots – 2015; Full coverage in 3 years
Technology for Planning
• GIS based decision making
• National GIS Mission Mode Project
Technology for Farmers
• Real time price information
• Online ordering of inputs
• Online cash, loan, relief payment with mobile
banking
Technology for Security
• Mobile Emergency Services
Technology for Financial Inclusion
• Mobile Banking
• Micro-ATM program
• CSCs/ Post Offices
Technology for Justice
• e-Courts, e-Police, e-Jails, e-Prosecution
Technology for Security
National Cyber Security Co-ordination Center
Ongoing Programme (NeGP) – will be revamped to cover these elements
14. Pillar 6. Information for All
Online Hosting of Information & documents
Citizens have open, easy access to information
Open data platform
Government pro-actively engages through social
media and web based platforms to inform citizens
MyGov.in
2-way communication between citizens and government
Online messaging to citizens on special occasions/programs
Largely utilise existing infrastructure – limited additional
resources needed
15. Pillar 7. Electronics Manufacturing
Target NET ZERO IMPORTS by 2020
Target NET ZERO Imports is a striking demonstration of intent
Ambitious goal which requires coordinated action on many fronts
Taxation, Incentives
Economies of Scale, Eliminate cost disadvantages
Focused areas – Big Ticket Items
FABS, Fab-less design, Set top boxes, VSATs, Mobiles, Consumer & Medical
Electronics, Smart Energy meters, Smart cards, micro-ATMs
Incubators, clusters
Skill development
Government procurement
There are many ongoing programs which will be fine-tuned.
Existing Structures inadequate to handle this goal. Need strengthening.
16. Pillar 8. IT for Jobs
•Coverage: 1 Crore students
•Timeline: 5 years
•Cost: Rs 200 Cr for weaker sections
•Nodal Agency: DeitY
Train people in smaller
towns & villages for IT
sector jobs
•Scope: Setting up of BPO per NE State
•Coverage: NE States
•Nodal Agency: DeitY
IT/ITES in NE
•Coverage: 3,00,000
•Timeline: 2 Years
•Nodal Agency: DeitY
Train Service Delivery Agents
to run viable businesses
delivering IT services
•Coverage: 5,00,000
•Timeline: 5 Years
•Nodal Agency: DoT
Telecom service providers to
train rural workforce to cater
to their own needs
New Scheme
IT ready
workforce
ICT enabled
growth in NE
Telecom ready
workforce
Ongoing
Skilled VLEs
and Viable
CSCs
17. Pillar 9. Early Harvest Programmes
•Coverage: Elected representatives, All Govt employees
•1.36 Cr mobiles and 22 Lakh emails
• Mass Messaging Application developed
IT platform for
messages
• Basket of e-Greetings templates available
• Crowd sourcing of e-Greetings thru MyGov
• e-Greetings Portal ready by 14 August 2014
Government Greetings
to be e-Greetings
• Coverage: All Central Govt. Offices in Delhi
• Operational in DeitY & Initiated in Urban
Development
• On-boarding started in other depts
• Procurement of devices – tender issued
Biometric attendance
Targeted Mass
messaging
since July 14
1st e-Greeting
from PM on
15th Aug 2014
To be
completed by
Oct 2014
18. Pillar 9. Early Harvest Programmes
•Scope: All universities on NKN
•400 additional Universities
•Cost: Rs 790 Cr
Wi-fi in All Universities
•Phase I upgradation for 10 Lakh employees done
•Ph II for 50 Lakh employees by March 2015
•Cost: Rs 98 Cr
Secure email within
government
• Standardised templates under preparation
Standardize government
email design
Approval - Oct
2014
Implementation
done by Dec
2015
Email to be primary
mode of
communication
To be ready by
October 2014
19. Pillar 9. Early Harvest Programmes
• Coverage: Cities with pop > 1 Mill., tourist centres
• Nodal Agency: DoT/ MoUDPublic wifi hotspots
• Nodal Agency: MHRD/ DeitY
School Books to be
eBooks
• DeitY’s Mobile Seva Platform ready
• Nodal Agency: MoES (IMD) / MHA (NDMA)
SMS based weather
information, disaster
alerts
• Nodal Agency: DeitY/ DoWCDNational Portal for Lost
& Found children
Digital Cities
Completed by
Dec 2015
In place by Dec
2014
Completed by
Mar 2015
In place by Oct
2014
20. Institutional Mechanisms at National Level
D I G I T A L I N D I A
Monitoring Committee on Digital India
Digital India Advisory
Group
(Chaired by Minister CIT)
DeitY Line Ministries
Apex Committee
(Chaired by Cab Sec.)
State Governments / UTs
CIO
21. Composition of Monitoring Committee on Digital India
• Prime Minister – Chairman
• Finance Minister
• Minister of Communications & IT
• Minister of RD
• Minister of HRD
• Minister of Health
Special Invitees:
• Principal Secretary to PM
• Cabinet Secretary
• Secretaries of Expenditure, Planning, DoT and Posts
• Secretary, DeitY – Convener
22. MINISTER
(Communications &
IT)
SECRETARY
(DeitY)
Addl. Secretary
(e-Gov)
Joint Secretary
(Electronics Hardware
Manufacturing)
Joint Secretary
(Personnel, Admn. &
Industry Promotion S/W)
Addl. Secretary
(Digital India)
Joint Secretary
(Infrastructure
Development)
Joint Secretary
(Capacity Building &
Digital Enablement
of Citizens)
Joint Secretary
(IT applications in un-
covered areas &
Process Re-engineering
Joint Secretary
(e-Gov)
Electronic Manufacturing –
Target Net Zero Imports
Public Internet Access
Programme
E-Governance: Reforming
Government through
Technology
Electronic Delivery of
Services - eKranti
Technology for Jobs
Information for All
D I G I T A L I N D I A
Reorganisation of
NIC
CIOs in important Ministries
23. Estimated Costs and Impacts
Overall Costs of Digital India
~ Rs 100,000 Cr in ongoing schemes (only DeitY, DOT & not incl. those in other line
Ministries)
~ Rs 13,000 Cr for new schemes & activities
Impact of Digital India by 2019
• Broadband in 2.5 lakh villages, universal phone connectivity
• Net Zero Imports by 2020
• 400,000 Public Internet Access Points
• Wi-fi in 2.5 lakh schools, all universities; Public wi-fi hotspots for
citizens
• Digital Inclusion: 1.7 Cr trained for IT, Telecom and Electronics Jobs
• Job creation: Direct 1.7 Cr. and Indirect at least 8.5 Cr.
• e-Governance & eServices: Across government
• India to be leader in IT use in services – health, education, banking
• Digitally empowered citizens – public cloud, internet access
24. Challenges & Changes Needed
Program on this scale never conceived
Each Pillar/program has own challenges
Human Resource Issues
NIC - not equipped for a fraction of this task (obsolesce) - needs revamping & restructuring
DeitY – needs program managers – at least 4 more officers at senior levels
Ministries – Need a Chief Information Officer / Chief Technology Officer
(CIO/CTO)
Could begin with CIOs 10 major Ministries
Can be anyone – from within or outside government
To be patterned as AS & FAs – dual reporting
Financial Resource Issues
Mostly structured around ongoing programs : Better focus, need some restructuring
Some others are process improvements or better utilisation of resources
A few new programs may be needed – particularly in Electronics manufacturing and Skill
Development
Coordination Issues
Program covers many other departments
Need commitment and effort
Leadership and support critical for success
25. Faciliate of Equipments
Satellite Support Equipments
Telecommunication Support Equipments
Fixed lī e and Wire less(P2P or Satellite Base)
Dish Antena UHF/VHF
Media Copper Cabels/Fibre Optics Cabels
Data Centre Support Equipments
Power Arrangement 24X7 for Above
Grid Power/Battery Base/Invertor/UPS
SMPS Po er Pla t DC Vōltage V/ 4V/4 V/ V/ V
Solar PV Power(ongrid/offgrid)
DG Power
26. Infra Products in Digital India
• Large
• Computor Infra Systems
• Large Telecom Infra Systems(Fixed & Wireless)
• Large Fibre Optics Infra Systems
• Quality Power Arrangement
• Skill Staff Software and Hardware
• Development Programme Partner
• Building and Shelters
• Committed to Go er e t of I dia Digital I dia i itiati e, DoT has a dated BSNL to
setup 25000 Wi-Fi Hotspots in rural exchanges of BSNL. The setting up of 25000 Wi-Fi
hotspots shall be funded from USO fund. Government shall provide full CAPEX and OPEX
support to the tune of 942 Crore for the project. The OPEX support of 100% shall be
provided by USOF for the 1st year and thereafter 75% support in the 2nd year, 50% support
in the 3rd year of operation shall be extended to BSNL. Under this project, 1 Wi-Fi Access
Point (AP) shall be setup initially in each rural exchange.
37. Digital India SCOPE Working
Telecom & ICT field
• Telepresence Services
• RailTel’s Telepresence Service is an end-to-end, Full high-definition (FHD-1080p)
videoconferencing service that gives users a virtual, face-to-face meeting experience.
• Data Center Services
• Great hosti g ea s ha i g po er, co trol a d peace of i d. A d that’s ho RailTel`s
customers feel when they trust our certified NOC team to manage their hosting needs and
challenges.
• Rack and Space Collocation
• RailTel facilitates co-location for equipment of telecom operators at its PoPs (Point of
Presence) mostly located at Railway stations. Railway route & buildings being in heart of the
city provide for high ARPU sites with maximum population coverage. RailTel also facilitates
roof top BTS sites & in building solution at Railway stations & other Railway buildings.
• Tower Collocation
• Wireless communications providers can now reduce capital expenditures and increase
coverage by teaming up with RailTel. Our existing nationwide network of MW towers and
other structures offers cellular, high speed data and other wireless communications
companies.
• RailTel provides Tower colocation facilities to Telecom operators for mobile BTS
• CCTV and Security Surveliances Systems
38. Digital India Technology Options
• Equipment
– SDH (Synchronous Digital Hierarchy)
– DWDM (Dense Wave Digital
Multiplexing)
– IP/MPLS (Multi Protocol Label
Switching)
JMV LPS LTD 38
OPGW
24 F OPGW
Tower
Repeater
Tower with JB
Tower
POWERGRID
S/S
POWERGRID
S/S
City PoP
City PoP
Intracity
Ring N/W
Intracity
Ring N/W
OPGW
24 F OPGW
Approach Cable
U/G OFC
24 F
U/G OFC
24 F
SDH Access Eqpt.
Shelter
DG set
SDH/
OADE
SDH Access Eqpt.
SDH/
OADE
39. Telecom Services Offered
Telecom
Services
Offered
Point to Point
Bandwidth
Internet
Services
MPLS Based
VPN
Infrastructure
Services
Others
JMV LPS LTD
Dark Fibre on UGOFC
Co-Location Services
PoP Infrastructure
Tower Space Leasing
SDH/DWDM
N X E1/E3/DS3/STM-1/STM-4/STM-16/STM-64/10G /100G Capacity
Scalable from present capacity of 400Gbps to Terabit Capacity
Multiple Self – resilient backbone rings
Internet Leased Line
2 Mbps – 1Gbps capacity links
Internet Security Measures
Three tier architecture
Dual home connectivity in Backbone to avoid
Single point of failure
Resilient & Secure Network Design to cater to
real time critical Power Transmission
applications
2 Mb – 10 G Layer-2 & Layer-3 VPN ports
Configurable Class of Service to suit data
criticality
Network Scalability to 500 Gbps in core and
10Gbps/port
Managed Services
WiFi Services
IP Transit Services
Data Center Services
39
40. NOFN
• National Optical Fibre Network (NOFN) project – a Govt. of India
initiative is world largest rural broad band connectivity project
through optical fiber.
• Under NOFN project, around 6600 blocks of India in around 650
districts shall be connected to 2,50,000 Gram Panchayats of
respective blocks by utilising existing fibre of BSNL, RAILTEL and
POWERGRID. Incremental fibre shall be laid wherever required
• Approx. 6 Lakh Km new incremental fiber to be laid.
• Minimum 100Mbps bandwidth at each Gram Panchayat
• BBNL (Bharat Broadband Network Limited)- a SPV has been set up
for establishment, management and Operation of NOFN project.
• Initial cost of project was around Rs. 20,000 Cr funded by USOF
(DOT ).
• Work allocation: BSNL (70%), RAILTEL (15%), POWERGRID (15%)
JMV LPS LTD
40
40
41. NOFN – Status so Far•
• Survey work had been completed and approved by BBNL for entire scope of
project (36000 GPs)
• Under Phase-I of project 9510 GPs are to be connected by laying around 22,000
Km of Under Ground Fiber in total 462 blocks in Telengana, Odisha, Jharkhand
& HP.
• Contracts for fiber laying has been issued to executing agencies to connect
7019 GPs in 341blocks. Balance 2491 GPs have been included in scope of
phase-1 work recently. Accordingly, tendering activities for award of T&L
contracts are under process.
• As on date incremental Fiber laying has been completed for 4562 GPs after
laying OFC of 10723Km.
• Trenching and ducting for approximately 14,966 Km have been completed till
date which includes 2541Km of T&L work in AP.
JMV LPS LTD
41
41
42. Digital Equipment Power Sources
• Grid Power 230VAC
• SMPS Power 48VDC
• SMPS Power 12-30 VDC
• UPS Power 230 V and 440V
• Solar Power for Stand alone Equip
• 30W Solar Power for GPON Equipments
• Solar Power for Facilities
• Equipment Instalation Indoor /Out Door
63. 1) Safety for Human life/ Building/Equipments:
To save human life from danger of electrical shock or death by blowing a fuse i.e. To provide an
alternative path for the fault current to flow so that it will not endanger the user
To protect buildings, machinery & appliances under fault conditions.
To ensure that all exposed conductive parts do not reach a dangerous potential.
To provide safe path to dissipate lightning and short circuit currents.
To provide stable platform for operation of sensitive electronic equipments i.e. To maintain the
voltage at any part of an electrical system at a known value so as to prevent over current or
excessive voltage on the appliances or equipment .
(2) Over voltage protection:
Lightning, line surges or unintentional contact with higher voltage lines can cause dangerously
high voltages to the electrical distribution system. Earthing provides an alternative path around
the electrical system to minimize damages in the System.
(3) Voltage stabilization:
There are many sources of electricity. Every transformer can be considered a separate source. If
there were not a common reference point for all these voltage sources it would be extremely
difficult to calculate their relationships to each other. The earth is the most omnipresent
conductive surface, and so it was adopted in the very beginnings of electrical distribution
systems as a nearly universal standard for all electric systems.
64. Factors affecting on Earth resistivity:
(1) Soil Resistivity:
It is the resistance of soil to the passage of electric current. The earth resistance value (ohmic
value) of an earth pit depends on soil resistivity. It is the resistance of the soil to the passage of
electric current.
It varies from soil to soil. It depends on the physical composition of the soil, moisture, dissolved
salts, grain size and distribution, seasonal variation, current magnitude etc.
In depends on the composition of soil, Moisture content, Dissolved salts, grain size and its
distribution, seasonal variation, current magnitude.
(2) Soil Condition:
Different soil conditions give different soil resistivity. Most of the soils are very poor conductors
of electricity when they are completely dry. Soil resistivity is measured in ohm-meters or ohm-
cm.
Soil plays a significant role in determining the performance of Electrode.
Soil with low resistivity is highly corrosive. If soil is dry then soil resistivity value will be very high.
If soil resistivity is high, earth resistance of electrode will also be high.
(3) Moisture:
Moisture has a great influence on resistivity value of soil. The resistivity of a soil can be
determined by the quantity of water held by the soil and resistivity of the water itself.
Conduction of electricity in soil is through water.
The resistance drops quickly to a more or less steady minimum value of about 15% moisture.
And further increase of moisture level in soil will have little effect on soil resistivity. In many
locations water table goes down in dry weather conditions. Therefore, it is essential to pour
water in and around the earth pit to maintain moisture in dry weather conditions. Moisture
65. 9) Effect of current magnitude:
Soil resistivity in the vicinity of ground electrode may be affected by current flowing from the
electrode into the surrounding soil.
The thermal characteristics and the moisture content of the soil will determine if a current of a
given magnitude and duration will cause significant drying and thus increase the effect of soil
resistivity
Maintain less than one Ohm Resistance from EARTH PIT conductor to a distance of 15 Meters
around the EARTH PIT with another conductor dip on the Earth at least 500 mm deep. Check
Voltage between Earth Pit conductors to Neutral of Mains Supply 220V AC 50 Hz it should be
less than 2.0 Volts.
Maximum allowable Earth resistance:
Major power station= 0.5 Ohm.
Major Sub-stations= 1.0 Ohm
Minor Sub-station = 2 Ohm
Neutral Bushing. =2 Ohm
Service connection = 4 Ohm
Medium Voltage Network =2 Ohm
L.T.Lightening Arrestor= 4 Ohm
L.T.Pole= 5 Ohm
H.T.Pole =10 Ohm
Tower =20-30 Ohm
70. An Arcing Fault is the flow of current through
the air between phase conductors or phase
conductors and neutral or ground. Concentrated
radiant energy is released at the point of arcing
an a small amount of time resulting
in Extremely High Temperature.
71. Fire Accident Due to Lightning
We Want India Safe Practice Earthing and
Protection
72. Why Accidents happen?
Accidents generally happen due to lack of
maintenance, lack of Supervision, lack of knowledge,
over confidence and negligence. Accidents may also
happen due to one or more of the following reasons:
Using improper tools
Improper/non usage of protective devices
Lack of proper instructions and supervision
Mental/physical condition of the employee
Poor Judgment
75. Copper Cladded Conductor For Electrical
Installation
The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper. These
conductors/ wires
or strands are equipped with the strength of steel with the conductivity and copper with the better corrosion
resistance property. The concentric copper cladding is metallurgic ally bonded to a steel core through a continuous,
solid cladding process using pressure rolling for primary bonding. The copper cladding
thickness remains constant surrounding steel. We use different steel grades for the steel core result in Dead Soft
Annealed, High strength and Extra High Strength Characteristics.
The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in Annealed
and Hard drawn. We are delivering products with varied conductivity and tensile strength as per the customer need.
Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
76. Most Efficient JointProcess
It is efficient and superior to all existing surface –to-surface
mechanical retention connectors.
77. What is Exothermic Welding System?
Copper to Bi-Metal and Alumenium
Types of Exothermic Joints:
Possible to join any bi metal except aluminum
Exothermic welding is a process of making maintain free highly molecular bonding process is superior in
performance connection to any known mechanical or compression-type surface-to-surface contact connector.
Exothermic weld connections provide current carrying (fusing) capacity equal to that of the conductor and will
not deteriorate with age.
It offers Electrical connections between two or more copper to copper and copper to steel conductors.
Highly portable method as it does not require any external power source or heat source, so it can be done
almost anywhere.
It provides strong permanent molecular bond among metallic conductors that cannot loosen and further will
not deteriorate with age.
Connection does not corrode with time and it offers permanent conductivity.
78.
79. Installation
ESE AT with radius protection form 32 mtr to 107 mtr.
DMC Insulator .
GI/FRP Mast .
Down Conductor Copper / Copper Cadmium
Cable 70 sq. mm
Copper Bonded Ground Earthing