SlideShare a Scribd company logo
1 of 2
STUDENT RISK ASSESSMENT
Date: 23/09/2015 Location: The Canteen Task being assessed: Students taking photos in college
General Risk assessment
Student Name: Ellie Cobbett
HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLAN
Hazard
Regardless of control measures
Persons
at risk
*1
Worst
outcome
*2
Probability
*3
Risk
Rating
A-E
Existing control measures taken
against the risk
What further control
measures are required when
and by whom
1. Tables and chairs in the
way
2. Potential fire risk
3. Food and drink could
spill
4. Hot food and drinks
5. People accessing the
area/getting in the way
-everyone
-students
-N/R
-major
-N/R
-minor
-N/R
-Pr
-R
-R
-Ps
-Fr
D
A
E
1. Clear the area before
hand to make sure the
tables and chairs are
moved away and aren’t
in the way.
2. –
3. –
4. –
5. Area is cornered off so
people don’t get in the
way of the photo
*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors
D = people with disabilities
X = young/inexperienced
L = lone workers
W = women of child-bearing
age
*2 This is without control measures
F = fatal
Maj = major injury or permanent disability
Min = minor injury
NR = non-reportable
*3 This is with control measures in place
Fr = frequent/likely/could occur repeatedly/expected
Pr = probable/not surprised/might occur often
Ps = possible/could occur sometime
R = remote/unlikely but conceivable
U = unlikely/improbable such that likelihood is almost zero
Preliminary risk assessment 1

More Related Content

What's hot

Student risk assessment art block location
Student risk assessment art block locationStudent risk assessment art block location
Student risk assessment art block location
niamhayes
 
Student risk assessment_georgia
Student risk assessment_georgiaStudent risk assessment_georgia
Student risk assessment_georgia
asmediab13
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
asmediab13
 
Student risk assessment rail outside kitson doc
Student risk assessment rail outside kitson docStudent risk assessment rail outside kitson doc
Student risk assessment rail outside kitson doc
LD7
 
Student risk assessment hampton
Student risk assessment hamptonStudent risk assessment hampton
Student risk assessment hampton
asmediac14
 
Risk assessment example
Risk assessment exampleRisk assessment example
Risk assessment example
asmediad14
 
Student risk assessment 1
Student risk assessment 1Student risk assessment 1
Student risk assessment 1
asmediae15
 
Student risk assessment magazine
Student risk assessment magazineStudent risk assessment magazine
Student risk assessment magazine
asmediae15
 

What's hot (20)

Student risk assessment 1
Student risk assessment 1Student risk assessment 1
Student risk assessment 1
 
Student risk assessment art block location
Student risk assessment art block locationStudent risk assessment art block location
Student risk assessment art block location
 
Student risk assessment_georgia
Student risk assessment_georgiaStudent risk assessment_georgia
Student risk assessment_georgia
 
Risk assesment for brick wall
Risk assesment for brick wallRisk assesment for brick wall
Risk assesment for brick wall
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Student risk assessment rail outside kitson doc
Student risk assessment rail outside kitson docStudent risk assessment rail outside kitson doc
Student risk assessment rail outside kitson doc
 
Student risk assessment_form
Student risk assessment_formStudent risk assessment_form
Student risk assessment_form
 
Student risk assessment 2
Student risk assessment 2Student risk assessment 2
Student risk assessment 2
 
Student risk assessment
Student risk assessment Student risk assessment
Student risk assessment
 
Student risk assessment hampton
Student risk assessment hamptonStudent risk assessment hampton
Student risk assessment hampton
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Risk assessment example
Risk assessment exampleRisk assessment example
Risk assessment example
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Student Risk Assessment
Student Risk AssessmentStudent Risk Assessment
Student Risk Assessment
 
Student risk assessment 1
Student risk assessment 1Student risk assessment 1
Student risk assessment 1
 
Student risk assessment magazine
Student risk assessment magazineStudent risk assessment magazine
Student risk assessment magazine
 
Student Risk Assessment
Student Risk AssessmentStudent Risk Assessment
Student Risk Assessment
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Risk assessment #1
Risk assessment #1Risk assessment #1
Risk assessment #1
 

Viewers also liked

Student risk assessment_form
Student risk assessment_formStudent risk assessment_form
Student risk assessment_form
amygban
 

Viewers also liked (20)

Research Task 3d: Similarities between all 3 parts - Kerrang Magazine
Research Task 3d: Similarities between all 3 parts - Kerrang MagazineResearch Task 3d: Similarities between all 3 parts - Kerrang Magazine
Research Task 3d: Similarities between all 3 parts - Kerrang Magazine
 
Magazine production schedule
Magazine production scheduleMagazine production schedule
Magazine production schedule
 
Pictures and explanation
Pictures and explanationPictures and explanation
Pictures and explanation
 
Article final
Article finalArticle final
Article final
 
Research Task 10: Research Article
Research Task 10: Research ArticleResearch Task 10: Research Article
Research Task 10: Research Article
 
Article copy
Article copy Article copy
Article copy
 
Introducing main coursework
Introducing main courseworkIntroducing main coursework
Introducing main coursework
 
Research Task 3c: Double Page Spread Kerrang Analysis
Research Task 3c: Double Page Spread Kerrang AnalysisResearch Task 3c: Double Page Spread Kerrang Analysis
Research Task 3c: Double Page Spread Kerrang Analysis
 
Task 2d - 3 different parts
Task 2d - 3 different partsTask 2d - 3 different parts
Task 2d - 3 different parts
 
Evaluation question 2
Evaluation question 2Evaluation question 2
Evaluation question 2
 
Magazine Questionnaire
Magazine QuestionnaireMagazine Questionnaire
Magazine Questionnaire
 
Contents page drawn draft
Contents page drawn draftContents page drawn draft
Contents page drawn draft
 
Research Task 3a: Front Cover Kerrang Analysis
Research Task 3a: Front Cover Kerrang AnalysisResearch Task 3a: Front Cover Kerrang Analysis
Research Task 3a: Front Cover Kerrang Analysis
 
Original/Final Photos.
Original/Final Photos.Original/Final Photos.
Original/Final Photos.
 
Student risk assessment_form
Student risk assessment_formStudent risk assessment_form
Student risk assessment_form
 
Planning my article
Planning my articlePlanning my article
Planning my article
 
Research task 10 Contents Page Drawn Draft
Research task 10 Contents Page Drawn DraftResearch task 10 Contents Page Drawn Draft
Research task 10 Contents Page Drawn Draft
 
Front cover drawn draft
Front cover drawn draftFront cover drawn draft
Front cover drawn draft
 
Production Schedule
Production ScheduleProduction Schedule
Production Schedule
 
Target audience research
Target audience researchTarget audience research
Target audience research
 

Similar to Preliminary risk assessment 1

Student risk assessment.doc stairs
Student risk assessment.doc stairsStudent risk assessment.doc stairs
Student risk assessment.doc stairs
a2media15d
 
Student risk assessment number 1
Student risk assessment number 1Student risk assessment number 1
Student risk assessment number 1
asmediae15
 
Risk assesment gate behind hampton
Risk assesment gate behind hamptonRisk assesment gate behind hampton
Risk assesment gate behind hampton
baldeep17_
 
Risk assesment gate behind hampton
Risk assesment gate behind hamptonRisk assesment gate behind hampton
Risk assesment gate behind hampton
baldeep17_
 
Student risk assessment bike shed
Student risk assessment   bike shedStudent risk assessment   bike shed
Student risk assessment bike shed
nicolehickman
 
Media white screen risk assesment
Media white screen risk assesmentMedia white screen risk assesment
Media white screen risk assesment
baldeep17_
 
Student risk assessment 1
Student risk assessment 1Student risk assessment 1
Student risk assessment 1
asmediad14
 
Second risk assessment 1
Second risk assessment 1Second risk assessment 1
Second risk assessment 1
elliefrancis
 
Student risk assessment 3
Student risk assessment 3Student risk assessment 3
Student risk assessment 3
asmediad14
 

Similar to Preliminary risk assessment 1 (20)

Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Risk assessment canteen
Risk assessment canteenRisk assessment canteen
Risk assessment canteen
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Amy Goodban Student risk assessment
Amy Goodban Student risk assessment Amy Goodban Student risk assessment
Amy Goodban Student risk assessment
 
Student risk assessment Amy Goodban 2
Student risk assessment Amy Goodban 2Student risk assessment Amy Goodban 2
Student risk assessment Amy Goodban 2
 
Student risk assessment.doc stairs
Student risk assessment.doc stairsStudent risk assessment.doc stairs
Student risk assessment.doc stairs
 
Student risk assessment number 1
Student risk assessment number 1Student risk assessment number 1
Student risk assessment number 1
 
Student risk assessment - canteen
Student risk assessment - canteenStudent risk assessment - canteen
Student risk assessment - canteen
 
Risk assesment gate behind hampton
Risk assesment gate behind hamptonRisk assesment gate behind hampton
Risk assesment gate behind hampton
 
Risk assesment gate behind hampton
Risk assesment gate behind hamptonRisk assesment gate behind hampton
Risk assesment gate behind hampton
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Preliminary Student Risk Assessment (Parts 1, 2 and 3).
Preliminary Student Risk Assessment (Parts 1, 2 and 3).Preliminary Student Risk Assessment (Parts 1, 2 and 3).
Preliminary Student Risk Assessment (Parts 1, 2 and 3).
 
Student risk assessment bike shed
Student risk assessment   bike shedStudent risk assessment   bike shed
Student risk assessment bike shed
 
Media white screen risk assesment
Media white screen risk assesmentMedia white screen risk assesment
Media white screen risk assesment
 
Student risk assessment 2
Student risk assessment 2Student risk assessment 2
Student risk assessment 2
 
Student risk assessment 1
Student risk assessment 1Student risk assessment 1
Student risk assessment 1
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Second risk assessment 1
Second risk assessment 1Second risk assessment 1
Second risk assessment 1
 
Student risk assessment 3
Student risk assessment 3Student risk assessment 3
Student risk assessment 3
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 

Recently uploaded

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

Preliminary risk assessment 1

  • 1. STUDENT RISK ASSESSMENT Date: 23/09/2015 Location: The Canteen Task being assessed: Students taking photos in college General Risk assessment Student Name: Ellie Cobbett HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLAN Hazard Regardless of control measures Persons at risk *1 Worst outcome *2 Probability *3 Risk Rating A-E Existing control measures taken against the risk What further control measures are required when and by whom 1. Tables and chairs in the way 2. Potential fire risk 3. Food and drink could spill 4. Hot food and drinks 5. People accessing the area/getting in the way -everyone -students -N/R -major -N/R -minor -N/R -Pr -R -R -Ps -Fr D A E 1. Clear the area before hand to make sure the tables and chairs are moved away and aren’t in the way. 2. – 3. – 4. – 5. Area is cornered off so people don’t get in the way of the photo *1 Sf = staff St = students Cr = contractors Cl = cleaners V = visitors D = people with disabilities X = young/inexperienced L = lone workers W = women of child-bearing age *2 This is without control measures F = fatal Maj = major injury or permanent disability Min = minor injury NR = non-reportable *3 This is with control measures in place Fr = frequent/likely/could occur repeatedly/expected Pr = probable/not surprised/might occur often Ps = possible/could occur sometime R = remote/unlikely but conceivable U = unlikely/improbable such that likelihood is almost zero