This document provides information on Prefi Company Profile, including contact information, descriptions of work, production details, NAICS classifications, UN organizations worked with, certifications, environmental and human rights policies, and danger/risk evaluation procedures. Prefi designs, manufactures and installs turnkey camp buildings and structures using galvanized steel and rockwool insulation. It has worked on projects in over 15 countries for construction, energy, mining and government clients. The company was founded in 1995 and has up to 750 employees.
Sherif Shafik Takla provides his personal and professional details, including over 18 years of experience in engineering roles for hotels, resorts, and cruise ships in Egypt, Dubai, and other locations. He has extensive experience opening new properties and currently works as the Director of Engineering for Ghaya Grand Hotel in Dubai. Takla includes his educational background, work history, qualifications, and references.
E-Profiil is an Estonian company that provides full-service solutions for complex industrial projects, from engineering to manufacturing to installation. They have the capabilities to handle heavy fabrication, lifting equipment up to 300 tons, and serve various industries including offshore, marine, energy and infrastructure. E-Profiil aims to be a trusted partner throughout every phase of a project.
1. The document provides details about the construction process and safety procedures for a building construction project. It discusses site planning, preliminary works like setting up drainage and scaffolding, and safety hazards and solutions at various stages of construction.
2. The document also outlines the functions of various construction plants and machinery used including excavators, dump trucks, cranes, concrete pumps, and their uses in earthwork, material handling, concrete works etc.
3. Key preliminary works discussed include establishing the construction entrance, access roads, signboards, storage areas and site office. The external works section explains the drainage system and techniques for horizontal and vertical control setting out the construction layout.
1. Emek Group is a Turkish manufacturing company established in 1942 that produces products for the telecommunications, energy, and automotive industries.
2. They have production facilities in Istanbul and produce telecommunication towers, manifolds for gas turbines that meet international standards, and chassis and components for vehicles and trailers.
3. Emek Group aims to ensure high quality and customer satisfaction throughout the project process from start to finish, and has implemented an ISO 9001 quality management system.
The document discusses the preliminary works of a construction site including site layout, safety features, machinery and equipment, site clearance, setting out, and earthworks and excavation that must be completed before main construction can begin in order to properly prepare the site. Safety is a top priority and features such as signage, barriers, and personal protective equipment help ensure safety of all personnel. The preliminary works lay the foundation for the subsequent construction phases including building foundations, structures, walls and more.
Nicholas Dyer has over 25 years of experience as an electrician and avionics technician. He currently works for Australian Aerospace assembling ARH Tigers and MRH 90 aircraft, which includes installing harnesses and avionics equipment. Prior to this, he held roles with various companies maintaining and installing electrical systems and equipment. He has extensive formal training and certifications in avionics, aircraft maintenance, programmable controllers, and electrical installation.
Nicholas Dyer has over 20 years of experience as an electrician and aircraft maintenance engineer. He has worked for several companies in Australia including Australian Aerospace assembling ARH Tigers and MRH 90s, and has qualifications in aircraft maintenance engineering. Prior to that, he worked in Trinidad and Tobago as an electrician for companies including the Petroleum Company of Trinidad and Tobago and Caribbean Development Co Ltd, and has electrical installation and trade training qualifications. He has strong computer and Microsoft software skills.
Sherif Shafik Takla provides his personal and professional details, including over 18 years of experience in engineering roles for hotels, resorts, and cruise ships in Egypt, Dubai, and other locations. He has extensive experience opening new properties and currently works as the Director of Engineering for Ghaya Grand Hotel in Dubai. Takla includes his educational background, work history, qualifications, and references.
E-Profiil is an Estonian company that provides full-service solutions for complex industrial projects, from engineering to manufacturing to installation. They have the capabilities to handle heavy fabrication, lifting equipment up to 300 tons, and serve various industries including offshore, marine, energy and infrastructure. E-Profiil aims to be a trusted partner throughout every phase of a project.
1. The document provides details about the construction process and safety procedures for a building construction project. It discusses site planning, preliminary works like setting up drainage and scaffolding, and safety hazards and solutions at various stages of construction.
2. The document also outlines the functions of various construction plants and machinery used including excavators, dump trucks, cranes, concrete pumps, and their uses in earthwork, material handling, concrete works etc.
3. Key preliminary works discussed include establishing the construction entrance, access roads, signboards, storage areas and site office. The external works section explains the drainage system and techniques for horizontal and vertical control setting out the construction layout.
1. Emek Group is a Turkish manufacturing company established in 1942 that produces products for the telecommunications, energy, and automotive industries.
2. They have production facilities in Istanbul and produce telecommunication towers, manifolds for gas turbines that meet international standards, and chassis and components for vehicles and trailers.
3. Emek Group aims to ensure high quality and customer satisfaction throughout the project process from start to finish, and has implemented an ISO 9001 quality management system.
The document discusses the preliminary works of a construction site including site layout, safety features, machinery and equipment, site clearance, setting out, and earthworks and excavation that must be completed before main construction can begin in order to properly prepare the site. Safety is a top priority and features such as signage, barriers, and personal protective equipment help ensure safety of all personnel. The preliminary works lay the foundation for the subsequent construction phases including building foundations, structures, walls and more.
Nicholas Dyer has over 25 years of experience as an electrician and avionics technician. He currently works for Australian Aerospace assembling ARH Tigers and MRH 90 aircraft, which includes installing harnesses and avionics equipment. Prior to this, he held roles with various companies maintaining and installing electrical systems and equipment. He has extensive formal training and certifications in avionics, aircraft maintenance, programmable controllers, and electrical installation.
Nicholas Dyer has over 20 years of experience as an electrician and aircraft maintenance engineer. He has worked for several companies in Australia including Australian Aerospace assembling ARH Tigers and MRH 90s, and has qualifications in aircraft maintenance engineering. Prior to that, he worked in Trinidad and Tobago as an electrician for companies including the Petroleum Company of Trinidad and Tobago and Caribbean Development Co Ltd, and has electrical installation and trade training qualifications. He has strong computer and Microsoft software skills.
HMD is a Saudi Arabian construction company seeking to partner with the client. It has over 10 years of experience in oil/gas, infrastructure, and other industries. HMD can provide services across the entire EPC value chain including construction, fabrication, manpower, and equipment. It currently has several ongoing projects of varying size for companies like Saudi Aramco.
Clough Murray & Roberts Marine provides engineering and construction services for marine infrastructure projects globally. It utilizes a full project lifecycle approach to reduce risk and optimize safety, productivity and cost. With over 50 years of experience delivering projects in challenging environments, it has extensive expertise in designing and constructing facilities such as ports, jetties, pipelines, and offshore oil and gas infrastructure.
Pandelis Lembesis has over 40 years of experience in telecommunications, facilities management, and logistics across projects in Saudi Arabia, Greece, Egypt, Libya, and Saudi Arabia. He has held positions as a Communication Supervisor, Operations and Maintenance Manager, Warehouse Manager, Facilities Manager, and Camp and Housing Manager. Currently, he is the Facilities Manager for Saudi Archirodon S.A., where he oversees three camps housing 2,300 employees and manages a budget of 1.6 million Saudi Riyals.
This document provides information and guidelines for shed sellers seeking ShedSafe accreditation. It explains that completing the specification module alone does not qualify a seller for accreditation, which requires an application, review of the module, and successful completion of a questionnaire. The document covers important considerations for correctly specifying sheds, including the National Construction Code building classes, importance levels, wind codes, terrain, topography, shielding, and additional requirements for cyclonic and alpine regions.
Equinox Group is a trading and contracting company operating in the UAE, Oman, Qatar, Pakistan, and India. It supplies products and services for oil/gas, power, water, and other industries. The company has two divisions: Equinox Global Trading supplies equipment and materials, while Sun Shine Engineering provides EPC projects, fabrication work, and other contracting services. The document provides details on Equinox's products, services, clients, operations, and completed/current projects.
Building Construction I Project 1 CompilationNatalie Yunxian
The document discusses the preliminaries work for a construction project, including earthwork activities like topsoil excavation and earth excavation using the cut and fill method to achieve the desired site topography. It also covers the important process of setting out, which involves transferring measurements and positions from design drawings onto the construction site by marking lines and pegs to accurately locate foundations and trenches. Proper preliminaries work is crucial for smoothly executing subsequent construction stages.
The document discusses the preliminaries work for a construction project, including earthwork activities like topsoil excavation and earth excavation using the cut and fill method to achieve the desired site topography. It also covers the important process of setting out, which involves transferring measurements and positions from design drawings onto the construction site by marking lines and pegs to accurately locate foundations and trenches. Proper preliminaries work is crucial for smoothly executing subsequent construction stages.
John Pennington provides a curriculum vitae summarizing his extensive experience working with rotating equipment such as gas turbines, steam turbines, gearboxes, pumps, compressors, and diesel/gas engines across various industries and locations internationally. He has over 40 years of experience in equipment maintenance, commissioning, training, and management roles. His technical skills include expertise in specific equipment models from manufacturers like Waukesha, Solar, Ruston, GE, Mitsubishi, and others.
This document provides specifications and guidelines for sellers of cold formed steel portal frame sheds to qualify for ShedSafe accreditation. It discusses key factors like the National Construction Code building classes that sheds fall under, importance levels based on intended use, determining the correct site wind speed which impacts structural design, and ensuring the shed specification captures all relevant location and intended use details. Qualifying as ShedSafe accredited requires completing an application, reviewing this module, and passing a building specification questionnaire.
Wael A. wasfy is an electrical engineer from Alexandria University in Egypt with over 30 years of experience managing elevator installation and maintenance projects. He is currently a consultant electrical power engineer and has previously held managerial roles with several major elevator companies. He is seeking new opportunities and believes his education and experience would make him a valuable addition to any company.
Cintasa S.A. is a Spanish company located in Utebo, Saragossa that has over 40 years of experience in material handling. It has facilities totaling over 21,000 square meters for manufacturing, offices, storage, and parking. Cintasa specializes in designing and manufacturing bulk material conveyor equipment such as belt conveyors and has completed projects on all continents, serving industries such as minerals, cement, quarries, and recycling. It has an international network of dealers in 26 countries across 5 continents.
HSB Marine is a Turkish company that specializes in designing, manufacturing, and installing floating marine structures. They utilize a single-source design-build approach to reduce costs and meet schedules. Their team of engineers, designers, and production specialists provide consulting, design, manufacturing, and construction services for floating docks, piers, marinas, and other marine structures using concrete, steel, and other materials. They have a factory in Adana, Turkey and also do on-site production for projects.
Cofely Fabricom is a leading supplier of oil and gas solutions with over 2,300 employees and 30 years of experience. It provides multi-technical expertise across various stages of projects from engineering to installation and maintenance. It has a global reach with offices and fabrication facilities across Europe, Africa, the Middle East, and Canada. Cofely Fabricom ensures smooth project execution through its internally-developed project management system and prioritizes safety across its operations.
This document provides a resume for Manuel E. Mangubat, including his personal details, education history, work experience operating heavy equipment such as cranes, loaders, and buses, and qualifications and training. Over his 18-year career, he has worked in the Philippines, Saudi Arabia, and Australia for companies in various industries such as railways, steel production, and logistics. His roles have included operating cranes, loaders, excavators, dump trucks, and buses to support construction, material handling, and transportation projects.
The document provides an overview of two construction sites visited by students - the BSP Village Commercial Centre and Kelab Ukay Residence. It describes the location, layout, and key features of each project. It also covers safety procedures and equipment used at construction sites, including signage, personal protective gear, scaffolding, safety nets, excavators, mobile cranes, backhoe-loaders, and concrete mixer trucks.
1. Site clearing involves removing vegetation from the construction site using machinery like excavators and bulldozers. Soil filling then levels the ground by cutting and filling soil.
2. Site layout includes temporary site facilities like offices, storage, and toilets. Retaining walls are built for sloped sites to prevent erosion. Fencing secures the boundary.
3. Setting out establishes horizontal and vertical control points to lay the foundations and guide subsequent construction stages according to the building plans.
PTSC Mechanical & Construction (PTSC M&C) is a leading EPC contractor in Vietnam that has successfully completed over 70 oil and gas projects. It is a subsidiary of PetroVietnam Technical Services Corporation (PTSC), which is the service arm of Vietnam's state-owned PetroVietnam oil and gas group. Some of PTSC M&C's capabilities include engineering, procurement, fabrication, installation, and commissioning of large offshore and onshore structures weighing up to 13,600 MT. It has extensive experience building platforms, pipelines, and subsea infrastructure in Vietnam and other countries. PTSC M&C maintains high safety, quality, and environmental standards and has strong project management and fabrication facilities.
Wind Drivetrain: Reliability and Serviceability of DrivetrainsTorben Haagh
An integral component of a wind turbine, the drivetrain is continually evolving as new concepts and designs are explored. As larger turbines are developed, and more wind farms are installed in deeper water, the service and maintenance of each component must also be considered.
Want to learn more about this topic? Please also visit our website: http://bit.ly/wind-drivetrain
This document provides specifications and guidelines for sellers of cold formed steel portal frame sheds to qualify for ShedSafe accreditation. It discusses key aspects of shed specification including building classes under the National Construction Code, importance levels based on intended use, determining the correct site wind speed based on region, terrain and topography, and ensuring the specification is accurate before ordering. Compliance with ShedSafe requirements, including using an accredited manufacturer, is required to receive accreditation.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive functioning. Exercise causes chemical changes in the brain that may help protect against mental illness and improve symptoms.
HMD is a Saudi Arabian construction company seeking to partner with the client. It has over 10 years of experience in oil/gas, infrastructure, and other industries. HMD can provide services across the entire EPC value chain including construction, fabrication, manpower, and equipment. It currently has several ongoing projects of varying size for companies like Saudi Aramco.
Clough Murray & Roberts Marine provides engineering and construction services for marine infrastructure projects globally. It utilizes a full project lifecycle approach to reduce risk and optimize safety, productivity and cost. With over 50 years of experience delivering projects in challenging environments, it has extensive expertise in designing and constructing facilities such as ports, jetties, pipelines, and offshore oil and gas infrastructure.
Pandelis Lembesis has over 40 years of experience in telecommunications, facilities management, and logistics across projects in Saudi Arabia, Greece, Egypt, Libya, and Saudi Arabia. He has held positions as a Communication Supervisor, Operations and Maintenance Manager, Warehouse Manager, Facilities Manager, and Camp and Housing Manager. Currently, he is the Facilities Manager for Saudi Archirodon S.A., where he oversees three camps housing 2,300 employees and manages a budget of 1.6 million Saudi Riyals.
This document provides information and guidelines for shed sellers seeking ShedSafe accreditation. It explains that completing the specification module alone does not qualify a seller for accreditation, which requires an application, review of the module, and successful completion of a questionnaire. The document covers important considerations for correctly specifying sheds, including the National Construction Code building classes, importance levels, wind codes, terrain, topography, shielding, and additional requirements for cyclonic and alpine regions.
Equinox Group is a trading and contracting company operating in the UAE, Oman, Qatar, Pakistan, and India. It supplies products and services for oil/gas, power, water, and other industries. The company has two divisions: Equinox Global Trading supplies equipment and materials, while Sun Shine Engineering provides EPC projects, fabrication work, and other contracting services. The document provides details on Equinox's products, services, clients, operations, and completed/current projects.
Building Construction I Project 1 CompilationNatalie Yunxian
The document discusses the preliminaries work for a construction project, including earthwork activities like topsoil excavation and earth excavation using the cut and fill method to achieve the desired site topography. It also covers the important process of setting out, which involves transferring measurements and positions from design drawings onto the construction site by marking lines and pegs to accurately locate foundations and trenches. Proper preliminaries work is crucial for smoothly executing subsequent construction stages.
The document discusses the preliminaries work for a construction project, including earthwork activities like topsoil excavation and earth excavation using the cut and fill method to achieve the desired site topography. It also covers the important process of setting out, which involves transferring measurements and positions from design drawings onto the construction site by marking lines and pegs to accurately locate foundations and trenches. Proper preliminaries work is crucial for smoothly executing subsequent construction stages.
John Pennington provides a curriculum vitae summarizing his extensive experience working with rotating equipment such as gas turbines, steam turbines, gearboxes, pumps, compressors, and diesel/gas engines across various industries and locations internationally. He has over 40 years of experience in equipment maintenance, commissioning, training, and management roles. His technical skills include expertise in specific equipment models from manufacturers like Waukesha, Solar, Ruston, GE, Mitsubishi, and others.
This document provides specifications and guidelines for sellers of cold formed steel portal frame sheds to qualify for ShedSafe accreditation. It discusses key factors like the National Construction Code building classes that sheds fall under, importance levels based on intended use, determining the correct site wind speed which impacts structural design, and ensuring the shed specification captures all relevant location and intended use details. Qualifying as ShedSafe accredited requires completing an application, reviewing this module, and passing a building specification questionnaire.
Wael A. wasfy is an electrical engineer from Alexandria University in Egypt with over 30 years of experience managing elevator installation and maintenance projects. He is currently a consultant electrical power engineer and has previously held managerial roles with several major elevator companies. He is seeking new opportunities and believes his education and experience would make him a valuable addition to any company.
Cintasa S.A. is a Spanish company located in Utebo, Saragossa that has over 40 years of experience in material handling. It has facilities totaling over 21,000 square meters for manufacturing, offices, storage, and parking. Cintasa specializes in designing and manufacturing bulk material conveyor equipment such as belt conveyors and has completed projects on all continents, serving industries such as minerals, cement, quarries, and recycling. It has an international network of dealers in 26 countries across 5 continents.
HSB Marine is a Turkish company that specializes in designing, manufacturing, and installing floating marine structures. They utilize a single-source design-build approach to reduce costs and meet schedules. Their team of engineers, designers, and production specialists provide consulting, design, manufacturing, and construction services for floating docks, piers, marinas, and other marine structures using concrete, steel, and other materials. They have a factory in Adana, Turkey and also do on-site production for projects.
Cofely Fabricom is a leading supplier of oil and gas solutions with over 2,300 employees and 30 years of experience. It provides multi-technical expertise across various stages of projects from engineering to installation and maintenance. It has a global reach with offices and fabrication facilities across Europe, Africa, the Middle East, and Canada. Cofely Fabricom ensures smooth project execution through its internally-developed project management system and prioritizes safety across its operations.
This document provides a resume for Manuel E. Mangubat, including his personal details, education history, work experience operating heavy equipment such as cranes, loaders, and buses, and qualifications and training. Over his 18-year career, he has worked in the Philippines, Saudi Arabia, and Australia for companies in various industries such as railways, steel production, and logistics. His roles have included operating cranes, loaders, excavators, dump trucks, and buses to support construction, material handling, and transportation projects.
The document provides an overview of two construction sites visited by students - the BSP Village Commercial Centre and Kelab Ukay Residence. It describes the location, layout, and key features of each project. It also covers safety procedures and equipment used at construction sites, including signage, personal protective gear, scaffolding, safety nets, excavators, mobile cranes, backhoe-loaders, and concrete mixer trucks.
1. Site clearing involves removing vegetation from the construction site using machinery like excavators and bulldozers. Soil filling then levels the ground by cutting and filling soil.
2. Site layout includes temporary site facilities like offices, storage, and toilets. Retaining walls are built for sloped sites to prevent erosion. Fencing secures the boundary.
3. Setting out establishes horizontal and vertical control points to lay the foundations and guide subsequent construction stages according to the building plans.
PTSC Mechanical & Construction (PTSC M&C) is a leading EPC contractor in Vietnam that has successfully completed over 70 oil and gas projects. It is a subsidiary of PetroVietnam Technical Services Corporation (PTSC), which is the service arm of Vietnam's state-owned PetroVietnam oil and gas group. Some of PTSC M&C's capabilities include engineering, procurement, fabrication, installation, and commissioning of large offshore and onshore structures weighing up to 13,600 MT. It has extensive experience building platforms, pipelines, and subsea infrastructure in Vietnam and other countries. PTSC M&C maintains high safety, quality, and environmental standards and has strong project management and fabrication facilities.
Wind Drivetrain: Reliability and Serviceability of DrivetrainsTorben Haagh
An integral component of a wind turbine, the drivetrain is continually evolving as new concepts and designs are explored. As larger turbines are developed, and more wind farms are installed in deeper water, the service and maintenance of each component must also be considered.
Want to learn more about this topic? Please also visit our website: http://bit.ly/wind-drivetrain
This document provides specifications and guidelines for sellers of cold formed steel portal frame sheds to qualify for ShedSafe accreditation. It discusses key aspects of shed specification including building classes under the National Construction Code, importance levels based on intended use, determining the correct site wind speed based on region, terrain and topography, and ensuring the specification is accurate before ordering. Compliance with ShedSafe requirements, including using an accredited manufacturer, is required to receive accreditation.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive functioning. Exercise causes chemical changes in the brain that may help protect against mental illness and improve symptoms.
The document discusses different types and sizes of mobile units, including demontable and stackable units ranging from 1.30 to 3 meters in width. It also mentions planning projects for mobile unit camps that can house 30, 150, or 250 men.
The 5000 Man Camp Project aims to build temporary worker housing for oil field workers in North Dakota. It will construct modular buildings to house 5000 workers on 1000 acres of privately owned land near Williston. The camp will help address the shortage of housing for the increased oil field workforce in the region.
The 500 Man Camp Project will construct temporary worker housing for oil field employees in North Dakota. The camp will include 500 beds in dormitory style rooms, with shared bathroom and kitchen facilities. It is expected to be completed by early 2023 to help meet the demand for workforce housing in the region's booming oil industry.
We build temporary camps and housing quickly for remote worksites. As a turn-key campsite builder, we specialize in constructing pre-engineered camps and accommodations for workers in extreme environments like deserts and tundra. We take pride in delivering high quality camps and housing in challenging conditions.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive function. Exercise causes chemical changes in the brain that may help protect against developing mental illness and improve symptoms for those who already suffer from conditions like anxiety and depression.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive functioning. Exercise causes chemical changes in the brain that may help protect against mental illness and improve symptoms.
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
How MJ Global Leads the Packaging Industry.pdfMJ Global
MJ Global's success in staying ahead of the curve in the packaging industry is a testament to its dedication to innovation, sustainability, and customer-centricity. By embracing technological advancements, leading in eco-friendly solutions, collaborating with industry leaders, and adapting to evolving consumer preferences, MJ Global continues to set new standards in the packaging sector.
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfthesiliconleaders
In the recent edition, The 10 Most Influential Leaders Guiding Corporate Evolution, 2024, The Silicon Leaders magazine gladly features Dejan Štancer, President of the Global Chamber of Business Leaders (GCBL), along with other leaders.
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...ABHILASH DUTTA
This presentation provides a thorough examination of Over-the-Top (OTT) platforms, focusing on their development and substantial influence on the entertainment industry, with a particular emphasis on the Indian market.We begin with an introduction to OTT platforms, defining them as streaming services that deliver content directly over the internet, bypassing traditional broadcast channels. These platforms offer a variety of content, including movies, TV shows, and original productions, allowing users to access content on-demand across multiple devices.The historical context covers the early days of streaming, starting with Netflix's inception in 1997 as a DVD rental service and its transition to streaming in 2007. The presentation also highlights India's television journey, from the launch of Doordarshan in 1959 to the introduction of Direct-to-Home (DTH) satellite television in 2000, which expanded viewing choices and set the stage for the rise of OTT platforms like Big Flix, Ditto TV, Sony LIV, Hotstar, and Netflix. The business models of OTT platforms are explored in detail. Subscription Video on Demand (SVOD) models, exemplified by Netflix and Amazon Prime Video, offer unlimited content access for a monthly fee. Transactional Video on Demand (TVOD) models, like iTunes and Sky Box Office, allow users to pay for individual pieces of content. Advertising-Based Video on Demand (AVOD) models, such as YouTube and Facebook Watch, provide free content supported by advertisements. Hybrid models combine elements of SVOD and AVOD, offering flexibility to cater to diverse audience preferences.
Content acquisition strategies are also discussed, highlighting the dual approach of purchasing broadcasting rights for existing films and TV shows and investing in original content production. This section underscores the importance of a robust content library in attracting and retaining subscribers.The presentation addresses the challenges faced by OTT platforms, including the unpredictability of content acquisition and audience preferences. It emphasizes the difficulty of balancing content investment with returns in a competitive market, the high costs associated with marketing, and the need for continuous innovation and adaptation to stay relevant.
The impact of OTT platforms on the Bollywood film industry is significant. The competition for viewers has led to a decrease in cinema ticket sales, affecting the revenue of Bollywood films that traditionally rely on theatrical releases. Additionally, OTT platforms now pay less for film rights due to the uncertain success of films in cinemas.
Looking ahead, the future of OTT in India appears promising. The market is expected to grow by 20% annually, reaching a value of ₹1200 billion by the end of the decade. The increasing availability of affordable smartphones and internet access will drive this growth, making OTT platforms a primary source of entertainment for many viewers.
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...my Pandit
Explore the fascinating world of the Gemini Zodiac Sign. Discover the unique personality traits, key dates, and horoscope insights of Gemini individuals. Learn how their sociable, communicative nature and boundless curiosity make them the dynamic explorers of the zodiac. Dive into the duality of the Gemini sign and understand their intellectual and adventurous spirit.
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
IMPACT Silver is a pure silver zinc producer with over $260 million in revenue since 2008 and a large 100% owned 210km Mexico land package - 2024 catalysts includes new 14% grade zinc Plomosas mine and 20,000m of fully funded exploration drilling.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
Understanding User Needs and Satisfying ThemAggregage
https://www.productmanagementtoday.com/frs/26903918/understanding-user-needs-and-satisfying-them
We know we want to create products which our customers find to be valuable. Whether we label it as customer-centric or product-led depends on how long we've been doing product management. There are three challenges we face when doing this. The obvious challenge is figuring out what our users need; the non-obvious challenges are in creating a shared understanding of those needs and in sensing if what we're doing is meeting those needs.
In this webinar, we won't focus on the research methods for discovering user-needs. We will focus on synthesis of the needs we discover, communication and alignment tools, and how we operationalize addressing those needs.
Industry expert Scott Sehlhorst will:
• Introduce a taxonomy for user goals with real world examples
• Present the Onion Diagram, a tool for contextualizing task-level goals
• Illustrate how customer journey maps capture activity-level and task-level goals
• Demonstrate the best approach to selection and prioritization of user-goals to address
• Highlight the crucial benchmarks, observable changes, in ensuring fulfillment of customer needs
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
1. Turn-key Pre-Engineered Camp Site Builder" in deserts or even extreme tundra conditions with excellence and passion.
Introduction page
PREFI COMPANY PROFILE
1.1. CONTACT INFO . . page 1
1.2. DESCRIPTION OF WORK . . page 1
1.3. PRODUCTION . . page 1
1.3.1. MOBILE UNITS . . page 1
1.3.2. PANEL BUILDINGS . . page 1
1.3.3. STEEL STRUCTURES . . page 1
1.4. NAICS CLASSIFICATION AND DESCRIPTION . page 1
1.5. UN ORGANIZATIONS PREFI IS IN DEAL . page 2
1.6. SHAREHOLDERS (PERCENTAGE OWNERSHIP) . page 2
1.7. AFFILIATES AND RELATED COMPANIES . page 2
1.8. KEY EXECUTIVES . . page 2
1.9. TOTAL EMPLOYEES . . page 2
1.10. CERTIFICATIONS . page 3
1.10.1. DUN&BRADSTREET CREDIBILITY CORP (NO: 53-526-0293) page 3
1.10.2. TSE-EN-ISO 9001:2008 QM . . page 3
1.10.3. GOST-R (From Russian Standarts – Governmental Organizations) . page 4
1.10.4. ECCS Acreditiv TUCSA Turkey since 2000 (NO: 26) . page 4
1.10.5. ASO (Industry Licence Ankara since 1995) (NO: 4776-8 / 211) page 4
1.10.6. NCAGE (NATO Security Certificate since 1999) (NO: T3936) page 4
1.10.7. FIRE REGISTRATION (From Russian Standarts – Governmental Organizations) page 5
1.10.8. TRADEMARK REGISTRATION FOR WORLD (NO: 993020) page 6
1.10.9. SERVICE ADEQUATES CERTIFICATE (NO: 06/7720) page 7
1.11 ENVIRONMENTAL POLICY . . page 7
1.12 HUMAN RIGHTS POLICY . . page 7
1.13 DANGER AND RISK EVALUATION PROCEDURE POLICY . page 8
1.14 OHS INSTRUCTIONS . . page 8
1.15 EXISTING MARKETS REFERANCES . . page 8
2. FINANCIALS . . page 9
2.1. BANK ACCOUNTS . . page 9
2.2. LATEST AUDITED FINANCIAL REPORTS . . page 10
2.3 TURKISH GOVERNMENT POST LETTER ABOUT PREFI ON 1995 . page 15
3. REFERANCES ( WITH ALSO NAICS CLASSIFICATION AND DESCRIPTIONS ) page 16
4. A REFERANCE DETAIL ABOUT OUR AUTOMATED BUILDING SYSTEM . page 26
5. PREFI AS A POWERFULL SUBCONTRACTOR FOR RWE . page 29
2. Page of 321
1.1. PREFI COMPANY PROFILE
1. COMPANY INFORMATION
1.1. CONTACT INFO
HEADQUARTERS AND FACTORIES
İstanbul Yolu 30.km Kazan-Ankara
Tel : +90 312 8154979
Fax : +90 312 8154978
Email : prefi@prefi.com.tr
Website : www.prefi.com.tr
Operational Status : OPERATIONAL
Type of Organization: Private Company
Any Bankrupcy : No outstanding or pending bankruptcy, judgment or legal action since 1995
Post-Employment : Restrictly we do not employ, or anticipate employing, any person(s) who is or was employed (acc.UN)
Ankara Trade Licence : 26-3546
Ankara Industrial Licence : 4776-8 / 211
Tax ID : 7330057921
Incorporation Date : 04.09.1995
Languages : TURKISH, ENGLISH, RUSSIAN
Slogan : “My dedicated Turn-key Camp Site Builder in deserts & tundras”
1.2. DESCRIPTION OF WORK
Designing, Manufacturing and Mounting of TurnKey Camp Buildings at the defined site area.
CAD-CAM manufacturing fort he best future value with galvanized strucrual steel and rockwool insulations incase of any flameability.
On August 1995, Prefi has been found by Mrs.Belma Yilmazyigit in Ankara. Prefi has been working on the behalf of construction
companies, petroleum companies, mining companies, energy companies and esteemed governments special projects; from a simple
mobile unit to three floored panelized buildings. Whether the climate is tundra or desert type, city center to terrorist area, Prefi has the
capability to build up the whole city, new site area.
1.3. PRODUCTION
1.3.1. MOBILE UNITS
From the 1,3*1,3mt Securities, GSM or CVOR Shelters to 3,6*13,1mt Trailers with full of equipment or specified items
1.3.2. PANEL BUILDINGS
1.3.2.1. 50 to 5.000 men camps which has housings, dormitories, offices, warehouses, canteens, ablution units, in turnkey
option.
1.3.2.2. Houses from 30m2 up to 180m2 for families
1.3.3. STEEL STRUCTURES
From simple warehouse of 100m2 with eave height 3mt ; Up to thousands of meter squares of Airport Halls.
1.4. NAICS CLASSIFICATION AND DESCRIPTION
236210 Industrial Building Construction ; Prefabricated industrial building (except warehouses) and erection
We have referances on industrial buildings from Gas Control Centers to Factories even in Azerbaican, Turkey
236220 Commercial and Institutional Building Construction ; Prefabricated commercial building and erection
236220 Commercial and Institutional Building Construction Logging camp construction
We have done from little market places to Hospitals even in Mauritania, Iraq, Turkey
321991 Manufactured Home (Mobile Home) Manufacturing ; Houses, prefabricated mobile homes, manufacturing
236115 New Single-Family Housing Construction (except Operative Builders) 336,655
236116 New Multifamily Housing Construction (except Operative Builders) 41,773
236117 New Housing Operative Builders 8,385
We have done hundereds of houses in Van City Desaster Relief Project Houses
Also recently Iraq Projects and Libyan Projects
238910 Site Preparation Contractors 44,916
We have to first open a road and then clean the surface and make a basement for our buildings;
Camps in tundra or desert condition where the site is even in Niger, Nigeria.
In Djibuti, mostly Prefi Buildings have been used in first non-local settlements too.
In Libya, the whole market was great and nish before the crisis of 2011, we are settling again.
721310 Rooming and Boarding Houses ; Dormitories, off campus
For the universities outside the city centers, multi purpose housing and dormitories has been done for living quarters.
928110 National Security ; Military bases and camps
3. Page of 322
We have build up more than 75.000m2 of military bases for Turkish Armed Forces.
We have build for US Armed Forces Iraq and Afghanistan and awaiting for Libyan too.
We have build for Azerbaican Armed Forces in Gence too.
1.5. UN ORGANIZATIONS PREFI IS IN DEAL
UN; UNCTAD; UNEP; UNCHS(Habitat); UNICEF; UNDP; WFP; UNHCR; UNRWA; UNFPA; UNOPS; UNU; ILO; FAO; UNESCO; ICAO;
WHO; WB; IMF; UPU; ITU; WMO; IMO; WTO; WIPO; IAPSO; IFAD; UNIDO; IAEA; ITC; ECA; ECE; ECLAC; ESCAP; ESCWA.
OUR UNCCS CLASSIFICATIONS AND DESCRIPTIONS
387100 Buildings, prefabricated for office, school, home, workshop or wareh TSE-ISO-EN 9001-2000 QM
387110 Buildings, prefabricated, permanent, office, school, home TSE-ISO-EN 9001-2000 QM
387111 Houses, prefabricated TSE-ISO-EN 9001-2000 QM
387112 Kitchens, prefabricated TSE-ISO-EN 9001-2000 QM
387120 Buildings, prefabricated, portable, office, school home TSE-ISO-EN 9001-2000 QM
387125 Prefabricated offices TSE-ISO-EN 9001-2000 QM
387140 Warehouses, prefabricated TSE-ISO-EN 9001-2000 QM
387141 Warehouses, prefabricated, permanent (steel, aluminium) TSE-ISO-EN 9001-2000 QM
387143 Warehouses, prefabricated, portable, lightweight TSE-ISO-EN 9001-2000 QM
387153 Ablutions, prefabricated TSE-ISO-EN 9001-2000 QM
387170 Hospitals, clinics and health projects, prefabricated TSE-ISO-EN 9001-2000 QM
387196 Workshops, prefabricated TSE-ISO-EN 9001-2000 QM
387200 Laboratories, prefabricated TSE-ISO-EN 9001-2000 QM
387900 Prefabricated buildings, parts thereof TSE-ISO-EN 9001-2000 QM
513581 Prefabricated housing (dwellings) construction TSE-ISO-EN 9001-2000 QM
513582 Prefabricated offices construction TSE-ISO-EN 9001-2000 QM
513583 Prefabricated schools construction TSE-ISO-EN 9001-2000 QM
513584 Prefabricated stores, general, construction TSE-ISO-EN 9001-2000 QM
513587 Prefabricated workshops construction TSE-ISO-EN 9001-2000 QM
523951 Prefabricated greenhouse services TSE-ISO-EN 9001-2000 QM
387130 Container units, office, workshop, home TSE-ISO-EN 9001-2000 QM
387131 Container units, emergency TSE-ISO-EN 9001-2000 QM
387132 Container, office TSE-ISO-EN 9001-2000 QM
387133 Container, ablution TSE-ISO-EN 9001-2000 QM
387134 Container, housing TSE-ISO-EN 9001-2000 QM
422220 Containers for atomic energy purposes TSE-ISO-EN 9001-2000 QM
492210 Containers TSE-ISO-EN 9001-2000 QM
492216 Containers, refrigerated TSE-ISO-EN 9001-2000 QM
497930 Airfield container trailer TSE-ISO-EN 9001-2000 QM
368961 Containers, insulated, 0 - 19 l TSE-ISO-EN 9001-2000 QM
368962 Containers, insulated, 20 - 50 l TSE-ISO-EN 9001-2000 QM
368963 Containers, insulated, 51 l and larger TSE-ISO-EN 9001-2000 QM
1.6. SHAREHOLDERS (PERCENTAGE OWNERSHIP)
As you are going to see; We have the power of being a Woman-Owner Business. We have the principle of being organized.
Always systematically building more.
Mrs.Belma Yilmazyigit (%80)
Mr.K.Bora Yilmazyigit (%10)
Mr.H.Vakur Yilmazyigit (%10)
1.7. AFFILIATES AND RELATED COMPANIES
BVB Construction Company is a subsidiary of Mrs.Yilmazyigit for construction purposes and construction processes. Cause prefabrication
is a high speed train where as construction is a traditional train
Whereas we mostly solving the roads and basements with the main contractors especially on abroad projects. We need simply a road, a
basement and a little secure location for build up.
1.8. KEY EXECUTIVES
KEMAL KARAKUCUK . - Deputy General Manager
SUKRU KESRIT . - Plant Manager
HATICE USTA . - Quality System Manager
METIN DUMAN . - Site Assembly Chief
CAĞRI ÜNAL . - Statics Design Chief
1.9. TOTAL EMPLOYEES
100-750 person with 12 subcontractors with an high-low flex capacity worker quantity for great sites abroad.
9. Page of 328
1.11 ENVIRONMENTAL POLICY
With also a policy is written on our statement, Turkish Government is strictly controlling our Factories each month about our impact on
nature. Also the list of residual materials capacity is being listed according to our capacity reports.
Prefi Principle 1: Prefi has ISO 9001:2000 Quality Management System in eider to solve every kind of problems with brain storm.
Prefi Principle 2: Prefi everyday creating a new method inorderto solve its own and nearby area enviromental problems for better
world.We here by seperate our rubbish like plastic bottle tops from steel caus while using paints.Thew rubbish is go into two.Steel is used
again and the plastic is used again.Where plastic is used is in PVC floors and steel is return us as a new steel plates.
Prefi Principle 3: Prefi shall find a solution in its own to again plastic rubbish into floor leveling and has to use it as a rawmaterial..We are
trying to find a solution at the moment.
1.12 HUMAN RIGHTS POLICY
Prefi Principle 1: Prefi Prefabs is not looking any gender, nationality, religious differencies by the way we are going to work for UN with the
mentality of“Days ought to be 48 hours.” with our best performances.
Prefi Principle 2: Prefi gives responsable answers according to the human rights from planning-engineering step, up to the mounting-
finishing steps,
1.13 DANGER AND RISK EVALUATION PROCEDURE POLICY
The object procedure policy; To define the potential dangers and risks related with them during activities of Prefi Prefabs Factory and to
define the basics and ways of expected and potential risks in order to take them under the control systematically.
I. Prior Dangers:
The topics which are graded 16(inclusive) or more than 16 according to the statistical evaluation:
The work on process is stopped when it is needed
Danger is taken under the control.
In order to have fully control over the situation, documented procedure/instructions are made up.
Monitoring and measuring plans are prepared and they are tracked.
Correcting or regulating actions to improve the current situation are defined.
They are documented and add in process, are applied and followed.
It is aimed to lower the 1st. Prior dangers to the acceptable limits according to the control results.
The chase of improvements numerically (statistically) is performed when it is possible to apply and they are tracked.
Related trainings for the responsible personnel are organized and done.
It is acted to check and control all of the applications about these subjects periodically.
II. Prior Dangers:
The topics which are graded more than 9(inclusive) and less than 16 according to the statistical evaluation:
Danger is taken under the control
The related and required instructions are organized when their need is emerged.
It is supplied to be monitored and be measured and they are tracked in the archives as much as possible.
Correcting and regulating actions contributing to the improvements are defined and they are applied and they are controlled for the last
step.
It is aimed to lower the 2st. Prior dangers to the acceptable limits according to the control results.
The personnel on the critical position is trained according to their required skills.
It is provided to be audited all applications in these kinds of subjects periodically.
III. Prior Dangers:
The topics and precautions which are graded less than 9(inclusive) or more than 4 according to the statistical evaluation are defined in the
section of planning applications and are controlled to apply or not. The personnel of the enterprise is trained according to the required skills
of positions. It is aimed to lower the 3rd. Prior dangers to the acceptable limits according to the control results
Control of Dangers and Risks:
Preclusive actions for the intention to reduce the considered dangers and their potential and probable risks or them under the control are
planned. In addition to these actions, in order to provide OHSAS 18001 requirements and permanent improvements, related applications
are defined. For example: Various ways showing how to take these dangers and risks under control , the ways which must be followed and
instructions which must also implemented, planned trainings exc.
Although it is impossible to provide a completely protection for potential dangers and probable related risk or putting out of sight, it can be
obtained to reduce the probabilities of potential dangers and those related risks by those applying control mechanisms. These control
systems are indicated below:
- Precautions for the source (New technology, repairing, restoration, exc.)
- Precautions for the environment (Employee size, improving the physical-chemical and biological conditions, plates and signs exc.)
- Precaution for the people on the position (Protective equipment, training, performance evaluation, documents and working span exc.)
Accountable of the Planned Action
The accountable of the planning activity is selected by the production manager. It is declared to the person who is selected for his position.
ISG accountable see over the defined risks, risks, priorities of them, important risks and application and control results prepared according
to them. He does corrections and regulations if needed. The programme confirmed by production chief is added to the administration plan
and keep on processing.
1.14 OHS INSTRUCTIONS
1. Every precaution taken concerning occupational health and safety shall be followed,
2. Training programs set up fort he establishment of a healthy and safe working environment shall be attended, given and announced
notifications and procedures shall be followed,
10. Page of 329
3. Working shall be in accordance with the safety and security signs announced at the working place, every unit shall be responsible of the
maintenance of the signs within their responsibilities,
4. Maximum attention shall be given in order not to affect own and other people’s health and safety negatively, and missions shall be
proceeded in accordance with the trainings and instructions given by the employer,
5. Working place shall not be left within the working hours, without the information and authorization of the employer,
6. Machines, tools, instruments, mediums dangerous
Our articles carry on to 99 items. Can be viewed online.
1.15 EXISTING MARKETS REFERANCES
With the referances below, our camps from different countries can be seen on the next pages. Any how all of your questions about your
new project’ are welcomed and can be asked from our executives.
1.15.1 NORTH AMERICA
We are proudly working on North American Countries companies for abroad projects especially on Africas and Asia
1.15.2 LATIN AMERICA
We are proudly working on Latin America Countries
1.15.3 EUROPE
We are proudly working in Eastern Europe and working for European Companies
1.15.4 MIDDLE EAST
It is a pleasure for us to build in Middle East in really hot conditions whenever we are working and building in Tundras
1.15.5 AFRICA
Mostly European and Russian companies we are working for in Africa for their better conditions of living and working.
1.15.6 ASIA
There the Asia has a great potential on mineral as when we work we see the power under ground
1.15.7 AUSTRLIA / OCEANIA
Not yet to meet for a new project
2. FINANCIALS
2.1. BANK ACCOUNTS
AKBANK - AKINCI BRANCH $ IBAN: TR23 0004 6006 8100 1000 1271 72, € IBAN:TR70 0004 6006 8103 6000 1271 73
TEBBANK - CANKAYA BRANCH $ IBAN: TR58 0003 2000 3070 0000 0186 82, € IBAN:TR21 0003 2000 3070 0000 0221 61
DENİZBANK - YENISEHIR BRANCH $ IBAN: TR39 0013 4000 0023 7489 3000 02, € IBAN:TR12 0013 4000 0023 7489 3000 03
11. Page of 3210
3. REFERANCES ( WITH ALSO NAICS CLASSIFICATION AND DESCRIPTIONS )
3.1 PREFI OWN STEEL FACTORY BUILDINGS
Contact: MR.K.BORA YILMAZYIGIT – OWNER – 90312 8154979 ; borap@tr.net
3.2 KISH IRAN 2010 (Iran Government Project)
Contact: may be requested from Prefi
Over 2.500.000 USD job has been finished in Kish Island Project in Iran
14. Page of 3213
3.4 RENASAINCE CONSTRUCTION FIRST LIBYAN CAMPS
Contact: MS.ELA ISIK – PROJECT PURCHASE – 90312 4413141; ela@volga.com.tr
Projects over 5.000.000USD in recent years
In Libya,
In Ukrain,
In Russia
15. Page of 3214
3.5 BM ENGINEERING ERMENEK DAM
Contact: SATI OZKARA - PURCHASE MANAGER - 90312 286 5353 ; sati.ozkara@bmmuh.com.tr
19. Page of 3218
3.7. UDDA BOYABAT DAM
Contact: KOKSAL ERGITURK – MANAGER – 90212 335 3361; koksale@dogusinsaat.com.tr
Over 1.500.000 USD job finish document is awaiting to be taken after our request.
3.9. CC TURKMALL LIBYAN DIFFERENT BASES
Contact: OZEN YENICERI– MANAGER – +90 216 651 5352 ; info@ccgroupco.com
20. Page of 3219
More referances on www.prefi.com.tr or can be demanded from vakur@prefi.com.tr
21. Page of 3220
4. A REFERANCE DETAIL ABOUT OUR BUILDING SYSTEM
System Details ( Galvanized and Automatic Production Details)
24. Page of 3223
5. PREFI AS A POWERFULL SUBCONTRACTOR FOR STEEL STRUCTURES
As being a great prefabricated camp buildings builder, Prefi is proud of being your subcontractor.
25. Page of 3224
We have also Great Referances to show as not only being a prefab camp builder; As a Steel Structural Manufacturer
Aktua Kazakhstan 2012
Also
Konya GES Energys Projects
26. Page of 3225
Main Military Activities Center with Two Halls, City of Van near Van Lake, Turkey
27. Page of 3226
Some Referances has to be given from MNG Construction too as Building up Baku-Nahcivan Passenger Terminal
New Housing Project Planning Center-Ankara
After 10 days of Heavy Working New Housing Project Planning Center has been Turn-Key delivered up-Ankara