SEMINAR REPORT ON:
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS.
At
Submitted By:
PARTHA SARATHI PARIDA
REG NO. 10010133
7TH SEMESTER
ELECTRICAL ENGINEERING
NTPC-SAIL Power Company Private Limited, Rourkela.
VEER SURENDRA SAI UNIVERSITY OF TECHNOLOGY, BURLA, ODISHA.
DEPARTMENT OF ELECTRICAL ENGINEERING
NSPCL, ROURKELA CAPTIVE POWER PLANT
NTPC Ltd formed joint venture with SAIL on 50:50 basis in March 2001 in the name
of NTPC-SAIL Power Company Private Limited (NSPCL). NSPCL took over captive
power plant-II located at Rourkela Steel Plant (2X60 MW) from SAIL.
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
2
03-Nov-2013
AN OVERVIEW OF CPP :-
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
3
03-Nov-2013
MAJOR EQUIPMENT IN CPP :-
• 2 GENERATORS
• 2 GENERATOR TRANSFORMERS
• 2 UNIT AUXILIARY TRANSFORMERS
• STATION TRANSFORMERS
• FEEDERS
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
4
03-Nov-2013
TECHNICAL DATA OF GENERATOR UNIT 1 AND 2:
• Generator Type : THRI 86/35
• Year of manufacture : 1985
• Stator No. : 1134 & 1135
• Rotor No. : 1134 & 1135
• Exciter type : Static
• Apparent power : 75 MVA
• Active power : 60 MW
• Current : 3.766 KA
• Voltage : 11.5 KV +5%
• Speed : 3000 Rpm
• Frequency : 50 Hz
• Power Factor : 0.8
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
5
03-Nov-2013
TECHNICAL DATA OF GEN. TRANSFORMER UNIT
1 AND 2:
• Make : Crompton Greaves Ltd
• Rating : 16.5/33/82.5/ MVA
• Type of cooling : ONAN/ONAF/OFAF
• No load voltage : HV : 138KV , LV : 11.5KV
• Winding : HV : STAR , LV : DELTA
• Phases : 3/3
• Frequency : 50 Hz
• Vector group : Ynd 11
• Rated current : HV : 345.20Amps ,LV 4141.90
Amps
• Total oil qty : 24,470 Lts
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
6
03-Nov-2013
TECHNICAL DATA OF UNIT AUX. TRANSFORMER
UNIT 1 AND 2:
• Make : Crompton Greaves Ltd
• Rating : 12.5 MVA
• Type of cooling : ONAN
• Voltage : HV : 11.5 KV , LV : 6.9 KV
• Phases : 3/3
• Frequency : 50 Hz
• Vector group : DYN 1
• Rated current : HV : 627.5 Amps ,
LV:1045.9 Amps
• Total oil qty. : 9,000 Lts
• Percentage impedance voltage : 7%
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
7
03-Nov-2013
TECHNICAL DATA OF STATION AUXILIARY
TRANSFORMER:
• Make : Crompton Graeves Ltd
• Rating : 20/25 MVA
• Cooling : ONAN/ONAF
• No Load voltage : 132/6.9/3.3 KV (UNLOADED )
• Current: HV 109.3 Amps LV 2091.8 Amps
• Frequency : 50 Hz
• Vector Group : YNY nd 011
• quantity of oil : 17500Lts
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
8
03-Nov-2013
SWITCHYARD:
SALIENT FEATURES OF 132KV SWITCHTYARD:-
• 20 OPERATING BAYS
• 02 GENERATORS
• 04 GRIDCO FEEDERS
• 06 SMELTER FEEDERS
• BUS COUPLER
• BUS TIE CUM BUS COUPLER
• STATION TRANSFORMERS
• 01 BT BAY
• ISOLATION TRANSFORMERS
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
9
03-Nov-2013
IMPORTANT COMPONENTS OF THE SWITCH YARD:
1. BUSBARS:
TYPES OF BUSBAR ARRANGEMENTS:
1. Single Bus-bar Arrangement.
2. Single Bus-bar System with Sectionalization
3. Ring Bus-bar system
4. Double Main and Transfer Bus-bar Arrangement
5. Duplicate Bus-bars System
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
10
03-Nov-2013
1. SINGLE BUS-BAR ARRANGEMENT
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
11
03-Nov-2013
In this arrangement a set of bus-bars is used for complete power station and
to this bus-bar are connected all generators, transformers and feeders
through circuit breakers and isolating switches.
2. SINGLE BUS-BAR SYSTEM WITH SECTIONALIZATION
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
12
03-Nov-2013
With increased number of generators and outgoing feeders connected to
the bus-bars, it becomes essential to provide arrangement for
sectionalizing the bus-bars so that a fault on any one section of the bus-
bars may not cause a complete shutdown. This is achieved by providing
a circuit breaker and isolating switches between the section.
3. RING BUS-BAR SYSTEM
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
13
03-Nov-2013
In this arrangement each feeder is supplied from two paths, so that in
case of failure of a section, supply is not interrupted.
4. DOUBLE MAIN AND TRANSFER BUS-BAR
ARRANGEMENT
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
14
03-Nov-2013
This arrangement incorporates all advantages of the double bus as well as
transfer bus scheme. This scheme needs a bus-coupler for the on load transfer of
circuits from one main bus to the other and a transfer coupler for taking out
circuit breaker of various circuits for maintenance.
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
15
03-Nov-2013
2. BUS COUPLER:
• Two different bus sections of two different power transformers are
connected by means of a bus coupler.
• The bus coupler becomes useful when one of the power transformers
fails or a fault occurs in either of the bus sections.
3. INSULATORS:
• The overhead line conductors should be supported on the poles or
towers in such a way that currents from conductors do not flow to
earth through supports i.e., line conductors must be properly insulated
from supports. This is achieved by securing line conductors to supports
with the help of INSULATORS.
• The insulators provide necessary insulation between line conductors
and supports and thus prevent any leakage current from conductors to
earth.
TYPES OF INSULATORS:
1.PIN TYPE: 2. SUSPENSION
TYPE:
3. STRAIN
INSULATORS:
4. SHACKEL
INSULATORS:
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
16
03-Nov-2013
4. CIRCUIT BREAKER & RELAYS:
• A circuit breaker is an automatically operated electrical switch designed
to protect an electrical current from damage caused by overload or
short circuit.
• Its basic function is to detect a fault condition and, by interrupting
continuity, to immediately discontinue electrical flow.
• The circuit breaker works along with the relays which give a tripping
signal in case of any irregularity or the faults.
• The circuit breaker then opens to open the circuit such that other
instruments of the system can be protected.
03-Nov-2013
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
17
5. ISOLATORS: (GOD)- GROUP OPERATED DISCONNECTOR:
• It is used to make sure that an electrical circuit can be completely de-
energised for service or maintenance.
• It allows isolation of apparatus such as circuit breakers and
transformers, and transmission lines, for maintenance.
• GOD’s are provided to facilitate isolation of breakers supplying power to
various feeders. In 220kv Switchyard, they are designed as 29A, 29B,
29C & 29E as follows
 29 A – main bus side GOD.
 29 B - Equipment side GOD.
 29 C - Transfer bus side GOD.
 29 E - Earth GOD.
03-Nov-2013
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
18
6. Current and voltage transformers
• Current or voltage instrument transformers are necessary for isolating
the protection, control and measurement equipment from the high
voltages of a power system, and for supplying the equipment with the
appropriate values of current and voltage - generally these are 1A or 5Α
for the current coils, and 120 V for the voltage coils.
03-Nov-2013
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
19
CURRENT TRANSFORMER VOLTAGE TRANSFORMER
8. LIGHTNING ARRESTER:
• A lightning arrester is a device used on electrical power systems
and telecommunication systems to protect the insulation and
conductors of the system from the damaging effects of lightning.
• The typical lightning arrester has a high-voltage terminal and a ground
terminal.
• When a lightning surge (or switching surge, which is very similar) travels
along the power line to the arrester, the current from the surge is
diverted through the arrestor, in most cases to earth.
03-Nov-2013
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
20
LIGHTNING ARRESTER
TRANSFORMER YARD:
• Transformer yard consists of following types of transformers
03-Nov-2013
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
21
CONCLUSION :-
• Switchyard is most essential part of the power system.
• It is the protective part of the whole power system.
• Switch yard is also most essential part for transmission, distribution, and
collection.
03-Nov-2013
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
22
BIBILIOGRAPHY :-
1. http://wikipedia.com
2. http://google.co.in
3. http://www.engineersedge.com
4. http://www.scribd.com
5. http://electricals4u.com
6. Power system Engineering by O P KOTHARI and I J NAGRATH
7. Power System By J B GUPTA
03-Nov-2013
DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA
23

More Related Content

Similar to pptpdf-131117235616-phpapp02.pdf

132 kv substation
132 kv substation132 kv substation
132 kv substation
Wipro
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
rohit nadella
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
ShubhoDas5
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02
Md Hasan
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
Aman Rajput
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Gangwal
 
Design of substation
Design of substationDesign of substation
Design of substation
SayanSarkar55
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
SayanSarkar55
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
jang041
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
Asif682330
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
SNEHAKANWAR1
 
Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
Asif682330
 
132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur
kishankky
 
Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Sachin Airan
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
imkanhaiyalal
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substation
shivashankar307
 
Short-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptShort-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.ppt
JatmylHarnero1
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
Adnan Sayed
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Rahul Prajapati
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
virat217995
 

Similar to pptpdf-131117235616-phpapp02.pdf (20)

132 kv substation
132 kv substation132 kv substation
132 kv substation
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
Design of substation
Design of substationDesign of substation
Design of substation
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
 
Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
 
132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur
 
Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substation
 
Short-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptShort-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.ppt
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 

More from Thien Phan Bản

Breaker_Failure_Protection.ppt
Breaker_Failure_Protection.pptBreaker_Failure_Protection.ppt
Breaker_Failure_Protection.ppt
Thien Phan Bản
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
Thien Phan Bản
 
megger-150210211712-conversion-gate01.ppt
megger-150210211712-conversion-gate01.pptmegger-150210211712-conversion-gate01.ppt
megger-150210211712-conversion-gate01.ppt
Thien Phan Bản
 
Breaker_Failure_Protection.ppt
Breaker_Failure_Protection.pptBreaker_Failure_Protection.ppt
Breaker_Failure_Protection.ppt
Thien Phan Bản
 
21955068-High-Low-Impedance-BusBar-Protection.ppt
21955068-High-Low-Impedance-BusBar-Protection.ppt21955068-High-Low-Impedance-BusBar-Protection.ppt
21955068-High-Low-Impedance-BusBar-Protection.ppt
Thien Phan Bản
 
basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdf
Thien Phan Bản
 
FUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdf
FUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdfFUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdf
FUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdf
Thien Phan Bản
 
High_Low_Impedance_BusBar_Protection.ppt
High_Low_Impedance_BusBar_Protection.pptHigh_Low_Impedance_BusBar_Protection.ppt
High_Low_Impedance_BusBar_Protection.ppt
Thien Phan Bản
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
Thien Phan Bản
 
11042019104945.pdf
11042019104945.pdf11042019104945.pdf
11042019104945.pdf
Thien Phan Bản
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx
Thien Phan Bản
 
14009762-ABB-Protection-Book.pdf
14009762-ABB-Protection-Book.pdf14009762-ABB-Protection-Book.pdf
14009762-ABB-Protection-Book.pdf
Thien Phan Bản
 
ppt100-110425022440-phpapp02.ppt
ppt100-110425022440-phpapp02.pptppt100-110425022440-phpapp02.ppt
ppt100-110425022440-phpapp02.ppt
Thien Phan Bản
 
chuong_1.ppt
chuong_1.pptchuong_1.ppt
chuong_1.ppt
Thien Phan Bản
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
Thien Phan Bản
 
Basic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdfBasic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdf
Thien Phan Bản
 
17649136-Relays.pdf
17649136-Relays.pdf17649136-Relays.pdf
17649136-Relays.pdf
Thien Phan Bản
 
17648889-Introduction-to-Power-System-Protection-Relays.pdf
17648889-Introduction-to-Power-System-Protection-Relays.pdf17648889-Introduction-to-Power-System-Protection-Relays.pdf
17648889-Introduction-to-Power-System-Protection-Relays.pdf
Thien Phan Bản
 
protectionprimer-121228115656-phpapp01.ppt
protectionprimer-121228115656-phpapp01.pptprotectionprimer-121228115656-phpapp01.ppt
protectionprimer-121228115656-phpapp01.ppt
Thien Phan Bản
 

More from Thien Phan Bản (20)

Breaker_Failure_Protection.ppt
Breaker_Failure_Protection.pptBreaker_Failure_Protection.ppt
Breaker_Failure_Protection.ppt
 
75181713.pdf
75181713.pdf75181713.pdf
75181713.pdf
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
megger-150210211712-conversion-gate01.ppt
megger-150210211712-conversion-gate01.pptmegger-150210211712-conversion-gate01.ppt
megger-150210211712-conversion-gate01.ppt
 
Breaker_Failure_Protection.ppt
Breaker_Failure_Protection.pptBreaker_Failure_Protection.ppt
Breaker_Failure_Protection.ppt
 
21955068-High-Low-Impedance-BusBar-Protection.ppt
21955068-High-Low-Impedance-BusBar-Protection.ppt21955068-High-Low-Impedance-BusBar-Protection.ppt
21955068-High-Low-Impedance-BusBar-Protection.ppt
 
basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdf
 
FUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdf
FUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdfFUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdf
FUNDAMENTALS_OF_BUS_PROTECTION_Handouts.pdf
 
High_Low_Impedance_BusBar_Protection.ppt
High_Low_Impedance_BusBar_Protection.pptHigh_Low_Impedance_BusBar_Protection.ppt
High_Low_Impedance_BusBar_Protection.ppt
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
 
11042019104945.pdf
11042019104945.pdf11042019104945.pdf
11042019104945.pdf
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx
 
14009762-ABB-Protection-Book.pdf
14009762-ABB-Protection-Book.pdf14009762-ABB-Protection-Book.pdf
14009762-ABB-Protection-Book.pdf
 
ppt100-110425022440-phpapp02.ppt
ppt100-110425022440-phpapp02.pptppt100-110425022440-phpapp02.ppt
ppt100-110425022440-phpapp02.ppt
 
chuong_1.ppt
chuong_1.pptchuong_1.ppt
chuong_1.ppt
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
 
Basic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdfBasic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdf
 
17649136-Relays.pdf
17649136-Relays.pdf17649136-Relays.pdf
17649136-Relays.pdf
 
17648889-Introduction-to-Power-System-Protection-Relays.pdf
17648889-Introduction-to-Power-System-Protection-Relays.pdf17648889-Introduction-to-Power-System-Protection-Relays.pdf
17648889-Introduction-to-Power-System-Protection-Relays.pdf
 
protectionprimer-121228115656-phpapp01.ppt
protectionprimer-121228115656-phpapp01.pptprotectionprimer-121228115656-phpapp01.ppt
protectionprimer-121228115656-phpapp01.ppt
 

Recently uploaded

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 

Recently uploaded (20)

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 

pptpdf-131117235616-phpapp02.pdf

  • 1. SEMINAR REPORT ON: SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS. At Submitted By: PARTHA SARATHI PARIDA REG NO. 10010133 7TH SEMESTER ELECTRICAL ENGINEERING NTPC-SAIL Power Company Private Limited, Rourkela. VEER SURENDRA SAI UNIVERSITY OF TECHNOLOGY, BURLA, ODISHA. DEPARTMENT OF ELECTRICAL ENGINEERING
  • 2. NSPCL, ROURKELA CAPTIVE POWER PLANT NTPC Ltd formed joint venture with SAIL on 50:50 basis in March 2001 in the name of NTPC-SAIL Power Company Private Limited (NSPCL). NSPCL took over captive power plant-II located at Rourkela Steel Plant (2X60 MW) from SAIL. DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 2 03-Nov-2013
  • 3. AN OVERVIEW OF CPP :- DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 3 03-Nov-2013
  • 4. MAJOR EQUIPMENT IN CPP :- • 2 GENERATORS • 2 GENERATOR TRANSFORMERS • 2 UNIT AUXILIARY TRANSFORMERS • STATION TRANSFORMERS • FEEDERS DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 4 03-Nov-2013
  • 5. TECHNICAL DATA OF GENERATOR UNIT 1 AND 2: • Generator Type : THRI 86/35 • Year of manufacture : 1985 • Stator No. : 1134 & 1135 • Rotor No. : 1134 & 1135 • Exciter type : Static • Apparent power : 75 MVA • Active power : 60 MW • Current : 3.766 KA • Voltage : 11.5 KV +5% • Speed : 3000 Rpm • Frequency : 50 Hz • Power Factor : 0.8 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 5 03-Nov-2013
  • 6. TECHNICAL DATA OF GEN. TRANSFORMER UNIT 1 AND 2: • Make : Crompton Greaves Ltd • Rating : 16.5/33/82.5/ MVA • Type of cooling : ONAN/ONAF/OFAF • No load voltage : HV : 138KV , LV : 11.5KV • Winding : HV : STAR , LV : DELTA • Phases : 3/3 • Frequency : 50 Hz • Vector group : Ynd 11 • Rated current : HV : 345.20Amps ,LV 4141.90 Amps • Total oil qty : 24,470 Lts DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 6 03-Nov-2013
  • 7. TECHNICAL DATA OF UNIT AUX. TRANSFORMER UNIT 1 AND 2: • Make : Crompton Greaves Ltd • Rating : 12.5 MVA • Type of cooling : ONAN • Voltage : HV : 11.5 KV , LV : 6.9 KV • Phases : 3/3 • Frequency : 50 Hz • Vector group : DYN 1 • Rated current : HV : 627.5 Amps , LV:1045.9 Amps • Total oil qty. : 9,000 Lts • Percentage impedance voltage : 7% DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 7 03-Nov-2013
  • 8. TECHNICAL DATA OF STATION AUXILIARY TRANSFORMER: • Make : Crompton Graeves Ltd • Rating : 20/25 MVA • Cooling : ONAN/ONAF • No Load voltage : 132/6.9/3.3 KV (UNLOADED ) • Current: HV 109.3 Amps LV 2091.8 Amps • Frequency : 50 Hz • Vector Group : YNY nd 011 • quantity of oil : 17500Lts DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 8 03-Nov-2013
  • 9. SWITCHYARD: SALIENT FEATURES OF 132KV SWITCHTYARD:- • 20 OPERATING BAYS • 02 GENERATORS • 04 GRIDCO FEEDERS • 06 SMELTER FEEDERS • BUS COUPLER • BUS TIE CUM BUS COUPLER • STATION TRANSFORMERS • 01 BT BAY • ISOLATION TRANSFORMERS DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 9 03-Nov-2013
  • 10. IMPORTANT COMPONENTS OF THE SWITCH YARD: 1. BUSBARS: TYPES OF BUSBAR ARRANGEMENTS: 1. Single Bus-bar Arrangement. 2. Single Bus-bar System with Sectionalization 3. Ring Bus-bar system 4. Double Main and Transfer Bus-bar Arrangement 5. Duplicate Bus-bars System DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 10 03-Nov-2013
  • 11. 1. SINGLE BUS-BAR ARRANGEMENT DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 11 03-Nov-2013 In this arrangement a set of bus-bars is used for complete power station and to this bus-bar are connected all generators, transformers and feeders through circuit breakers and isolating switches.
  • 12. 2. SINGLE BUS-BAR SYSTEM WITH SECTIONALIZATION DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 12 03-Nov-2013 With increased number of generators and outgoing feeders connected to the bus-bars, it becomes essential to provide arrangement for sectionalizing the bus-bars so that a fault on any one section of the bus- bars may not cause a complete shutdown. This is achieved by providing a circuit breaker and isolating switches between the section.
  • 13. 3. RING BUS-BAR SYSTEM DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 13 03-Nov-2013 In this arrangement each feeder is supplied from two paths, so that in case of failure of a section, supply is not interrupted.
  • 14. 4. DOUBLE MAIN AND TRANSFER BUS-BAR ARRANGEMENT DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 14 03-Nov-2013 This arrangement incorporates all advantages of the double bus as well as transfer bus scheme. This scheme needs a bus-coupler for the on load transfer of circuits from one main bus to the other and a transfer coupler for taking out circuit breaker of various circuits for maintenance.
  • 15. DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 15 03-Nov-2013 2. BUS COUPLER: • Two different bus sections of two different power transformers are connected by means of a bus coupler. • The bus coupler becomes useful when one of the power transformers fails or a fault occurs in either of the bus sections. 3. INSULATORS: • The overhead line conductors should be supported on the poles or towers in such a way that currents from conductors do not flow to earth through supports i.e., line conductors must be properly insulated from supports. This is achieved by securing line conductors to supports with the help of INSULATORS. • The insulators provide necessary insulation between line conductors and supports and thus prevent any leakage current from conductors to earth.
  • 16. TYPES OF INSULATORS: 1.PIN TYPE: 2. SUSPENSION TYPE: 3. STRAIN INSULATORS: 4. SHACKEL INSULATORS: DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 16 03-Nov-2013
  • 17. 4. CIRCUIT BREAKER & RELAYS: • A circuit breaker is an automatically operated electrical switch designed to protect an electrical current from damage caused by overload or short circuit. • Its basic function is to detect a fault condition and, by interrupting continuity, to immediately discontinue electrical flow. • The circuit breaker works along with the relays which give a tripping signal in case of any irregularity or the faults. • The circuit breaker then opens to open the circuit such that other instruments of the system can be protected. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 17
  • 18. 5. ISOLATORS: (GOD)- GROUP OPERATED DISCONNECTOR: • It is used to make sure that an electrical circuit can be completely de- energised for service or maintenance. • It allows isolation of apparatus such as circuit breakers and transformers, and transmission lines, for maintenance. • GOD’s are provided to facilitate isolation of breakers supplying power to various feeders. In 220kv Switchyard, they are designed as 29A, 29B, 29C & 29E as follows  29 A – main bus side GOD.  29 B - Equipment side GOD.  29 C - Transfer bus side GOD.  29 E - Earth GOD. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 18
  • 19. 6. Current and voltage transformers • Current or voltage instrument transformers are necessary for isolating the protection, control and measurement equipment from the high voltages of a power system, and for supplying the equipment with the appropriate values of current and voltage - generally these are 1A or 5Α for the current coils, and 120 V for the voltage coils. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 19 CURRENT TRANSFORMER VOLTAGE TRANSFORMER
  • 20. 8. LIGHTNING ARRESTER: • A lightning arrester is a device used on electrical power systems and telecommunication systems to protect the insulation and conductors of the system from the damaging effects of lightning. • The typical lightning arrester has a high-voltage terminal and a ground terminal. • When a lightning surge (or switching surge, which is very similar) travels along the power line to the arrester, the current from the surge is diverted through the arrestor, in most cases to earth. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 20 LIGHTNING ARRESTER
  • 21. TRANSFORMER YARD: • Transformer yard consists of following types of transformers 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 21
  • 22. CONCLUSION :- • Switchyard is most essential part of the power system. • It is the protective part of the whole power system. • Switch yard is also most essential part for transmission, distribution, and collection. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 22 BIBILIOGRAPHY :- 1. http://wikipedia.com 2. http://google.co.in 3. http://www.engineersedge.com 4. http://www.scribd.com 5. http://electricals4u.com 6. Power system Engineering by O P KOTHARI and I J NAGRATH 7. Power System By J B GUPTA
  • 23. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 23