CAPITALIZATION WORK
Enhancement of Store Functions,
Expenditures & its Recovery Plan
Project Work
1) Separation of Quality Dept. and Store
2) Fabric Inspection Machine
3) Conveyor System
4) Hand Pallet Truck
CURRENT STORE LAYOUTQualityTables
FreeSpace
Fabric Checking mc 1 Fabric Checking mc 2
Fabric Loader /Slider
Fabric Loader /Slider
Fabric Store Area
PROPOSED STORE LAYOUTPassage
Quality deptt. & New Fabric Checking m/c
Conveyor for material
Loading
Fabric Loader /SliderFabric Store Area
Project – Separation Work of Quality Department
Partition Work to be done - Expenditure Rs. 1.50 Lacs.
Merits - 1. Store security will be improved
2. Better space utilization
3. More clarity of usage of
manpower & area
Proposal For Fabric Inspection
Machine
Costing of Inspection by M/C
Costing Sheet for Fabric M/c
Fabric Checked per hour 15m/min 900/hr
Total In 8 Hrs 7200
Total in a Month (A) 7200x26 187200
Labour Cost (B) 1 Fabric Checker +1 Helper = 8000+6620 14670
Electricity Cost/Month(C) 2units/hr x 8hr x 9/unit x 26 days 3744
Total Cost D=(B+C) 18414
Cost /mtr (D/A) 0.09/Mtr
Costing of Manual Inspection/Checking
Type of Fabric Manual Fabric Checked in mtr
Dec-14 Jan-15
Grey (A) 5,27,625 348,691
Dyed (B) 7,05,833 946,093
Total C =(A+B) 12,33,458 12,94,781
Labour Cost (D) 2,34,048 3,53,474
Cost/Mtr E = (D/C) 0.19/m 0.27/m
Average Cost 0.23/m
Recovery Period of Fabric Inspection
Machine
In Mtr
• Total Fabric Checked in a year 12,50,000 x12 15000000
• Total Cost saving in a year 1,50,00,000x0.10 1500000
• Machine Cost 750000
• Therefore we recover the cost in 6 months
Benefits Of Fabric Inspection machine
• Improvement in Fabric Quality & Handling
• Helps in Traceability
• Space Utilisation
• Reduce Labour Cost
• Time Saving
Project – Conveyor System For Fabric
Loading Process
Conveyor System For Fabric
Loading Process
•
Recovery Period for Conveyor System
In Mtr
• Total Fabric Checked in a year 9,25,000 x12 1,11,00,000
• Total Cost saving in a yea 1,11,00,000x0.10 11,10,000
• Conveyor Cost 5,00,000
• Therefore We recover the cost in less than 6 months
BENEFITS OF CONVEYOR SYSTEM
• REMOVE RISK AND CHANCES OF ACCIDENT
• HELPS IN STANDARDISATION OF THE PROCESS
• MAKE THE PROCESS FAST & RELIABLE
• IMPROVE EFFICIENCY OF THE LABOUR
Hand Pallet
MERITS:-
1) It will help to move the material fast
2) It will increase the efficiency of Labour
3) It will save time
CONCLUSION
• This project will reduce the manpower cost as
well as loading process time. The entire
project will convert from manual process to
automation.
Total Budget for this Project
• Separation work of Store & Quality Dept. = Rs 1,50,000
• Fabric Inspection Machine = Rs 15,00,000
• Conveyor System = Rs 5,00,000
• Hand Pallet = Rs 50,000
Total = Rs 22,00,000
Ppt

More Related Content

Similar to Ppt

Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...
IRJET Journal
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
Ankur Shukla
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
ashaby
 
ppt-project-final.ppt
ppt-project-final.pptppt-project-final.ppt
ppt-project-final.ppt
steel14
 
Presentation1
Presentation1Presentation1
Presentation1
NAMANCHOUDHARY14
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET Journal
 
MyPGDMM_MS_Chap12_TQM (1).pdf
MyPGDMM_MS_Chap12_TQM (1).pdfMyPGDMM_MS_Chap12_TQM (1).pdf
MyPGDMM_MS_Chap12_TQM (1).pdf
GeethikaNayanaprabha2
 
Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4
CarlosMoura111
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout Javier Siles
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
Sagar Sangam Sahu
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
Ganesh TN
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
Seta Wicaksana
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
RahbiMalek
 
Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
Amethia Export (Director- P K Sahab)
 
Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...
Sumit Bhattacharya
 
SELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptx
SELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptxSELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptx
SELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptx
DIBYARANJAN MAHANTA
 
Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysisvideoaakash15
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysisvideoaakash15
 

Similar to Ppt (20)

Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
 
ppt-project-final.ppt
ppt-project-final.pptppt-project-final.ppt
ppt-project-final.ppt
 
Presentation1
Presentation1Presentation1
Presentation1
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
 
MyPGDMM_MS_Chap12_TQM (1).pdf
MyPGDMM_MS_Chap12_TQM (1).pdfMyPGDMM_MS_Chap12_TQM (1).pdf
MyPGDMM_MS_Chap12_TQM (1).pdf
 
Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
 
Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...
 
SELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptx
SELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptxSELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptx
SELECTION OFMaterial handling EQUIPMENT FOR CONSTRUCTION PROJECT.pptx
 
Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysis
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 

Recently uploaded

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
bosssp10
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
Allensmith572606
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 

Recently uploaded (20)

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 

Ppt

  • 1. CAPITALIZATION WORK Enhancement of Store Functions, Expenditures & its Recovery Plan
  • 2. Project Work 1) Separation of Quality Dept. and Store 2) Fabric Inspection Machine 3) Conveyor System 4) Hand Pallet Truck
  • 3. CURRENT STORE LAYOUTQualityTables FreeSpace Fabric Checking mc 1 Fabric Checking mc 2 Fabric Loader /Slider Fabric Loader /Slider Fabric Store Area
  • 4. PROPOSED STORE LAYOUTPassage Quality deptt. & New Fabric Checking m/c Conveyor for material Loading Fabric Loader /SliderFabric Store Area
  • 5. Project – Separation Work of Quality Department Partition Work to be done - Expenditure Rs. 1.50 Lacs. Merits - 1. Store security will be improved 2. Better space utilization 3. More clarity of usage of manpower & area
  • 6. Proposal For Fabric Inspection Machine
  • 7. Costing of Inspection by M/C Costing Sheet for Fabric M/c Fabric Checked per hour 15m/min 900/hr Total In 8 Hrs 7200 Total in a Month (A) 7200x26 187200 Labour Cost (B) 1 Fabric Checker +1 Helper = 8000+6620 14670 Electricity Cost/Month(C) 2units/hr x 8hr x 9/unit x 26 days 3744 Total Cost D=(B+C) 18414 Cost /mtr (D/A) 0.09/Mtr
  • 8. Costing of Manual Inspection/Checking Type of Fabric Manual Fabric Checked in mtr Dec-14 Jan-15 Grey (A) 5,27,625 348,691 Dyed (B) 7,05,833 946,093 Total C =(A+B) 12,33,458 12,94,781 Labour Cost (D) 2,34,048 3,53,474 Cost/Mtr E = (D/C) 0.19/m 0.27/m Average Cost 0.23/m
  • 9. Recovery Period of Fabric Inspection Machine In Mtr • Total Fabric Checked in a year 12,50,000 x12 15000000 • Total Cost saving in a year 1,50,00,000x0.10 1500000 • Machine Cost 750000 • Therefore we recover the cost in 6 months
  • 10. Benefits Of Fabric Inspection machine • Improvement in Fabric Quality & Handling • Helps in Traceability • Space Utilisation • Reduce Labour Cost • Time Saving
  • 11. Project – Conveyor System For Fabric Loading Process
  • 12. Conveyor System For Fabric Loading Process •
  • 13. Recovery Period for Conveyor System In Mtr • Total Fabric Checked in a year 9,25,000 x12 1,11,00,000 • Total Cost saving in a yea 1,11,00,000x0.10 11,10,000 • Conveyor Cost 5,00,000 • Therefore We recover the cost in less than 6 months
  • 14. BENEFITS OF CONVEYOR SYSTEM • REMOVE RISK AND CHANCES OF ACCIDENT • HELPS IN STANDARDISATION OF THE PROCESS • MAKE THE PROCESS FAST & RELIABLE • IMPROVE EFFICIENCY OF THE LABOUR
  • 15. Hand Pallet MERITS:- 1) It will help to move the material fast 2) It will increase the efficiency of Labour 3) It will save time
  • 16. CONCLUSION • This project will reduce the manpower cost as well as loading process time. The entire project will convert from manual process to automation.
  • 17. Total Budget for this Project • Separation work of Store & Quality Dept. = Rs 1,50,000 • Fabric Inspection Machine = Rs 15,00,000 • Conveyor System = Rs 5,00,000 • Hand Pallet = Rs 50,000 Total = Rs 22,00,000