This document discusses the selection and use of material handling equipment (MHE) at construction project sites. It defines material handling and outlines its objectives, including cost reduction, waste reduction, and improved productivity and working conditions. Key factors in selecting MHE are identified, such as suitability, capacity, availability, and cost. The principles of planning, material flow, and mechanization are covered. Steps in the selection process include establishing the study scope, determining material volumes and needs, evaluating alternative systems, and selecting equipment categories. Advantages of using MHE include improved efficiency and reduced costs, while disadvantages include additional capital and maintenance costs.