P R O J E C T P R O P O S A L
on
Paribar O Saisab Bikash Paddakhep (POS BP)
Family and Early Childhood Development Initiative
Submitted to
Submitted by
Hospital More, Gabindagonj
Gaibandha-5740
Bangladesh
E-maildabaloybu@gmail.com
0171635424301813639267, 880-05423-750095
Date of Submission: 14-09-2011
Table of Contents
Sl No. Content Page No.
1 Executive Summary 04
2 Back Ground of the Organization 05
3 Project Brief
3.1 Background and rationale 06
3.2 Problem Identification and Needs Assessment 08
4 Title, Goal/Purpose, Objectives and Outcome
4.1 Title 08
4.2 Goal/Purpose 08
4.3 Objective and Activities 09
4.4 Outcome 12
5 Stakeholders
5.1 Target Groups 12
5.2 Equal participation of Men and Women 13
6 Geographical Location 13
7 Duration 13
8 Strategy and methodology 13
9 Project Management (Human Resources, Reporting, Monitoring & Evaluation) 14
10 Challenges 14
11 Logical Framework Annex A
12 Activity Gant Chart Annex B
13 Budget Annex C
Project Proposal on POS BP submitted by GDBC 2
Abbreviations/Acronyms
GDBC Dabaloy Biggan Club
POS BP Poribar O Saisab Bikash Padakkhep
POS BK Poribar O Saisab Bikash Kendra
CSO Civil Society Organization
BCC Behavioral Change Communication
NGO Non Government Organization
UP Union Parishad
Project Proposal on POS BP submitted by GDBC 3
1. Executive Summary
Dabaloy Biggan Club(GDBC) is a non-government voluntary organization (NGO) established in
2005 has been working for the betterment of rural poor and disadvantaged people in Gaibandha
District. The project Paribar o Saisab Bikash Padakkhep (POS BP) is an initiative of GDBC
aiming to build an apt, just and equitable society where tranquility and peace living together. It has
achieved people’s trusteeship and encouragement for the pitoling project experimentally. The
project addressed major problems by involving community people including male and female as
key actors in problem identification and prioritization, planning, implementing undertaken
initiative effectively. Side by side education and learning session are being provided to them
coherently and separately for parents and children in a regular wise. Local and available materials
and equipments are being adopted in the project. After six month, organization observed that the
piloting project has brought out a remarkable level success along with positive trends within these
areas. It has great effectiveness to create awareness in terms of people’s education, relationship,
social performance, family and social law with especial emphasizes to empower the women as
well as to upholds the rights of girl children. Community people become easily absorbed with the
project intervention like solidarity, socialization, proper education, massive awareness and women
empowerment and they are cordially appreciated the adoption of socialization process to build a
society where people will contributive to the nation being a human resource.
The project has a divine process to build a strong and unite social bondage among civil society
with special concern to women, youth and children from every level. The pro would work to assist
to develop well-planned family structures with a learning environment. For this, the project will
provide education learning courses incorporating social and family laws, perspective respect ness
to religion, statutory household tasks and behavioral change communication. The project also
assists to practice their learning through socialization process. These comprehensive socializations
process also be reviewed by them in a participatory easy. The project assists to build up children
folk as future resources by providing practical knowledge and timely character building approach.
Overall the project will enable a strong and responsive social bondage among the community
people who would be capacitated to identify their problems and undertake integrated initiatives for
effective solution.
GDBC would like to undertake the project to create awareness in terms of people’s education,
relationship, social performance, family and social law with especial emphasizes to empower the
women as well as to uphold the rights of girl children. The project will work with solidarity,
socialization, proper education, massive awareness and women empowerment for targeted people
to build a society where people will contributive to the nation being a human resource. The project
will enable them to develop a well-planed family structure within the community where couple
and their children will learn knowledge of theoretical and practical at the same time. Proposed
family will learn about knowledge of social and family laws, perspectives religion, statutory
household tasks and behavioral change communication through comprehensive social education
and socialization process in a with participatory ways. The project will assist to build up children
folk as future human resources by providing practical knowledge and Behavioral Change
Communication (BCC). The targeted children will able to play a significant role as valuable in the
country development by their learning and gained knowledge. To establish a strong and responsive
community human circle within the working areas by identifying identify local resources as well
as problems and integrated initiatives the project will contribute to establish a just and equitable
society.
The project directly work for create massive awareness in terms of people’s education,
relationship, social performance, family and social law with especial emphasizes to empower the
women as well as to uphold the rights of girl children. The project also works to create massive
awareness among the people about different development issues; to identify and reduce existing
problems at family, community and society level; to improve inter relationship among the
community people by establishing human bridge; to transfer skills and knowledge to become
Project Proposal on POS BP submitted by GDBC 4
activate as real inhabitants; encourage and activate people to reduce early marriage by 45% at the
end of the project; to increase household income through enhancing capacity building as well as to
increase accessibility of free education facilities for the children with emphasis to girls.
Major activities are includes Project Lunching Workshop, Field Office Establishment,
POS BK Establishment, Teachers training and orientation, Parents & Children
involvement, Civil Society Organization Formation and activate, Develop low cost
available materials, Workshop on Local Resource Identification and Mobilization,
orientation on the project theme and approach, training on Socialization Process and
Education Methodology, Training on social mobilization and advocacy, Books publication,
Monthly Tea Circle, Monthly Sharing Meeting, Training on Capacity Building, Weekly
meeting, training on Socialization Process, Annual Get Together, Refreshers Training, Day
Observance, open dialogue, message dissemination, case study collection, Drama, theatre,
cultural functions on awareness raising, monitoring, evaluation and reporting etc
2. Back Ground of the Organization
Dabaloy Biggan Club(GDBC) is a non-government voluntary organization (NGO) established
in1998 has been working for the betterment of rural poor and disadvantaged people in Gaibandha
District. It obtained legal registration from social service department during October 2000.
Gaibandha is a northern district of Bangladesh comprised of 7 Upazilas, 82 Unions and 2
municipalities with an area of 2,179 sq. km. Brahmaputra, Tista, Jamuna and Karotoa have
crisscrossed the district. As a result, natural calamities including monsoon flood; draught, river
erosion, cold wave, tornado etc are common occurrences in this district.
Gobindagonj is the biggest Upazila in Gaibandha with a total population of 4, 61,428 covering
areas of 482 sq. km. About 64% people are poor including extreme poor, poor and tribal ethnicities
living in this upazila. Tribal families are living here in this upazila very inhumanly as if they are
simply trivial minority. The literacy rate of this Upazila is very poor and about 99% women in
remote and tribal areas are fully belonged illiterate. On the other hand, women and girls are the
victims of early marriage, polygamy, divorces, dowry, rapping and many other kinds of physical
torture as well as domestic violence due to economical deprivation along with influence of
religious bound and prejudice of the society. They are the victims of dual exploitation both by
poverty and gender discrimination. Rich & influential people always take chances to exploit
women physically, mentally and even economically. At the family level women including children
are sometime fully denied from rights. Though now a day, women are encouragingly involve in
different income generating activities by the sole support of different local and national level
NGOs but these are no sufficient according to the demand as the productive and reproductive rate
also not adequate. Yet, most of the extreme poor have to depend to the local moneylender to meet
up their need. Yet, around (70 -80) % extreme poor of the poor communities are fully unable to
manage food three times in a day. According to GDBC’s observation and survey, they have to pass
very critically during Monga (seasonal food crisis) when they have to take credit form local
moneylenders with high rate of service charges or take advance money on labouring. Children are
sent to laboring instead of sending school. Student attendance in primary school is less than 43%.
Economic disparity among poor and rich is very high and leadership of poor is rarely viewed.
Government Service provider institutions including Department of Health, Livestock, Education
and Union Parishad are not accountable and transparent enough to provide their service deliveries.
Consequently, poor and poorest people who are living in distanced and remote areas could not get
the services which they deserve. Especially status of health service is very poor due to
communication difficulties. However, now a days, due to frequent intervention of different Local,
National, International NGOs are working to address different development issues as like on
education, health, livelihood oriented agriculture, disaster management as so on
Under such circumstances, Dabaloy Biggan Club(GDBC) come close to the poor people with
particular emphasis to bring out positive changes at the family, society as well as national level.
GDBC realized that solidarity, socialization, proper education, massive awareness and women
Project Proposal on POS BP submitted by GDBC 5
empowerment are very prior to develop to change the condition and position of rural men and
women.
3. Project Brief
3.1 Background and rationale
Being a non-government voluntary development organization GDBC desire to implement
something innovative and creative projects to diversify its elevated outputs for the target people.
The project Paribar o Saisab Bikash Padakkhep (POS BP) is such initiative of the organization
aiming to build an apt, just and equitable society where tranquility and peace living together. At
the beginning of this year, organization started the project for piloting integrating family approach
by the active involvement of whole family members including children and parents. It established
3 education learning centers namely Paribar o Saisab Bikash Kendra (POS BK) at Mohimagonj
union and Gobindagonj Paurashabha in Gaibandha district.
The project addressed major problems by involving community people including male and female
as key actors in problem identification and prioritization to suitable initiative for solution. Side by
side education and learning session are being provided to them coherently and separately for
parents and children in a regular wise. Local and available materials and equipments are being
adopted in the project. After six month, organization observed that the piloting project has brought
out a remarkable level success along with positive trends within these areas. It has great
effectiveness to create awareness in terms of people’s education, relationship, social performance,
family and social law with especial emphasizes to empower the women as well as to upholds the
rights of girl children. Community people become easily absorbed with the project intervention
like solidarity, socialization, proper education, massive awareness and women empowerment and
they are cordially appreciated the adoption of socialization process to build a society where people
will contributive to the nation being a human resource.
The project has a divine process to build a strong and unite social bondage among civil society
with special concern to women, youth and children from every level. The pro would work to assist
to develop well-planned family structures with a learning environment. For this, the project will
provide education learning courses incorporating social and family laws, perspective respect ness
to religion, statutory household tasks and behavioral change communication. The project also
assists to practice their learning through socialization process. These comprehensive socializations
process also be reviewed by them in a participatory easy. The project assists to build up children
folk as future resources by providing practical knowledge and timely character building approach.
Overall the project will enable a strong and responsive social bondage among the community
people who would be capacitated to identify their problems and undertake integrated initiatives for
effective solution.
Gobindagonj is the biggest Upazila in Gaibandha with a total population of 4, 61,428 covering
areas of 482 sq. km. About 64% people are poor including extreme poor, poor and tribal ethnicities
living in this upazila. Tribal families are living here in this upazila very inhumanly as if they are
simply trivial minority. The literacy rate of this Upazila is very poor and about 99% women in
remote and tribal areas are fully belonged illiterate. On the other hand, women and girls are the
victims of early marriage, polygamy, divorces, dowry, rapping and many other kinds of physical
torture as well as domestic violence due to economical deprivation along with influence of
religious bound and prejudice of the society. They are the victims of dual exploitation both by
poverty and gender discrimination. Rich & influential people always take chances to exploit
women physically, mentally and even economically. At the family level women including children
are sometime fully denied from rights. Socio-economic status of this upazila is also very poor as a
large portion of total population are occupied with agriculture, some others are occupied with
rickshaw and van pulling, labour, and some are occupied with small trades and business. Tribal
people are also neglected and derived who are generally occupied with labouring in agriculture
sectors. People of the targeted areas are remaining poor and uneducated due to deep lack of
awareness, lack of information opportunities and lack of employment. Though local level
employment opportunities are exists but which is so poor according to the need of the localities.
Project Proposal on POS BP submitted by GDBC 6
To address the prevailing situation, GDBC would like to undertake the project to create awareness
in terms of people’s education, relationship, social performance, family and social law with
especial emphasizes to empower the women as well as to upholds the rights of girl children. The
project will work with solidarity, socialization, proper education, massive awareness and women
empowerment for targeted people to build a society where people will contributive to the nation
being a human resource. The project will enable them to develop a well-planed family structure
within the community where couple and their children will learn knowledge of theoretical and
practical at the same time. Proposed family will learn about knowledge of social and family laws,
perspectives religion, statutory household tasks and behavioral change communication through
comprehensive social education and socialization process in a with participatory ways. The project
will assist to build up children folk as future human resources by providing practical knowledge
and Behavioral Change Communication (BCC). The targeted children will able to play a
significant role as valuable in the country development by their learning and gained knowledge. To
establish a strong and responsive community human circle within the working areas by identifying
identify local resources as well as problems and integrated initiatives the project will contribute to
establish a just and equitable society.
3.2 Problem Identification and Needs Assessment
Gobindagonj is the biggest Upazila in Gaibandha with a total population of 4, 61,428 covering
areas of 482 sq. km. About 64% people are poor including extreme poor, poor and tribal ethnicities
living in this upazila. Tribal families are living here in this upazila very inhumanly as if they are
simply trivial minority. The literacy rate of this Upazila is very poor and about 99% women in
remote and tribal areas are fully belonged illiterate. On the other hand, women and girls are the
victims of early marriage, polygamy, divorces, dowry, rapping and many other kinds of physical
torture as well as domestic violence due to economical deprivation along with influence of
religious bound and prejudice of the society. They are the victims of dual exploitation both by
poverty and gender discrimination. Rich & influential people always take chances to exploit
women physically, mentally and even economically. At the family level women including children
are sometime fully denied from rights. Socio-economic status of this upazila is also very poor as a
large portion of total population are occupied with agriculture, some others are occupied with
rickshaw and van pulling, labour, and some are occupied with small trades and business. Tribal
people are also neglected and derived who are generally occupied with labouring in agriculture
sectors. People of the targeted areas are remaining poor and uneducated due to deep lack of
awareness, lack of information opportunities and lack of employment. Though local level
employment opportunities are exists but which is so poor according to the need of the localities.
People of the proposed areas are fully ignored from education, health and effective services from
different government and non-governmental service providers. They are fully incapable to
negotiate their actual needs with others because of lack of information, shame, awareness, and
skill. Furthermore, local government structures are also very weak. GDBC carefully observes that
though many NGOs are working effectively, yet there prevail some problems regarding the target
people’s empowerment, capacity building, active participation etc. According to assessment of the
organization, there are significant level gaps are prevailing in relation to the overall development
of the targeted people. There are great leakage in the process of solidarity, socialization, proper
education, massive awareness and women empowerment. Due to inadequate education facilities,
many children are being deprived from education as well as due to innate level of unawareness
most of the parents engage their children in their household affairs or in income generation
activities. As a result, rate of drop out from primary education increased.
Being realized, GDBC felt the necessity to undertake a integrated initiative through Paribar o
Saisab Bikash Padakkhep (POS BP) to create awareness in terms of people’s education,
relationship, social performance, family and social law with especial emphasizes to empower the
women as well as to upholds the rights of girl children.
Project Proposal on POS BP submitted by GDBC 7
4. Goal/Purpose, Objectives and Outcome
4.1 Title of the project
Paribar O Saisab Bikash Kendra (POS BP)
4.2 Goal/Purpose
Goal/Purpose
Build an apt, just and equitable society where tranquility and peace living together
4.3 Objective and Activities
General
Create awareness in terms of people’s education, relationship, social performance, family and
social law with especial emphasizes to empower the women as well as to upholds the rights of girl
children.
Specific
- To create massive awareness among the people about different development issues
- To identify and reduce existing problems at family, community and society level
- To improve inter relationship among the community people by establishing human bridge
- To transfer skills and knowledge to become activate as real inhabitants
- Encourage and activate people to reduce early marriage by 45% at the end of the project
- To increase household income through enhancing capacity building
- To increase accessibility of free education facilities for the children with emphasis to girls
Activities
1. Project Lunching Workshop
A Project Lunching Workshop will be organized just before going to implement the project where
Civil Society, Local Government Structures including Upazila and Union Parishad, like minded
NGOs representatives and others social actors will attend. The workshop will be held to publicize
the thematic areas including goal and objective of the project.
2. Staff Recruitment
Organization will recruit required 7 full project staff to implement the project through
advertisement in local Newspapers. Staff will be recruited through formal written and interviewing
test encouraging female applicants for the project.
3. Field Office Establishment
Organization will establish 3 field offices for effective communication and smooth implementation
of the project. Those offices are being setup at Gobindogonj Paurashabha, Kamdia and
Mohimagonj unions in Gobindogonj Upazila under Gaibandha district.
4. POS BK Establishment
Organization will establish 120 POS BK centers in 120 villages under 17 unions and 1
Pourashabha . 120 Centers will be established in 120 villages/wards under each
union/paurashabha. Relavant CSO will work here as POS BK management committee.
5. Teachers Recruitment
Organization will recruit 120 Teachers to facilitate Poribar O Saisab Bikash Kendra (POS BK), 1
Teacher for each POS BP for effective implementation of learning session at the centers. Teacher
cum Facilitator will be recruited through merit test. These positions are only for women reserved.
Project Proposal on POS BP submitted by GDBC 8
6. Parents and Children selection
The project will work 25 couples (50 persons) for each Poribar O Saisab Bikash Kendra (POS
BK), and 25 pair children (50) from those families. According to the targeting criteria organization
will select those families.
7. Civil Society Organization Formation
The project will form Civil Society Organization (CSOs) in each targeted village as major actors
of the project. They are performing perform directly as Social Change Agent (CSA) in their
community. Each CSO will consist of 9 members including POS BK teacher, two potential couples
(4 persons), 2 teachers from government & non-government school or college, 2 from relevant UP
members. CSO will work, as major actors of the project as well as management team who will
take over the overall role and responsibility to organize of POS BK successfully.
8. Develop and collect different low cost available materials
Organization will develop and collect 28 kinds of low-cost and available resources and materials
including pictures, geographical maps, calendar, khathas, pencils, pen, playing kits etc which are
cheapest and locally available.
9. Workshop on Local Resource Identification and Mobilization for CSO
The project will organize Workshop on Local Resource Identification and Mobilization for CSO
separately through 8 batches where the CSO’s members will be well-informed and capacitated for
local resource identification and its mobilization.
10. Materials delivery to the POS BK
Organization will deliver 32 kinds of low-cost equipments and materials including including
pictures, geographical maps, calendar, khathas, pencils, pen, playing kits etc to all POS BK.
11. Orientation for staff members and Teachers on the project theme and approach
The project will organize a daylong orientation for staff and teachers of the project on the theme
and approach of the project which will be organized in 1batch. The orientation will enable them to
perform their respective role and responsibilities accordingly.
12. Training on Socialization Process and Education Methodology for Staff and Teachers
5 daylong training on Socialization process would be offered for the staff and Teachers of POS BK
so that they would be able to perform adequately about adopt socialization process as well as
education methodology which will be organized be organized in 1batch.
13. Training for CSO members on Social Mobilization and Advocacy
The project will offer 3 day long training for CSO members on Social Mobilization and Advocacy
which will be organized separately in 8 batches so that they would be able to perform their role
and responsibilities as well.
14. Books publication for POS BK students
The project will publish 4 indispensable books containing different practical knowledge, ideas,
concentration building tips and laws on basic education of religion, statutory, social and family
level. Besides those books assist to develop the learners in terms of values, norms, behavior like
respectfulness to others, coherent family and social relationship. Project will publish 50000 books
for the targeted people involved with the project.
15. Monthly Tea Circle Discussion for Parents
Monthly Tea Circle Discussion for targeted Parents will be organize to provide various types of
essential educational session on education, health & hygiene, savings and collection, family
planning and law, HIV/AIDS conceptions, gender & development water and sanitation, IGAs etc.
16. Monthly Sharing Meeting with Parents and Children
Monthly Sharing Meeting with Parents and Children will be organize for sharing and discussion on
Project Proposal on POS BP submitted by GDBC 9
the perspective views, observation, weakness, addition about POS BK by the cordial facilitation of
project staff.
17. Training on Capacity Building for Parents
The project will organize 2 daylong 120 batches of training for Parents on Capacity Building by
providing different types of skills and technical knowledge to undertake their perspective IGA
initiatives. Too undertake IGA initiatives the project will provide financial supports also.
18. Weekly sharing meeting of CSO
The project will assist to organize 104 weekly meetings of the targeted CSO. Civil Society
Organization will meet at the end of every week where they will share and review their planning,
implementing initiatives and recovery process in details.
19. Training on Socialization Process for CSO members
The project will organize 3 day long training on Socialization Process for CSO members
separately through 8 batches so that they would also able to adopt socialization process at their
every step of initiatives.
20. POS BK Annual Get Together
The project will organize POS BK annual get together where all the targeted families including
their children will attend. A formal discussion on the progress, achievement, weakness and
learning will shared among the participants.
21. Refreshers Training for Staff and Teachers
The project will provide 2 daylong refreshers training for Staff and Teachers on Socialization
process and education methodology to review and enhance their performance.
22. International Human Rights Day Observance
Project stakeholders including staff, teachers, parents, children will observe International Human
Rights Day in an integrated way through a colourful rally, discussion meeting and cultural
function.
23. Begum Rokeya Dibash Observance
Project stakeholders including staff, teachers, parents, children will observe Begum Rokeya
Dibash in an integrated way through a colourful rally, discussion meeting and cultural function.
24. Opinion sharing meeting with local government representatives
The project will organize 4 opinion sharing meetings with local government representatives where
CSO, parents, teachers and other stakeholders will be participated as interrogator.
25. Open dialogue with service provider representatives
The project will organize 4 opinion dialogue with service provide representative local government
representatives where CSO, parents, teachers and other stakeholders will be participated as
interrogator.
26. Message dissemination of POS BK through poster
The project will disseminate core message of the project through publishing 50000 posters to
increase the level of awareness among the community people
27. Message dissemination of POS BK through leaflet
The project will disseminate core message of the project through publishing 50000 leaflet contains
the theme, focus, goal, objectives and effectiveness of the POS BK.
28. Case study collection and booklet publication
The project will collect best 1050 cases from 150000 families depending on their success and will
publish 10000 booklet which will help to assess the effectiveness and results of the project.
29. Drama/theatre show on development issues
Organization will organize 6 drama/theatres on different development issues including early
Project Proposal on POS BP submitted by GDBC 10
marriage, dowry, polygamy; protect violence against women, drug users, HIV/AIDS etc to
increase the awareness among the project stakeholders. These shows will be showed by the own
artists of POS BK.
30. Cultural functions on development issues
Organization will organize 6 cultural functions on different development issues including early
marriage, dowry, polygamy; protect violence against women, drug users, HIV/AIDS to increase
the awareness among the project stakeholders. These shows will be showed by the own artists of
POS BK.
31. Regular Monitoring, supervision and evaluation
Monitoring and supervision is continuous activities under the project. Top to Bottom project
stakeholders will be involved for project supervision and monitoring to intensify the diversified
outputs of the project. Progress and process monitoring will be adopted for evaluation. An external
evaluation will also be conducted after the end of the project.
32. Reporting and documentation
Reporting and documentation is also a continuous process under this project. Quarterly narrative
report and financial statement will be produced and send to the donor agencies at the end of every
three months. Half yearly progress report also be produced and submitted to the donor
organization. Annual report also be produced and finally a project completion report will be
produced and submitted.
4.4Outcome
Expected outcome
- A Project Lunching Workshop organized
- 7 Staff members recruited
- 7 Field Office Established and continued
- 120 POS BK Established and continued
- 120 Teachers recruited for 21 POS BK
- 15000 couple of Parents & Children selected
- 120 Civil Society Organization (CSO) Formed and activated
- 32 kinds of low cost available materials including books and others educational materials
developed delivered to POS BK
- Knowledge and awareness on Local Resource Identification and Mobilization among the CSO
members enhanced
- Project theme and approach disseminated to staff and teachers as well
- Knowledge and awareness on Socialization Process and Education Methodology for staff and
Teachers enhanced
- CSO members become activated as social change agent through effective mobilization and
advocacy
- About 65% parents become aware about different social development issues
- Relationship among parents, children, teachers and CSO improved
- Family level income increased
- 2 annual get together of POS BK successfully organized
- International Human Rights Day and Begum Rokeya Dibash optimistically observed
- Responsiveness of local government representatives and others service providers increased
- Different message of POS BK disseminated
- 50000 posters and 1010 case study booklet published
- 15 cultural shows and 15 drama and theatre staged as well
- A Sound civilization established by transferring human being into human resources
- State, society and family level problems increasingly solved by socialization process
- Local and available resources identified
- Couple and children become the key actors for social change
- Regular meeting of CSO, POS BP and project staff members are continuing
- They are identifying their own problems regarding family and society level and they are
planning and implementing their undertaken activities
- Monitoring and supervision of the project continuing
Project Proposal on POS BP submitted by GDBC 11
- Quarterly, half-yearly and annual report including financial statements are producing
5. Stakeholders
5.1 Target Groups
This is community based project generally follows to include all community people with especial
concern for the poor and deprived people. These are as follows-
- Parents and children
- Community people
- Community Society Organization (CSO)
- Civil Society (including teachers, media people, kazi, imam with others professionals)
- Local government
- Service providers
These regions characterized by less level of education and awareness, high rate of school drop out
and limited schools. Target group is less aware about their basic rights. Beside attitude of service
providers are not in satisfactory level. The target group is disadvantaged in agriculture;
productions always collapse due to inadequate knowledge on farm and non-farm activities.
Marketing facilities of products also limited due to communication difficulties and improper
knowledge. Nutritional status of inhabitant in the project areas is insufficient, beside high rate of
mother mortality rate.
5.2 Equal participation of Men and Women
The project has holistic approach and unique elevation to involve the stakeholders including men
and women along with their children into the project cycle. Project has included active
involvement of the Civil Society Organization (CSO) where 9 members from various communities
including civil society, teachers, parents and UP representatives. They will work, as major actors of
the project as well as management team of POS BK where men and women are also emphasized.
Besides, women are the reserved for the position of Teachers for POS BK. In addition, the project
emphasized for women and girls education.
6 Geographical Location
District Upazilas Unions Village/ward Total Targeted HHs
Gaibandha Gobindogonj
Kamdia 3 75
Rajahar 3 75
Darbasta 3 75
Fulbari 3 75
Rakhalburuz 3 75
Mohimagonj 3 75
Paurashabha 3 75
01 01 07 21 525
7. Duration
14-06-2012------13-06-2017
8. Strategy and methodology
Project will establish 120 Paribar o Saisab Bikash Kendra (POS BK) at the community level. Each
Kendra will be facilitated 1 female Teacher. They will work to disseminate different information;
knowledge, characters tips and others need based instruction. They will build emotional and social
bondage among the learner. She will be responsible for the following tasks
- Make the lessons enjoyable (Incorporating story telling, local vise versa singing, dancing
and clapping) separately for the couple and children
Project Proposal on POS BP submitted by GDBC 12
- Provide lessons of practical knowledge instead of governmental textbook lesson including
social and family laws, perspectives religion, statutory household tasks and behavioral
change communication
- They will use local level and feasible learning materials for easy understanding of the
participants
Besides Civil Society Organization (CSO) will be activated and continued by their own initiatives
and they will government and manage the Kendra. CSO will work, as major actors of the project
will arrange meeting, gathering, cultural sharing and events. They will coordinate with the teacher
and couple and relevant parents by social mobilization and motivation. They will work directly as
Social Change Agent (CSA).
All the targeted 15000 children including boys and girls also play crucial role to change the
present situation. After gaining different development knowledge they will work directly with their
family and also practice in their daily life. By the side of growing of the children they will be able
to build up themselves as human resources so that they would able to contribute for the country
development.
POS BK will be the centre to impart proper communicative, practical education to build a future
world of human resources. Project Staff and Teacher will work with close collaboration. In the
learning center there will be used 32 kinds of low cost equipments and materials including 4
books, which are locally collectable and cost effective. Civil Society Organization (CSO) will be
activated independently. The project has divine morality to attract towards the theme of the
project. Regular meeting of CSO, POS BP and project staff members will be continued to identify
problems regarding family and society level and they will plan and implement accordingly. In
addition, Monitoring and supervision of the project is also a continuous process of the project to
bring out the best output of the initiatives.
9. Project Management (Human Resources, Reporting, Monitoring & Evaluation)
Human Resources
7 staff members including 1 Project Manager (PM), 3 Monitoring Officer, 1 Accountant, 7 Filed
Supervisors and 1 Office Assistant will be worked as full time staff of the project. Besides, 120
Women Teachers will work as Teacher of POS BK. Total numbers of human resource are 28.
Reporting
Periodical report like quarterly report, half yearly report will be produced and submitted to donor
and GDBC management team within scheduled timeframe. The reports will contain progressive as
well as informative data, facts, figure and financial statement. Different reports of the project are
as follows-
- Quarterly report after every three months of the project
- Half yearly report after every six months of the project
- Annual report at the end of the each year
- Project completion and evaluation report just after completion of the project
Monitoring & Evaluation
Monitoring System is very significant for project evaluation that provides instruction and
indication to change the strategies. It also includes innovative ideas in the strategies and polices of
project implementation. GDBC always emphasizes for proper monitoring and evaluation. GDBC’s
monitoring team including project director will be involved for the Monitoring Officer of the
project. Monitoring officer will be responsible for overall monitoring and supervision of 20 POS
BP. He/she will collect data and information and make a compilation report to present internal
management team of GDBC. She/he will provide necessary feedback to the Management Team
and senior staff of the organization. Besides, CSO will be the focal point to monitor and supervise
the Kendra’s activities properly and in their regular meeting they will discuss each other about
their findings and according to their finding and observation they will report to the Project
manager and Project officer in a regular basis. Overall the project is being implemented in a
participatory ways as like there also involvement of local government structures into the
monitoring and supervision mechanism.
10. Challenges
During the implementation of the project there may raise some risks in association with key
Project Proposal on POS BP submitted by GDBC 13
activities but GDBC believes and has experiences to overcome together with all project
stakeholders. GDBC has extended people’s trusteeship about to implement the project as it has
experimentally implemented in some areas. GDBC will be able to understand the project
stakeholders about the concepts and theme of the project to cope with any kinds of risks.
Project Proposal on POS BP submitted by GDBC 14

Pp text final

  • 1.
    P R OJ E C T P R O P O S A L on Paribar O Saisab Bikash Paddakhep (POS BP) Family and Early Childhood Development Initiative Submitted to Submitted by Hospital More, Gabindagonj Gaibandha-5740 Bangladesh E-maildabaloybu@gmail.com 0171635424301813639267, 880-05423-750095
  • 2.
    Date of Submission:14-09-2011 Table of Contents Sl No. Content Page No. 1 Executive Summary 04 2 Back Ground of the Organization 05 3 Project Brief 3.1 Background and rationale 06 3.2 Problem Identification and Needs Assessment 08 4 Title, Goal/Purpose, Objectives and Outcome 4.1 Title 08 4.2 Goal/Purpose 08 4.3 Objective and Activities 09 4.4 Outcome 12 5 Stakeholders 5.1 Target Groups 12 5.2 Equal participation of Men and Women 13 6 Geographical Location 13 7 Duration 13 8 Strategy and methodology 13 9 Project Management (Human Resources, Reporting, Monitoring & Evaluation) 14 10 Challenges 14 11 Logical Framework Annex A 12 Activity Gant Chart Annex B 13 Budget Annex C Project Proposal on POS BP submitted by GDBC 2
  • 3.
    Abbreviations/Acronyms GDBC Dabaloy BigganClub POS BP Poribar O Saisab Bikash Padakkhep POS BK Poribar O Saisab Bikash Kendra CSO Civil Society Organization BCC Behavioral Change Communication NGO Non Government Organization UP Union Parishad Project Proposal on POS BP submitted by GDBC 3
  • 4.
    1. Executive Summary DabaloyBiggan Club(GDBC) is a non-government voluntary organization (NGO) established in 2005 has been working for the betterment of rural poor and disadvantaged people in Gaibandha District. The project Paribar o Saisab Bikash Padakkhep (POS BP) is an initiative of GDBC aiming to build an apt, just and equitable society where tranquility and peace living together. It has achieved people’s trusteeship and encouragement for the pitoling project experimentally. The project addressed major problems by involving community people including male and female as key actors in problem identification and prioritization, planning, implementing undertaken initiative effectively. Side by side education and learning session are being provided to them coherently and separately for parents and children in a regular wise. Local and available materials and equipments are being adopted in the project. After six month, organization observed that the piloting project has brought out a remarkable level success along with positive trends within these areas. It has great effectiveness to create awareness in terms of people’s education, relationship, social performance, family and social law with especial emphasizes to empower the women as well as to upholds the rights of girl children. Community people become easily absorbed with the project intervention like solidarity, socialization, proper education, massive awareness and women empowerment and they are cordially appreciated the adoption of socialization process to build a society where people will contributive to the nation being a human resource. The project has a divine process to build a strong and unite social bondage among civil society with special concern to women, youth and children from every level. The pro would work to assist to develop well-planned family structures with a learning environment. For this, the project will provide education learning courses incorporating social and family laws, perspective respect ness to religion, statutory household tasks and behavioral change communication. The project also assists to practice their learning through socialization process. These comprehensive socializations process also be reviewed by them in a participatory easy. The project assists to build up children folk as future resources by providing practical knowledge and timely character building approach. Overall the project will enable a strong and responsive social bondage among the community people who would be capacitated to identify their problems and undertake integrated initiatives for effective solution. GDBC would like to undertake the project to create awareness in terms of people’s education, relationship, social performance, family and social law with especial emphasizes to empower the women as well as to uphold the rights of girl children. The project will work with solidarity, socialization, proper education, massive awareness and women empowerment for targeted people to build a society where people will contributive to the nation being a human resource. The project will enable them to develop a well-planed family structure within the community where couple and their children will learn knowledge of theoretical and practical at the same time. Proposed family will learn about knowledge of social and family laws, perspectives religion, statutory household tasks and behavioral change communication through comprehensive social education and socialization process in a with participatory ways. The project will assist to build up children folk as future human resources by providing practical knowledge and Behavioral Change Communication (BCC). The targeted children will able to play a significant role as valuable in the country development by their learning and gained knowledge. To establish a strong and responsive community human circle within the working areas by identifying identify local resources as well as problems and integrated initiatives the project will contribute to establish a just and equitable society. The project directly work for create massive awareness in terms of people’s education, relationship, social performance, family and social law with especial emphasizes to empower the women as well as to uphold the rights of girl children. The project also works to create massive awareness among the people about different development issues; to identify and reduce existing problems at family, community and society level; to improve inter relationship among the community people by establishing human bridge; to transfer skills and knowledge to become Project Proposal on POS BP submitted by GDBC 4
  • 5.
    activate as realinhabitants; encourage and activate people to reduce early marriage by 45% at the end of the project; to increase household income through enhancing capacity building as well as to increase accessibility of free education facilities for the children with emphasis to girls. Major activities are includes Project Lunching Workshop, Field Office Establishment, POS BK Establishment, Teachers training and orientation, Parents & Children involvement, Civil Society Organization Formation and activate, Develop low cost available materials, Workshop on Local Resource Identification and Mobilization, orientation on the project theme and approach, training on Socialization Process and Education Methodology, Training on social mobilization and advocacy, Books publication, Monthly Tea Circle, Monthly Sharing Meeting, Training on Capacity Building, Weekly meeting, training on Socialization Process, Annual Get Together, Refreshers Training, Day Observance, open dialogue, message dissemination, case study collection, Drama, theatre, cultural functions on awareness raising, monitoring, evaluation and reporting etc 2. Back Ground of the Organization Dabaloy Biggan Club(GDBC) is a non-government voluntary organization (NGO) established in1998 has been working for the betterment of rural poor and disadvantaged people in Gaibandha District. It obtained legal registration from social service department during October 2000. Gaibandha is a northern district of Bangladesh comprised of 7 Upazilas, 82 Unions and 2 municipalities with an area of 2,179 sq. km. Brahmaputra, Tista, Jamuna and Karotoa have crisscrossed the district. As a result, natural calamities including monsoon flood; draught, river erosion, cold wave, tornado etc are common occurrences in this district. Gobindagonj is the biggest Upazila in Gaibandha with a total population of 4, 61,428 covering areas of 482 sq. km. About 64% people are poor including extreme poor, poor and tribal ethnicities living in this upazila. Tribal families are living here in this upazila very inhumanly as if they are simply trivial minority. The literacy rate of this Upazila is very poor and about 99% women in remote and tribal areas are fully belonged illiterate. On the other hand, women and girls are the victims of early marriage, polygamy, divorces, dowry, rapping and many other kinds of physical torture as well as domestic violence due to economical deprivation along with influence of religious bound and prejudice of the society. They are the victims of dual exploitation both by poverty and gender discrimination. Rich & influential people always take chances to exploit women physically, mentally and even economically. At the family level women including children are sometime fully denied from rights. Though now a day, women are encouragingly involve in different income generating activities by the sole support of different local and national level NGOs but these are no sufficient according to the demand as the productive and reproductive rate also not adequate. Yet, most of the extreme poor have to depend to the local moneylender to meet up their need. Yet, around (70 -80) % extreme poor of the poor communities are fully unable to manage food three times in a day. According to GDBC’s observation and survey, they have to pass very critically during Monga (seasonal food crisis) when they have to take credit form local moneylenders with high rate of service charges or take advance money on labouring. Children are sent to laboring instead of sending school. Student attendance in primary school is less than 43%. Economic disparity among poor and rich is very high and leadership of poor is rarely viewed. Government Service provider institutions including Department of Health, Livestock, Education and Union Parishad are not accountable and transparent enough to provide their service deliveries. Consequently, poor and poorest people who are living in distanced and remote areas could not get the services which they deserve. Especially status of health service is very poor due to communication difficulties. However, now a days, due to frequent intervention of different Local, National, International NGOs are working to address different development issues as like on education, health, livelihood oriented agriculture, disaster management as so on Under such circumstances, Dabaloy Biggan Club(GDBC) come close to the poor people with particular emphasis to bring out positive changes at the family, society as well as national level. GDBC realized that solidarity, socialization, proper education, massive awareness and women Project Proposal on POS BP submitted by GDBC 5
  • 6.
    empowerment are veryprior to develop to change the condition and position of rural men and women. 3. Project Brief 3.1 Background and rationale Being a non-government voluntary development organization GDBC desire to implement something innovative and creative projects to diversify its elevated outputs for the target people. The project Paribar o Saisab Bikash Padakkhep (POS BP) is such initiative of the organization aiming to build an apt, just and equitable society where tranquility and peace living together. At the beginning of this year, organization started the project for piloting integrating family approach by the active involvement of whole family members including children and parents. It established 3 education learning centers namely Paribar o Saisab Bikash Kendra (POS BK) at Mohimagonj union and Gobindagonj Paurashabha in Gaibandha district. The project addressed major problems by involving community people including male and female as key actors in problem identification and prioritization to suitable initiative for solution. Side by side education and learning session are being provided to them coherently and separately for parents and children in a regular wise. Local and available materials and equipments are being adopted in the project. After six month, organization observed that the piloting project has brought out a remarkable level success along with positive trends within these areas. It has great effectiveness to create awareness in terms of people’s education, relationship, social performance, family and social law with especial emphasizes to empower the women as well as to upholds the rights of girl children. Community people become easily absorbed with the project intervention like solidarity, socialization, proper education, massive awareness and women empowerment and they are cordially appreciated the adoption of socialization process to build a society where people will contributive to the nation being a human resource. The project has a divine process to build a strong and unite social bondage among civil society with special concern to women, youth and children from every level. The pro would work to assist to develop well-planned family structures with a learning environment. For this, the project will provide education learning courses incorporating social and family laws, perspective respect ness to religion, statutory household tasks and behavioral change communication. The project also assists to practice their learning through socialization process. These comprehensive socializations process also be reviewed by them in a participatory easy. The project assists to build up children folk as future resources by providing practical knowledge and timely character building approach. Overall the project will enable a strong and responsive social bondage among the community people who would be capacitated to identify their problems and undertake integrated initiatives for effective solution. Gobindagonj is the biggest Upazila in Gaibandha with a total population of 4, 61,428 covering areas of 482 sq. km. About 64% people are poor including extreme poor, poor and tribal ethnicities living in this upazila. Tribal families are living here in this upazila very inhumanly as if they are simply trivial minority. The literacy rate of this Upazila is very poor and about 99% women in remote and tribal areas are fully belonged illiterate. On the other hand, women and girls are the victims of early marriage, polygamy, divorces, dowry, rapping and many other kinds of physical torture as well as domestic violence due to economical deprivation along with influence of religious bound and prejudice of the society. They are the victims of dual exploitation both by poverty and gender discrimination. Rich & influential people always take chances to exploit women physically, mentally and even economically. At the family level women including children are sometime fully denied from rights. Socio-economic status of this upazila is also very poor as a large portion of total population are occupied with agriculture, some others are occupied with rickshaw and van pulling, labour, and some are occupied with small trades and business. Tribal people are also neglected and derived who are generally occupied with labouring in agriculture sectors. People of the targeted areas are remaining poor and uneducated due to deep lack of awareness, lack of information opportunities and lack of employment. Though local level employment opportunities are exists but which is so poor according to the need of the localities. Project Proposal on POS BP submitted by GDBC 6
  • 7.
    To address theprevailing situation, GDBC would like to undertake the project to create awareness in terms of people’s education, relationship, social performance, family and social law with especial emphasizes to empower the women as well as to upholds the rights of girl children. The project will work with solidarity, socialization, proper education, massive awareness and women empowerment for targeted people to build a society where people will contributive to the nation being a human resource. The project will enable them to develop a well-planed family structure within the community where couple and their children will learn knowledge of theoretical and practical at the same time. Proposed family will learn about knowledge of social and family laws, perspectives religion, statutory household tasks and behavioral change communication through comprehensive social education and socialization process in a with participatory ways. The project will assist to build up children folk as future human resources by providing practical knowledge and Behavioral Change Communication (BCC). The targeted children will able to play a significant role as valuable in the country development by their learning and gained knowledge. To establish a strong and responsive community human circle within the working areas by identifying identify local resources as well as problems and integrated initiatives the project will contribute to establish a just and equitable society. 3.2 Problem Identification and Needs Assessment Gobindagonj is the biggest Upazila in Gaibandha with a total population of 4, 61,428 covering areas of 482 sq. km. About 64% people are poor including extreme poor, poor and tribal ethnicities living in this upazila. Tribal families are living here in this upazila very inhumanly as if they are simply trivial minority. The literacy rate of this Upazila is very poor and about 99% women in remote and tribal areas are fully belonged illiterate. On the other hand, women and girls are the victims of early marriage, polygamy, divorces, dowry, rapping and many other kinds of physical torture as well as domestic violence due to economical deprivation along with influence of religious bound and prejudice of the society. They are the victims of dual exploitation both by poverty and gender discrimination. Rich & influential people always take chances to exploit women physically, mentally and even economically. At the family level women including children are sometime fully denied from rights. Socio-economic status of this upazila is also very poor as a large portion of total population are occupied with agriculture, some others are occupied with rickshaw and van pulling, labour, and some are occupied with small trades and business. Tribal people are also neglected and derived who are generally occupied with labouring in agriculture sectors. People of the targeted areas are remaining poor and uneducated due to deep lack of awareness, lack of information opportunities and lack of employment. Though local level employment opportunities are exists but which is so poor according to the need of the localities. People of the proposed areas are fully ignored from education, health and effective services from different government and non-governmental service providers. They are fully incapable to negotiate their actual needs with others because of lack of information, shame, awareness, and skill. Furthermore, local government structures are also very weak. GDBC carefully observes that though many NGOs are working effectively, yet there prevail some problems regarding the target people’s empowerment, capacity building, active participation etc. According to assessment of the organization, there are significant level gaps are prevailing in relation to the overall development of the targeted people. There are great leakage in the process of solidarity, socialization, proper education, massive awareness and women empowerment. Due to inadequate education facilities, many children are being deprived from education as well as due to innate level of unawareness most of the parents engage their children in their household affairs or in income generation activities. As a result, rate of drop out from primary education increased. Being realized, GDBC felt the necessity to undertake a integrated initiative through Paribar o Saisab Bikash Padakkhep (POS BP) to create awareness in terms of people’s education, relationship, social performance, family and social law with especial emphasizes to empower the women as well as to upholds the rights of girl children. Project Proposal on POS BP submitted by GDBC 7
  • 8.
    4. Goal/Purpose, Objectivesand Outcome 4.1 Title of the project Paribar O Saisab Bikash Kendra (POS BP) 4.2 Goal/Purpose Goal/Purpose Build an apt, just and equitable society where tranquility and peace living together 4.3 Objective and Activities General Create awareness in terms of people’s education, relationship, social performance, family and social law with especial emphasizes to empower the women as well as to upholds the rights of girl children. Specific - To create massive awareness among the people about different development issues - To identify and reduce existing problems at family, community and society level - To improve inter relationship among the community people by establishing human bridge - To transfer skills and knowledge to become activate as real inhabitants - Encourage and activate people to reduce early marriage by 45% at the end of the project - To increase household income through enhancing capacity building - To increase accessibility of free education facilities for the children with emphasis to girls Activities 1. Project Lunching Workshop A Project Lunching Workshop will be organized just before going to implement the project where Civil Society, Local Government Structures including Upazila and Union Parishad, like minded NGOs representatives and others social actors will attend. The workshop will be held to publicize the thematic areas including goal and objective of the project. 2. Staff Recruitment Organization will recruit required 7 full project staff to implement the project through advertisement in local Newspapers. Staff will be recruited through formal written and interviewing test encouraging female applicants for the project. 3. Field Office Establishment Organization will establish 3 field offices for effective communication and smooth implementation of the project. Those offices are being setup at Gobindogonj Paurashabha, Kamdia and Mohimagonj unions in Gobindogonj Upazila under Gaibandha district. 4. POS BK Establishment Organization will establish 120 POS BK centers in 120 villages under 17 unions and 1 Pourashabha . 120 Centers will be established in 120 villages/wards under each union/paurashabha. Relavant CSO will work here as POS BK management committee. 5. Teachers Recruitment Organization will recruit 120 Teachers to facilitate Poribar O Saisab Bikash Kendra (POS BK), 1 Teacher for each POS BP for effective implementation of learning session at the centers. Teacher cum Facilitator will be recruited through merit test. These positions are only for women reserved. Project Proposal on POS BP submitted by GDBC 8
  • 9.
    6. Parents andChildren selection The project will work 25 couples (50 persons) for each Poribar O Saisab Bikash Kendra (POS BK), and 25 pair children (50) from those families. According to the targeting criteria organization will select those families. 7. Civil Society Organization Formation The project will form Civil Society Organization (CSOs) in each targeted village as major actors of the project. They are performing perform directly as Social Change Agent (CSA) in their community. Each CSO will consist of 9 members including POS BK teacher, two potential couples (4 persons), 2 teachers from government & non-government school or college, 2 from relevant UP members. CSO will work, as major actors of the project as well as management team who will take over the overall role and responsibility to organize of POS BK successfully. 8. Develop and collect different low cost available materials Organization will develop and collect 28 kinds of low-cost and available resources and materials including pictures, geographical maps, calendar, khathas, pencils, pen, playing kits etc which are cheapest and locally available. 9. Workshop on Local Resource Identification and Mobilization for CSO The project will organize Workshop on Local Resource Identification and Mobilization for CSO separately through 8 batches where the CSO’s members will be well-informed and capacitated for local resource identification and its mobilization. 10. Materials delivery to the POS BK Organization will deliver 32 kinds of low-cost equipments and materials including including pictures, geographical maps, calendar, khathas, pencils, pen, playing kits etc to all POS BK. 11. Orientation for staff members and Teachers on the project theme and approach The project will organize a daylong orientation for staff and teachers of the project on the theme and approach of the project which will be organized in 1batch. The orientation will enable them to perform their respective role and responsibilities accordingly. 12. Training on Socialization Process and Education Methodology for Staff and Teachers 5 daylong training on Socialization process would be offered for the staff and Teachers of POS BK so that they would be able to perform adequately about adopt socialization process as well as education methodology which will be organized be organized in 1batch. 13. Training for CSO members on Social Mobilization and Advocacy The project will offer 3 day long training for CSO members on Social Mobilization and Advocacy which will be organized separately in 8 batches so that they would be able to perform their role and responsibilities as well. 14. Books publication for POS BK students The project will publish 4 indispensable books containing different practical knowledge, ideas, concentration building tips and laws on basic education of religion, statutory, social and family level. Besides those books assist to develop the learners in terms of values, norms, behavior like respectfulness to others, coherent family and social relationship. Project will publish 50000 books for the targeted people involved with the project. 15. Monthly Tea Circle Discussion for Parents Monthly Tea Circle Discussion for targeted Parents will be organize to provide various types of essential educational session on education, health & hygiene, savings and collection, family planning and law, HIV/AIDS conceptions, gender & development water and sanitation, IGAs etc. 16. Monthly Sharing Meeting with Parents and Children Monthly Sharing Meeting with Parents and Children will be organize for sharing and discussion on Project Proposal on POS BP submitted by GDBC 9
  • 10.
    the perspective views,observation, weakness, addition about POS BK by the cordial facilitation of project staff. 17. Training on Capacity Building for Parents The project will organize 2 daylong 120 batches of training for Parents on Capacity Building by providing different types of skills and technical knowledge to undertake their perspective IGA initiatives. Too undertake IGA initiatives the project will provide financial supports also. 18. Weekly sharing meeting of CSO The project will assist to organize 104 weekly meetings of the targeted CSO. Civil Society Organization will meet at the end of every week where they will share and review their planning, implementing initiatives and recovery process in details. 19. Training on Socialization Process for CSO members The project will organize 3 day long training on Socialization Process for CSO members separately through 8 batches so that they would also able to adopt socialization process at their every step of initiatives. 20. POS BK Annual Get Together The project will organize POS BK annual get together where all the targeted families including their children will attend. A formal discussion on the progress, achievement, weakness and learning will shared among the participants. 21. Refreshers Training for Staff and Teachers The project will provide 2 daylong refreshers training for Staff and Teachers on Socialization process and education methodology to review and enhance their performance. 22. International Human Rights Day Observance Project stakeholders including staff, teachers, parents, children will observe International Human Rights Day in an integrated way through a colourful rally, discussion meeting and cultural function. 23. Begum Rokeya Dibash Observance Project stakeholders including staff, teachers, parents, children will observe Begum Rokeya Dibash in an integrated way through a colourful rally, discussion meeting and cultural function. 24. Opinion sharing meeting with local government representatives The project will organize 4 opinion sharing meetings with local government representatives where CSO, parents, teachers and other stakeholders will be participated as interrogator. 25. Open dialogue with service provider representatives The project will organize 4 opinion dialogue with service provide representative local government representatives where CSO, parents, teachers and other stakeholders will be participated as interrogator. 26. Message dissemination of POS BK through poster The project will disseminate core message of the project through publishing 50000 posters to increase the level of awareness among the community people 27. Message dissemination of POS BK through leaflet The project will disseminate core message of the project through publishing 50000 leaflet contains the theme, focus, goal, objectives and effectiveness of the POS BK. 28. Case study collection and booklet publication The project will collect best 1050 cases from 150000 families depending on their success and will publish 10000 booklet which will help to assess the effectiveness and results of the project. 29. Drama/theatre show on development issues Organization will organize 6 drama/theatres on different development issues including early Project Proposal on POS BP submitted by GDBC 10
  • 11.
    marriage, dowry, polygamy;protect violence against women, drug users, HIV/AIDS etc to increase the awareness among the project stakeholders. These shows will be showed by the own artists of POS BK. 30. Cultural functions on development issues Organization will organize 6 cultural functions on different development issues including early marriage, dowry, polygamy; protect violence against women, drug users, HIV/AIDS to increase the awareness among the project stakeholders. These shows will be showed by the own artists of POS BK. 31. Regular Monitoring, supervision and evaluation Monitoring and supervision is continuous activities under the project. Top to Bottom project stakeholders will be involved for project supervision and monitoring to intensify the diversified outputs of the project. Progress and process monitoring will be adopted for evaluation. An external evaluation will also be conducted after the end of the project. 32. Reporting and documentation Reporting and documentation is also a continuous process under this project. Quarterly narrative report and financial statement will be produced and send to the donor agencies at the end of every three months. Half yearly progress report also be produced and submitted to the donor organization. Annual report also be produced and finally a project completion report will be produced and submitted. 4.4Outcome Expected outcome - A Project Lunching Workshop organized - 7 Staff members recruited - 7 Field Office Established and continued - 120 POS BK Established and continued - 120 Teachers recruited for 21 POS BK - 15000 couple of Parents & Children selected - 120 Civil Society Organization (CSO) Formed and activated - 32 kinds of low cost available materials including books and others educational materials developed delivered to POS BK - Knowledge and awareness on Local Resource Identification and Mobilization among the CSO members enhanced - Project theme and approach disseminated to staff and teachers as well - Knowledge and awareness on Socialization Process and Education Methodology for staff and Teachers enhanced - CSO members become activated as social change agent through effective mobilization and advocacy - About 65% parents become aware about different social development issues - Relationship among parents, children, teachers and CSO improved - Family level income increased - 2 annual get together of POS BK successfully organized - International Human Rights Day and Begum Rokeya Dibash optimistically observed - Responsiveness of local government representatives and others service providers increased - Different message of POS BK disseminated - 50000 posters and 1010 case study booklet published - 15 cultural shows and 15 drama and theatre staged as well - A Sound civilization established by transferring human being into human resources - State, society and family level problems increasingly solved by socialization process - Local and available resources identified - Couple and children become the key actors for social change - Regular meeting of CSO, POS BP and project staff members are continuing - They are identifying their own problems regarding family and society level and they are planning and implementing their undertaken activities - Monitoring and supervision of the project continuing Project Proposal on POS BP submitted by GDBC 11
  • 12.
    - Quarterly, half-yearlyand annual report including financial statements are producing 5. Stakeholders 5.1 Target Groups This is community based project generally follows to include all community people with especial concern for the poor and deprived people. These are as follows- - Parents and children - Community people - Community Society Organization (CSO) - Civil Society (including teachers, media people, kazi, imam with others professionals) - Local government - Service providers These regions characterized by less level of education and awareness, high rate of school drop out and limited schools. Target group is less aware about their basic rights. Beside attitude of service providers are not in satisfactory level. The target group is disadvantaged in agriculture; productions always collapse due to inadequate knowledge on farm and non-farm activities. Marketing facilities of products also limited due to communication difficulties and improper knowledge. Nutritional status of inhabitant in the project areas is insufficient, beside high rate of mother mortality rate. 5.2 Equal participation of Men and Women The project has holistic approach and unique elevation to involve the stakeholders including men and women along with their children into the project cycle. Project has included active involvement of the Civil Society Organization (CSO) where 9 members from various communities including civil society, teachers, parents and UP representatives. They will work, as major actors of the project as well as management team of POS BK where men and women are also emphasized. Besides, women are the reserved for the position of Teachers for POS BK. In addition, the project emphasized for women and girls education. 6 Geographical Location District Upazilas Unions Village/ward Total Targeted HHs Gaibandha Gobindogonj Kamdia 3 75 Rajahar 3 75 Darbasta 3 75 Fulbari 3 75 Rakhalburuz 3 75 Mohimagonj 3 75 Paurashabha 3 75 01 01 07 21 525 7. Duration 14-06-2012------13-06-2017 8. Strategy and methodology Project will establish 120 Paribar o Saisab Bikash Kendra (POS BK) at the community level. Each Kendra will be facilitated 1 female Teacher. They will work to disseminate different information; knowledge, characters tips and others need based instruction. They will build emotional and social bondage among the learner. She will be responsible for the following tasks - Make the lessons enjoyable (Incorporating story telling, local vise versa singing, dancing and clapping) separately for the couple and children Project Proposal on POS BP submitted by GDBC 12
  • 13.
    - Provide lessonsof practical knowledge instead of governmental textbook lesson including social and family laws, perspectives religion, statutory household tasks and behavioral change communication - They will use local level and feasible learning materials for easy understanding of the participants Besides Civil Society Organization (CSO) will be activated and continued by their own initiatives and they will government and manage the Kendra. CSO will work, as major actors of the project will arrange meeting, gathering, cultural sharing and events. They will coordinate with the teacher and couple and relevant parents by social mobilization and motivation. They will work directly as Social Change Agent (CSA). All the targeted 15000 children including boys and girls also play crucial role to change the present situation. After gaining different development knowledge they will work directly with their family and also practice in their daily life. By the side of growing of the children they will be able to build up themselves as human resources so that they would able to contribute for the country development. POS BK will be the centre to impart proper communicative, practical education to build a future world of human resources. Project Staff and Teacher will work with close collaboration. In the learning center there will be used 32 kinds of low cost equipments and materials including 4 books, which are locally collectable and cost effective. Civil Society Organization (CSO) will be activated independently. The project has divine morality to attract towards the theme of the project. Regular meeting of CSO, POS BP and project staff members will be continued to identify problems regarding family and society level and they will plan and implement accordingly. In addition, Monitoring and supervision of the project is also a continuous process of the project to bring out the best output of the initiatives. 9. Project Management (Human Resources, Reporting, Monitoring & Evaluation) Human Resources 7 staff members including 1 Project Manager (PM), 3 Monitoring Officer, 1 Accountant, 7 Filed Supervisors and 1 Office Assistant will be worked as full time staff of the project. Besides, 120 Women Teachers will work as Teacher of POS BK. Total numbers of human resource are 28. Reporting Periodical report like quarterly report, half yearly report will be produced and submitted to donor and GDBC management team within scheduled timeframe. The reports will contain progressive as well as informative data, facts, figure and financial statement. Different reports of the project are as follows- - Quarterly report after every three months of the project - Half yearly report after every six months of the project - Annual report at the end of the each year - Project completion and evaluation report just after completion of the project Monitoring & Evaluation Monitoring System is very significant for project evaluation that provides instruction and indication to change the strategies. It also includes innovative ideas in the strategies and polices of project implementation. GDBC always emphasizes for proper monitoring and evaluation. GDBC’s monitoring team including project director will be involved for the Monitoring Officer of the project. Monitoring officer will be responsible for overall monitoring and supervision of 20 POS BP. He/she will collect data and information and make a compilation report to present internal management team of GDBC. She/he will provide necessary feedback to the Management Team and senior staff of the organization. Besides, CSO will be the focal point to monitor and supervise the Kendra’s activities properly and in their regular meeting they will discuss each other about their findings and according to their finding and observation they will report to the Project manager and Project officer in a regular basis. Overall the project is being implemented in a participatory ways as like there also involvement of local government structures into the monitoring and supervision mechanism. 10. Challenges During the implementation of the project there may raise some risks in association with key Project Proposal on POS BP submitted by GDBC 13
  • 14.
    activities but GDBCbelieves and has experiences to overcome together with all project stakeholders. GDBC has extended people’s trusteeship about to implement the project as it has experimentally implemented in some areas. GDBC will be able to understand the project stakeholders about the concepts and theme of the project to cope with any kinds of risks. Project Proposal on POS BP submitted by GDBC 14