Category Management


       Marjolein Dijkshoorn
           Sydney, October 2012
Whereas Capgemini supports clients with the improvement of the entire procurement
strategy, organisation, processes and execution, this document will focus solely on
category management

                                                                                       STRATEGIC
                                                                                       Defines procurements prime objectives to
                                  Procurement                                          align and support the business strategy.
                                    Strategy
                                  Development                                          Business alignment through the
                                                                                       Procurement Board. Participants executive
                            Governance & Organisation
                                                                                       level.
                                  Development




                                 Category Planning
                                                                                       TACTICAL
                                                                                        Specific strategies and market approach
                                                                                       for Commodity groups covering market
                                                                                       and spend profiling, selection and
                Purchase                                     Supplier                  switching. The commodity strategy will
                Demand              Sourcing                Relationship               determine the optimum geographic
               Management                                   Management                 approach.

                                                                                       Alignment through Multi Functional Teams.
                             Supply Planning & Control                                 Participants functional level (e.g. HR,
                                                                                       marketing, IT)

                            Provision of Goods & Services                              OPERATIONAL
                                                                                       The delivery of benefits through a
                                                                                       compliant environment based on
                                                                                       information, procedures and policies in
          IT                          People                 Knowledge & Information   line with the strategy
                        Managing the Enablers                                          Alignment through compliance.




                                                                                                                             Presentation Map
Category Management is the management of a specific group of commodities with
     similar characteristics, with the aim to increase efficiency and realise cost savings
                                    Category Management Definition                         Category Management Benefits

         “the entire science of the procurement subject applied to       1. Savings. Category Managers can leverage expertise and insight
                       a single genre of expenditure”.                       into a whole category as a means of driving value from a
                                                                             particular deal.
        In Category Management products or services that have similar    2. Consolidation of spend. When managing by category,
        characteristics and are bought from similar supply markets are       consolidation opportunities can become apparent as well as well
        grouped together and treated as a discrete group or category.        as opportunities to outsource.
        These categories are then more manageable from a procurement     3. Internal vs External alignment. It links customer requirements
        perspective because the items in a category require the same         with supply market capabilities.
        supplier market intelligence, the same sourcing strategies and   4. Team work. It enables the business requirements definition or
        similar supplier relationship management programmes.                 specification to be developed so that it delivers best value.
                                                                             Defining your business requirements is a team game in that it
        The key elements of Category Management include end-to-end           identifies both the user requirements and commercial
        management of the supply chain, acute market awareness, sound        expectations.
        (if not expert) technical knowledge, good SRM and excellent      5. Leverage. It ensures that all relevant spend is included in the
        stakeholder relationships. Also, an understanding of actual          category so that your leverage is maximised.
                                                                         6. It reduces risk. Creating categories and putting them under the
        consumer needs – at the other end of the supply chain.               proper management of experts enables you to spot any trends
                                                                             or developments that might create a commercial risk and do
                                                                             something to prevent or mitigate it.
                                                                         7. Clear Responsibilities and Communication. It helps to build
                                                                             good communications across the entire value chain. Category
                                                                             Management gives you the visibility and opportunity to
                                                                             communicate the right message in the right way to the right
                                                                             people to get the result you want.
                                                                         8. Trust. It builds trust and co-working across all of the value chain.
                                                                         9. Comprehensiveness. It ensures that many supply options are
                                                                             considered rather than just the obvious one.



                                                                                                                                             Presentation Map
CIPS Research 2011: State of the art of category management
Capgemini’s Procurement specialists and Procurement as a Service™ provide a strong
solution to compliment the clients Sourcing organization and Category Management
approach
                                                     CAPGEMINI PROCUREMENT
          STRATEGIC PROCUREMENT                                 CATEGORY SUPPORT                         ON-DEMAND PROCUREMENT PLATFORM

Strategic services that leverage Capgemini's      Spend analysis, category intelligence, event        The leading Sourcing and Category
unique mix of procurement and industry            management and supply risk analysis are the         Management solutions to improve efficiency in
sector expertise, as well as deep                 key activities in our category support offering.    sourcing process
understanding of client needs.                    The support function of Procurement as a            • Spend Analysis
                                                  Service provides services to the clients retained   • eSourcing / event management
Acting as an extension of the clients             category managers.                                  • Supplier Network
procurement organization, Capgemini will                                                              • Contract Management
perform strategic sourcing and category                                                               • Savings tracking
management for assigned spend categories.                                                             • Project Workflow


   Strategic Procurement

                                 Category                 Contract                Supplier              Compliance                Content
     Strategic Sourcing         Management               Management             Relationship            Management              Management
                                                                                Management


   Category Support

             Spend Analysis              Category & Market Intelligence              Event Factory                    Supply Risk Analysis




                                                                                                                                         Presentation Map
Today, Capgemini BPO manages over $12.5B AUD spend with the majority being indirect
spend categories. Our knowledge in these categories will enable us to bring acceleration
to the clients sourcing process
                                                                                                      CAPGEMINI CATEGORY TREE
1                 2                      3                   4                    5                      6             7                     8                       9                   10                      11                   12
OFFICE            FACILITY               REAL ESTATE         PROFESSIONAL         HUMAN                  IT & COMMUNI- FINANCIAL             MARKETING               TRAVEL              LOGISTICS               MRO                  PRODUCTION
                  MANAGEMENT                                 SERVICES             RESOURCES              CATION        SERVICES                                                                                                       EQUIPMENT

1.1               2.1                    3.1                 4.1                  5.1                    6.1              7.1                8.1                     9.1                 10.1                    11.1                 12.1
Office Supplies   Cleaning Services      Contractors &       Management           Recruitment            Hardware         Banking Services   Commercial &            Conferences &       Air Transportation      Spare Parts          Material Handling
                                         Renovation          Consultants                                                                     Production Print        Meetings                                                         Equipment

1.2               2.2                    3.2                 4.2                  5.2                    6.2              7.2                8.2                     9.2                 10.2.                   11.2                 12.2
Furniture         Security               Rents               IT Consultants       Training               Peripherals      Auditing           Communication           Hotels              Road Transportation     Hand Tools           Production Equipment
                                                                                                                                             Consultants

1.3               2.3                    3.3                 4.3                  5.3                    6.3              7.3                8.3                     9.3                 10.3                    11.3                 12.3
Office Machines   Canteen                Property            Engineering          Employee Benefits      Software         Insurance          Media                   Rental Cars         Rail Transportation     Protective Gear &    Test & Measurement
                                                             Consultants                                                                                                                                         Clothing             Equipment

1.4               2.4                    3.4                 4.4                  5.4                    6.4              7.4                8.4                     9.4                 10.4                    11.4                 12.99
Subscriptions     Electricity            Development         Legal Services       Employee Recognition   IT Services      P- card Services   Events & Exhibitions    Train               Sea Transportation      Lab Supplies         Other Capital
                                         Consultancies                                                                                                                                                                                Equipment

1.5               2.5                    3.5                 4.5                  5.5                    6.5              7.99               8.5                     9.5                 10.5                    11.5
Literature        Water and Waste        Brokers             Temporary Labor -    Fleet Cars             Telecom          Other Financial    Advertising Agencies    Travel Management   Courier and Small       Lubricants
                  Water                                      Admin                                                        Services                                                       Package Services

1.6               2.6                    3.99                4.6                  5.6                    6.6                                 8.6                     9.6                 10.6                    11.6
Coffee & Other    HVAC                   Other Real Estate   Temporary Labor –    Payroll Services       Data Com                            Market Research         Air                 Warehouse - 3rd         Air and Gas
Vending                                                      Skilled                                                                                                                     Party Space

1.7               2.7                                        4.99                 5.99                   6.7                                 8.7                     9.7                 10.7                    11.7
Paper             Waste Management                           Other Professional   Other Human            Phones Systems                      Promotional             T&E Card            Customs Services        Chemicals
                                                             Services             Resources                                                  Merchandise

1.99              2.8                                                                                    6.8                                 8.8                     9.99                10.8                    11.8
Other Office      Landscaping Services                                                                   Accessories                         Sales Services          Other Travel        Freight Bill Auditing   Cutting Tools
                                                                                                                                                                                         Services

                  2.9 Snow Removal                                                                       6.99                                8.9                                         10.9                    11.99
                  Services                                                                               Other IT &                          Marketing Consultants                       Storage Systems         Other MRO
                                                                                                         Communications

                  2.8                                                                                                                        8.99                                        10.99
                  Mailroom Services                                                                                                          Other                                       Other Logistics
                                                                                                                                             Marketing

                  2.99
                  Other Facility
                  Mgmt/Maintenance




                                                                                                                                                                                                                                     Presentation Map
Strategic Procurement manages spend savings and supplier performance through our
global network of category managers as well as local experts

        Service Delivery Model
                                                                                                       TRANSACTIONAL
                                                                                                        DELIVERY HUBS
 • Activities which require close access to
   the client, such as stakeholder
   management, sourcing wave planning,           REGIONAL / GLOBAL                                OFFSHORE    CATEGORY SUPPORT
   and complex category sourcing are                  DELIVERY                                     DELIVERY             MARKET
                                                                                                   CENTERS         INTELLIGENCE
   performed locally                                                                                             SPEND ANALYSIS
 • Strategic sourcing and category                                                                 ENGLISH
                                                                                                 LANGUAGE
                                                                                                                     EVENT (RFx)
                                                                                                                       FACTORY
   management activities are performed        NEAR-SHORE
                                                                    STRATEGIC
                                                  GLOBAL
   onshore / onsite and offshore based on        DELIVERY           SOURCING
                                                            PROJECT SOURCING
   category complexity, stakeholder              ENGLISH        SOURCING LITE
   alignment client requirements. Typical      LANGUAGE              PROJECTS

   ratio is 50% onshore / 50% offshore
 • Local delivery is supported by our
   regional and global category managers
   who provides sourcing strategy                                       LOCAL DELIVERY
   expertise                                                           ( onsite / onshore)
 • Category support such as spend analysis                                         CATEGORY SUPPORT
                                                                LANGUAGE
   and reporting are performed by local                           CENTRIC
                                                                                 MARKET INTELLIGENCE
                                                                                      SPEND ANALYSIS
   procurement specialist or performed in                                         STAKEHOLDER MGMT
                                                                 ONSIGHT
   English from India                                           ON-SHORE
                                                                                  SOURCING & PROJECT
                                                                                      WAVE PLANNING
                                                                                  STRATEGIC SOURCING
                                                                 SUPPORTS
                                                                                    PROJECT SOURCING
                                                                   OVER 37
                                                                                SERVICE MANAGEMENT
                                                               LANGUAGES




                                                                                                                                   Presentation Map
Capgemini takes a comprehensive view of Category Management

                       SP1.0                                    SP2.0                                       SP3.0                                  SP4.0

                        Procurement Strategy                              Category                                    Category                              Category
                             & Planning                                   Planning                                  Development                            Management

                 1.1     Assess client environment        2.1      Profile category                   3.1    Mobilize                        4.1    Manage demand

                                                                                                             Continuous improvement
                 1.2     Perform spend analysis           2.2      Create category strategy           3.2                                    4.2    Manage supply
                                                                                                             initiative

                         Idea generation &                         Define, assess initiatives &
                 1.3                                      2.3                                         3.3    Compliance initiative           4.3    Manage savings & compliance
                         opportunity identification                prioritize

                 1.4     Goal & objective setting                                                     3.4    Strategic sourcing initiative   4.4    Manage stakeholders

                                                                                                      3.5    Initiative implementation       4.5    Manage risk

                                                                                                                                             4.6    Manage supplier

                                                                                                                                             4.7    Project based sourcing


                                                                                                                                             •   Spend Profiler
                                                      •   Business Intelligence                   •   eSourcing
                                                                                                                                             •   Workflow
  Tools




                 • Spend Profiler                     •   Supplier Positioning                    •   Workflow
                                                                                                                                             •   Business Intelligence
                 • Business Intelligence              •   Supply Preferencing                     •   Business Intelligence
                                                                                                                                             •   SLA and Operational Reporting
                                                      •   Five Forces                             •   Contract Management
                                                                                                                                             •   Contract Management

                                                                            Workflow and issue resolution infrastructure
  Intelligence




                                                      •   Category Packs                          •   Category packs
                 • Spend analysis                                                                                                            • Cross client processes
                                                      •   Cross-client best practices             •   Rfx Templates and scenarios
                 • Category intelligence packs                                                                                               • Category specific KPI´s
                                                      •   Supplier listings                       •   Contract templates
                 • Benchmarking                                                                                                              • Benchmarking
                                                      •   Supply market intelligence              •   Quarterly analysis




                                                                                                                                                                                  Presentation Map
Realizing savings and ensuring client governance in all initiatives



                                          Idea                     Opportunity                                Identified                            Captured                       Realized
  Savings Status
                      Strategic
                      Sourcing




                                                             Profile           Create
                                                                                                   Qualify             Source And               Implement Contract
                                      Assessment            Sourcing          Sourcing
                                                                                                  Suppliers              Award                     And Savings
                                                            Category          Strategy
   Initiative Types


                        Compliance




                                                                                                 Identify &              Develop
                                                                                                                                          Stake-holder                             Monitor
                                      Hypothesis              Run Compliance Reports              Quantify             Implement.                            Implement
                                                                                                                                             Buy-in                                Progress
                                                                                                  Suppliers             Approach
                      Improvement
                       Continuous




                                                                                                Quantify &              Finalize
                                                                Validate Need And                                                         Stake-holder                             Monitor
                                     Identify Need                                               Validate            Recommendat                             Implement
                                                                Develop Approach                                                             Buy-in                                Progress
                                                                                                Opportunity               ion




                                                     A                                     B                                         C                                      D
            Council
           Tollgates                  Stakeholder agreement on project    Stakeholder sign-off on approach and            Stakeholder sign-off on           Project evaluation and transition to
                                           details for development                 project execution                  implementation plan and savings             on-going maintenance




                                                                                                                                                                                          Presentation Map
Capgemini‘s Spend Analysis process creates normalized, enriched data to enable
sourcing and supplier optimization analysis


                  Data Extraction &                       Data Cleansing &
                                                                                               Analysis & Reporting
                    Aggregation                            Classification


       •   Extract data from source systems    • Data cleansing , grouping &           • Advanced spend reporting &
       •   Load data into Spend Profiler         classification                          analysis
       •   Aggregate and map all data files    • Classify transaction data to          • Provision of cleansed and
       •   Data validation checkpoint to         hierarchy                               classified data extract
           ensure accuracy and                 • Conduct mapping workshops to          • Final presentation view of Spend
           completeness of loaded data           review classifications, exceptions,     Analysis results
                                                 and to ensure business accuracy




                              Industrialized and automated process supported by Spend solution




                                                                                                                            Presentation Map
For industrialized outsourced categories, Capgemini maintain a library of category
    know-how and insight to accelerate benefit delivery and opportunity size




                                               Market Characteristics




                                                     Category
                                                      Insight




                                            Historic Areas of Opportunity




High Level Solution Overview session. 1st
                                                                                     Presentation Map
October 2009
Category Intelligence is managed by a dedicated Knowledge Manager or Procurement
Specialist, and is proactively updated as part of the Sourcing Close process


        Category Tree Excerpt
        2                   6
        FACILITY            IT &
        MANAGEMENT          COMMUNICATION

        2.1                 6.1
        Cleaning Services   Hardware               Category
        2.2                 6.2
                                                   Intelligence
        Security            Computer Peripherals
                                                   Packs
        2.3                 6.3
        Canteen             Software


        2.4                 6.4
        Electricity         IT Operations


        2.5                 6.5
        Water and Waste     Telecom
        Water

        2.6
        Heating
                            6.6
                            Data Com
                                                                        Knowledge Leverage                             Knowledge Harvesting
        2.7                 6.7
        Waste Management    Phones & Accessories            Profile    Create                                              Implement
                                                                                           Qualify        Source And
                                                           Sourcing   Sourcing                                              Contract
                                                                                          Suppliers         Award
        2.8                 6.8                            Category   Strategy                                             And Savings
        Mailroom Services   Switchboard

                                                                                 Hardware Sourcing Initiative
        2.99                6.99
        Other Facility      Other IT &
        Mgmt/Maintenance    Communications




                                                                                                                                          Presentation Map
Category Management and Compliance is used by Capgemini to ensure realized savings
and create sustainable improvements
                                                                                                 Exceptions                                    Compliance
Capgemini Category Managers interact with Client Stakeholders to                                Management                                      Strategy


help:                                                                                                              I                  A
                                                                                  Reporting &                                                               Sourcing
  • Standardize specification/rationalize items                                    Tracking
                                                                                                      H                                            B
                                                                                                                          Identify
  • Measure, manage and improve compliance
                                                                                                                   Ring
                                                                                                                                     Capture
  • Gain earlier involvement in the sourcing and buying process                Communicate
                                                                                 Policies
                                                                                                   G              Fence
                                                                                                                                                    C          Channel
                                                                                                                                                               Planning
                                                                                                                          Realize
  • Build people effectiveness, education programs
  • Increase efficiencies                                                                                     F                                D
                                                                                       Category
                                                                                     Communication
                                                                                                                            E                          Channel
                                                                                                                                                    Implementation

                                                                                                                         Content
                                                                                                                       Management




       Compliance Management Framework
                                                      3 to 6+ months based on Category

                        Develop         Develop or revise
                                                                Identify key                                                  Design/                                Design & deliver
      Define the      performance         commodity                                     Create
                                                                stakeholders                                                  Develop                                    training/
     sponsorship       metrics &         procedures &                                  reporting
                                                                  and any                                                 implementation                             communications
    network for the     targets            policies to                                 process /
                                                                   impact                                                 & communication                                 to key
      commodity         to drive            address                                      tools
                                                                  on them                                                  Strategy/plan                               stakeholders
                        behavior          compliance



                                • Category managers drive and manage their specific compliance management framework and approach
                                  based on leading practices
                                • Extensive communication with business units, suppliers and stakeholders to ensure unique business
                                  requirements are understood and incorporated
                                • Category specific requirements are taken in to account for each given category


                                                                                                                                                                                Presentation Map
Capgemini will leverage the clients existing technology and supplement, as desired, by
our leading on-demand solutions

TRUE PLATFORM PHILOSOPHY – Procurement technology AND procurement services
ON-DEMAND DELIVERY – IBX Smart Cloud | on-demand or hybrid delivery | ISO-certified
READY TO USE – Preconfigured | digitized assets | procurement-ready supplier community
USER-FRIENDLY – Enhanced multi-channel, call-off, end-user interface

                 SOURCE TO CONTRACT

                           SOURCING SUITE                    SAVINGS TRACKER


                      CONTRACT MANAGEMENT                 SUPPLIER PERFORMANCE


                           SPEND ANALYSIS                   PROJECT WORKFLOW




                                           Collect          Prepare                          Analyze &
                 Define Project                                                  Negotiate
                                        Information        Negotiation                        Award




                                                                                                         Presentation Map
Capgemini has broad Category Management experience, globally and in the Australian
market




                                                                            Presentation Map
Appendix




           Presentation Map
Capgemini Credentials in Strategic Sourcing and Category Management (1/4)

    Client                                               Engagement Aim and Approach Overview
             • A Global Strategic Sourcing programme looking at all areas of spend on a global basis, i.e..non-production, production, services and
               outsourced spend. Capgemini’s Strategic Sourcing methodology is being followed, key stages of which are; capability assessment, in
               depth commodity profiling of selected focus areas, sourcing strategy and implementation.

             • Rapid Sourcing Assessment; Segmented and analysed indirect spend. Identified overall value proposition and high opportunity areas.
             • Strategic Sourcing Commodity Pilots (in progress); Employed Capgemini strategic sourcing methodology for five commodity pilots: office
               supplies, travel, temporary labour, small package delivery, computer hardware and cellular phones (~7% of the indirect spend). Includes
               commodity profiling, strategy, demand management policy changes, RFPs/analysis, negotiating strategies, contracting and
               implementation plans.
             • Organization Blueprint; Created a Commodity Sourcing & Procurement vision. Designed CSP organization structure, roles &
               responsibilities, key processes, and a CSP policy.
             • Purchase-to Pay Future State Solution; Designed future state processes for travel, expense and capital purchases that streamlined the
               processes and incorporated the use of enabling e-procurement technologies.
             • Scoped the processes and determined the list of suppliers
             • Analysed the processes and developed improvement initiatives
             • Developed an invitation package to suppliers asking for a partnership relationship based on preferred customers prices and
               improvement initiatives
             • Analysed responses and developed pricing schedule and improvement initiatives
             • Rationalised suppliers, helped negotiate initial savings
             • Developed improvement agenda for future savings
             • Our involvement commenced with initial assessment of client company purchasing organization, process and technology capabilities as
               well as estimating potential savings opportunities across several commodity groups.
             • Strategic Sourcing engagement roll-out commenced with identification and implementation of “Quick Wins” opportunities, followed by
               traditional Commodity Sourcing comprising of direct material commodity groups totaling approximately $ 50 MM in spend and $ 100
               MM in Indirect Spend.
             • Significant change management responsibility was entrusted on Capgemini to manage and communicate new sourcing process as well
               as train and transfer knowledge to their existing personnel. Capgemini also assisted in transforming the organizational structure as well
               as establishing the process to make Procurement as a required core competency for the Client.
             • Capgemini provided methodology, leading practice experience and knowledge, project management and coaching to all cross-functional
               teams involved. The first wave of the project focused on 4 commodity groups, such as Commodity Chemicals, Specialty Chemicals and
               Packaging Materials.



                                                                                                                                                    Presentation Map
Capgemini Credentials in Strategic Sourcing and Category Management (2/4)

    Client                                               Engagement Aim and Approach Overview
             • A Sourcing Assessment was conducted across Europe, Asia and the Americas, reviewing spend, opportunities and the current
               Procurement capability. This culminated in a Capability Development Plan, which included a business case for the implementation of a
               new organisation and supporting infrastructure changes which would be implemented in parallel to several short-term cost reduction
               initiatives.
             • A New Organisation Design was developed based upon the development of organisational design principles, the key Procurement
               processes and the business needs. Fundamental changes include the formation of multi-functional, Sourcing Group Teams which will
               operate above site level and on a regional / global basis; establishment of a Procurement Leadership team; closer integration with the
               New Product Development process; clear reporting lines to the executive and throughout the Procurement organisation; and senior
               executive alignment to key suppliers. This was supported by job profiles, RASI, recruitment processes, detailed resource plans and
               costs, and job evaluation (Hay Assessment).
             • Programme Mobilisation necessitated the mobilisation of multifunctional Sourcing Group Teams across the globe - 22 sourcing
               groups, over 170 full time employees, covering over £1 billion spend. This has been enabled through strong programme management
               covering communications, issue management, benefits tracking and formal reporting.
             • Programme Implementation involved all the sourcing groups in the development of terms of reference, conducted commodity
               profiling, developing sourcing group strategies and implementing initiatives to achieve annual benefits targets. Additional work has also
               been completed to maximise and ensure sustainability of benefits.
             •   Strategic Sourcing Program
             •   Designed and assisted implementation of program
             •   Trained resources in all aspects of required sourcing capabilities
             •   Assisted in delivering cost reductions from negotiation to component standardization to headcount reductions
             •   Developed sourcing vision leveraging Capgemini ASE workshop
             •   Developed and implemented commodity specific sourcing strategies
             •   Assisted with implementation of Component Supplier Management software package
             • The objectives of the Strategic Sourcing Scoping engagement were to:-
                    • identify those categories of indirect spend where a strategic sourcing approach could deliver realisable benefits
                    • quantify the potential scale of those benefits
                    • identify the techniques that could be employed to deliver those benefits
             • Capgemini were engaged to support the Global Purchasing department of this FTSE 100 Life Sciences company in its search to improve
               purchasing effectiveness of indirect spend. The objectives of the Strategic Sourcing Scoping engagement were to:-
                    • identify those categories of indirect spend where a strategic sourcing approach could deliver realisable benefits
                    • quantify the potential scale of those benefits
                    • identify the techniques that could be employed to deliver those benefits

                                                                                                                                                    Presentation Map
Capgemini Credentials in Strategic Sourcing and Category Management (3/4)

    Client                                               Engagement Aim and Approach Overview
             • The engagement covered a turnkey eProcurement implementation in 10 months starting with package selection and business case
               construction through to the e-Enablement of 12 commodity groups across 40+ sites and encompassing 16,000 employees. The
               engagement combined supply chain, change management and package implementation skills to ensure the complete success and
               maximum benefits to Royal and SunAlliance.
             • Reviewed of 10 eProcurement point to point packages, according to the firms global requirements of purchasing goods and services
               resulting in a clear and objective recommendation.
             • Construction of a business case with demonstrable bottom line impact.
             • Implementation of three commodity groups across 5 business sites within 14 weeks as first stage pilot covering over 2,500 employees.
             • Full push/pull integration to SAP R/3 and Lotus Notes.
             • Strategic sourcing across all commodity groups to improve commercial arrangements, rationalise the supply base, standardise
               requirements and implement leading practice supply management techniques.
             • Management of implementation of Ariba across over 40 business sites covering 16,000 employees to ensure on time delivery of
               complete system to Royal and SunAlliance.
             • e-Enablement of 12 commodity groups, including services by end of engagement.
             • First Ariba client in Europe to adopt Ariba Network.
             • A High Level Sourcing Assessment was conducted reviewing spend, commodity suitability characteristics, and key business drivers for
               change. This culminated in a business case for the project and a shortlist of 6 commodities, including castings and plastic mouldings,
               which were then prioritised for implementation
             • Programme Mobilisation necessitated the mobilisation of an internal multifunctional work team, including purchasing, engineering, and
               administrative staff. The internal team, plus all relevant suppliers, were fully trained on the auction tool, the overall reverse auction
               process, and the expectations of all stakeholders.
             • Programme Implementation involved the development of terms of reference, dynamic commerce templates, event strategies, post
               event analysis, and planning to achieve benefits. Specific deliverables included:
                    • supplier search and selection
                    • demand specification
                    • delivery of training programme
                    • development and implementation of event strategies
                    • post auction analysis




                                                                                                                                                    Presentation Map
Capgemini Credentials in Strategic Sourcing and Category Management (4/4)

    Client                                              Engagement Aim and Approach Overview
             • Related to this program, the airline wanted to maintain the culture and spirit of their employees in the midst of change.
             • An initial 10-week study was performed to identify specific recommendations for improvements.
             • Study identified four key areas where improvements would yield significant improvements and cost savings, based on initial process
               analysis and leading practices gap analysis.
             • Included a comprehensive commodity program and process and organizational improvements.
             • The final business cases and improvement portfolio projected savings to be over $8 million in the first year.
             • Capgemini used the recommendations from this study to conduct a 9-month implementation program.

             • A Strategic Sourcing Analysis looking at all areas of expenditure i.e. Programme-specific and Operating expenditure. Capgemini’s
               Strategic Sourcing methodology followed, key stages of which are; capability assessment, in-depth commodity profiling of selected focus
               areas, sourcing strategy and implementation.
             • Capgemini are provided methodology, leading practice experience, knowledge and coaching to the client team involved.
             • The Analysis has focused on 18 commodity groups, such as training provision, telecommunications, travel, print and stationery and IT
               equipment.
             • Quick win opportunities were identified and over £250,000 secured
             • Joint team formed with the client to implement the strategy




                                                                                                                                                  Presentation Map
Contact information




                      Susan Beeston                                        Marjolein
                      Vice President BTC – Business Consulting
                                                                           Dijkshoorn
           Insert     susan.beeston@capgemini.com                 Insert   Senior Consultant/ SCM
          contact     Capgemini                                  contact   marjolein.dijkshoorn@capgemini.com
          picture     7/77 King Street                           picture
                      Sydney, NSW 2000                                     Capgemini
                      Australia                                            7/77 King Street
                                                                           Sydney, NSW 2000
                                                                           Australia




                                                                                                                Presentation Map

Point Of View Category Management v1.0 final

  • 1.
    Category Management Marjolein Dijkshoorn Sydney, October 2012
  • 2.
    Whereas Capgemini supportsclients with the improvement of the entire procurement strategy, organisation, processes and execution, this document will focus solely on category management STRATEGIC Defines procurements prime objectives to Procurement align and support the business strategy. Strategy Development Business alignment through the Procurement Board. Participants executive Governance & Organisation level. Development Category Planning TACTICAL Specific strategies and market approach for Commodity groups covering market and spend profiling, selection and Purchase Supplier switching. The commodity strategy will Demand Sourcing Relationship determine the optimum geographic Management Management approach. Alignment through Multi Functional Teams. Supply Planning & Control Participants functional level (e.g. HR, marketing, IT) Provision of Goods & Services OPERATIONAL The delivery of benefits through a compliant environment based on information, procedures and policies in IT People Knowledge & Information line with the strategy Managing the Enablers Alignment through compliance. Presentation Map
  • 3.
    Category Management isthe management of a specific group of commodities with similar characteristics, with the aim to increase efficiency and realise cost savings Category Management Definition Category Management Benefits “the entire science of the procurement subject applied to 1. Savings. Category Managers can leverage expertise and insight a single genre of expenditure”. into a whole category as a means of driving value from a particular deal. In Category Management products or services that have similar 2. Consolidation of spend. When managing by category, characteristics and are bought from similar supply markets are consolidation opportunities can become apparent as well as well grouped together and treated as a discrete group or category. as opportunities to outsource. These categories are then more manageable from a procurement 3. Internal vs External alignment. It links customer requirements perspective because the items in a category require the same with supply market capabilities. supplier market intelligence, the same sourcing strategies and 4. Team work. It enables the business requirements definition or similar supplier relationship management programmes. specification to be developed so that it delivers best value. Defining your business requirements is a team game in that it The key elements of Category Management include end-to-end identifies both the user requirements and commercial management of the supply chain, acute market awareness, sound expectations. (if not expert) technical knowledge, good SRM and excellent 5. Leverage. It ensures that all relevant spend is included in the stakeholder relationships. Also, an understanding of actual category so that your leverage is maximised. 6. It reduces risk. Creating categories and putting them under the consumer needs – at the other end of the supply chain. proper management of experts enables you to spot any trends or developments that might create a commercial risk and do something to prevent or mitigate it. 7. Clear Responsibilities and Communication. It helps to build good communications across the entire value chain. Category Management gives you the visibility and opportunity to communicate the right message in the right way to the right people to get the result you want. 8. Trust. It builds trust and co-working across all of the value chain. 9. Comprehensiveness. It ensures that many supply options are considered rather than just the obvious one. Presentation Map CIPS Research 2011: State of the art of category management
  • 4.
    Capgemini’s Procurement specialistsand Procurement as a Service™ provide a strong solution to compliment the clients Sourcing organization and Category Management approach CAPGEMINI PROCUREMENT STRATEGIC PROCUREMENT CATEGORY SUPPORT ON-DEMAND PROCUREMENT PLATFORM Strategic services that leverage Capgemini's Spend analysis, category intelligence, event The leading Sourcing and Category unique mix of procurement and industry management and supply risk analysis are the Management solutions to improve efficiency in sector expertise, as well as deep key activities in our category support offering. sourcing process understanding of client needs. The support function of Procurement as a • Spend Analysis Service provides services to the clients retained • eSourcing / event management Acting as an extension of the clients category managers. • Supplier Network procurement organization, Capgemini will • Contract Management perform strategic sourcing and category • Savings tracking management for assigned spend categories. • Project Workflow Strategic Procurement Category Contract Supplier Compliance Content Strategic Sourcing Management Management Relationship Management Management Management Category Support Spend Analysis Category & Market Intelligence Event Factory Supply Risk Analysis Presentation Map
  • 5.
    Today, Capgemini BPOmanages over $12.5B AUD spend with the majority being indirect spend categories. Our knowledge in these categories will enable us to bring acceleration to the clients sourcing process CAPGEMINI CATEGORY TREE 1 2 3 4 5 6 7 8 9 10 11 12 OFFICE FACILITY REAL ESTATE PROFESSIONAL HUMAN IT & COMMUNI- FINANCIAL MARKETING TRAVEL LOGISTICS MRO PRODUCTION MANAGEMENT SERVICES RESOURCES CATION SERVICES EQUIPMENT 1.1 2.1 3.1 4.1 5.1 6.1 7.1 8.1 9.1 10.1 11.1 12.1 Office Supplies Cleaning Services Contractors & Management Recruitment Hardware Banking Services Commercial & Conferences & Air Transportation Spare Parts Material Handling Renovation Consultants Production Print Meetings Equipment 1.2 2.2 3.2 4.2 5.2 6.2 7.2 8.2 9.2 10.2. 11.2 12.2 Furniture Security Rents IT Consultants Training Peripherals Auditing Communication Hotels Road Transportation Hand Tools Production Equipment Consultants 1.3 2.3 3.3 4.3 5.3 6.3 7.3 8.3 9.3 10.3 11.3 12.3 Office Machines Canteen Property Engineering Employee Benefits Software Insurance Media Rental Cars Rail Transportation Protective Gear & Test & Measurement Consultants Clothing Equipment 1.4 2.4 3.4 4.4 5.4 6.4 7.4 8.4 9.4 10.4 11.4 12.99 Subscriptions Electricity Development Legal Services Employee Recognition IT Services P- card Services Events & Exhibitions Train Sea Transportation Lab Supplies Other Capital Consultancies Equipment 1.5 2.5 3.5 4.5 5.5 6.5 7.99 8.5 9.5 10.5 11.5 Literature Water and Waste Brokers Temporary Labor - Fleet Cars Telecom Other Financial Advertising Agencies Travel Management Courier and Small Lubricants Water Admin Services Package Services 1.6 2.6 3.99 4.6 5.6 6.6 8.6 9.6 10.6 11.6 Coffee & Other HVAC Other Real Estate Temporary Labor – Payroll Services Data Com Market Research Air Warehouse - 3rd Air and Gas Vending Skilled Party Space 1.7 2.7 4.99 5.99 6.7 8.7 9.7 10.7 11.7 Paper Waste Management Other Professional Other Human Phones Systems Promotional T&E Card Customs Services Chemicals Services Resources Merchandise 1.99 2.8 6.8 8.8 9.99 10.8 11.8 Other Office Landscaping Services Accessories Sales Services Other Travel Freight Bill Auditing Cutting Tools Services 2.9 Snow Removal 6.99 8.9 10.9 11.99 Services Other IT & Marketing Consultants Storage Systems Other MRO Communications 2.8 8.99 10.99 Mailroom Services Other Other Logistics Marketing 2.99 Other Facility Mgmt/Maintenance Presentation Map
  • 6.
    Strategic Procurement managesspend savings and supplier performance through our global network of category managers as well as local experts Service Delivery Model TRANSACTIONAL DELIVERY HUBS • Activities which require close access to the client, such as stakeholder management, sourcing wave planning, REGIONAL / GLOBAL OFFSHORE CATEGORY SUPPORT and complex category sourcing are DELIVERY DELIVERY MARKET CENTERS INTELLIGENCE performed locally SPEND ANALYSIS • Strategic sourcing and category ENGLISH LANGUAGE EVENT (RFx) FACTORY management activities are performed NEAR-SHORE STRATEGIC GLOBAL onshore / onsite and offshore based on DELIVERY SOURCING PROJECT SOURCING category complexity, stakeholder ENGLISH SOURCING LITE alignment client requirements. Typical LANGUAGE PROJECTS ratio is 50% onshore / 50% offshore • Local delivery is supported by our regional and global category managers who provides sourcing strategy LOCAL DELIVERY expertise ( onsite / onshore) • Category support such as spend analysis CATEGORY SUPPORT LANGUAGE and reporting are performed by local CENTRIC MARKET INTELLIGENCE SPEND ANALYSIS procurement specialist or performed in STAKEHOLDER MGMT ONSIGHT English from India ON-SHORE SOURCING & PROJECT WAVE PLANNING STRATEGIC SOURCING SUPPORTS PROJECT SOURCING OVER 37 SERVICE MANAGEMENT LANGUAGES Presentation Map
  • 7.
    Capgemini takes acomprehensive view of Category Management SP1.0 SP2.0 SP3.0 SP4.0 Procurement Strategy Category Category Category & Planning Planning Development Management 1.1 Assess client environment 2.1 Profile category 3.1 Mobilize 4.1 Manage demand Continuous improvement 1.2 Perform spend analysis 2.2 Create category strategy 3.2 4.2 Manage supply initiative Idea generation & Define, assess initiatives & 1.3 2.3 3.3 Compliance initiative 4.3 Manage savings & compliance opportunity identification prioritize 1.4 Goal & objective setting 3.4 Strategic sourcing initiative 4.4 Manage stakeholders 3.5 Initiative implementation 4.5 Manage risk 4.6 Manage supplier 4.7 Project based sourcing • Spend Profiler • Business Intelligence • eSourcing • Workflow Tools • Spend Profiler • Supplier Positioning • Workflow • Business Intelligence • Business Intelligence • Supply Preferencing • Business Intelligence • SLA and Operational Reporting • Five Forces • Contract Management • Contract Management Workflow and issue resolution infrastructure Intelligence • Category Packs • Category packs • Spend analysis • Cross client processes • Cross-client best practices • Rfx Templates and scenarios • Category intelligence packs • Category specific KPI´s • Supplier listings • Contract templates • Benchmarking • Benchmarking • Supply market intelligence • Quarterly analysis Presentation Map
  • 8.
    Realizing savings andensuring client governance in all initiatives Idea Opportunity Identified Captured Realized Savings Status Strategic Sourcing Profile Create Qualify Source And Implement Contract Assessment Sourcing Sourcing Suppliers Award And Savings Category Strategy Initiative Types Compliance Identify & Develop Stake-holder Monitor Hypothesis Run Compliance Reports Quantify Implement. Implement Buy-in Progress Suppliers Approach Improvement Continuous Quantify & Finalize Validate Need And Stake-holder Monitor Identify Need Validate Recommendat Implement Develop Approach Buy-in Progress Opportunity ion A B C D Council Tollgates Stakeholder agreement on project Stakeholder sign-off on approach and Stakeholder sign-off on Project evaluation and transition to details for development project execution implementation plan and savings on-going maintenance Presentation Map
  • 9.
    Capgemini‘s Spend Analysisprocess creates normalized, enriched data to enable sourcing and supplier optimization analysis Data Extraction & Data Cleansing & Analysis & Reporting Aggregation Classification • Extract data from source systems • Data cleansing , grouping & • Advanced spend reporting & • Load data into Spend Profiler classification analysis • Aggregate and map all data files • Classify transaction data to • Provision of cleansed and • Data validation checkpoint to hierarchy classified data extract ensure accuracy and • Conduct mapping workshops to • Final presentation view of Spend completeness of loaded data review classifications, exceptions, Analysis results and to ensure business accuracy Industrialized and automated process supported by Spend solution Presentation Map
  • 10.
    For industrialized outsourcedcategories, Capgemini maintain a library of category know-how and insight to accelerate benefit delivery and opportunity size Market Characteristics Category Insight Historic Areas of Opportunity High Level Solution Overview session. 1st Presentation Map October 2009
  • 11.
    Category Intelligence ismanaged by a dedicated Knowledge Manager or Procurement Specialist, and is proactively updated as part of the Sourcing Close process Category Tree Excerpt 2 6 FACILITY IT & MANAGEMENT COMMUNICATION 2.1 6.1 Cleaning Services Hardware Category 2.2 6.2 Intelligence Security Computer Peripherals Packs 2.3 6.3 Canteen Software 2.4 6.4 Electricity IT Operations 2.5 6.5 Water and Waste Telecom Water 2.6 Heating 6.6 Data Com Knowledge Leverage Knowledge Harvesting 2.7 6.7 Waste Management Phones & Accessories Profile Create Implement Qualify Source And Sourcing Sourcing Contract Suppliers Award 2.8 6.8 Category Strategy And Savings Mailroom Services Switchboard Hardware Sourcing Initiative 2.99 6.99 Other Facility Other IT & Mgmt/Maintenance Communications Presentation Map
  • 12.
    Category Management andCompliance is used by Capgemini to ensure realized savings and create sustainable improvements Exceptions Compliance Capgemini Category Managers interact with Client Stakeholders to Management Strategy help: I A Reporting & Sourcing • Standardize specification/rationalize items Tracking H B Identify • Measure, manage and improve compliance Ring Capture • Gain earlier involvement in the sourcing and buying process Communicate Policies G Fence C Channel Planning Realize • Build people effectiveness, education programs • Increase efficiencies F D Category Communication E Channel Implementation Content Management Compliance Management Framework 3 to 6+ months based on Category Develop Develop or revise Identify key Design/ Design & deliver Define the performance commodity Create stakeholders Develop training/ sponsorship metrics & procedures & reporting and any implementation communications network for the targets policies to process / impact & communication to key commodity to drive address tools on them Strategy/plan stakeholders behavior compliance • Category managers drive and manage their specific compliance management framework and approach based on leading practices • Extensive communication with business units, suppliers and stakeholders to ensure unique business requirements are understood and incorporated • Category specific requirements are taken in to account for each given category Presentation Map
  • 13.
    Capgemini will leveragethe clients existing technology and supplement, as desired, by our leading on-demand solutions TRUE PLATFORM PHILOSOPHY – Procurement technology AND procurement services ON-DEMAND DELIVERY – IBX Smart Cloud | on-demand or hybrid delivery | ISO-certified READY TO USE – Preconfigured | digitized assets | procurement-ready supplier community USER-FRIENDLY – Enhanced multi-channel, call-off, end-user interface SOURCE TO CONTRACT SOURCING SUITE SAVINGS TRACKER CONTRACT MANAGEMENT SUPPLIER PERFORMANCE SPEND ANALYSIS PROJECT WORKFLOW Collect Prepare Analyze & Define Project Negotiate Information Negotiation Award Presentation Map
  • 14.
    Capgemini has broadCategory Management experience, globally and in the Australian market Presentation Map
  • 15.
    Appendix Presentation Map
  • 16.
    Capgemini Credentials inStrategic Sourcing and Category Management (1/4) Client Engagement Aim and Approach Overview • A Global Strategic Sourcing programme looking at all areas of spend on a global basis, i.e..non-production, production, services and outsourced spend. Capgemini’s Strategic Sourcing methodology is being followed, key stages of which are; capability assessment, in depth commodity profiling of selected focus areas, sourcing strategy and implementation. • Rapid Sourcing Assessment; Segmented and analysed indirect spend. Identified overall value proposition and high opportunity areas. • Strategic Sourcing Commodity Pilots (in progress); Employed Capgemini strategic sourcing methodology for five commodity pilots: office supplies, travel, temporary labour, small package delivery, computer hardware and cellular phones (~7% of the indirect spend). Includes commodity profiling, strategy, demand management policy changes, RFPs/analysis, negotiating strategies, contracting and implementation plans. • Organization Blueprint; Created a Commodity Sourcing & Procurement vision. Designed CSP organization structure, roles & responsibilities, key processes, and a CSP policy. • Purchase-to Pay Future State Solution; Designed future state processes for travel, expense and capital purchases that streamlined the processes and incorporated the use of enabling e-procurement technologies. • Scoped the processes and determined the list of suppliers • Analysed the processes and developed improvement initiatives • Developed an invitation package to suppliers asking for a partnership relationship based on preferred customers prices and improvement initiatives • Analysed responses and developed pricing schedule and improvement initiatives • Rationalised suppliers, helped negotiate initial savings • Developed improvement agenda for future savings • Our involvement commenced with initial assessment of client company purchasing organization, process and technology capabilities as well as estimating potential savings opportunities across several commodity groups. • Strategic Sourcing engagement roll-out commenced with identification and implementation of “Quick Wins” opportunities, followed by traditional Commodity Sourcing comprising of direct material commodity groups totaling approximately $ 50 MM in spend and $ 100 MM in Indirect Spend. • Significant change management responsibility was entrusted on Capgemini to manage and communicate new sourcing process as well as train and transfer knowledge to their existing personnel. Capgemini also assisted in transforming the organizational structure as well as establishing the process to make Procurement as a required core competency for the Client. • Capgemini provided methodology, leading practice experience and knowledge, project management and coaching to all cross-functional teams involved. The first wave of the project focused on 4 commodity groups, such as Commodity Chemicals, Specialty Chemicals and Packaging Materials. Presentation Map
  • 17.
    Capgemini Credentials inStrategic Sourcing and Category Management (2/4) Client Engagement Aim and Approach Overview • A Sourcing Assessment was conducted across Europe, Asia and the Americas, reviewing spend, opportunities and the current Procurement capability. This culminated in a Capability Development Plan, which included a business case for the implementation of a new organisation and supporting infrastructure changes which would be implemented in parallel to several short-term cost reduction initiatives. • A New Organisation Design was developed based upon the development of organisational design principles, the key Procurement processes and the business needs. Fundamental changes include the formation of multi-functional, Sourcing Group Teams which will operate above site level and on a regional / global basis; establishment of a Procurement Leadership team; closer integration with the New Product Development process; clear reporting lines to the executive and throughout the Procurement organisation; and senior executive alignment to key suppliers. This was supported by job profiles, RASI, recruitment processes, detailed resource plans and costs, and job evaluation (Hay Assessment). • Programme Mobilisation necessitated the mobilisation of multifunctional Sourcing Group Teams across the globe - 22 sourcing groups, over 170 full time employees, covering over £1 billion spend. This has been enabled through strong programme management covering communications, issue management, benefits tracking and formal reporting. • Programme Implementation involved all the sourcing groups in the development of terms of reference, conducted commodity profiling, developing sourcing group strategies and implementing initiatives to achieve annual benefits targets. Additional work has also been completed to maximise and ensure sustainability of benefits. • Strategic Sourcing Program • Designed and assisted implementation of program • Trained resources in all aspects of required sourcing capabilities • Assisted in delivering cost reductions from negotiation to component standardization to headcount reductions • Developed sourcing vision leveraging Capgemini ASE workshop • Developed and implemented commodity specific sourcing strategies • Assisted with implementation of Component Supplier Management software package • The objectives of the Strategic Sourcing Scoping engagement were to:- • identify those categories of indirect spend where a strategic sourcing approach could deliver realisable benefits • quantify the potential scale of those benefits • identify the techniques that could be employed to deliver those benefits • Capgemini were engaged to support the Global Purchasing department of this FTSE 100 Life Sciences company in its search to improve purchasing effectiveness of indirect spend. The objectives of the Strategic Sourcing Scoping engagement were to:- • identify those categories of indirect spend where a strategic sourcing approach could deliver realisable benefits • quantify the potential scale of those benefits • identify the techniques that could be employed to deliver those benefits Presentation Map
  • 18.
    Capgemini Credentials inStrategic Sourcing and Category Management (3/4) Client Engagement Aim and Approach Overview • The engagement covered a turnkey eProcurement implementation in 10 months starting with package selection and business case construction through to the e-Enablement of 12 commodity groups across 40+ sites and encompassing 16,000 employees. The engagement combined supply chain, change management and package implementation skills to ensure the complete success and maximum benefits to Royal and SunAlliance. • Reviewed of 10 eProcurement point to point packages, according to the firms global requirements of purchasing goods and services resulting in a clear and objective recommendation. • Construction of a business case with demonstrable bottom line impact. • Implementation of three commodity groups across 5 business sites within 14 weeks as first stage pilot covering over 2,500 employees. • Full push/pull integration to SAP R/3 and Lotus Notes. • Strategic sourcing across all commodity groups to improve commercial arrangements, rationalise the supply base, standardise requirements and implement leading practice supply management techniques. • Management of implementation of Ariba across over 40 business sites covering 16,000 employees to ensure on time delivery of complete system to Royal and SunAlliance. • e-Enablement of 12 commodity groups, including services by end of engagement. • First Ariba client in Europe to adopt Ariba Network. • A High Level Sourcing Assessment was conducted reviewing spend, commodity suitability characteristics, and key business drivers for change. This culminated in a business case for the project and a shortlist of 6 commodities, including castings and plastic mouldings, which were then prioritised for implementation • Programme Mobilisation necessitated the mobilisation of an internal multifunctional work team, including purchasing, engineering, and administrative staff. The internal team, plus all relevant suppliers, were fully trained on the auction tool, the overall reverse auction process, and the expectations of all stakeholders. • Programme Implementation involved the development of terms of reference, dynamic commerce templates, event strategies, post event analysis, and planning to achieve benefits. Specific deliverables included: • supplier search and selection • demand specification • delivery of training programme • development and implementation of event strategies • post auction analysis Presentation Map
  • 19.
    Capgemini Credentials inStrategic Sourcing and Category Management (4/4) Client Engagement Aim and Approach Overview • Related to this program, the airline wanted to maintain the culture and spirit of their employees in the midst of change. • An initial 10-week study was performed to identify specific recommendations for improvements. • Study identified four key areas where improvements would yield significant improvements and cost savings, based on initial process analysis and leading practices gap analysis. • Included a comprehensive commodity program and process and organizational improvements. • The final business cases and improvement portfolio projected savings to be over $8 million in the first year. • Capgemini used the recommendations from this study to conduct a 9-month implementation program. • A Strategic Sourcing Analysis looking at all areas of expenditure i.e. Programme-specific and Operating expenditure. Capgemini’s Strategic Sourcing methodology followed, key stages of which are; capability assessment, in-depth commodity profiling of selected focus areas, sourcing strategy and implementation. • Capgemini are provided methodology, leading practice experience, knowledge and coaching to the client team involved. • The Analysis has focused on 18 commodity groups, such as training provision, telecommunications, travel, print and stationery and IT equipment. • Quick win opportunities were identified and over £250,000 secured • Joint team formed with the client to implement the strategy Presentation Map
  • 20.
    Contact information Susan Beeston Marjolein Vice President BTC – Business Consulting Dijkshoorn Insert susan.beeston@capgemini.com Insert Senior Consultant/ SCM contact Capgemini contact marjolein.dijkshoorn@capgemini.com picture 7/77 King Street picture Sydney, NSW 2000 Capgemini Australia 7/77 King Street Sydney, NSW 2000 Australia Presentation Map

Editor's Notes

  • #8 Colours hard to read, though we like it, readability guidelines
  • #9 Please fix the graphics, as noted
  • #12 Re-design and insert after slides 15-18
  • #14 New slide