1 Write short noteson:
(a) Key project resources: Committing to resources, both financially and contractually, means looking
closely at your budget and the needs of the project. The tighter the budget, the more important it is that
you run a streamlined project, and the more efficiently you'll have to utilize your resources. Your overall
projectresourceswill include:
 How many people you need for the project: This is not necessarily the number of people who
will be involved at any level, but the number of people you will need to get the project
accomplished.
(b)Three mainrequirementsoffundinga project through projectfinance:
 Applicants should have South African citizenship and should be 18 years and above. Applicants
shouldhave a legal statusasadults.There will notbe fundingforadhoc groups.
 The NAC is unlikely to fund the entire budget of the project. Applicants are advised to raise
otherfunding.
 Funding generally granted for mainly the artistic program and applicants must declare all
sourcesof funding.


(c) Medium term financing for projects: Medium Term finance are sources of finance available for the
mid-term of between 3 – 5 years typically used to finance an expansion of a business or to purchase
large fixed assets. It is usually the larger amounts of borrowing or the use of the funds that
differentiates medium sources of finance from short term, although a number of the short term options
are available forthe mid-term.
The annual cost of mediumterm
(d) Bottom up estimation for creating project budget: Bottom up approach is used for creating projects.
By using this approach project management system works properly and this approach is also beneficial
for projectmanagersalso.
These five stepswillsend
2 What isoff take contract? Explainthe various typesof off take contracts.
Answer: An agreement entered between a producer and a buyer to buy/sell a certain amount of the
future production. It is generally negotiated long before the construction of a facility to guarantee a
market for the facility's future production and improve chances of getting financing for the installation
concerned.
These agreements are fairly common in the natural resource sector, where capital costs to extract the
resources are important. They usually include several protective clauses and can take months to
negotiate.
3 Explainthe differentkeyprojectdocuments.
Answer: In Project Management, one of the major responsibilities of the project manager is to keep
proper documentation for the project and to keep the documents up to date. At any point in time
during the life of the project, these documents can be really useful consulting about the various aspects
related to the project. When it comes to managing the project effectively, there are certain
documentation standards that the manager should adhere with. So, for a manager to know which
documents these are and then keeping them and maintaining standards for these holds a lot of
significance.
4 Write short noteson:
(a)Project parties in a construction project: A project cannot proceed without adequate financing, and
the cost of providing adequate financing can be quite large. For these reasons, attention to project
finance is an important aspect of project management. Finance is also a concern to the other
organizations involved in a project such as the general contractor and material suppliers. Unless an
ownerimmediatelyand
(b)Types of working capital: Working capital is classified into different types and the classification is
basedon the followingviews:
 Balance SheetView
 OperatingCycle

(c) Project cash flows: When beginning capital-budgeting analysis, it is important to determine a
project'scash flows.These cashflowscanbe segmentedasfollows:
 Initial Investment Outlay: These are the costs that are needed to start the project, such as new
equipment,installation,etc.
 Operating Cash Flow over a Project's Life: This is the additional cash flow a new project
generates.
 Terminal-Year Cash Flow: This is the final cash flow, both the inflows and outflows, at the end
of the project's life; for example, potential salvage value at the end of a machine's life. Example:
ExpansionProject
(d)Payback period method used to evaluate an investment on a project: Payback method does not
consider the present value of cash flows. Under this method, an investment project is accepted or
rejected on the basis of payback period. Payback period means the period of time that a project requires
recovering the money invested in it. The payback period of a project is expressed in years and is
computedusingthe followingformula:
5 What are the problemsassociated with BOOT projects.
Answer: A BOOT funding model involves a single organisation, or consortium (BOOT provider) designing,
building, funding, owning and operating the scheme for a defined period of time and then transferring
thisownershipacrosstoan agreedparty.
Customers enter into long term supply contracts with the BOOT operator and are charged accordingly
for the service delivered.The service
6 Explainthe differenttypesofmanagementcontracts (a type of PPP).
Answer: PPPs can be categorized into two types: a PPP of a purely contractual nature and a PPP of an
institutional nature.Thiscategorizationisadoptedbythe EuropeanUnionandbymanyothercountries.
In a PPP of a purely contractual nature, the partnership between the public and the private sector is
basedsolelyoncontractual links,
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601

More Related Content

What's hot

Project appraisal for financial markets
Project appraisal for financial marketsProject appraisal for financial markets
Project appraisal for financial markets
karangoyal972
 
Project Financing
Project FinancingProject Financing
Project Financing
khankm
 
A Legal Checklist
A Legal Checklist A Legal Checklist
A Legal Checklist
Sarah Fox
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
MahSobeh
 
Presentationon infrastructure project_finance
Presentationon infrastructure project_financePresentationon infrastructure project_finance
Presentationon infrastructure project_finance
sabinji
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
lucaschinsheng
 
Project finance 3 risks associated with projects & contracts
Project finance 3   risks associated with projects & contractsProject finance 3   risks associated with projects & contracts
Project finance 3 risks associated with projects & contracts
Srinivas Associates
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanRobert Jutson
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
Ind as 23
Ind as 23Ind as 23
Ind as 23
Mohit Goyal
 
Construction Contract Review Checklist
Construction Contract Review ChecklistConstruction Contract Review Checklist
Construction Contract Review Checklist
Sarah Fox
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
Pavitr1203
 
Financial Appraisal
Financial AppraisalFinancial Appraisal
Financial Appraisal
ROXYMAX
 
IAS 11
IAS 11IAS 11
IAS 11RS P
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo
 

What's hot (20)

Project appraisal for financial markets
Project appraisal for financial marketsProject appraisal for financial markets
Project appraisal for financial markets
 
Project Financing
Project FinancingProject Financing
Project Financing
 
A Legal Checklist
A Legal Checklist A Legal Checklist
A Legal Checklist
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Presentationon infrastructure project_finance
Presentationon infrastructure project_financePresentationon infrastructure project_finance
Presentationon infrastructure project_finance
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
 
Project finance 3 risks associated with projects & contracts
Project finance 3   risks associated with projects & contractsProject finance 3   risks associated with projects & contracts
Project finance 3 risks associated with projects & contracts
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
Ind as 23
Ind as 23Ind as 23
Ind as 23
 
Construction Contract Review Checklist
Construction Contract Review ChecklistConstruction Contract Review Checklist
Construction Contract Review Checklist
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
 
Financial Appraisal
Financial AppraisalFinancial Appraisal
Financial Appraisal
 
IAS 11
IAS 11IAS 11
IAS 11
 
Procurement system
Procurement systemProcurement system
Procurement system
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Proj.fin.term+loan
Proj.fin.term+loanProj.fin.term+loan
Proj.fin.term+loan
 
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
 
Akinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 SubmittedAkinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 Submitted
 

Viewers also liked

Présentation salon edu
Présentation salon eduPrésentation salon edu
Présentation salon edu
Etheve David
 
Mf0013 & internal audit & control
Mf0013 & internal audit & controlMf0013 & internal audit & control
Mf0013 & internal audit & control
smumbahelp
 
Tauzeeh Ul-Masail (Fazil Lankrani)
Tauzeeh Ul-Masail  (Fazil Lankrani)Tauzeeh Ul-Masail  (Fazil Lankrani)
Tauzeeh Ul-Masail (Fazil Lankrani)
shia qaum
 
Finale_Pub non nucleare fino al 2012_00
Finale_Pub non nucleare fino al 2012_00Finale_Pub non nucleare fino al 2012_00
Finale_Pub non nucleare fino al 2012_00Fabio Pistella
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
Mu0017 – talent management and employee retention
Mu0017 – talent management and employee retentionMu0017 – talent management and employee retention
Mu0017 – talent management and employee retention
smumbahelp
 
Mr. fateh Sarhan corporate HSE Manager -update cv
Mr. fateh  Sarhan  corporate HSE Manager -update cvMr. fateh  Sarhan  corporate HSE Manager -update cv
Mr. fateh Sarhan corporate HSE Manager -update cv
Fateh Sarhan
 
Sites International - Portfolio 2015
Sites International - Portfolio 2015Sites International - Portfolio 2015
Sites International - Portfolio 2015
Khaled M. Abdel-Gawad
 
Ppt pohon kelapa
Ppt pohon kelapaPpt pohon kelapa
Ppt pohon kelapa
ratna ainun
 
Diapositiva
DiapositivaDiapositiva
Diapositiva
Manuellita-leiva
 
Bibliometric network analysis: Software tools, techniques, and an analysis o...
Bibliometric network analysis: Software tools, techniques, and an analysis o...Bibliometric network analysis: Software tools, techniques, and an analysis o...
Bibliometric network analysis: Software tools, techniques, and an analysis o...
Nees Jan van Eck
 

Viewers also liked (11)

Présentation salon edu
Présentation salon eduPrésentation salon edu
Présentation salon edu
 
Mf0013 & internal audit & control
Mf0013 & internal audit & controlMf0013 & internal audit & control
Mf0013 & internal audit & control
 
Tauzeeh Ul-Masail (Fazil Lankrani)
Tauzeeh Ul-Masail  (Fazil Lankrani)Tauzeeh Ul-Masail  (Fazil Lankrani)
Tauzeeh Ul-Masail (Fazil Lankrani)
 
Finale_Pub non nucleare fino al 2012_00
Finale_Pub non nucleare fino al 2012_00Finale_Pub non nucleare fino al 2012_00
Finale_Pub non nucleare fino al 2012_00
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Mu0017 – talent management and employee retention
Mu0017 – talent management and employee retentionMu0017 – talent management and employee retention
Mu0017 – talent management and employee retention
 
Mr. fateh Sarhan corporate HSE Manager -update cv
Mr. fateh  Sarhan  corporate HSE Manager -update cvMr. fateh  Sarhan  corporate HSE Manager -update cv
Mr. fateh Sarhan corporate HSE Manager -update cv
 
Sites International - Portfolio 2015
Sites International - Portfolio 2015Sites International - Portfolio 2015
Sites International - Portfolio 2015
 
Ppt pohon kelapa
Ppt pohon kelapaPpt pohon kelapa
Ppt pohon kelapa
 
Diapositiva
DiapositivaDiapositiva
Diapositiva
 
Bibliometric network analysis: Software tools, techniques, and an analysis o...
Bibliometric network analysis: Software tools, techniques, and an analysis o...Bibliometric network analysis: Software tools, techniques, and an analysis o...
Bibliometric network analysis: Software tools, techniques, and an analysis o...
 

Similar to Pm0012 project finance and budgeting

Pm0012 – project finance and budgeting
Pm0012 – project finance and budgetingPm0012 – project finance and budgeting
Pm0012 – project finance and budgetingsmumbahelp
 
Dear students get fully solved assignments Send your semester & Specializatio...
Dear students get fully solved assignments Send your semester & Specializatio...Dear students get fully solved assignments Send your semester & Specializatio...
Dear students get fully solved assignments Send your semester & Specializatio...
smumbahelp
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptx
MIANMNADEEM
 
Pm0010 introduction to project management
Pm0010 introduction to project managementPm0010 introduction to project management
Pm0010 introduction to project management
consult4solutions
 
Pm chapter 1
Pm chapter 1Pm chapter 1
Pm chapter 1
Golam Bitonsir
 
340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx
gilbertkpeters11344
 
Pm chapter 1...
Pm chapter 1...Pm chapter 1...
Pm chapter 1...
Golam Bitonsir
 
Pm0012 – project finance and budgeting
Pm0012 –  project finance and budgetingPm0012 –  project finance and budgeting
Pm0012 – project finance and budgetingsmumbahelp
 
Pm0012 project finance and budgeting
Pm0012   project finance and budgetingPm0012   project finance and budgeting
Pm0012 project finance and budgeting
smumbahelp
 
Contractual Steps for Smooth Delivery of Infrastructure Projects
Contractual Steps for Smooth Delivery of Infrastructure ProjectsContractual Steps for Smooth Delivery of Infrastructure Projects
Contractual Steps for Smooth Delivery of Infrastructure Projects
AM Publications
 
Pm 0012 project finance and budgeting
Pm 0012   project finance and budgetingPm 0012   project finance and budgeting
Pm 0012 project finance and budgeting
smumbahelp
 
Pm0012 project finance and budgeting
Pm0012 project finance and budgetingPm0012 project finance and budgeting
Pm0012 project finance and budgeting
consult4solutions
 
financial management
financial management financial management
financial management
harshal patil
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docx
arnoldmeredith47041
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
RudreshSamant
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
smumbahelp
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
Adepitan Oluwasoro, PMP, CSM, MBA
 
UU-Project Chapter 3.pptx
UU-Project Chapter 3.pptxUU-Project Chapter 3.pptx
UU-Project Chapter 3.pptx
KiyaTesfaye2
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignments
smumbahelp
 
Pm0010 summer-2016
Pm0010 summer-2016Pm0010 summer-2016
Pm0010 summer-2016
smumbahelp
 

Similar to Pm0012 project finance and budgeting (20)

Pm0012 – project finance and budgeting
Pm0012 – project finance and budgetingPm0012 – project finance and budgeting
Pm0012 – project finance and budgeting
 
Dear students get fully solved assignments Send your semester & Specializatio...
Dear students get fully solved assignments Send your semester & Specializatio...Dear students get fully solved assignments Send your semester & Specializatio...
Dear students get fully solved assignments Send your semester & Specializatio...
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptx
 
Pm0010 introduction to project management
Pm0010 introduction to project managementPm0010 introduction to project management
Pm0010 introduction to project management
 
Pm chapter 1
Pm chapter 1Pm chapter 1
Pm chapter 1
 
340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx
 
Pm chapter 1...
Pm chapter 1...Pm chapter 1...
Pm chapter 1...
 
Pm0012 – project finance and budgeting
Pm0012 –  project finance and budgetingPm0012 –  project finance and budgeting
Pm0012 – project finance and budgeting
 
Pm0012 project finance and budgeting
Pm0012   project finance and budgetingPm0012   project finance and budgeting
Pm0012 project finance and budgeting
 
Contractual Steps for Smooth Delivery of Infrastructure Projects
Contractual Steps for Smooth Delivery of Infrastructure ProjectsContractual Steps for Smooth Delivery of Infrastructure Projects
Contractual Steps for Smooth Delivery of Infrastructure Projects
 
Pm 0012 project finance and budgeting
Pm 0012   project finance and budgetingPm 0012   project finance and budgeting
Pm 0012 project finance and budgeting
 
Pm0012 project finance and budgeting
Pm0012 project finance and budgetingPm0012 project finance and budgeting
Pm0012 project finance and budgeting
 
financial management
financial management financial management
financial management
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docx
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
UU-Project Chapter 3.pptx
UU-Project Chapter 3.pptxUU-Project Chapter 3.pptx
UU-Project Chapter 3.pptx
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignments
 
Pm0010 summer-2016
Pm0010 summer-2016Pm0010 summer-2016
Pm0010 summer-2016
 

Recently uploaded

CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 

Recently uploaded (20)

CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 

Pm0012 project finance and budgeting

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 Assignment DRIVE FALL 2015 PROGRAM MBADS (SEM 3/SEM 5) MBAFLEX/ MBA (SEM3) PGDPMN(SEM 1) SUBJECT CODE & NAME PM 0012 – PROJECT FINANCEAND BUDGETING BK ID B1938 CREDIT & MARKS 4 CREDITS & 60 MARKS 1 Write short noteson: (a) Key project resources: Committing to resources, both financially and contractually, means looking closely at your budget and the needs of the project. The tighter the budget, the more important it is that you run a streamlined project, and the more efficiently you'll have to utilize your resources. Your overall projectresourceswill include:  How many people you need for the project: This is not necessarily the number of people who will be involved at any level, but the number of people you will need to get the project accomplished. (b)Three mainrequirementsoffundinga project through projectfinance:  Applicants should have South African citizenship and should be 18 years and above. Applicants shouldhave a legal statusasadults.There will notbe fundingforadhoc groups.  The NAC is unlikely to fund the entire budget of the project. Applicants are advised to raise otherfunding.  Funding generally granted for mainly the artistic program and applicants must declare all sourcesof funding.   (c) Medium term financing for projects: Medium Term finance are sources of finance available for the mid-term of between 3 – 5 years typically used to finance an expansion of a business or to purchase
  • 2. large fixed assets. It is usually the larger amounts of borrowing or the use of the funds that differentiates medium sources of finance from short term, although a number of the short term options are available forthe mid-term. The annual cost of mediumterm (d) Bottom up estimation for creating project budget: Bottom up approach is used for creating projects. By using this approach project management system works properly and this approach is also beneficial for projectmanagersalso. These five stepswillsend 2 What isoff take contract? Explainthe various typesof off take contracts. Answer: An agreement entered between a producer and a buyer to buy/sell a certain amount of the future production. It is generally negotiated long before the construction of a facility to guarantee a market for the facility's future production and improve chances of getting financing for the installation concerned. These agreements are fairly common in the natural resource sector, where capital costs to extract the resources are important. They usually include several protective clauses and can take months to negotiate. 3 Explainthe differentkeyprojectdocuments. Answer: In Project Management, one of the major responsibilities of the project manager is to keep proper documentation for the project and to keep the documents up to date. At any point in time during the life of the project, these documents can be really useful consulting about the various aspects related to the project. When it comes to managing the project effectively, there are certain documentation standards that the manager should adhere with. So, for a manager to know which documents these are and then keeping them and maintaining standards for these holds a lot of significance. 4 Write short noteson: (a)Project parties in a construction project: A project cannot proceed without adequate financing, and the cost of providing adequate financing can be quite large. For these reasons, attention to project finance is an important aspect of project management. Finance is also a concern to the other organizations involved in a project such as the general contractor and material suppliers. Unless an ownerimmediatelyand
  • 3. (b)Types of working capital: Working capital is classified into different types and the classification is basedon the followingviews:  Balance SheetView  OperatingCycle  (c) Project cash flows: When beginning capital-budgeting analysis, it is important to determine a project'scash flows.These cashflowscanbe segmentedasfollows:  Initial Investment Outlay: These are the costs that are needed to start the project, such as new equipment,installation,etc.  Operating Cash Flow over a Project's Life: This is the additional cash flow a new project generates.  Terminal-Year Cash Flow: This is the final cash flow, both the inflows and outflows, at the end of the project's life; for example, potential salvage value at the end of a machine's life. Example: ExpansionProject (d)Payback period method used to evaluate an investment on a project: Payback method does not consider the present value of cash flows. Under this method, an investment project is accepted or rejected on the basis of payback period. Payback period means the period of time that a project requires recovering the money invested in it. The payback period of a project is expressed in years and is computedusingthe followingformula: 5 What are the problemsassociated with BOOT projects. Answer: A BOOT funding model involves a single organisation, or consortium (BOOT provider) designing, building, funding, owning and operating the scheme for a defined period of time and then transferring thisownershipacrosstoan agreedparty. Customers enter into long term supply contracts with the BOOT operator and are charged accordingly for the service delivered.The service 6 Explainthe differenttypesofmanagementcontracts (a type of PPP). Answer: PPPs can be categorized into two types: a PPP of a purely contractual nature and a PPP of an institutional nature.Thiscategorizationisadoptedbythe EuropeanUnionandbymanyothercountries. In a PPP of a purely contractual nature, the partnership between the public and the private sector is basedsolelyoncontractual links, Dear students get fully solved assignments Send your semester & Specialization name to our mail id :