This document contains a site plan for a proposed development. It includes labels for various existing and proposed features on the site such as buildings, roads, and landscaped areas. Dimensioned drawings are provided for the ground floor plan and site section. Text on the drawings provides additional information such as floor levels, scales, and dates.
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)Vicky Lee
Methods of Documentation and Measured Drawings (ARC1215) (ARC60305) is a short semester course conducted in Taylor’s University that aims to develop an understanding of the principles of building preservation and the method of recording it in three documentation methods; measured drawings, written documentation and photographic documentation. The ideas of application and management of architectural historic documentation will be presented as part of the overall knowledge of building preservation. For measured drawings, students are to document historically and architecturally significant buildings in the form of as-built drawings. The task requires 10 to 20 students per group depending on the size and complexity of the building to be measured that involve field works consisting measuring technique such as photographing, sketches, use of theodolite and measuring tape. The outcomes of the subject are collections of plans, sections, elevations, details and axonometric views / models; complemented with a report that explains about the background, history, culture architectural style, construction and ornamentation of the given building.
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)Vicky Lee
Methods of Documentation and Measured Drawings (ARC1215) (ARC60305) is a short semester course conducted in Taylor’s University that aims to develop an understanding of the principles of building preservation and the method of recording it in three documentation methods; measured drawings, written documentation and photographic documentation. The ideas of application and management of architectural historic documentation will be presented as part of the overall knowledge of building preservation. For measured drawings, students are to document historically and architecturally significant buildings in the form of as-built drawings. The task requires 10 to 20 students per group depending on the size and complexity of the building to be measured that involve field works consisting measuring technique such as photographing, sketches, use of theodolite and measuring tape. The outcomes of the subject are collections of plans, sections, elevations, details and axonometric views / models; complemented with a report that explains about the background, history, culture architectural style, construction and ornamentation of the given building.
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
Conservation works is the most complex method in restoring the element and facade of the old building. Without conservation, the heritage building cannot long last until the expected age.
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...Angeline KH
Measuring these shop houses for conservation purposes the condition of the shop houses as well as their architectural development are analyzed and recorded.
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
Design and Application of passive fire protection stated in Uniform Building By-Laws of Malaysia. It contains graphical guidance to make the law items easier to comprehend and apply.
Credit to: UTM alumni
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
Conservation works is the most complex method in restoring the element and facade of the old building. Without conservation, the heritage building cannot long last until the expected age.
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...Angeline KH
Measuring these shop houses for conservation purposes the condition of the shop houses as well as their architectural development are analyzed and recorded.
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
Design and Application of passive fire protection stated in Uniform Building By-Laws of Malaysia. It contains graphical guidance to make the law items easier to comprehend and apply.
Credit to: UTM alumni
Coastal homes have a reputation for severe weather. The location that gives you
fantastic views also magnifies the elements such as severe temperatures, sun, salt
and wind day in and day out, wearing down your home’s exterior faster. Impact
products from Integrity Windows and Doors sustain the structural quality of your
home because of Ultrex®, a pultruded fiberglass material that is built to perform.
Ultrex outlasts the competition under normal conditions, but on the coast it leaves
them in the dust. Other materials can corrode and vinyl can distort, crack and
fade in just a handful of years, but durable low-maintenance Ultrex weathers the
harsh coastal conditions and looks fantastic in the sun.
Opendatabay - Open Data Marketplace.pptxOpendatabay
Opendatabay.com unlocks the power of data for everyone. Open Data Marketplace fosters a collaborative hub for data enthusiasts to explore, share, and contribute to a vast collection of datasets.
First ever open hub for data enthusiasts to collaborate and innovate. A platform to explore, share, and contribute to a vast collection of datasets. Through robust quality control and innovative technologies like blockchain verification, opendatabay ensures the authenticity and reliability of datasets, empowering users to make data-driven decisions with confidence. Leverage cutting-edge AI technologies to enhance the data exploration, analysis, and discovery experience.
From intelligent search and recommendations to automated data productisation and quotation, Opendatabay AI-driven features streamline the data workflow. Finding the data you need shouldn't be a complex. Opendatabay simplifies the data acquisition process with an intuitive interface and robust search tools. Effortlessly explore, discover, and access the data you need, allowing you to focus on extracting valuable insights. Opendatabay breaks new ground with a dedicated, AI-generated, synthetic datasets.
Leverage these privacy-preserving datasets for training and testing AI models without compromising sensitive information. Opendatabay prioritizes transparency by providing detailed metadata, provenance information, and usage guidelines for each dataset, ensuring users have a comprehensive understanding of the data they're working with. By leveraging a powerful combination of distributed ledger technology and rigorous third-party audits Opendatabay ensures the authenticity and reliability of every dataset. Security is at the core of Opendatabay. Marketplace implements stringent security measures, including encryption, access controls, and regular vulnerability assessments, to safeguard your data and protect your privacy.
Techniques to optimize the pagerank algorithm usually fall in two categories. One is to try reducing the work per iteration, and the other is to try reducing the number of iterations. These goals are often at odds with one another. Skipping computation on vertices which have already converged has the potential to save iteration time. Skipping in-identical vertices, with the same in-links, helps reduce duplicate computations and thus could help reduce iteration time. Road networks often have chains which can be short-circuited before pagerank computation to improve performance. Final ranks of chain nodes can be easily calculated. This could reduce both the iteration time, and the number of iterations. If a graph has no dangling nodes, pagerank of each strongly connected component can be computed in topological order. This could help reduce the iteration time, no. of iterations, and also enable multi-iteration concurrency in pagerank computation. The combination of all of the above methods is the STICD algorithm. [sticd] For dynamic graphs, unchanged components whose ranks are unaffected can be skipped altogether.
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...pchutichetpong
M Capital Group (“MCG”) expects to see demand and the changing evolution of supply, facilitated through institutional investment rotation out of offices and into work from home (“WFH”), while the ever-expanding need for data storage as global internet usage expands, with experts predicting 5.3 billion users by 2023. These market factors will be underpinned by technological changes, such as progressing cloud services and edge sites, allowing the industry to see strong expected annual growth of 13% over the next 4 years.
Whilst competitive headwinds remain, represented through the recent second bankruptcy filing of Sungard, which blames “COVID-19 and other macroeconomic trends including delayed customer spending decisions, insourcing and reductions in IT spending, energy inflation and reduction in demand for certain services”, the industry has seen key adjustments, where MCG believes that engineering cost management and technological innovation will be paramount to success.
MCG reports that the more favorable market conditions expected over the next few years, helped by the winding down of pandemic restrictions and a hybrid working environment will be driving market momentum forward. The continuous injection of capital by alternative investment firms, as well as the growing infrastructural investment from cloud service providers and social media companies, whose revenues are expected to grow over 3.6x larger by value in 2026, will likely help propel center provision and innovation. These factors paint a promising picture for the industry players that offset rising input costs and adapt to new technologies.
According to M Capital Group: “Specifically, the long-term cost-saving opportunities available from the rise of remote managing will likely aid value growth for the industry. Through margin optimization and further availability of capital for reinvestment, strong players will maintain their competitive foothold, while weaker players exit the market to balance supply and demand.”
1. GRASS FIELD
GUARD
HOUSE
PARKING LOT
GUARD
POST
CARPARK
SEKOLAH TAHFIZ
OIL PALM FIELD
JALANISTANALAMA
EXISTING STRUCTURE
EXISTING ROAD
EXISTING ROAD
OUT
IN
FROM BANTING
EXISTING PLANTATION
EXISTING PLANTATION
OUT
IN
94436
23350
ISTANA
BANDAR
BANTING
PELABUHAN
KLANG
PUCHONG
PULAU
KETAM
PULAU
KELANG
FROM KLIA
(AIRPORT)
LEMBAH KLANG SELATAN HIGHWAY
SELANGOR
STRAIT OF
MALACCA
SHAH ALAMKLANG
SHAH ALAM HIGHWAY
ISTANA BANDAR JUGRA
JALAN KLINIK
JALANISTANALAMA
JALANBANDAR
JALAN TELUK PULAI
BANDAR BANTING
JALAN AIR TAWAR
SUNGAI LANGAT
MASJID SULTAN
ALAE'DDIN
MASJID SULTAN
ALAUDDIN
SEKOLAH KEBANGSAAN BANDAR
FROMBANTING
JALANPUSARA
LORONG WAWASAN
SEKOLAH RENDAH
AGAMA KAMPUNG
BANDAR
JUGRA SPORT
FISHING (JSF)
SEKOLAH TAFIZ
MAKAM DIRAJA KG.
BANDAR
26.2.2015
AS STATED
19.1.2015
JUGRA TEAM
JUGRA TEAM
IBJ-001
1
KEY PLAN
1N NTS
LOCATION PLAN
2N NTS Scale: 1:750
SITE PLAN
3N
74
2. 4370
FFL 00.00
SFL 00.00
GROUND FLOOR
FFL +02.80
SFL +02.80
GROUND FLOOR
RL + 07.17
ROOF
7170
Y Z AA AB AC AD AE AF AGW
5096 4110 5588 2024 10640 5711 4924 5725
49668
2800
5857
540850
750 540
A B C D E F G H I J K L M
4450 3950 3950 3950 3950 3950 6100 3425 3425
3050 3050 1825 1600 1600 1825
37150
7474
6937
93762
GUARD ROOM
SEC
SITE
SEC
SITE
KEY PLAN
Scale: 1:750
0 2 4 6 8 100
SITE SECTION
1
IBJ-002
2
74
3. W12
W14
W14
W14
W14
W14
W15
W15
W15
W15 W15 W15
W15W15W15
W15
W15
W15
W16
W16
W16
W16
W16
W17
W16
W17
W18 W18 W18 W18
W18
D28
D29
D27
D22
D25
D22
D26
D24
D25
D18
D18
D23
D32
D33
D28
D21
D20D20
D19
D20
D20
D31
D18
D21D21D21
D28
D18
D18
D18
W15 W15
D33
W13
W1
W2c W2d
W2a W2b W3a
W3b
W3c
W3c
W4a W4a
W4c
W4b W4a
D1
D2
D3
D2
D3
D3
D3
D5
D4 D4
W4c
W5a
W5b
D5
D6a
D6b
D7a
D7a
D7a
D6c
D7b
D7b
D7b
D7b
D8
D8
W5c
W5d
PORCH
FFL=+0.02
THRONE ROOM 1
FFL=+0.10
FFL=0.00
ROOM
3.3m x 3.2mCOURTYARD
FFL=0.00
8.2m x 5.7m
ROOM
TOILET
CHAMBER
4.8m x 3.4m
CORRIDOR
FFL=+0.1013.2m x 4.1m
12.8m x 7.5m
OFFICE
4.6m x 3.7m
FOYER
4.6m x 3.6m
CHAMBER
3.3m x 3.2m
3.6m x 3.1m
3.3m x 3.1m
4.8m x 5.8m
4.3m x 3.6m
4.3m x 3.6m
ROYAL BANQUET ROOM
W1
D5
S
X2
S
X3
S
X4
S
X7
S
X1
S
X5
S
X8
S
Y2
S
S
Y2
LANDSCAPE
LANDSCAPE
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C13
C15
C18
C19
C20
C25
C8
C8
C8
C8
C8
C8
C25
C25
C25
C8
C19
C2
C25
C9 C9 C9
C9 C20C9 C9 C9
C7 C9
C9
C2 C6
C6C2 C6
C10
C15
C6
C6
C6
C6
C18 C6 C6
C6 C6 C5
C5
C1
C1
C1
C13
C13C13
C3
C4
C4
C4
C15
C15
C5
C25
S
X6
CHAMBER
CHAMBER OFFICE
4.6m x 3.7m
FOYER
4.6m x 3.6m
COURTYARD
FFL=0.00
8.2m x 5.7m
CHAMBER
4.8m x 3.4m
ROOM
3.3m x 3.2m
S
Y1
S
Y1
Y3
28
25
24
21
20
17
15
12
11
10
9
7
5
2
1
R T W X AA AD AE AF AGO Q S U V Y Z AB AC
3
4
6
8
13
14
16
18
19
22
23
26
27
29
30
31
A B C D E F G H I J K L M N P
36004900340049003600
36033899522938733558
4413445750822607
139075926
82863575
3642
35753575357562062234
396539753905
70866
4450 3955 3950 3950 3950 3950 3050 3050 1825 1600 1600 1825 3826 3650 5096 4110 5588 10640 5711 4924 5725
5376 3610 7325 3710 1755 3930 5459 64572797
2024 5857
94304
S
X2
S
X3
S
X4
S
X7
S
X1
S
X5
S
X8
S
X6
S
Y3
C27 C27
C28C28C28
C28 C28 C28
C28 C28
C28
C28 C28 C28 C28
C28
C28
C28
c28
C28
C28
C28
C28
C28 C28 C28
C28
C28
C28
C28
C28C28
C29 C29
C29 C29
C29 C29
C29 C29
C30
C30C30
C30
C30 C30
C31C31
C32
c32
C32 C33
C32
C32
C33C33
C32
C32
C32
C32
C32
C33
C33
C34
C34 C34
C34
C34
C34
C35
C34
C34 C34
C34 C34
C34
C35
C35
C35
C34
C34
C34
C34
c32
c32
c32 c32
C36 C36
C36 C36
C36
C36
C36
C36
C36
C36 C36
C37 C37 C36
C37
C37 C37
C37
C37 C37
C37 C37
C36
C36
c36
c36
C38 C38
C38 C38
C38
C38
C38
C39
C38
C40
C40
C40
C40
C39
c38
C38
C38
C38
C39
C39
c41
C42 C42 C42 C42 C42
c43c43
C43 C43
C43 C43
C43 C43
C44
C44
C44
C44
C44
C26
C26
C26
C26
S
X9
S
X9
INACCESSIBLE
INACCESSIBLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
3.9m x 14.3m
PLATFORM
3.9m x 14.3m
PLATFORM
WALKWAY 3.92m x 6.30m
PLATFORM
WAITING ROOM
FFL = +0.10
4.2m x 4.7m
ASSEMBLY HALL
16m x 20m
FFL = +0.14
ELECTRIC
LANDING
FFL = +0.73
WALKWAY
FFL = +0.05
WALKWAY
FFL = +0.10
CENTER COURT
FFL = +0.16
COURT
FFL = +0.24
CORRIDOR
FFL = +0.13
LANDING
FFL = +0.79
KITCHEN
4.3m x 14m
STOREROOM
2.2m x 2.4m
ROYAL FAMILY AREA
4.7m x 5.7m
ROYAL BEDROOM
5.6m x 3.6m
INTERMEDIATE AREA
3.6m x 5.3m
ROYAL ROOM
5.0m x 5.3m
ROYAL BEDROOM
3.6m x 5.3m
LANDING
FFL = +0.76
WALKWAY
FFL = +0.18
TURFING
3.0m x 6.4m
FFL = -0.05
TURFING
3.0m x 15m
FFL = -0.05
GUARD
ROOM
TOILET
TURFING
4.8m x 4.3m
FFL = -0.05
5.8m x 9.3m
ROOM
10m x 3.3m
TOILET
2.7m x 3.5m
TURFING
4.8m x 4.3m
FFL = -0.05
WALKWAY
FFL = +0.10
CARPARK
22m x 16m
ROYAL BATH
(MALE)
ROYAL BATH
(FEMALE)
WATER
FEATURE
WATER
FEATURE
TURFING
20m x 6.9m
TURFING
13m x 28m
FFL = -0.13
FFL = - 0.13
PRISON
2.5m x 2.0m
PRISON
2.5m x 2.0m
MANHOLE
D30
D33 D33 D33 D33 D33
D30
TURFING
2.8m x 12.2m
WATER
FEATURE
PLATFORM
3.5m x 12m
26.2.2015
1:200
19.1.2015
JUGRA TEAM
JUGRA TEAM
IBJ-003
3
75
00 2 4 6 8 10 M
COMBINED GROUND FLOOR
1
4. X6
S
X6
S
Y2
S
Y1
X8
S
X8
S
X5
S
X1
S
X7
S
X4
S
X3
S
X2
S
X5
S
X1
S
X7
S
X4
S
X3
S
X2
S
W6
W6
W7
W7 W7
W7 W8a
W8b
W8a
W8a W8a
W8a
W9
W10W11
D10
D11
D11
D12 D12
D12
D13
D13
D16
D14
D15
D17
D17
W9
W8a
D12
D10
D12
W8a
D9
BALCONY
FFL=+3.60 FFL=+3.57 12.9m x 4.8m
CHAMBER
6.5m x 3.3m
13.2m x 4.2m
FOYER
4.7m x 3.7m
BED ROOM
BED ROOM
7.6m x 3.0m BED ROOM
3.8m x 3.3m
RESTING ROOM
6.5m x 3.3m
FFL=+3.12
4.7m x 3.8m
15.7m x 6.3m
CORRIDOR
D15
C16
C17
C21
C22
C24
C21
C13
C22 C22
C24
C17
C14
C5
C5
C5
C5
C22
C22 C22
C23
C23
C11 C14
C12
C12
C47
C47 C47
C47
C16
C14
C14
C13
BALCONY
BALCONY
BED ROOM
7.6m x 3.0m
BED ROOM
4.7m x 3.8m
FOYER
4.7m x 3.7m
C11
S
C13
C14
C14
C13
W21
W21
W21
W21
W21 W21
W21
W21
W21
W21
W22 W22
W22
W21
W21
W21
W22
W19W19
W22
W21
W21
D33
D28 D28
C45
C45
C45
C45
C46
C46
C46 C46
C28
C28
C28
C28
C28
C28
C28
C28C28
C28
C28
C28
C28
C28C28
C28 C28 C28 C28 C28
C28C28
C28
C28
S
X9
S
X9
LANDING
FFL = +2.49
ASSEMBLY HALL
16m x 20m
FFL = +2.49
4.1m x 4.6m
INACCESSIBLE
INACCESSIBLE
INACCESSIBLE
S
Y1
D24
W9
W9
M2
M2
M1
ROOM
4.2m x 5.5m
ROOM
2.5m x 3m
ROOM
2.4m x 2.7m
W24
W23
W24W24
S
Y2
S
Y1
28
25
24
21
20
17
15
12
11
10
9
7
5
2
1
R T W X AA AD AE AF AGO Q S U V Y Z AB AC
3
4
6
8
13
14
16
18
19
22
23
26
27
29
30
31
A B C D E F G H I J K L M N P
36004900340049003600
36033899522938733558
4413445750822607
139075926
82863575
3642
35753575357562062234
396539753905
70866
4450 3955 3950 3950 3950 3950 3050 3050 1825 1600 1600 1825 3826 3650 5096 4110 5588 10640 5711 4924 5725
5376 3610 7325 3710 1755 3930 5459 64572797
2024 5857
94304
S
Y3
C44
C44
C44
C44
26.2.2015
1:200
19.1.2015
JUGRA TEAM
JUGRA TEAM
00 2 4 6 8 10M
COMBINED FIRST FLOOR
1
IBJ-004
4
74
5. A B C D E F G H I J K L M
W1
W2c W2d
W2a W2b W3a
W3b
W3c
W3c
W4a W4a
W4c
W4b W4a
D1
D2
D3
D2
D3
D3
D3
D4 D4
W4c
W5a
W5b
D6a
D6b
D7a
D7a
D7a
D6c
D7b
D7b
D7b
D7b
D8
D8
W5c
W5d
PORCH
FFL=+0.02
THRONE ROOM 1
FFL=+0.10
S
X2
S
X3
S
X4
S
X7
S
X1
S
X5
S
Y1
FFL=0.00
ROOM
3.3m x 3.2mCOURTYARD
FFL=0.00
8.2m x 5.7m
ROOM
CHAMBER
4.8m x 3.4m
CORRIDOR
FFL=+0.1013.2m x 4.1m
12.8m x 7.5m
OFFICE
4.6m x 3.7m
FOYER
4.6m x 3.6m
CHAMBER
3.3m x 3.2m
3.6m x 3.1m
3.3m x 3.1m
4.8m x 5.8m
4.3m x 3.6m
4.3m x 3.6m
ROYAL BANQUET ROOM
W1
D5
4450 3950 3950 3950 3950 3950 6100 3425 3425
3050 3050 1825 1600 1600 1825
37150
20400
360060003600
49003400490036003600
S
X2
S
X3
S
X4
S
X7
S
X1
S
X5
S
X8
S
X8
S
Y2
S
Y1
S
Y2
TURFING
LANDSCAPE
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C47
C15
C18
C19
C20
C25
C8
C8
C8
C8
C8
C8
C25
C25
C25
C8
C19
C2
C25
C9 C9 C9
C9 C20C9 C9 C9
C7 C9
C9
C2 C6
C6C2 C6
C10
C15
C6
C6
C6
C6
C18 C6 C6
C6 C6 C5
C5
C1
C1
C1
C47
C47C47
C3
C4
C4
C4
C15
C15
C5
C25
S
X6
S
X6
CHAMBER
CHAMBER OFFICE
4.6m x 3.7m
FOYER
4.6m x 3.6m
COURTYARD
FFL=0.00
8.2m x 5.7m
CHAMBER
4.8m x 3.4m
ROOM
3.3m x 3.2m3.9m x 14.3m
PLATFORM
3.9m x 14.3m
PLATFORM
WALKWAY 3.92m x 6.30m
PLATFORM
12
15
17
20
21
24
25
28
TOILET
D5
D5
26.2.2015
1:100
19.1.2015
JUGRA TEAM
JUGRA TEAM
IBJ-005
5
LEGEND
74
00 1 2 3 4 5 m
GROUND FLOOR
A
6. W12
W14
W14
W14
W14
W14
W15
W15
W15
W15 W15 W15
W15W15W15
W15
W15
W15
W16
W16
W16
W16
W16
W17
W16
W17
D28
D29
D27
D22
D25
D22
D26
D24
D25
D33
D28
D21
D20D20
D19
D20
D20
D31
D21D21D21
D28
W15 W15
D33
W13
D7b
D7b
D7b
D7b
W5c
W5d
S
Y2
S
S
Y2
C1
C5
C1
C1
C1
Y3
R T W X AA AD AE AF AGY Z AB AC
13
14
16
18
19
22
23
26
27
29
30
31
M N P
36033899522938733558
4413445750822607
137515926
39839
3826 3650 5096 4110 5588 10640 5711 4924 5725
5376 3610 7325 3710 1755 3930 5459 64572797
2024 5857
57149
S
Y3
C27 C27
C28C28C28
C28 C28 C28
C28 C28
C28
C28 C28 C28 C28
C28
C28
C28
c28
C28
C28
C28
C28
C28 C28 C28
C28
C28
C28
C28
C28C28
C29 C29
C29 C29
C29 C29
C29 C29
C30
C30C30
C30
C30 C30
C31C31
C32
c32
C32 C33
C32
C32
C33C33
C32
C32
C32
C32
C32
C33
C33
C34
C34 C34
C34
C34
C34
C35
C34
C34 C34
C34 C34
C34
C35
C35
C35
C34
C34
C34
C34
c32
c32
c32 c32
C36 C36
C26
C26
C26
C26
S
X9
S
X9
WAITING ROOM
FFL = +0.10
4.2m x 4.7m
ASSEMBLY HALL
16m x 20m
FFL = +0.14
ELECTRIC
LANDING
FFL = +0.73
WALKWAY
FFL = +0.05
LANDING
FFL = +0.79
STOREROOM
2.2m x 2.4m
ROYAL FAMILY AREA
4.7m x 5.7m
ROYAL BEDROOM
5.6m x 3.6m
INTERMEDIATE AREA
3.6m x 5.3m
ROYAL ROOM
5.0m x 5.3m
ROYAL BEDROOM
3.6m x 5.3m
LANDING
FFL = +0.76
WALKWAY
FFL = +0.18
TURFING
3.0m x 6.4m
FFL = -0.05
TURFING
3.0m x 15m
FFL = -0.05
GUARD
ROOM
TOILET
TURFING
4.8m x 4.3m
FFL = -0.05
5.8m x 9.3m
ROOM
TURFING
4.8m x 4.3m
FFL = -0.05
WALKWAY
FFL = +0.10
ROYAL BATH
(MALE)
ROYAL BATH
(FEMALE)
WATER
FEATURE
FFL = - 0.13
WATER
FEATURE
26.2.2015
1:100
19.1.2015
JUGRA TEAM
JUGRA TEAM
IBJ-006
6
74
GROUND FLOOR
B
LEGEND
00 1 2 3 4 5M
7. 11
10
9
7
5
2
1
O Q S U V Y Z AB AC
3
4
6
8
M
82863575
3642
35753575357562062234
396539753905
31027
5376 23127 6457
5376 3610 7325 3710 39302797
5459
40419
S
X9
S
X9
1755
W14
W18 W18 W18 W18
W18
D18
D18
D23
D32
D18
D18
D18
D18
W13
c32
C36 C36
C36 C36
C36
C36
C36
C36
C36
C36 C36
C37 C37 C36
C37
C37 C37
C37
C37 C37
C37 C37
C36
C36
c36
c36
C38 C38
C38 C38
C38
C38
C38
C39
C38
C40
C40
C40
C40
C39
c38
C38
C38
C38
C39
C39
C42 C42 C42 C42 C42
c43c43
C43 C43
C43 C43
C43 C43
C44
C44
C44
C44
C44
INACCESSIBLE
INACCESSIBLE
MANHOLE
MANHOLE
MANHOLE
MANHOLE
WALKWAY
FFL = +0.10
CENTER COURT
FFL = +0.16
COURT
FFL = +0.24
CORRIDOR
FFL = +0.13
KITCHEN
4.3m x 14m
10m x 3.3m
TOILET
2.7m x 3.5m
CARPARK
22m x 16m
WATER
FEATURE
TURFING
20m x 6.9m
TURFING
13m x 28m
FFL = -0.13
PRISON
2.5m x 2.0m
PRISON
2.5m x 2.0m
MANHOLE
D30
D33 D33 D33 D33 D33
D30
TURFING
2.8m x 12.2m
PLATFORM
3.5m x 12m
13
c32
26.2.2015
1:100
19.1.2015
JUGRA TEAM
JUGRA TEAM
LEGEND
IBJ-007
7
74
GROUND FLOOR
C 00 1 2 3 4 5M
8. A B C D E F G H I J K L M
4450 3950 3950 3950 3950 3950 6100 3425 3425
3050 3050 1825 1600 1600 1825
37150
20400
360060003600
49003400490036003600
X6
S
X6
S
Y2
S
Y1
Y2
S
X8
S
X8
S
X5
S
X1
S
X7
S
X4
S
X3
S
X2
S
Y1
S
X5
S
X1
S
X7
S
X4
S
X3
S
X2
S
W6
W6
W7
W7 W7
W7 W8a
W8b
W8a
W8a W8a
W8a
W9
W9
W9
W10W11
D10
D11
D11
D12 D12
D12
D13
D13
D16
D14
D15
D17
D17
W9
W8a
D12
D10
D12
W8a
D9
BALCONY
FFL=+3.60 FFL=+3.57 12.9m x 4.8m
CHAMBER
6.5m x 3.3m
13.2m x 4.2m
FOYER
4.7m x 3.7m
BED ROOM
BED ROOM
7.6m x 3.0m BED ROOM
3.8m x 3.3m
RESTING ROOM
6.5m x 3.3m
FFL=+3.12
4.7m x 3.8m
15.7m x 6.3m
CORRIDOR
D15
C16
C17
C21
C22
C24
C21
C13
C22 C22
C24
C17
C14
C5
C5
C5
C5
C22
C22 C22
C23
C23
C11 C14
C12
C12
C47
C47 C47
C47
C16
C14
C14
C13
BALCONY
BALCONY
BED ROOM
7.6m x 3.0m
BED ROOM
4.7m x 3.8m
FOYER
4.7m x 3.7m
C11
S
12
15
17
20
21
24
25
28
C13
C14
C14
C13
M2
M2
C44
C44
C44
26.2.2015
1:100
19.1.2015
JUGRA TEAM
JUGRA TEAM
LEGEND
IBJ-008
8
74
00 1 2 3 4 5 m
FIRST FLOOR
A
9. W9
W9
W21
W21
W21
W21
W21 W21
W21
W21
W21
W21
W22 W22
W22
W21
W21
W21
W22
W19W19
W22
W21
W21
D33
D28 D28
C45
C45
C45
C45
C46
C46
C46 C46
C28
C28
C28
C28
C28
C28
C28
C28C28
C28
C28
C28
C28
C28C28
C28 C28 C28 C28 C28
C28C28
C28
C28
M
LANDING
FFL = +2.49
ASSEMBLY HALL
16m x 20m
FFL = +2.49
4.1m x 4.6m
INACCESSIBLE
D24
W9
W9
C14a
C14a
ROOM
4.2m x 5.5m
ROOM
2.5m x 3m
ROOM
2.4m x 2.7m
W24
W23
W24W24
S
S
Y2
Y3
S
X9
S
X9
R T W X AA AD AE AF AGN P
3826 3650 5096 4110 5588 10640 5711 4924 5725
5376 3610 7325 3710 1755 3930 5459 64572797
2024 5857
57149
S
Y2
28
25
24
21
20
17
15
12
13
14
16
18
19
22
23
26
27
29
30
31
36004900340049003600
36033899522938733558
4413445750822607
139075926
40233
S
Y3
26.2.2015
1:100
19.1.2015
JUGRA TEAM
JUGRA TEAM
IBJ-009
9
74
FIRST FLOOR
B
LEGEND
00 1 2 3 4 5M
10. X8
S
W21 W21
S
X9
INACCESSIBLE
INACCESSIBLE
12
11
10
9
7
5
2
1
O Q S U V Y Z AB AC
3
4
6
8
M
82863575
3642
35753575357562062234
396539753905
30633
5376 19197 6457
3610 7325 3710 1755 3930 5459 64572797
9389
40419
26.2.2015
1:100
19.1.2015
JUGRA TEAM
JUGRA TEAM
LEGEND
IBJ-010
10
74
FIRST FLOOR
C 00 1 2 3 4 5M