PRESSURES FROM THE ENVIRONMENT ARE PUSHING
COMPANIES TO CONSTANTLY MOVE AND ADJUST
3
Volatility Changes are happening fast and are unpredictable
Uncertainty
The five-year strategic plan has gone through, it is impossible to
know whether the 12-month plan will be viable
Complexity
The company is an open system where the interdependencies
between players are numerous and complex
Ambiguity
The certainty of the result of large investments gives way to
experimentation and rapid iteration
End of cycles
Business models change to more innovative, more open-ended
models that offer more value to customers
Selfhood
Someone want to be recognized for what he/she is, and to exist
in a group whose raison d'être and purpose he/she shares
TIME OF DIGITAL DARWINISM
4
• Technologies are changing consumer
behaviors and expectations, forcing more
and more companies to adapt
• Business decision-makers face a paradox:
technologies are part of the problem and part
of the solution
• Decision-makers focus their adaptation on
technologies, while the phenomenon is more
complex
TECHNOLOGIES’ IMPACTS
AS SEEN THROUGH THE SEISMOGRAM ANGLE
5
AT THE ORIGIN OF THE SHOCKS
THE EMERGENCE OF NEW TECHNOLOGIES
6
Technology
introduction
Disruptive
technology
introduction
SHOCKS CAN BE MEASURED ON 2 AXES
7
Intensity
Propagation
A SHOCK WILL IMPACT 5 DOMAINS
8
Propagation
Job done
Activities of
the business
Social Economic Political Cultural
Values &
beliefs
Intensity
Job done
Activities of
the business
Social Economic Political Cultural
Values &
beliefs
Intensity
WHEN THE SHOCK WAVE STRIKES THE CULTURE
IT SPREADS RAPIDLY IN THE OPPOSITE DIRECTION, SWEEPING IN
ITS PATH ANYTHING THAT HAS NOT ADAPTED
9
Propagation
10
Humans Strategy
Process Technologies
Tangible
Intangible
HUMANS ARE AT THE CENTER OF STAKES AND OPPORTUNITIES
MORE THAN 50% OF TRANSFORMATION PROJECTS FAIL BECAUSE OF HUMANS
Guidance in the transformation journey is necessary
11
OUR MISSION
PÖL facilitates transformation and increases the performance of
individuals and companies through conferences, workshops,
coaching, and trainings in innovation, leadership and strategy,
based on lean & agile values and practices.
FOUNDATIONS OF BUSINESS AGILITY
12
Vision
Collaboration Anticipation
Fast
Cost-effective
Value creation driven
Total satisfaction
Iterations
13
THE AGILE ENTERPRISE
The Agile Enterprise is a group of persons who anticipate and
dynamically adjust to the ongoing changes in the environment in
order to reach a common goal for which the purpose is shared.
ORGANIZATIONAL AGILITY
Execution Agility
(Implementation)
Capacity to deliver more value
within projects and operations at
a faster pace and the lowest
possible cost
Strategy Agility
(Directions)
Capacity to change directions
and reallocate resources fast to
seize the right opportunities
Leadership Agility
(Culture)
Capacity to apply the right
behaviors with the right mindset
at the right time to be aligned
with the demand of an ever-
changing environment
« The Agile
Enterprise is a group
of people who
anticipate and
dynamically adjust to
the ongoing changes
in the environment in
order to reach a
common goal for
which the meaning is
shared ».
- J. Barrand, Author
The Agile Enterprise, 2010
14
TOTAL HUMAN PERFORMANCE
«In a world where
decisions are
increasingly taken
by algorithms, there
is an urgent need to
grow human
performance for
mankind to remain
master of its
destiny».
- F. Moreau, Agile Facilitator
2016
4 domains of human performance to master - based on the FACE model by agil’OA
To Be
Life skills
& attitude
To Do
Knowledge
& technical skills
Act together
Collective
behaviors
& mindset
Context
Understand & adjust to your
ever-changing environment
Be a lifelong student
Be true to yourself
Be an anthropologist
Be a team player
15
MAIN POINTS OF IMPROVEMENT
OF THE PERFORMANCE WE ARE DEALING WITH
16
Leadership
• Unlock humans in operations or projects
• Clarify / simplify roles and responsibilities
• Align collaboration principles
• Specify cooperation frameworks
• Increase cohesion
• Develop autonomy
• Bring more organizational structure
• Developing individual and collective trust
Strategy
• Contextualization / environment analysis
• Alignment of vision
• Quick-wins & quick-fix
• Strengthening performance measures
• Strategic backlog prioritization
• Master planning
• Planning and agile management of
innovation projects
• Budgetary alignment
4 AREAS OF INTERVENTION
17
Strategy
Leadership
Innovation
Our programs are scalable
based on the stage of
development of the client
company and what it needs
Agility starter
AGILITY STARTER PROGRAMS
• Often the starting point of our mandates
• Provides alignment with vision, priorities for improvement and modalities of
cooperation
• Easily identifies the underlying levers of business performance development
• Can "save" a project or a team going through difficult times
18
Agility Starter
for a Team
Agility Starter for
Executive Board
Agile Project
Management
• Contextualization of the team
• Strategic Alignment
• Identification of "quick-wins" for
cooperation
• Assessment of individual
development needs
• Creating a collective action plan
• Contextualization of the
company
• Strategic Alignment
• Identification of "quick-wins" of
management cooperation
• Assessment of individual
development needs
• Creating a collective action plan
• Facilitation of project teams in
agile mode (Scrum or Kanban)
• Supervision of the agile coach to
optimize its interventions in the
context specific to each
company and each team
LEADERSHIP PROGRAMS
• The goal is to grow managerial skills as well as the autonomy of the team
• Our programs cover internal leadership that activates each person's
internal triggers, as well as external leadership, which focuses on improving
people’s capacity to cooperate, anticipate, and innovate together
19
External Agile Leadership
Coaching
Internal Agile Leadership
Coaching
• Initial personal coaching following the Agility Starter
workshop
• Identification of internal levers to activate or grow
• Assessment of personal development needs
• Personal coaching - tailor-made programs according
to individual needs
• Follow-up of the collective actions defined during
the Agility Starter workshop
• Evaluation of the development needs of the team
• Integration of the agile leadership model in the
organization and management practice of teams
• Team coaching - tailor-made programs according to
the needs of the team
STRATEGY PROGRAMS
• The goal is to strengthen the position of the company in its market
• Allows to define and refine the business model and the strategy of an
enterprise according to its stage of development and its needs
• Facilitates or complements ad hoc actions requiring specialized expertise
20
Navigator
Strategy
Agile Strategy Master Plan Ad-hoc programs
• Strategic alignment
workshop addressing 4
pillars (vision, forces,
hindrances, direction)
• Identification of market
opportunities
• Production of a strategic
agenda
• Strategic alignment
workshop for the 4 key
areas of a strategy
including 40
components (business
model, market analysis,
strategy, performance
plan)
• Production of a strategic
actions backlog
• Formulation of a master
plan based on the
elements resulting from
the agile strategy
• Production of a
communication
document for employees
and the market
• Marketing
• Sales
• Data analysis and
dashboards
• Project planning
• Project management
INNOVATION PROGRAMS
• The goal is to ensure the best chance of success for your innovation initiatives
• Programs are based on the lean and agile techniques of incubation and
acceleration of silicon valley
21
Customer
development
Business
Modeling
Validation Propulsion
• Search for the market
problem and the
solution opportunity
• Definition of the first
characteristics of the
product / service
• Design thinking
workshop
• Business model
workshop to produce
business assumptions
and hypothesis to
validate, using the
Business Model canvas
framework
• MVP Prototyping
• Traction measurement
• MVP finalization
• Product deployment
and launch plan
• Performance
Measurement
• Refocusing and
iterations following
results
2016 CASE STUDIES
•National Bank of Canada
Agility starter for a group of 19 vice-presidents on a strategic project aimed at changing the mode
of cooperation in the company. Strategic alignment, team alignement, definition of the next action.
•BDC - Business Development Bank
Facilitation program to design of a new service offering for its 35,000 clients. Support in defining a
program to achieve the goal, facilitating workshop meetings and aligning the vision, facilitating and
contributing to the activities strategic planing and leadership transformation.
•Emergensys
Agility Starter workshop with the delivery department of the company. Individual and collective
coaching to transform the leadership of the company as well as collaboration methods to
accelerate and improve client delivery
•Canada Council for the Arts (VUCAVU.ca project)
Facilitation for the definition of the strategic plan and the business plan of a new media art
distribution platform, agility starter workshop of the management team, support in the recruitment
of a first operational team
22
SOME TOOLS AND METHODS
23
THE 1/10TH BUSINESS SCOPING PRINCIPLE
SCALE DOWN TO SCALE UP
Return on investment and value creation are
at the core of our mandates. In order to
ensure the best return on investment, we
design our programs according to the 1/10th
principle.
It’s a 3-step process.
- We identify your opportunity and we
measure it before launching a pilot program
on 1/10th of this total opportunity
- We measure the results and learn lessons to
improve the next iteration
- We renew the optimized program on a
second 10th of your opportunity.We reiterate
this process until you get your best ROI
24
Seizable
Opportunity
1/10th of the
opportunity
1/10th as an
investissement
PRODUCE YOUR BUSINESS STRATEGY IN LESS THAN 3 HOURS
WITH THE CRYSTAL DYNAMIC METHODOLOGY
This unique approach provides a fast and
reliable way to define, diagnose or align the
strategy of a company or a project.
Originally designed with technology start-up
entrepreneurs, this methodology is now used
in different industries in North America,
Europe, and India.
It includes the production of 4 canvas to
obtain an holistic view of your company and
its priority action plan:
- Business model footprint
- Analysis of the market environment
- Agile strategies
- Financial Performance Plan
25
TURNING LEADERSHIP STYLE INTO AGILE
USING THE AGILE PROFILE® FRAMEWORK
AN AGIL’OA METHODOLOGY
We believe that in a turbulent economic environment the
future belongs to the most agile organizations and leaders.
The Agile profile® tool and methodology makes it possible
to measure, analyze and increase the level of agility of a
group of collaborators.The objective is to increase the
performance of the company by aligning the behaviors of
managers and the company's culture with the demand of its
environment.
The model suggests that a leader must apply three main
behaviors in the current economic environment:
- Anticipate: anticipate changes, plan, make scenarios, and
anticipate the consequences of actions
- Cooperate: coordinating activities by applying a "win-win"
approach, satisfying others and nurturing a sense of purpose
- Innovate: improve things, make a difference and change just
what needs to be changed at the right time
26
THANKYOU FORYOUR INTEREST
• Frederic Moreau, PÖL Digital
Montréal, QC, Canada
Cell. +1 514 503-3357 - fred@poldigital.com
ca.linkedin.com/in/fredericmoreau/
www.poldigital.com
• Stay up-to-date with PÖL
Twitter : @frederic_moreau
Facebook : facebook.com/poldigital
Slide share : http://fr.slideshare.net/frederic0moreau
27

PÖL Digital Service Offerings

  • 1.
    FACILITATING INNOVATION, LEADERSHIP& STRATEGY The Agile Enterprise Enabled • Montréal •
  • 2.
    @frederic_moreau 2 Agile facilitator andcoach, I increase the performance of people and companies in a turbulent world through workshop, coaching, conference, and training in #innovation, #leadership and #strategy.
  • 3.
    PRESSURES FROM THEENVIRONMENT ARE PUSHING COMPANIES TO CONSTANTLY MOVE AND ADJUST 3 Volatility Changes are happening fast and are unpredictable Uncertainty The five-year strategic plan has gone through, it is impossible to know whether the 12-month plan will be viable Complexity The company is an open system where the interdependencies between players are numerous and complex Ambiguity The certainty of the result of large investments gives way to experimentation and rapid iteration End of cycles Business models change to more innovative, more open-ended models that offer more value to customers Selfhood Someone want to be recognized for what he/she is, and to exist in a group whose raison d'être and purpose he/she shares
  • 4.
    TIME OF DIGITALDARWINISM 4 • Technologies are changing consumer behaviors and expectations, forcing more and more companies to adapt • Business decision-makers face a paradox: technologies are part of the problem and part of the solution • Decision-makers focus their adaptation on technologies, while the phenomenon is more complex
  • 5.
    TECHNOLOGIES’ IMPACTS AS SEENTHROUGH THE SEISMOGRAM ANGLE 5
  • 6.
    AT THE ORIGINOF THE SHOCKS THE EMERGENCE OF NEW TECHNOLOGIES 6 Technology introduction Disruptive technology introduction
  • 7.
    SHOCKS CAN BEMEASURED ON 2 AXES 7 Intensity Propagation
  • 8.
    A SHOCK WILLIMPACT 5 DOMAINS 8 Propagation Job done Activities of the business Social Economic Political Cultural Values & beliefs Intensity
  • 9.
    Job done Activities of thebusiness Social Economic Political Cultural Values & beliefs Intensity WHEN THE SHOCK WAVE STRIKES THE CULTURE IT SPREADS RAPIDLY IN THE OPPOSITE DIRECTION, SWEEPING IN ITS PATH ANYTHING THAT HAS NOT ADAPTED 9 Propagation
  • 10.
    10 Humans Strategy Process Technologies Tangible Intangible HUMANSARE AT THE CENTER OF STAKES AND OPPORTUNITIES MORE THAN 50% OF TRANSFORMATION PROJECTS FAIL BECAUSE OF HUMANS Guidance in the transformation journey is necessary
  • 11.
    11 OUR MISSION PÖL facilitatestransformation and increases the performance of individuals and companies through conferences, workshops, coaching, and trainings in innovation, leadership and strategy, based on lean & agile values and practices.
  • 12.
    FOUNDATIONS OF BUSINESSAGILITY 12 Vision Collaboration Anticipation Fast Cost-effective Value creation driven Total satisfaction Iterations
  • 13.
    13 THE AGILE ENTERPRISE TheAgile Enterprise is a group of persons who anticipate and dynamically adjust to the ongoing changes in the environment in order to reach a common goal for which the purpose is shared.
  • 14.
    ORGANIZATIONAL AGILITY Execution Agility (Implementation) Capacityto deliver more value within projects and operations at a faster pace and the lowest possible cost Strategy Agility (Directions) Capacity to change directions and reallocate resources fast to seize the right opportunities Leadership Agility (Culture) Capacity to apply the right behaviors with the right mindset at the right time to be aligned with the demand of an ever- changing environment « The Agile Enterprise is a group of people who anticipate and dynamically adjust to the ongoing changes in the environment in order to reach a common goal for which the meaning is shared ». - J. Barrand, Author The Agile Enterprise, 2010 14
  • 15.
    TOTAL HUMAN PERFORMANCE «Ina world where decisions are increasingly taken by algorithms, there is an urgent need to grow human performance for mankind to remain master of its destiny». - F. Moreau, Agile Facilitator 2016 4 domains of human performance to master - based on the FACE model by agil’OA To Be Life skills & attitude To Do Knowledge & technical skills Act together Collective behaviors & mindset Context Understand & adjust to your ever-changing environment Be a lifelong student Be true to yourself Be an anthropologist Be a team player 15
  • 16.
    MAIN POINTS OFIMPROVEMENT OF THE PERFORMANCE WE ARE DEALING WITH 16 Leadership • Unlock humans in operations or projects • Clarify / simplify roles and responsibilities • Align collaboration principles • Specify cooperation frameworks • Increase cohesion • Develop autonomy • Bring more organizational structure • Developing individual and collective trust Strategy • Contextualization / environment analysis • Alignment of vision • Quick-wins & quick-fix • Strengthening performance measures • Strategic backlog prioritization • Master planning • Planning and agile management of innovation projects • Budgetary alignment
  • 17.
    4 AREAS OFINTERVENTION 17 Strategy Leadership Innovation Our programs are scalable based on the stage of development of the client company and what it needs Agility starter
  • 18.
    AGILITY STARTER PROGRAMS •Often the starting point of our mandates • Provides alignment with vision, priorities for improvement and modalities of cooperation • Easily identifies the underlying levers of business performance development • Can "save" a project or a team going through difficult times 18 Agility Starter for a Team Agility Starter for Executive Board Agile Project Management • Contextualization of the team • Strategic Alignment • Identification of "quick-wins" for cooperation • Assessment of individual development needs • Creating a collective action plan • Contextualization of the company • Strategic Alignment • Identification of "quick-wins" of management cooperation • Assessment of individual development needs • Creating a collective action plan • Facilitation of project teams in agile mode (Scrum or Kanban) • Supervision of the agile coach to optimize its interventions in the context specific to each company and each team
  • 19.
    LEADERSHIP PROGRAMS • Thegoal is to grow managerial skills as well as the autonomy of the team • Our programs cover internal leadership that activates each person's internal triggers, as well as external leadership, which focuses on improving people’s capacity to cooperate, anticipate, and innovate together 19 External Agile Leadership Coaching Internal Agile Leadership Coaching • Initial personal coaching following the Agility Starter workshop • Identification of internal levers to activate or grow • Assessment of personal development needs • Personal coaching - tailor-made programs according to individual needs • Follow-up of the collective actions defined during the Agility Starter workshop • Evaluation of the development needs of the team • Integration of the agile leadership model in the organization and management practice of teams • Team coaching - tailor-made programs according to the needs of the team
  • 20.
    STRATEGY PROGRAMS • Thegoal is to strengthen the position of the company in its market • Allows to define and refine the business model and the strategy of an enterprise according to its stage of development and its needs • Facilitates or complements ad hoc actions requiring specialized expertise 20 Navigator Strategy Agile Strategy Master Plan Ad-hoc programs • Strategic alignment workshop addressing 4 pillars (vision, forces, hindrances, direction) • Identification of market opportunities • Production of a strategic agenda • Strategic alignment workshop for the 4 key areas of a strategy including 40 components (business model, market analysis, strategy, performance plan) • Production of a strategic actions backlog • Formulation of a master plan based on the elements resulting from the agile strategy • Production of a communication document for employees and the market • Marketing • Sales • Data analysis and dashboards • Project planning • Project management
  • 21.
    INNOVATION PROGRAMS • Thegoal is to ensure the best chance of success for your innovation initiatives • Programs are based on the lean and agile techniques of incubation and acceleration of silicon valley 21 Customer development Business Modeling Validation Propulsion • Search for the market problem and the solution opportunity • Definition of the first characteristics of the product / service • Design thinking workshop • Business model workshop to produce business assumptions and hypothesis to validate, using the Business Model canvas framework • MVP Prototyping • Traction measurement • MVP finalization • Product deployment and launch plan • Performance Measurement • Refocusing and iterations following results
  • 22.
    2016 CASE STUDIES •NationalBank of Canada Agility starter for a group of 19 vice-presidents on a strategic project aimed at changing the mode of cooperation in the company. Strategic alignment, team alignement, definition of the next action. •BDC - Business Development Bank Facilitation program to design of a new service offering for its 35,000 clients. Support in defining a program to achieve the goal, facilitating workshop meetings and aligning the vision, facilitating and contributing to the activities strategic planing and leadership transformation. •Emergensys Agility Starter workshop with the delivery department of the company. Individual and collective coaching to transform the leadership of the company as well as collaboration methods to accelerate and improve client delivery •Canada Council for the Arts (VUCAVU.ca project) Facilitation for the definition of the strategic plan and the business plan of a new media art distribution platform, agility starter workshop of the management team, support in the recruitment of a first operational team 22
  • 23.
    SOME TOOLS ANDMETHODS 23
  • 24.
    THE 1/10TH BUSINESSSCOPING PRINCIPLE SCALE DOWN TO SCALE UP Return on investment and value creation are at the core of our mandates. In order to ensure the best return on investment, we design our programs according to the 1/10th principle. It’s a 3-step process. - We identify your opportunity and we measure it before launching a pilot program on 1/10th of this total opportunity - We measure the results and learn lessons to improve the next iteration - We renew the optimized program on a second 10th of your opportunity.We reiterate this process until you get your best ROI 24 Seizable Opportunity 1/10th of the opportunity 1/10th as an investissement
  • 25.
    PRODUCE YOUR BUSINESSSTRATEGY IN LESS THAN 3 HOURS WITH THE CRYSTAL DYNAMIC METHODOLOGY This unique approach provides a fast and reliable way to define, diagnose or align the strategy of a company or a project. Originally designed with technology start-up entrepreneurs, this methodology is now used in different industries in North America, Europe, and India. It includes the production of 4 canvas to obtain an holistic view of your company and its priority action plan: - Business model footprint - Analysis of the market environment - Agile strategies - Financial Performance Plan 25
  • 26.
    TURNING LEADERSHIP STYLEINTO AGILE USING THE AGILE PROFILE® FRAMEWORK AN AGIL’OA METHODOLOGY We believe that in a turbulent economic environment the future belongs to the most agile organizations and leaders. The Agile profile® tool and methodology makes it possible to measure, analyze and increase the level of agility of a group of collaborators.The objective is to increase the performance of the company by aligning the behaviors of managers and the company's culture with the demand of its environment. The model suggests that a leader must apply three main behaviors in the current economic environment: - Anticipate: anticipate changes, plan, make scenarios, and anticipate the consequences of actions - Cooperate: coordinating activities by applying a "win-win" approach, satisfying others and nurturing a sense of purpose - Innovate: improve things, make a difference and change just what needs to be changed at the right time 26
  • 27.
    THANKYOU FORYOUR INTEREST •Frederic Moreau, PÖL Digital Montréal, QC, Canada Cell. +1 514 503-3357 - fred@poldigital.com ca.linkedin.com/in/fredericmoreau/ www.poldigital.com • Stay up-to-date with PÖL Twitter : @frederic_moreau Facebook : facebook.com/poldigital Slide share : http://fr.slideshare.net/frederic0moreau 27