SlideShare a Scribd company logo
MATHEW PETER MORRISON
Home Phone: 604-466-3160
Cell Phone: 604-341-9575
E-MAIL: mpeterm o@gmail.com
PROFILE
Peter Morrison has 25 plus years of construction, project and operations management experience
including project management, construction management, scheduling, contract
development/administration/control, management reporting, procurement/material control, cost
analysis, estimating, manufacturing resource planning, and hardware/software system design. Projects
include the development, upgrading and relocation of petroleum mining/upgrading facilities, mining and
mineral processing facilities, the operation of heavy industrial plants, and commercial properties.
WORK HISTORY
M IDWEST CONSTRUCTORS (SUPREM E GROUP OF COM PANIES),
FORT M CM URRAY, AB
(via 1612137 Alberta Ltd.)
2013 - 2015
Construction/Site Manger, installing buildings and modules for Trains 3 &
4 expansion, and expanding the existing f lotation and pipe rack structures
on Trains 1 & 2. Directly responsible for the construction installation of
f our structural buildings, the installation of piping and electrical modules,
the installation of six new flotation cells, agitators, motors, and piping.
Directly involved and responsible on two projects f rom aw ard, site
development, resource loading, schedule review and implementation,
crane management, HSE program, materials program, contract
management, quality control, reporting and close out. Developed,
review ed and revised schedules to mitigate delivery delays of the client
supplied materials. Developed mitigation strategies directly with the client,
scoped/costed and implemented changes to the contract. Also managed
subcontractors and their schedules to ensure the on time completion of
the project. Directly managed all site staff and client representatives
through to successful project completions.
AM EC/IMPERIAL OIL LTD., FORT M CMURRAY, AB
(via 1612137 Alberta Ltd.)
2012 - 2013
Construction Lead on the Aurora Mine Relocation Project. Area positions
held over the duration of the project include Civil Lead for nights,
Construction Lead for the Process Warm Water Pump house and
Construction Lead for the Fort Hills site during the relocation and
reinstallation phase of the relocation of Trains 2 and 3 at the Aurora Mine
Site. Directly responsible to the Project Construction Lead coordinating
various site coordinators and contractors through their work scopes,
w orking with them to dir ect their efforts to maintaining a safe work
environment, completion of their work on schedule and the delivery of a
quality installation.
ENBRIDGE PIPELINES INC., EDM ONTON, AB
(via 1612137 Alberta Ltd.)
2011 - 2012
Project Consultant on various pipeline projects directly responsible to the
Project Director and Project Controls Manager f or the coordination of
stakeholder works, project controls activities including estimating,
scheduling, cost control, design control, gating process, risk
management, hiring, systems setup, project reporting, and administration.
MATHEW PETER MORRISON
Home Phone: 604-466-3160
Cell Phone: 604-341-9575
E-MAIL: mpeterm o@gmail.com
PARK DEROCHIE COATINGS LTD., EDM ONTON, AB 2008 - 2010
Manger of Coatings Division, directly responsible f or the management of
w orks and personnel of shop and field operations. Also responsible f or
ongoing development of the management systems utilized in the
execution of projects. Areas of responsibility include d business
development, staff planning, construction planning, constructability
review s, f acility and equipment planning, hiring and negotiating rates and
assignment terms with the clients. Duties also included client relations,
contract negotiation, management and project/manage ment reporting.
HATCH LTD., VANCOUVER, BC 2008
Director of Construction, directly responsible for the development of the
construction management department in the Vancouver office. Areas of
responsibility included business and staff planning, construction planning,
constructability reviews, f acility and equipment planning, hiring and
negotiating rates and assignment terms with the client. Duties also
included set up and construction management of the start up phase of the
Endako Expansion Project.
HATCH LTD., VANCOUVER, BC 2007
Project Controls Manager, directly responsible for the development of the
controls team and implementation of corporate systems in the Vancouver
of f ice. Areas of responsibility included planning, estimating, procurement,
contracts, cost control, and engineering control, with a staff of 25. Duties
also included client relations, project planning/execution, staff
planning/training, and project/management reporting.
M UTUAL CONSTRUCTION (2000) LTD., VANCOUVER, BC 2005 - 2006
Operations Manager, directly responsible f or the execution and
administration of all Mutual Construction civil and industrial projects.
Managed all corporate field resources including up to 80 personnel,
equipment, materials and subcontractors. Duties include d client
relations, project planning/execution, staff planning/training, equipment
planning, supervision of project staff and management reporting.
LPD CONTRACTORS INC./SYNCRUDE CANADA LTD., FORT
M CMURRAY, AB
(via Gold Coast P&D Co. Ltd.)
2004 - 2005
Site Project Manager, directly responsible for the development, execution
and administration of LPD Contractors Inc.’s site wide f ireproofing
contract with a peak personnel level of 285 people and over 700K work
f orce hours. Duties included client relations, project planning/execution,
staf f planning/training, equipment planning, supervision of project staff,
coordination and development of scope re-estimate, contract re-
development, and management reporting.
JACOBS CANADA/SYNCRUDE CANADA LTD., FORT MCMURRAY, AB
(via Gold Coast P&D Co. Ltd.)
2003
Contracts Administrator and Materials Manager , directly responsible for
the development, execution and administration control of JACOBS’
MATHEW PETER MORRISON
Home Phone: 604-466-3160
Cell Phone: 604-341-9575
E-MAIL: mpeterm o@gmail.com
subcontractors and change management system with the UE-1 Project
Management team. Duties included contract control from request for
proposal development to contract close out, coordination of material
requirements and delivery with Syncrude operations, control of all field
procurement, including the development and closing of all requests for
quotations of major equipment and f acilities, and supervision of material
coordination staff.
COLT ENGINEERING/SHELL CANADA LTD., EDM ONTON, AB
(via Gold Coast P&D Co. Ltd.)
2001 - 2002
Cost Control Supervisor , directly responsible for the cost control and
change management system on the joint venture EPCM contract for the
Athabasca Oilsands Dow nstream Project – Scotford Modifications. Duties
included cost engineering of definitive estimate to control budget, c ontrol
and analysis supervision of cost control team, management reporting and
perf orming project/client-specific analyses.
TECK COM INCO, RED DOG, AK 2000 - 2001
Contract Administration and Cost Control Lead, directly responsible for
the contract administration/cost analysis, and project administration on
the EPCM contract for modifications to the Red Dog mine site in Northern
Alaska. Duties included cost control and analysis, project contracts
development and administration, developing and implementing
administrative controls, and performing project/ client-specific analyses.
SOUTHERN PERU COPPER CORP., CUAJONE, PERU 1998 - 2000
Cost Engineer, directly responsible f or the cost system
development/implementation, cost control/forecasting, cost reporting,
relief scheduling, contract administration development and
implementation f or the installation of the river diversion tunnel, dam and
pipeline at the Caujone mine in Peru. Duties included cost control and
analysis, project scheduling, contract administration, developing and
implementing technical document control, and performing project/client-
specific analyses.
TECK COM INCO, RED DOG, AK 1996 - 1998
Project Controls Lead, directly responsible for the contract
administration/cost analysis, scheduling, technical document control, f ield
procurement and project administration on the EPCM contract for
modif ications to the Red Dog port site on the Chukchi Sea. Duties
included cost control and analysis, project scheduling, contracts
administration, f ield procurement, developing and implementing
administrative controls, and performing project/ client-specific analyses.
TECK COM INCO, TRAIL METALLURGICAL COMPLEX, TRAIL, BC 1995 - 1996
Cost Analyst/Planner, responsible for scheduling and maintaining capital
cost EPCM project reporting and analysis, performing cost control and
analysis, control of project change management system, expediting major
MATHEW PETER MORRISON
Home Phone: 604-466-3160
Cell Phone: 604-341-9575
E-MAIL: mpeterm o@gmail.com
(50K+) purchase orders, liaising between the engineering disciplines,
construction, project and client management, preparing the project
contribution worksheet, and developing and implementing project/client
specific cost reporting and analysis functions.
COM INCO ENGINEERING SERVICES LTD., TRAIL, BC 1990 - 1992
Estimator/Labour Analyst/Planner, responsible f or estimating, scheduling
and maintaining EPCM capital projects, performing material and labour
analysis, and developing and implementing project/client specific cost
reporting and analysis functions.
GOLD COAST P&D CO. LTD., PORT MOODY, BC 1994 - 1995
Ow ner/General Manager, responsible for marketing the company,
developing multi-market pricing, estimating, purchasing, managing, and
supervising all projects in general contracting/painting and decorating
f ield.
DGS CONSTRUCTION LTD., SURREY, BC 1992 - 1994
Carpenter/Foreman, responsible for relief supervision, perfor ming all
aspects of carpentry, and assisting subcontractors.
WEDGE CLAM P INTERNATIONAL, RICHMOND, BC 1989 - 1990
Manager, Manufacturing Systems responsible for managing the
implementation of MRP II systems, documenting and revising
manuf acturing processes, methods, procedures, and standards,
controlling inventory for local and f oreign warehouses, and sourcing and
purchasing materials/equipment. Manufacturing Systems Consultant
responsible for assessing and documenting production and inventory
systems, researching alternative production systems, selecting and
negotiating purchase of Expandable MRP II sof tware, and other required
computer hardware and accessories, and preparing existing production
systems for conversion to Expandable MRP II.
EDUCATION/QUALIFICATIONS
 Diploma in Netw ork & Internet Support Specialist – Windows 2000, CDI College, 2003
 Diploma in Operations Management Technology, BCIT, BC, 1989
 Various Project Management courses including “In house”, Stanford University, etc

More Related Content

What's hot

Resume
ResumeResume
cv2017rvs - Copy
cv2017rvs - Copycv2017rvs - Copy
cv2017rvs - Copy
Roman Victor A. Santos RMP
 
_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015
Mark Maudsley
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
Zeonn Koh
 
Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18
Ken Bossung
 
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
Khalid Alismail
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
Ahmad Majdalawi
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume Master
Greg Krall
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
Harry Dutreix
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
Mohamed Youssry
 
Johns resume
Johns resumeJohns resume
Johns resume
John De Rivera
 
2015 CV
2015 CV 2015 CV
2015 CV
Jamal Monte
 
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
Francisco Cortez
 
Resume Gp
Resume GpResume Gp
Resume Gp
gabrielpuerta
 
CV updated February 2017
CV updated  February 2017CV updated  February 2017
CV updated February 2017
Mostafa Kamel Mohamed El Zeiny
 
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
svandegrift
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
Sam Marino
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
Erfan Farooqui
 

What's hot (19)

Resume
ResumeResume
Resume
 
cv2017rvs - Copy
cv2017rvs - Copycv2017rvs - Copy
cv2017rvs - Copy
 
_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18
 
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume Master
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Johns resume
Johns resumeJohns resume
Johns resume
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
CV updated February 2017
CV updated  February 2017CV updated  February 2017
CV updated February 2017
 
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 

Viewers also liked

Poster William
Poster WilliamPoster William
карта мышления
карта мышлениякарта мышления
карта мышленияkirovaevgenia
 
Nagaraja Naik - Resume 105805
Nagaraja Naik - Resume 105805Nagaraja Naik - Resume 105805
Nagaraja Naik - Resume 105805
Nagaraja Naik
 
карта мышления
карта мышлениякарта мышления
карта мышленияkirovaevgenia
 
Managing health reform through an economic downturn
Managing health reform through an economic downturnManaging health reform through an economic downturn
Managing health reform through an economic downturn
Nuffield Trust
 
Onderwijstijd: neem de ruimte!
Onderwijstijd: neem de ruimte!Onderwijstijd: neem de ruimte!
Onderwijstijd: neem de ruimte!
servicepuntihks
 
Examens voor keuzedelen: kip of ei?
Examens voor keuzedelen: kip of ei?Examens voor keuzedelen: kip of ei?
Examens voor keuzedelen: kip of ei?
servicepuntihks
 
Mamma mia proabastos
Mamma mia proabastosMamma mia proabastos
Mamma mia proabastos
reina
 

Viewers also liked (8)

Poster William
Poster WilliamPoster William
Poster William
 
карта мышления
карта мышлениякарта мышления
карта мышления
 
Nagaraja Naik - Resume 105805
Nagaraja Naik - Resume 105805Nagaraja Naik - Resume 105805
Nagaraja Naik - Resume 105805
 
карта мышления
карта мышлениякарта мышления
карта мышления
 
Managing health reform through an economic downturn
Managing health reform through an economic downturnManaging health reform through an economic downturn
Managing health reform through an economic downturn
 
Onderwijstijd: neem de ruimte!
Onderwijstijd: neem de ruimte!Onderwijstijd: neem de ruimte!
Onderwijstijd: neem de ruimte!
 
Examens voor keuzedelen: kip of ei?
Examens voor keuzedelen: kip of ei?Examens voor keuzedelen: kip of ei?
Examens voor keuzedelen: kip of ei?
 
Mamma mia proabastos
Mamma mia proabastosMamma mia proabastos
Mamma mia proabastos
 

Similar to Peter Morrison Resume Sept 2015

Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
Roger Berryment
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
Alistair Howson
 
Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 Resume
John Hartman
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
Philip Kwiatkowski
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
Jim McGowan
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
Jack Oldrin
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
Klaus Kucyk
 
CM Resume
CM Resume CM Resume
CM Resume
MARK BECKET
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
Chris Perry
 
API 510 RESUME
API 510 RESUMEAPI 510 RESUME
API 510 RESUME
Jason Evans
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
ivan fletcher
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
Buenaventura Andal
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
pramod patel
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpine
Penny McAlpine
 
resume of suresh
resume of sureshresume of suresh
resume of suresh
koti Suresh_Koti123
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper
 
Bill resume
Bill resumeBill resume
Bill resume
Awili Bill
 
Resume Rev A 3-22-16
Resume Rev A 3-22-16Resume Rev A 3-22-16
Resume Rev A 3-22-16
Michael Fletcher
 
Resume
ResumeResume
Resume
Prasanth k
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
Tomy Pappu
 

Similar to Peter Morrison Resume Sept 2015 (20)

Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 Resume
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
CM Resume
CM Resume CM Resume
CM Resume
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
 
API 510 RESUME
API 510 RESUMEAPI 510 RESUME
API 510 RESUME
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpine
 
resume of suresh
resume of sureshresume of suresh
resume of suresh
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 
Bill resume
Bill resumeBill resume
Bill resume
 
Resume Rev A 3-22-16
Resume Rev A 3-22-16Resume Rev A 3-22-16
Resume Rev A 3-22-16
 
Resume
ResumeResume
Resume
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 

Peter Morrison Resume Sept 2015

  • 1. MATHEW PETER MORRISON Home Phone: 604-466-3160 Cell Phone: 604-341-9575 E-MAIL: mpeterm o@gmail.com PROFILE Peter Morrison has 25 plus years of construction, project and operations management experience including project management, construction management, scheduling, contract development/administration/control, management reporting, procurement/material control, cost analysis, estimating, manufacturing resource planning, and hardware/software system design. Projects include the development, upgrading and relocation of petroleum mining/upgrading facilities, mining and mineral processing facilities, the operation of heavy industrial plants, and commercial properties. WORK HISTORY M IDWEST CONSTRUCTORS (SUPREM E GROUP OF COM PANIES), FORT M CM URRAY, AB (via 1612137 Alberta Ltd.) 2013 - 2015 Construction/Site Manger, installing buildings and modules for Trains 3 & 4 expansion, and expanding the existing f lotation and pipe rack structures on Trains 1 & 2. Directly responsible for the construction installation of f our structural buildings, the installation of piping and electrical modules, the installation of six new flotation cells, agitators, motors, and piping. Directly involved and responsible on two projects f rom aw ard, site development, resource loading, schedule review and implementation, crane management, HSE program, materials program, contract management, quality control, reporting and close out. Developed, review ed and revised schedules to mitigate delivery delays of the client supplied materials. Developed mitigation strategies directly with the client, scoped/costed and implemented changes to the contract. Also managed subcontractors and their schedules to ensure the on time completion of the project. Directly managed all site staff and client representatives through to successful project completions. AM EC/IMPERIAL OIL LTD., FORT M CMURRAY, AB (via 1612137 Alberta Ltd.) 2012 - 2013 Construction Lead on the Aurora Mine Relocation Project. Area positions held over the duration of the project include Civil Lead for nights, Construction Lead for the Process Warm Water Pump house and Construction Lead for the Fort Hills site during the relocation and reinstallation phase of the relocation of Trains 2 and 3 at the Aurora Mine Site. Directly responsible to the Project Construction Lead coordinating various site coordinators and contractors through their work scopes, w orking with them to dir ect their efforts to maintaining a safe work environment, completion of their work on schedule and the delivery of a quality installation. ENBRIDGE PIPELINES INC., EDM ONTON, AB (via 1612137 Alberta Ltd.) 2011 - 2012 Project Consultant on various pipeline projects directly responsible to the Project Director and Project Controls Manager f or the coordination of stakeholder works, project controls activities including estimating, scheduling, cost control, design control, gating process, risk management, hiring, systems setup, project reporting, and administration.
  • 2. MATHEW PETER MORRISON Home Phone: 604-466-3160 Cell Phone: 604-341-9575 E-MAIL: mpeterm o@gmail.com PARK DEROCHIE COATINGS LTD., EDM ONTON, AB 2008 - 2010 Manger of Coatings Division, directly responsible f or the management of w orks and personnel of shop and field operations. Also responsible f or ongoing development of the management systems utilized in the execution of projects. Areas of responsibility include d business development, staff planning, construction planning, constructability review s, f acility and equipment planning, hiring and negotiating rates and assignment terms with the clients. Duties also included client relations, contract negotiation, management and project/manage ment reporting. HATCH LTD., VANCOUVER, BC 2008 Director of Construction, directly responsible for the development of the construction management department in the Vancouver office. Areas of responsibility included business and staff planning, construction planning, constructability reviews, f acility and equipment planning, hiring and negotiating rates and assignment terms with the client. Duties also included set up and construction management of the start up phase of the Endako Expansion Project. HATCH LTD., VANCOUVER, BC 2007 Project Controls Manager, directly responsible for the development of the controls team and implementation of corporate systems in the Vancouver of f ice. Areas of responsibility included planning, estimating, procurement, contracts, cost control, and engineering control, with a staff of 25. Duties also included client relations, project planning/execution, staff planning/training, and project/management reporting. M UTUAL CONSTRUCTION (2000) LTD., VANCOUVER, BC 2005 - 2006 Operations Manager, directly responsible f or the execution and administration of all Mutual Construction civil and industrial projects. Managed all corporate field resources including up to 80 personnel, equipment, materials and subcontractors. Duties include d client relations, project planning/execution, staff planning/training, equipment planning, supervision of project staff and management reporting. LPD CONTRACTORS INC./SYNCRUDE CANADA LTD., FORT M CMURRAY, AB (via Gold Coast P&D Co. Ltd.) 2004 - 2005 Site Project Manager, directly responsible for the development, execution and administration of LPD Contractors Inc.’s site wide f ireproofing contract with a peak personnel level of 285 people and over 700K work f orce hours. Duties included client relations, project planning/execution, staf f planning/training, equipment planning, supervision of project staff, coordination and development of scope re-estimate, contract re- development, and management reporting. JACOBS CANADA/SYNCRUDE CANADA LTD., FORT MCMURRAY, AB (via Gold Coast P&D Co. Ltd.) 2003 Contracts Administrator and Materials Manager , directly responsible for the development, execution and administration control of JACOBS’
  • 3. MATHEW PETER MORRISON Home Phone: 604-466-3160 Cell Phone: 604-341-9575 E-MAIL: mpeterm o@gmail.com subcontractors and change management system with the UE-1 Project Management team. Duties included contract control from request for proposal development to contract close out, coordination of material requirements and delivery with Syncrude operations, control of all field procurement, including the development and closing of all requests for quotations of major equipment and f acilities, and supervision of material coordination staff. COLT ENGINEERING/SHELL CANADA LTD., EDM ONTON, AB (via Gold Coast P&D Co. Ltd.) 2001 - 2002 Cost Control Supervisor , directly responsible for the cost control and change management system on the joint venture EPCM contract for the Athabasca Oilsands Dow nstream Project – Scotford Modifications. Duties included cost engineering of definitive estimate to control budget, c ontrol and analysis supervision of cost control team, management reporting and perf orming project/client-specific analyses. TECK COM INCO, RED DOG, AK 2000 - 2001 Contract Administration and Cost Control Lead, directly responsible for the contract administration/cost analysis, and project administration on the EPCM contract for modifications to the Red Dog mine site in Northern Alaska. Duties included cost control and analysis, project contracts development and administration, developing and implementing administrative controls, and performing project/ client-specific analyses. SOUTHERN PERU COPPER CORP., CUAJONE, PERU 1998 - 2000 Cost Engineer, directly responsible f or the cost system development/implementation, cost control/forecasting, cost reporting, relief scheduling, contract administration development and implementation f or the installation of the river diversion tunnel, dam and pipeline at the Caujone mine in Peru. Duties included cost control and analysis, project scheduling, contract administration, developing and implementing technical document control, and performing project/client- specific analyses. TECK COM INCO, RED DOG, AK 1996 - 1998 Project Controls Lead, directly responsible for the contract administration/cost analysis, scheduling, technical document control, f ield procurement and project administration on the EPCM contract for modif ications to the Red Dog port site on the Chukchi Sea. Duties included cost control and analysis, project scheduling, contracts administration, f ield procurement, developing and implementing administrative controls, and performing project/ client-specific analyses. TECK COM INCO, TRAIL METALLURGICAL COMPLEX, TRAIL, BC 1995 - 1996 Cost Analyst/Planner, responsible for scheduling and maintaining capital cost EPCM project reporting and analysis, performing cost control and analysis, control of project change management system, expediting major
  • 4. MATHEW PETER MORRISON Home Phone: 604-466-3160 Cell Phone: 604-341-9575 E-MAIL: mpeterm o@gmail.com (50K+) purchase orders, liaising between the engineering disciplines, construction, project and client management, preparing the project contribution worksheet, and developing and implementing project/client specific cost reporting and analysis functions. COM INCO ENGINEERING SERVICES LTD., TRAIL, BC 1990 - 1992 Estimator/Labour Analyst/Planner, responsible f or estimating, scheduling and maintaining EPCM capital projects, performing material and labour analysis, and developing and implementing project/client specific cost reporting and analysis functions. GOLD COAST P&D CO. LTD., PORT MOODY, BC 1994 - 1995 Ow ner/General Manager, responsible for marketing the company, developing multi-market pricing, estimating, purchasing, managing, and supervising all projects in general contracting/painting and decorating f ield. DGS CONSTRUCTION LTD., SURREY, BC 1992 - 1994 Carpenter/Foreman, responsible for relief supervision, perfor ming all aspects of carpentry, and assisting subcontractors. WEDGE CLAM P INTERNATIONAL, RICHMOND, BC 1989 - 1990 Manager, Manufacturing Systems responsible for managing the implementation of MRP II systems, documenting and revising manuf acturing processes, methods, procedures, and standards, controlling inventory for local and f oreign warehouses, and sourcing and purchasing materials/equipment. Manufacturing Systems Consultant responsible for assessing and documenting production and inventory systems, researching alternative production systems, selecting and negotiating purchase of Expandable MRP II sof tware, and other required computer hardware and accessories, and preparing existing production systems for conversion to Expandable MRP II. EDUCATION/QUALIFICATIONS  Diploma in Netw ork & Internet Support Specialist – Windows 2000, CDI College, 2003  Diploma in Operations Management Technology, BCIT, BC, 1989  Various Project Management courses including “In house”, Stanford University, etc