SlideShare a Scribd company logo
…continued…
Michael Fletcher
24783 Shady Oaks Blvd Montgomery, TX 77316
m2fletcher@yahoo.com Cell: 832-693-3599
PROJECT SUPERINTENDENT
Project Administration  ConstructionOperations  Logistics
Highly accomplished professional with background of success in commercial and petrochemical
construction.Outstandingcriticalthinkingandproblem-solvingskillsandproficiencyintoolsofconstruction
supervision. Able to implement knowledge of Industrial Construction to provide meaningful, practical
solutions to builder issues. Confident communicator and results-oriented leader with expertise in overall
planning,organization,anddirection ofproject logisticsand people management.
Core Competencies
 StrategicTimelines
 BudgetAnalysis
 EquipmentOperations
 Procurement / Cost
Reductions
 Safety
 Labor Relations
 QualityAssurance
 ClientRelations
 Code Compliance
Professional Experience
Bayou Construction
Project Manager September2015 to December2015
Management of schedule, budget, scope, manpower, material and equipment on Industrial piping
projects.Maintaincommunicationswithownerconcerning; permits,security, placementof equipment
and facilitiesrequiredtoexecuteprojectinatimelyandsafe manner.
 SPR Oil Storage Facility
Michael FletcherPage 1
MICHAEL FLETCHER  Page 2
CDI CORPORATION
HuntsmanChemical
ConstructionCoordinator September2014 to June 2015
Management, scheduling and inspection of projects with regular planning and strategy sessions. Work
with Plant Operations to insure permits and necessary information is received by the Contractor in a
timely manner to insure the contractor can work safely in areas normally unavailable due to product
movement. Projectsinclude:
 PO Storage and Handling PHA LOPA Revalidation.
 SAUMulti-Tube Reactor Installationand refit,
 F-B-74 Vacuum Pump Replacement
 DebottleneckG-55Alkoxylation
THE ETHYL CORPORATION
ConstructionCoordinator July 2013 to August 2014
Managementof civil,structural,andmechanical projects. Coordinationof twonestedcontractorsintheir
dailyactivities. Managementof variousprojectssuchas:
 Rail Storage expansionContractor review,drawing review,pricingand schedule
 Blast Resistant structures
 All process improvementsrequiring Mechanical and Civil disciplines.
EMC SERVICES,Houston Texas
Project Superintendent October 2010 to July2013
Management of Industrial construction Contractors and projects representing EMC and owners during
the complete constructionproject.Managementof all disciplinesinvolvedinprojects.
NotableProjects:
 NOV Tuboscope Pipe CoatingPlantinSheldon,Texas
 EL TampquenoCheeseFactory in Schulenburg, Texas Michael FletcherPage 2
MICHAEL FLETCHER  Page 3
UNIVERSALPERSONNELforVALEROREFINING,MEMPHIS TENNESSEE
Civil ConstructionManager June 2008 to October2009
Management of Industrial Civil Contractors and projects representing the interest of Memphis Valero
Refiningduringthe civilportionof The FCCUExpansionProjectscheduled.
NotableProjects:
 NorthWall Soil Nailing Project.
 FCCU Expansionfoundations.
 Cryo UnitExpansionfoundations.
 CoolingTower-9construction.
 Pumpbases.
 Platformfoundations.
 Pipe supportfoundations.
 Duct Bank construction.
 Crane Foundations
JV INDUSTRIAL COMPANIES, INC. – LaPorte, TX September 2006 to June 2008
Project SuperintendentandCivil/Structural Estimator
Manage project administration and building logistics for multimillion-dollar civil projects. Maintain
thoroughandon-goingdiscussionof designsandmethodsof buildingwithclients, engineers,supervisors,
and subcontractors. Research pricing for project takeoff and civil-related tasks and materials. Develop
technical information and bid packages for review and approval. Inspect project for progress; ensure
compliance withblueprintsand codes,troubleshootingandlaunchingcorrectiveactionstoavertpotential
problemsandensure on-timecompletion.
NotableProjectsand Achievements:
 Exceptional recordof safetyand accident-free worksites.
 Reputationforon-time,on-budgetcompletionof projects.
 Conductcost / benefitanalysistoensure profitabilityandtopreserve level of qualitydelivered.
 Maintain exceptional crew morale and environmental safety, fostering strong performance and
qualitystandards.
 Texas City Valero to Houston Valero Pipeline Project with metering station with pig
launcher/catcher. Michael FletcherPage 3
MICHAEL FLETCHER  Page 4
GENERALPETROCHEM INDUSTRIAL,INC.-Pearland,TX July2004to February2006
Project Manager
Directed operations for Commercial Industrial Division. Managed 3 superintendents tasked
with overseeingdiverseprojectsrelatedto petroleumindustryconstruction.
NotableProjectsand Achievements:
 Projectsat ValeroRefining, The LubrizolCorporationandChevronPhillips
ALLIANCE CONSTRUCTION, INC. –The Woodlands, TX October 1996 to January 2004
Project Superintendent
Accountable forall phasesof large commercial constructionprojects,out-of-the-hole tocompletion.
 Grogans Mill ShoppingandOffice Center,The Woodlands,TX(1996-1997)
 SplendoraI.S.DElementarySchool andJuniorHighSchool,Splendora,TX(1997-1999)
 CrossroadsBaptistChurch,The Woodlands,TX (1999-2000)
 WagnerMulti-MediaOffice andWarehouse Complex Houston,TX(2001-2002)
 St. JohnsUMC, Richmond,TX. (2002-2003)
 St. Lawrence CatholicSchool,Sugarland,TX.(2001)
Additionalexperienceas ConstructionCoordinatorforReddy Engineering and Construction,Houston, TX,
Austin Road and Bridge TexasMunicipalPowerAuthority,Gibbons Creek Power Plant Project, Carlos, TX
and Owner of MS Builders, Conroe, TX; Commercial and Industrial Civil Construction
Educational Background
Coursework in business law completed in General Studies Program
Sam Houston State University - Huntsville, TX
Competent Person Excavation Shoring
OSHA 40
Michael FletcherPage 4

More Related Content

What's hot

cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015Andrew De Jong
 
Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Joseph Pirrone
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume MasterGreg Krall
 
AMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions ExpertiseAMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions Expertise
AM Technical Solutions, Inc
 
Shakeel ahmed resume
Shakeel ahmed  resumeShakeel ahmed  resume
Shakeel ahmed resume
Shakeel Ahmed
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016John Brennan
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project Outcomes
Jamie Morien
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
Sonny Daigrepont
 
A TEC Consulting: Connecting People, Markets and Technology.
A TEC Consulting: Connecting People, Markets and Technology.A TEC Consulting: Connecting People, Markets and Technology.
A TEC Consulting: Connecting People, Markets and Technology.
A TEC Group
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015Steve Tate
 
Five Key Considerations for Design Build Projects
Five Key Considerations for Design Build ProjectsFive Key Considerations for Design Build Projects
Five Key Considerations for Design Build Projects
Suzanne Cody
 

What's hot (18)

Resume Gp
Resume GpResume Gp
Resume Gp
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015
 
Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014
 
Thai Truong Resume
Thai Truong ResumeThai Truong Resume
Thai Truong Resume
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume Master
 
AMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions ExpertiseAMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions Expertise
 
Shakeel ahmed resume
Shakeel ahmed  resumeShakeel ahmed  resume
Shakeel ahmed resume
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project Outcomes
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 
A TEC Consulting: Connecting People, Markets and Technology.
A TEC Consulting: Connecting People, Markets and Technology.A TEC Consulting: Connecting People, Markets and Technology.
A TEC Consulting: Connecting People, Markets and Technology.
 
CV17
CV17CV17
CV17
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015
 
Five Key Considerations for Design Build Projects
Five Key Considerations for Design Build ProjectsFive Key Considerations for Design Build Projects
Five Key Considerations for Design Build Projects
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 

Viewers also liked

GreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimizedGreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimizedJose Calderon Garcia
 
CV Craig Hill Address2016
CV Craig Hill Address2016CV Craig Hill Address2016
CV Craig Hill Address2016Craig Hill
 
Reglas de tildación
Reglas de tildaciónReglas de tildación
Reglas de tildación
Angie Harumi Mendoza Hirata
 
Bolsos2016
Bolsos2016Bolsos2016
Bolsos2016
Leonardo Pines
 
Escritura1
Escritura1Escritura1
Escritura1
Leonardo Pines
 
Mecanica cuantica
Mecanica cuanticaMecanica cuantica
Mecanica cuantica
william Morales
 
General uses of wall putty
General uses of wall puttyGeneral uses of wall putty
General uses of wall putty
Trimurti Products
 
Dawid madzia
Dawid madziaDawid madzia
Dawid madzia
F3rgI
 

Viewers also liked (11)

GreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimizedGreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimized
 
CV Craig Hill Address2016
CV Craig Hill Address2016CV Craig Hill Address2016
CV Craig Hill Address2016
 
St Olaf Buntrock Commons_CV
St Olaf Buntrock Commons_CVSt Olaf Buntrock Commons_CV
St Olaf Buntrock Commons_CV
 
Reglas de tildación
Reglas de tildaciónReglas de tildación
Reglas de tildación
 
paper-presentation
paper-presentationpaper-presentation
paper-presentation
 
Bolsos2016
Bolsos2016Bolsos2016
Bolsos2016
 
Escritura1
Escritura1Escritura1
Escritura1
 
MIT_Fitness_&_Aquatic_Center__CV
MIT_Fitness_&_Aquatic_Center__CVMIT_Fitness_&_Aquatic_Center__CV
MIT_Fitness_&_Aquatic_Center__CV
 
Mecanica cuantica
Mecanica cuanticaMecanica cuantica
Mecanica cuantica
 
General uses of wall putty
General uses of wall puttyGeneral uses of wall putty
General uses of wall putty
 
Dawid madzia
Dawid madziaDawid madzia
Dawid madzia
 

Similar to Resume Rev A 3-22-16

Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16tyeeseeker
 
Proschek, Thomas Resume r2
Proschek, Thomas Resume r2Proschek, Thomas Resume r2
Proschek, Thomas Resume r2Tom Proschek
 
Gregory Lipham Resume 2015
Gregory Lipham Resume 2015Gregory Lipham Resume 2015
Gregory Lipham Resume 2015Gregory Lipham
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)
Brian Joyner, MBA
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vincent Winkler
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume Rebecca Selinger
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
Austin Mattson II
 
Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe
 
GOOCH_PRE-QUALIFICATION_PROFILE.pdf
GOOCH_PRE-QUALIFICATION_PROFILE.pdfGOOCH_PRE-QUALIFICATION_PROFILE.pdf
GOOCH_PRE-QUALIFICATION_PROFILE.pdf
FrankEkejija1
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projectspramod patel
 
Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015Bob Skidmore
 
UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16Ken Simmons
 

Similar to Resume Rev A 3-22-16 (20)

Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
PIC Brochure 101615
PIC Brochure 101615PIC Brochure 101615
PIC Brochure 101615
 
CV
CVCV
CV
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
Proschek, Thomas Resume r2
Proschek, Thomas Resume r2Proschek, Thomas Resume r2
Proschek, Thomas Resume r2
 
Gregory Lipham Resume 2015
Gregory Lipham Resume 2015Gregory Lipham Resume 2015
Gregory Lipham Resume 2015
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 
Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
GOOCH_PRE-QUALIFICATION_PROFILE.pdf
GOOCH_PRE-QUALIFICATION_PROFILE.pdfGOOCH_PRE-QUALIFICATION_PROFILE.pdf
GOOCH_PRE-QUALIFICATION_PROFILE.pdf
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015
 
UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16
 
GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 

Resume Rev A 3-22-16

  • 1. …continued… Michael Fletcher 24783 Shady Oaks Blvd Montgomery, TX 77316 m2fletcher@yahoo.com Cell: 832-693-3599 PROJECT SUPERINTENDENT Project Administration  ConstructionOperations  Logistics Highly accomplished professional with background of success in commercial and petrochemical construction.Outstandingcriticalthinkingandproblem-solvingskillsandproficiencyintoolsofconstruction supervision. Able to implement knowledge of Industrial Construction to provide meaningful, practical solutions to builder issues. Confident communicator and results-oriented leader with expertise in overall planning,organization,anddirection ofproject logisticsand people management. Core Competencies  StrategicTimelines  BudgetAnalysis  EquipmentOperations  Procurement / Cost Reductions  Safety  Labor Relations  QualityAssurance  ClientRelations  Code Compliance Professional Experience Bayou Construction Project Manager September2015 to December2015 Management of schedule, budget, scope, manpower, material and equipment on Industrial piping projects.Maintaincommunicationswithownerconcerning; permits,security, placementof equipment and facilitiesrequiredtoexecuteprojectinatimelyandsafe manner.  SPR Oil Storage Facility Michael FletcherPage 1
  • 2. MICHAEL FLETCHER  Page 2 CDI CORPORATION HuntsmanChemical ConstructionCoordinator September2014 to June 2015 Management, scheduling and inspection of projects with regular planning and strategy sessions. Work with Plant Operations to insure permits and necessary information is received by the Contractor in a timely manner to insure the contractor can work safely in areas normally unavailable due to product movement. Projectsinclude:  PO Storage and Handling PHA LOPA Revalidation.  SAUMulti-Tube Reactor Installationand refit,  F-B-74 Vacuum Pump Replacement  DebottleneckG-55Alkoxylation THE ETHYL CORPORATION ConstructionCoordinator July 2013 to August 2014 Managementof civil,structural,andmechanical projects. Coordinationof twonestedcontractorsintheir dailyactivities. Managementof variousprojectssuchas:  Rail Storage expansionContractor review,drawing review,pricingand schedule  Blast Resistant structures  All process improvementsrequiring Mechanical and Civil disciplines. EMC SERVICES,Houston Texas Project Superintendent October 2010 to July2013 Management of Industrial construction Contractors and projects representing EMC and owners during the complete constructionproject.Managementof all disciplinesinvolvedinprojects. NotableProjects:  NOV Tuboscope Pipe CoatingPlantinSheldon,Texas  EL TampquenoCheeseFactory in Schulenburg, Texas Michael FletcherPage 2
  • 3. MICHAEL FLETCHER  Page 3 UNIVERSALPERSONNELforVALEROREFINING,MEMPHIS TENNESSEE Civil ConstructionManager June 2008 to October2009 Management of Industrial Civil Contractors and projects representing the interest of Memphis Valero Refiningduringthe civilportionof The FCCUExpansionProjectscheduled. NotableProjects:  NorthWall Soil Nailing Project.  FCCU Expansionfoundations.  Cryo UnitExpansionfoundations.  CoolingTower-9construction.  Pumpbases.  Platformfoundations.  Pipe supportfoundations.  Duct Bank construction.  Crane Foundations JV INDUSTRIAL COMPANIES, INC. – LaPorte, TX September 2006 to June 2008 Project SuperintendentandCivil/Structural Estimator Manage project administration and building logistics for multimillion-dollar civil projects. Maintain thoroughandon-goingdiscussionof designsandmethodsof buildingwithclients, engineers,supervisors, and subcontractors. Research pricing for project takeoff and civil-related tasks and materials. Develop technical information and bid packages for review and approval. Inspect project for progress; ensure compliance withblueprintsand codes,troubleshootingandlaunchingcorrectiveactionstoavertpotential problemsandensure on-timecompletion. NotableProjectsand Achievements:  Exceptional recordof safetyand accident-free worksites.  Reputationforon-time,on-budgetcompletionof projects.  Conductcost / benefitanalysistoensure profitabilityandtopreserve level of qualitydelivered.  Maintain exceptional crew morale and environmental safety, fostering strong performance and qualitystandards.  Texas City Valero to Houston Valero Pipeline Project with metering station with pig launcher/catcher. Michael FletcherPage 3
  • 4. MICHAEL FLETCHER  Page 4 GENERALPETROCHEM INDUSTRIAL,INC.-Pearland,TX July2004to February2006 Project Manager Directed operations for Commercial Industrial Division. Managed 3 superintendents tasked with overseeingdiverseprojectsrelatedto petroleumindustryconstruction. NotableProjectsand Achievements:  Projectsat ValeroRefining, The LubrizolCorporationandChevronPhillips ALLIANCE CONSTRUCTION, INC. –The Woodlands, TX October 1996 to January 2004 Project Superintendent Accountable forall phasesof large commercial constructionprojects,out-of-the-hole tocompletion.  Grogans Mill ShoppingandOffice Center,The Woodlands,TX(1996-1997)  SplendoraI.S.DElementarySchool andJuniorHighSchool,Splendora,TX(1997-1999)  CrossroadsBaptistChurch,The Woodlands,TX (1999-2000)  WagnerMulti-MediaOffice andWarehouse Complex Houston,TX(2001-2002)  St. JohnsUMC, Richmond,TX. (2002-2003)  St. Lawrence CatholicSchool,Sugarland,TX.(2001) Additionalexperienceas ConstructionCoordinatorforReddy Engineering and Construction,Houston, TX, Austin Road and Bridge TexasMunicipalPowerAuthority,Gibbons Creek Power Plant Project, Carlos, TX and Owner of MS Builders, Conroe, TX; Commercial and Industrial Civil Construction Educational Background Coursework in business law completed in General Studies Program Sam Houston State University - Huntsville, TX Competent Person Excavation Shoring OSHA 40 Michael FletcherPage 4