Mark Maudsley BSc (Hons)
9 Salcombe Close, Sale, Cheshire, M33 5HL, , 0790 403 1803 (m)
e-mail: markmaudsley@hotmail.com
Profile / Summary
Enthusiastic and versatile degree-qualified Project Engineer with strong technical and
commercial background with unquestioned ability to work as a team player and project
leader. 25+ years experience in the Nuclear, chemical, Oil, Gas and utilities industries
covering project management, project engineering and estimating / costing work. Currently
working on de-commissioning B29 and B30 and to CDMS regulations.
Experience and achievements
NIS LTD,Chorley
2011 to present
Project Engineer responsible for de-commissioning projects SDP, B30 and 29. Project
management extends from the concept stage through to design, manufacture,
construction, installation and commissioning of the facilities up to final
handover to the customer
BABCOCK MARINE, MOD ROYAL DEVONPORT DOCKYARD (Matchtech) Nov
2009 to June 2011
Project Engineer (Contract)
Part of project management team responsible for de-commissioning nuclear submarines.
• Ensuring a plan of key activities and milestones is in place (and maintained),
which consistently represents the programme to be achieved for the package.
• Planning, managing, monitoring and implementing project cost control.
• Delegating appropriate levels of authority to ensure that the work package
deliverables meet the programme, to the required quality and within agreed
costs.
• Ensuring that the work package is aligned to the design and associated
safety cases philosophy and is correctly interpreted with the minimum of
change, whilst remaining fit for purpose.
• Meet the requirements of the safety case for the defuelling project during
design, construction and inactive commissioning.
• Ensuring that the work package construction proceeds in accordance with the
project programme whilst meeting the requirements of the project quality
goals and safety case requirements.
• Regularly reviewing the progress of work within the project and provide
management reports on work packages status, including changes to the risk
profile, variance analyses and solutions for corrective action as appropriate.
• Ensuring the requirements of Health & Safety Legislation is met by
compliance with project procedures.
MARDALE PIPES PLUS LTD Nov 2008 to June 2009
(Provider of piping and engineering solutions. Specialists in piping technology,
management, group services, stockholding, manufacturing for subsea, oil & gas and
petrochemical industries).
1
Mark Maudsley BSc (Hons)
9 Salcombe Close, Sale, Cheshire, M33 5HL, , 0790 403 1803 (m)
e-mail: markmaudsley@hotmail.com
Subsea Project Manager
• Responsible for compiling project packages.
• Utilisation of purchasing systems in line with client specifications and commercial
conditions.
• Building project schedules and expediting work.
KNOWSLEY SK LTD. April 2008 – November 2008
(The company is renowned for the design, manufacture and delivery of innovative fire
fighting systems for the protection of high value oil, gas & petrochemical installations).
Contract Engineer
• Responsible for compiling project packages.
• Responsible for procurement of systems from P&ID and GA drawings in line with
client specifications.
• Managed commercial compliance of projects.
BALMORAL OFFSHORE ENGINEERING June 2007 – April 2008
(Specialist supplier of technology-led composite and polymer solutions for the subsea Oil &
Gas sector).
Proposal Engineer
• Responsible for costing project packages.
• Responsible for bid compliance - ensuring bids meet clients’ needs in terms of
delivery, technical and quality standards.
• Sourcing within supply chain new suppliers and ensuring that they meet
requirements.
• Estimating material, labour, logistics and technical compliance.
SHELL UK July 2006 – June 2007
(Global Technical Campaign Team - Recruitment).
Technical Advisor (Contract)
• Part of team reviewing recruitment and selection of candidates for oil & gas
operations.
• Assessment of candidate capabilities and matching with recruitment needs.
• Delivery of presentations to the oil & gas recruitment market to promote
opportunities specifically for Welding Engineers, Metallurgists, Design Engineers.
Mechanical Engineers and Project Managers.
PROCLAD INTERNATIONAL PIPELINES LTD June 2005 – June 2006
(Engaged In the manufacture of steel tubes – providing pipes and tubes for the energy
industries).
Project Manager
2
Mark Maudsley BSc (Hons)
9 Salcombe Close, Sale, Cheshire, M33 5HL, , 0790 403 1803 (m)
e-mail: markmaudsley@hotmail.com
• Responsible for project management, commercial sales and financial control of
various piping system packages.
• Liaising with clients and suppliers to ensure delivery of products and all associated
services pertaining to the project.
• Ensuring the smooth transition of projects while Proclad relocated to Scotland (this
was a year long process).
UNITED PIPEPLINES LTD June 1995 – June 2005
(United Pipelines project manage, manufacture, test and supply corrosion resistant pipeline
systems for the oil, gas and chemical Industries).
Senior Project Engineer
• Generation of technical sales quotes & estimates
• Responsible for hiring of contract staff, inspectors and machinery
• Built, managed and maintained detailed project schedules and requirements
• Contingency planning
WEIR MATERIALS – Senior Project Engineer 1989-1993
HILL GRAHAM CONTROLS LTD – Contract Engineer 1988-1989
BREVINI LTD – Sales Engineer 1986-1988
ECONOMATICS – Student Design Engineer 1984-1985
Qualifications & Training
BSc (Hons) Manufacturing & Materials Science, Manchester Metropolitan University - 1994
OND Engineering Technology – North Cheshire College - 1983
HND Mechanical & Production Engineering – Sheffield City Polytechnic – 1986
Pegasus Project Control System
Auto CAD 2006
Non-Destructive Testing (PCN II, RI, MPI, DP)
Site Coatings Inspectors Certificate
Risk Assesment level 2
Passport to safety
Personal Details
Date of Birth: 5 10 62
Family Status: Married
Driving License: Full
Interests: Rugby League & Union (representing England in 2002 in the amateur
four nations) and generally keeping fit.
References available upon request.
3

_Mark_Maudsley_CV_2015

  • 1.
    Mark Maudsley BSc(Hons) 9 Salcombe Close, Sale, Cheshire, M33 5HL, , 0790 403 1803 (m) e-mail: markmaudsley@hotmail.com Profile / Summary Enthusiastic and versatile degree-qualified Project Engineer with strong technical and commercial background with unquestioned ability to work as a team player and project leader. 25+ years experience in the Nuclear, chemical, Oil, Gas and utilities industries covering project management, project engineering and estimating / costing work. Currently working on de-commissioning B29 and B30 and to CDMS regulations. Experience and achievements NIS LTD,Chorley 2011 to present Project Engineer responsible for de-commissioning projects SDP, B30 and 29. Project management extends from the concept stage through to design, manufacture, construction, installation and commissioning of the facilities up to final handover to the customer BABCOCK MARINE, MOD ROYAL DEVONPORT DOCKYARD (Matchtech) Nov 2009 to June 2011 Project Engineer (Contract) Part of project management team responsible for de-commissioning nuclear submarines. • Ensuring a plan of key activities and milestones is in place (and maintained), which consistently represents the programme to be achieved for the package. • Planning, managing, monitoring and implementing project cost control. • Delegating appropriate levels of authority to ensure that the work package deliverables meet the programme, to the required quality and within agreed costs. • Ensuring that the work package is aligned to the design and associated safety cases philosophy and is correctly interpreted with the minimum of change, whilst remaining fit for purpose. • Meet the requirements of the safety case for the defuelling project during design, construction and inactive commissioning. • Ensuring that the work package construction proceeds in accordance with the project programme whilst meeting the requirements of the project quality goals and safety case requirements. • Regularly reviewing the progress of work within the project and provide management reports on work packages status, including changes to the risk profile, variance analyses and solutions for corrective action as appropriate. • Ensuring the requirements of Health & Safety Legislation is met by compliance with project procedures. MARDALE PIPES PLUS LTD Nov 2008 to June 2009 (Provider of piping and engineering solutions. Specialists in piping technology, management, group services, stockholding, manufacturing for subsea, oil & gas and petrochemical industries). 1
  • 2.
    Mark Maudsley BSc(Hons) 9 Salcombe Close, Sale, Cheshire, M33 5HL, , 0790 403 1803 (m) e-mail: markmaudsley@hotmail.com Subsea Project Manager • Responsible for compiling project packages. • Utilisation of purchasing systems in line with client specifications and commercial conditions. • Building project schedules and expediting work. KNOWSLEY SK LTD. April 2008 – November 2008 (The company is renowned for the design, manufacture and delivery of innovative fire fighting systems for the protection of high value oil, gas & petrochemical installations). Contract Engineer • Responsible for compiling project packages. • Responsible for procurement of systems from P&ID and GA drawings in line with client specifications. • Managed commercial compliance of projects. BALMORAL OFFSHORE ENGINEERING June 2007 – April 2008 (Specialist supplier of technology-led composite and polymer solutions for the subsea Oil & Gas sector). Proposal Engineer • Responsible for costing project packages. • Responsible for bid compliance - ensuring bids meet clients’ needs in terms of delivery, technical and quality standards. • Sourcing within supply chain new suppliers and ensuring that they meet requirements. • Estimating material, labour, logistics and technical compliance. SHELL UK July 2006 – June 2007 (Global Technical Campaign Team - Recruitment). Technical Advisor (Contract) • Part of team reviewing recruitment and selection of candidates for oil & gas operations. • Assessment of candidate capabilities and matching with recruitment needs. • Delivery of presentations to the oil & gas recruitment market to promote opportunities specifically for Welding Engineers, Metallurgists, Design Engineers. Mechanical Engineers and Project Managers. PROCLAD INTERNATIONAL PIPELINES LTD June 2005 – June 2006 (Engaged In the manufacture of steel tubes – providing pipes and tubes for the energy industries). Project Manager 2
  • 3.
    Mark Maudsley BSc(Hons) 9 Salcombe Close, Sale, Cheshire, M33 5HL, , 0790 403 1803 (m) e-mail: markmaudsley@hotmail.com • Responsible for project management, commercial sales and financial control of various piping system packages. • Liaising with clients and suppliers to ensure delivery of products and all associated services pertaining to the project. • Ensuring the smooth transition of projects while Proclad relocated to Scotland (this was a year long process). UNITED PIPEPLINES LTD June 1995 – June 2005 (United Pipelines project manage, manufacture, test and supply corrosion resistant pipeline systems for the oil, gas and chemical Industries). Senior Project Engineer • Generation of technical sales quotes & estimates • Responsible for hiring of contract staff, inspectors and machinery • Built, managed and maintained detailed project schedules and requirements • Contingency planning WEIR MATERIALS – Senior Project Engineer 1989-1993 HILL GRAHAM CONTROLS LTD – Contract Engineer 1988-1989 BREVINI LTD – Sales Engineer 1986-1988 ECONOMATICS – Student Design Engineer 1984-1985 Qualifications & Training BSc (Hons) Manufacturing & Materials Science, Manchester Metropolitan University - 1994 OND Engineering Technology – North Cheshire College - 1983 HND Mechanical & Production Engineering – Sheffield City Polytechnic – 1986 Pegasus Project Control System Auto CAD 2006 Non-Destructive Testing (PCN II, RI, MPI, DP) Site Coatings Inspectors Certificate Risk Assesment level 2 Passport to safety Personal Details Date of Birth: 5 10 62 Family Status: Married Driving License: Full Interests: Rugby League & Union (representing England in 2002 in the amateur four nations) and generally keeping fit. References available upon request. 3