Performance
Indicators
for Plastic
Manufacturing
Suni Vatnhamar 2016 1
PERFORMANCE INDICATORS FOR PLASTIC PACKAGING
MANUFACTURING
Complete set of performance indicators for
plastic packaging production
Ready for use !
Suni Vatnhamar 2016 2
PERFORMANCE INDICATORS
(PI)
OPERATIONS
FINANCE
SALES EXCELLENCE
HR
Suni Vatnhamar 2016 3
PERFORMANCE INDICATORS
OPERATIONS
 OEE
 Internal Rejects
 Customer complaints
 Capacity Utilisation
 Spoilage
 Materials Variance
 Energy consumption
 Man efficiency
 Delivery precision
Suni Vatnhamar 2016 4
PI Operations
1) OEE% (overall equipment effectiveness)
OEE Availability% x OEE Quality x OEE Performance%
2) Internal Rejects%
number of rejected parts
Total Number Produced (good + rejects)
Suni Vatnhamar 2016 5
3) Customer complaints
3a) Number of total customers complaints
Number of recorded customers complaints (product-related) which are
proven to be a result of our failure or one of our suppliers.
Reported as an absolute number with an annual target to be set
based on improvement versus previous year’s result.
# per month/YTD with target based on improvement versus LY
3b) Number of customer complaints resulting in credit notes
# per month/YTD with target based on improvement versus LY
3c) Value of credit notes from customer complaints
Value per month/YTD with target based on improvement versus LY
PI Operations
Suni Vatnhamar 2016 6
PI Operations
4) Capacity Utilization%
100% - Non-Utilization due to no customer order
Total Theoretical Available Machine Hours
Theoretical Available Machine Hours based on 7days/24hrs
operations system.
5) Spoilage
Using existing definition, but introducing Raw Material Variance
as a more important PI in this field.
Suni Vatnhamar 2016 7
PI Operations
6) Materials Variance
Total good units produced (T)
100% -
Total resins used in Conversion process (T)
Suni Vatnhamar 2016 8
Materials Variance
Measure is A - B = C
Month
Operations
(Conversion process)
Opening
Stock
Resin (T)
Masterbatch
&
Additives (T)
Excluding
‘Flake’
Closing
Stock
Resin (T)
Masterbatch
&
Additives (T)
Excluding
‘Flake’
Stock
Resin
purchased
during
month
AB C
Good bottles
x
StdCut off *
* Same time every month
Cut off *
Suni Vatnhamar 2016 9
Materials Variance
Losses within the Conversion Process
Good bottles
Held stock
Rejects
Purge
Contami-
nation Masterbatch/
additives
over use
Incorrect
std’s
STOCK Materials Variance
90-95 %
Suni Vatnhamar 2016 10
PI Operations
7) Energy
kwh used per tonnage converted (calculated automatically in
Hyperion from reported Kwh and tonnage converted)
8) Man efficiency
Tonnage Converted per average FTE
9) Delivery Precision%
Number of order lines delivered on agreed delivery date against total
number of order lines ordered by the customers in the same period –
expressed in %
Suni Vatnhamar 2016 11
PERFORMANCE INDICATORS
FINANCE
 RM days
 FG days
 Creditor days
 Debtor days
 WC turnover
 EVA
 Overdue receivables
Suni Vatnhamar 2016 12
PI Finance
1) Raw Material days
See definition in Financial handbook
2) Finished Goods days
See definition in Financial handbook
3) Creditors days
See definition in Financial handbook
4) Debtors days
See definition in Financial handbook
Suni Vatnhamar 2016 13
PI Finance
5) Working Capital Turnover
Net sales (S4000) over last 12 months
Average Normalized Working Capital (Norm_WC)over last 4 quarters
6) EVA
See definition in Financial handbook
7) Overdue receivables
Proportion of receivables >30 days overdue expressed as a
percentage of total receivables
Suni Vatnhamar 2016 14
PERFORMANCE INDICATORS
SALES EXCELLENCE
 Sales per employee
 Organic growth
 New order balance
 RMC per tonnage
 # of customer visits
 # of prospect visits
 # and value of quotations
 # of enquiries
Suni Vatnhamar 2016 15
PI Sales Excellence - Hyperion
1) Sales per employee
2) Organic growth
Increase/decrease of tonnage sold compared to previous year, excluding
impact of acquisitions, transferred business, or disposals, expressed as a
percentage.
3) New order balance
Annualized sales value (after ramp up) of new confirmed orders
starting within next 12 months minus value of annualized
confirmed losses expressed as a value.
4) RMC per tonnage
Raw material contribution per sold tonnage of polymers
Suni Vatnhamar 2016 16
PI Sales Excellence to be reported in
CRM system
6) # of total customer visits
7) # of visits to prospects
8) # of quotations
9) Value of quotations
10) # of enquiries from customers
Suni Vatnhamar 2016 17
PERFORMANCE INDICATORS
HR
 Sick leave % direct workers
 Sick Leave % indirect people
 LTA
Suni Vatnhamar 2016 18
PI HR
1)Sick leave direct worker (%)
Sick leave (%)= total number of sick days / (total number of days
worked + days away) for all direct workers
2) Sick leave indirect workers
Sick leave (%)= total number of sick days / (total number of days
worked + days away) for all indirect workers.
3) Lost Time Accidents (LTA)
reported as number of Lost Time Accidents per 1 million working
hours on a rolling 12 months period
Suni Vatnhamar 2016 19

More Related Content

What's hot

S&OP Implementation Roadmap
S&OP Implementation RoadmapS&OP Implementation Roadmap
S&OP Implementation Roadmap
Anand Subramaniam
 
ISO 14001:2015 (Environmental Management Systems) Awareness Training
ISO 14001:2015 (Environmental Management Systems) Awareness TrainingISO 14001:2015 (Environmental Management Systems) Awareness Training
ISO 14001:2015 (Environmental Management Systems) Awareness Training
Operational Excellence Consulting
 
MRM - Management Review Meeting Presentation
MRM - Management Review Meeting PresentationMRM - Management Review Meeting Presentation
MRM - Management Review Meeting Presentation
Engr. Syed Noor Mustafa Shah
 
Best of the Best S&OP Conference
Best of the Best S&OP ConferenceBest of the Best S&OP Conference
Best of the Best S&OP Conference
Steelwedge
 
S&OP Thought Leadership.
S&OP Thought Leadership.S&OP Thought Leadership.
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
Brian Thomas
 
Lean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap posterLean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap poster
Francisco Pulgar-Vidal, MBA, Lean Six Sigma MBB
 
10 Key Challenges to S&OP Excellence
10 Key Challenges to S&OP Excellence 10 Key Challenges to S&OP Excellence
10 Key Challenges to S&OP Excellence
President Stephen Crane Consulting, LLC
 
What and why compliance audit 28 12 18
What and why compliance audit 28 12 18 What and why compliance audit 28 12 18
What and why compliance audit 28 12 18
Rimen Ahmed
 
S&OP Introduction
S&OP IntroductionS&OP Introduction
S&OP Introduction
steelwedge2000
 
coca-cola-business-environmental-social-governance-report-2021.pdf
coca-cola-business-environmental-social-governance-report-2021.pdfcoca-cola-business-environmental-social-governance-report-2021.pdf
coca-cola-business-environmental-social-governance-report-2021.pdf
Rise29
 
AVATA S&OP / IBP Express
AVATA S&OP / IBP ExpressAVATA S&OP / IBP Express
AVATA S&OP / IBP Express
AVATA
 
Aula 2 panorama geral
Aula 2 panorama geralAula 2 panorama geral
Aula 2 panorama geral
Giovanna Ortiz
 
Sales and Operations Planning (S&OP) Overview
Sales and Operations Planning (S&OP) OverviewSales and Operations Planning (S&OP) Overview
Sales and Operations Planning (S&OP) Overview
Michael Ryan
 
OEE
OEEOEE
Sales, Inventory & Operations Planning During High Growth, GMCR
Sales, Inventory & Operations Planning During High Growth, GMCRSales, Inventory & Operations Planning During High Growth, GMCR
Sales, Inventory & Operations Planning During High Growth, GMCR
Innovation Enterprise
 
Quality Management Financial Plan PowerPoint Presentation Slides
Quality Management Financial Plan PowerPoint Presentation SlidesQuality Management Financial Plan PowerPoint Presentation Slides
Quality Management Financial Plan PowerPoint Presentation Slides
SlideTeam
 
S&Op Training
S&Op TrainingS&Op Training
S&Op Training
Wajihuddin
 

What's hot (20)

S&OP Implementation Roadmap
S&OP Implementation RoadmapS&OP Implementation Roadmap
S&OP Implementation Roadmap
 
ISO 14001:2015 (Environmental Management Systems) Awareness Training
ISO 14001:2015 (Environmental Management Systems) Awareness TrainingISO 14001:2015 (Environmental Management Systems) Awareness Training
ISO 14001:2015 (Environmental Management Systems) Awareness Training
 
LEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINALLEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINAL
 
Tollgate Presentation
Tollgate PresentationTollgate Presentation
Tollgate Presentation
 
MRM - Management Review Meeting Presentation
MRM - Management Review Meeting PresentationMRM - Management Review Meeting Presentation
MRM - Management Review Meeting Presentation
 
Best of the Best S&OP Conference
Best of the Best S&OP ConferenceBest of the Best S&OP Conference
Best of the Best S&OP Conference
 
S&OP Thought Leadership.
S&OP Thought Leadership.S&OP Thought Leadership.
S&OP Thought Leadership.
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Lean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap posterLean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap poster
 
10 Key Challenges to S&OP Excellence
10 Key Challenges to S&OP Excellence 10 Key Challenges to S&OP Excellence
10 Key Challenges to S&OP Excellence
 
What and why compliance audit 28 12 18
What and why compliance audit 28 12 18 What and why compliance audit 28 12 18
What and why compliance audit 28 12 18
 
S&OP Introduction
S&OP IntroductionS&OP Introduction
S&OP Introduction
 
coca-cola-business-environmental-social-governance-report-2021.pdf
coca-cola-business-environmental-social-governance-report-2021.pdfcoca-cola-business-environmental-social-governance-report-2021.pdf
coca-cola-business-environmental-social-governance-report-2021.pdf
 
AVATA S&OP / IBP Express
AVATA S&OP / IBP ExpressAVATA S&OP / IBP Express
AVATA S&OP / IBP Express
 
Aula 2 panorama geral
Aula 2 panorama geralAula 2 panorama geral
Aula 2 panorama geral
 
Sales and Operations Planning (S&OP) Overview
Sales and Operations Planning (S&OP) OverviewSales and Operations Planning (S&OP) Overview
Sales and Operations Planning (S&OP) Overview
 
OEE
OEEOEE
OEE
 
Sales, Inventory & Operations Planning During High Growth, GMCR
Sales, Inventory & Operations Planning During High Growth, GMCRSales, Inventory & Operations Planning During High Growth, GMCR
Sales, Inventory & Operations Planning During High Growth, GMCR
 
Quality Management Financial Plan PowerPoint Presentation Slides
Quality Management Financial Plan PowerPoint Presentation SlidesQuality Management Financial Plan PowerPoint Presentation Slides
Quality Management Financial Plan PowerPoint Presentation Slides
 
S&Op Training
S&Op TrainingS&Op Training
S&Op Training
 

Viewers also liked

Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...
Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...
Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...
Ajjay Kumar Gupta
 
Entrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-projectEntrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-project
Zohaib Ahmed
 
How to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable ProductsHow to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable Products
Ajjay Kumar Gupta
 
Plastic recycling business plan
Plastic recycling business planPlastic recycling business plan
Plastic recycling business plan
Khulna university of engineering and technology
 
15 Business Plan On Plastics Recycling
15 Business Plan On Plastics Recycling15 Business Plan On Plastics Recycling
15 Business Plan On Plastics RecyclingDr. Trilok Kumar Jain
 
Plastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business PlanPlastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business Plan
Ayush Man Tamrakar
 
Plastic use as building material ppt
Plastic use as building material pptPlastic use as building material ppt
Plastic use as building material ppt
Deepak Sharma
 
Plastics .ppt
Plastics .pptPlastics .ppt
Plastics .ppt
Sean Kurian
 
BUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTICBUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTIC
Abhishek Mewada
 
Plastic pollution ppt
Plastic pollution pptPlastic pollution ppt
Plastic pollution pptNishant
 

Viewers also liked (10)

Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...
Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...
Recycling of Waste Plastics: Starting a Business, How to Start a Plastic Recy...
 
Entrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-projectEntrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-project
 
How to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable ProductsHow to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable Products
 
Plastic recycling business plan
Plastic recycling business planPlastic recycling business plan
Plastic recycling business plan
 
15 Business Plan On Plastics Recycling
15 Business Plan On Plastics Recycling15 Business Plan On Plastics Recycling
15 Business Plan On Plastics Recycling
 
Plastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business PlanPlastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business Plan
 
Plastic use as building material ppt
Plastic use as building material pptPlastic use as building material ppt
Plastic use as building material ppt
 
Plastics .ppt
Plastics .pptPlastics .ppt
Plastics .ppt
 
BUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTICBUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTIC
 
Plastic pollution ppt
Plastic pollution pptPlastic pollution ppt
Plastic pollution ppt
 

Similar to Performance Indicators for Plastic Manufacturing

Modelling tool guidance presentation animated version 3 unlocked
Modelling tool guidance presentation animated  version 3   unlockedModelling tool guidance presentation animated  version 3   unlocked
Modelling tool guidance presentation animated version 3 unlocked
maxford1979
 
Business Intelligence in FMCG
Business Intelligence in FMCGBusiness Intelligence in FMCG
Business Intelligence in FMCG09bm8049
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
Karl Suni Vatnhamar
 
Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016
Barry Crisp
 
Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Farrukh Hasnain
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coating
John William
 
Feasibility studies
Feasibility studiesFeasibility studies
Feasibility studies
usamaabdelaziz
 
Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018
WorldCircularEconomyForum2018
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5
DANANG WID
 
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated AnalyticsTanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
ChinkiTyagi
 
June 2016 till date colour profile.
June 2016 till date  colour  profile.June 2016 till date  colour  profile.
June 2016 till date colour profile.
GOPI NATHAN
 
june 2016 till date- colour profile.
june 2016 till date- colour  profile.june 2016 till date- colour  profile.
june 2016 till date- colour profile.GOPI NATHAN
 
Synergi Plant - Intro.pptx
Synergi Plant - Intro.pptxSynergi Plant - Intro.pptx
Synergi Plant - Intro.pptx
AmaraGillani1
 
Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...
Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...
Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...
SAP Ariba
 
Kpi basics construction _building material_industry 2009
Kpi basics  construction _building material_industry 2009Kpi basics  construction _building material_industry 2009
Kpi basics construction _building material_industry 2009
Venkat Subbu
 
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
QueBIT Consulting
 
Mba om 08_inventory_management
Mba om 08_inventory_managementMba om 08_inventory_management
Mba om 08_inventory_management
Niranjana K.R.
 

Similar to Performance Indicators for Plastic Manufacturing (20)

SIMA Strategy Final
SIMA Strategy FinalSIMA Strategy Final
SIMA Strategy Final
 
Modelling tool guidance presentation animated version 3 unlocked
Modelling tool guidance presentation animated  version 3   unlockedModelling tool guidance presentation animated  version 3   unlocked
Modelling tool guidance presentation animated version 3 unlocked
 
Business Intelligence in FMCG
Business Intelligence in FMCGBusiness Intelligence in FMCG
Business Intelligence in FMCG
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Proposal Final
Proposal FinalProposal Final
Proposal Final
 
Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016
 
Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coating
 
Resume Victor Gonzalez
Resume Victor GonzalezResume Victor Gonzalez
Resume Victor Gonzalez
 
Feasibility studies
Feasibility studiesFeasibility studies
Feasibility studies
 
Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5
 
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated AnalyticsTanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
 
June 2016 till date colour profile.
June 2016 till date  colour  profile.June 2016 till date  colour  profile.
June 2016 till date colour profile.
 
june 2016 till date- colour profile.
june 2016 till date- colour  profile.june 2016 till date- colour  profile.
june 2016 till date- colour profile.
 
Synergi Plant - Intro.pptx
Synergi Plant - Intro.pptxSynergi Plant - Intro.pptx
Synergi Plant - Intro.pptx
 
Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...
Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...
Success Measurement: Measuring the Value and Performance of Your Source-to-Pa...
 
Kpi basics construction _building material_industry 2009
Kpi basics  construction _building material_industry 2009Kpi basics  construction _building material_industry 2009
Kpi basics construction _building material_industry 2009
 
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
 
Mba om 08_inventory_management
Mba om 08_inventory_managementMba om 08_inventory_management
Mba om 08_inventory_management
 

Recently uploaded

Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
CIOWomenMagazine
 

Recently uploaded (10)

Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
 

Performance Indicators for Plastic Manufacturing

  • 2. PERFORMANCE INDICATORS FOR PLASTIC PACKAGING MANUFACTURING Complete set of performance indicators for plastic packaging production Ready for use ! Suni Vatnhamar 2016 2
  • 4. PERFORMANCE INDICATORS OPERATIONS  OEE  Internal Rejects  Customer complaints  Capacity Utilisation  Spoilage  Materials Variance  Energy consumption  Man efficiency  Delivery precision Suni Vatnhamar 2016 4
  • 5. PI Operations 1) OEE% (overall equipment effectiveness) OEE Availability% x OEE Quality x OEE Performance% 2) Internal Rejects% number of rejected parts Total Number Produced (good + rejects) Suni Vatnhamar 2016 5
  • 6. 3) Customer complaints 3a) Number of total customers complaints Number of recorded customers complaints (product-related) which are proven to be a result of our failure or one of our suppliers. Reported as an absolute number with an annual target to be set based on improvement versus previous year’s result. # per month/YTD with target based on improvement versus LY 3b) Number of customer complaints resulting in credit notes # per month/YTD with target based on improvement versus LY 3c) Value of credit notes from customer complaints Value per month/YTD with target based on improvement versus LY PI Operations Suni Vatnhamar 2016 6
  • 7. PI Operations 4) Capacity Utilization% 100% - Non-Utilization due to no customer order Total Theoretical Available Machine Hours Theoretical Available Machine Hours based on 7days/24hrs operations system. 5) Spoilage Using existing definition, but introducing Raw Material Variance as a more important PI in this field. Suni Vatnhamar 2016 7
  • 8. PI Operations 6) Materials Variance Total good units produced (T) 100% - Total resins used in Conversion process (T) Suni Vatnhamar 2016 8
  • 9. Materials Variance Measure is A - B = C Month Operations (Conversion process) Opening Stock Resin (T) Masterbatch & Additives (T) Excluding ‘Flake’ Closing Stock Resin (T) Masterbatch & Additives (T) Excluding ‘Flake’ Stock Resin purchased during month AB C Good bottles x StdCut off * * Same time every month Cut off * Suni Vatnhamar 2016 9
  • 10. Materials Variance Losses within the Conversion Process Good bottles Held stock Rejects Purge Contami- nation Masterbatch/ additives over use Incorrect std’s STOCK Materials Variance 90-95 % Suni Vatnhamar 2016 10
  • 11. PI Operations 7) Energy kwh used per tonnage converted (calculated automatically in Hyperion from reported Kwh and tonnage converted) 8) Man efficiency Tonnage Converted per average FTE 9) Delivery Precision% Number of order lines delivered on agreed delivery date against total number of order lines ordered by the customers in the same period – expressed in % Suni Vatnhamar 2016 11
  • 12. PERFORMANCE INDICATORS FINANCE  RM days  FG days  Creditor days  Debtor days  WC turnover  EVA  Overdue receivables Suni Vatnhamar 2016 12
  • 13. PI Finance 1) Raw Material days See definition in Financial handbook 2) Finished Goods days See definition in Financial handbook 3) Creditors days See definition in Financial handbook 4) Debtors days See definition in Financial handbook Suni Vatnhamar 2016 13
  • 14. PI Finance 5) Working Capital Turnover Net sales (S4000) over last 12 months Average Normalized Working Capital (Norm_WC)over last 4 quarters 6) EVA See definition in Financial handbook 7) Overdue receivables Proportion of receivables >30 days overdue expressed as a percentage of total receivables Suni Vatnhamar 2016 14
  • 15. PERFORMANCE INDICATORS SALES EXCELLENCE  Sales per employee  Organic growth  New order balance  RMC per tonnage  # of customer visits  # of prospect visits  # and value of quotations  # of enquiries Suni Vatnhamar 2016 15
  • 16. PI Sales Excellence - Hyperion 1) Sales per employee 2) Organic growth Increase/decrease of tonnage sold compared to previous year, excluding impact of acquisitions, transferred business, or disposals, expressed as a percentage. 3) New order balance Annualized sales value (after ramp up) of new confirmed orders starting within next 12 months minus value of annualized confirmed losses expressed as a value. 4) RMC per tonnage Raw material contribution per sold tonnage of polymers Suni Vatnhamar 2016 16
  • 17. PI Sales Excellence to be reported in CRM system 6) # of total customer visits 7) # of visits to prospects 8) # of quotations 9) Value of quotations 10) # of enquiries from customers Suni Vatnhamar 2016 17
  • 18. PERFORMANCE INDICATORS HR  Sick leave % direct workers  Sick Leave % indirect people  LTA Suni Vatnhamar 2016 18
  • 19. PI HR 1)Sick leave direct worker (%) Sick leave (%)= total number of sick days / (total number of days worked + days away) for all direct workers 2) Sick leave indirect workers Sick leave (%)= total number of sick days / (total number of days worked + days away) for all indirect workers. 3) Lost Time Accidents (LTA) reported as number of Lost Time Accidents per 1 million working hours on a rolling 12 months period Suni Vatnhamar 2016 19