SlideShare a Scribd company logo
Resume
Paramasivam govindan
E-mail: paramesmech@gmail.com
Mob- +601126452015
+919677811552.
Career Profile
To be in a challenging position in a progressive company, and to be a perfect
professional and effective solution provider by applying my skill and knowledge. I would like to
apply technology in innovative ways to solve problems in a better way, manage everything
effectively and efficiently and improve the quality of human life.
Academic credentials
B.E Mechanical Engineering- May -2008
PSNA College of Engineering &Technology
Kodhantaraman nagar Dindigul-624622
Tamilnadu India
First class (65 %) (2009) Anna University Chennai.
TOTAL EXPERIENCE: 6 YEARS
PROJECTS HANDLED AT INDIA & ABROAD
• Erection of 1X1000 MW super critical coal fired Boiler for TNB, ALSTOM at MANJUNG-
IV,MALAYSIA.-14000TONS
• Maintenance and shut down work of coal conveyor system for TNB ,REMACO at MANJUNG-
I, II, III, MALAYSIA
• Maintenance and shut down work of 1X1000 MW super critical coal fired Boiler for TNB
ALSTOM at MANJUNG- IV,MALAYSIA
• Erection of 2X 600 MW sub critical coal fired Mutiara Thermal Power plant( COASTAL
ENERGEN ) EDAC Engineering Limited Tuticorin Tamilnadu,india
• Erection of 2X 600 MW Boiler for North Chennai thermal power plant (BHEL ) at UB
ENGINEERING LTD CHENNAI
• Erection 3X 33 MW Boiler (BHARATH OMAN REFINERY LIMITED ) at M/S DOWEL
ERECTORS PRIVATE LIMITED at Mathyapradesh BINA
WORK EXPERIENCE
• Company : M/s, EVERSENDAI ENGINEERING.SDN.BHD. MALAYSIA
• Project : 1X1000 MW JANA MANJUNG SUPER CRITICAL BOILER
• Designation : ENGINEER (BOILER STEEL STRUCTURE ERECTION)
• Duration : JULY 2012 TO PRESENT
ROLES AND RESPONSIBILITES
 To handle the Entire Execution of conveyor system
 To handle the Replace the pulley and bearing assembly
 To handle pulley erection and proper alignment work
 To handle the Replace the roller entire system
 To handle the conveyor belt replacing work
 To handle the Entire boiler structure erection work
 To handle the erection of Boiler Ceiling Girder lifting
 To handle the erection of APH structure
 To handle the execution of Enclosure structure & Silencer
 Maintain the sequence of Erection of BOILER STRUCTURES
 To review construction drawings in advance for smooth work Execution
 To prepare the every work before start applying the work permit (SWMS & HIRAC)
 To prepare the every month Lifting gear inspection report
 To prepare the DOSS inspection report
 To prepare the bill of materials for the drawing issued
 Inspection of the job at all stages & preparing report for the corresponding job
 Experience in managing daily activities like material requisition, vendor document and follow up
and coordination with other engineering discipline
 Arrangement of Tools & Tackles for erection
 Co-ordination with client for planning and schedule, Progress monitoring and Material
Management
 Measurement checking and clearing of contractor Bills / Invoice
 Site mobilization, managing of site Labor, vendor development for site Material Requirements
• Company : M/S EDAC ENGINEERING LTD.
• Project : 2X 600MW THERMAL POWER PLANT
• Designation : ENGINEER (PRESSURE PARTS ERECTION)
• Duration : February 2011 to June 2012.
ROLES AND RESPONSIBILITES
 Engineering support and guidance for pressure parts erection, piping erection of boiler and fit
up activities.
 Execution of welding activities as per the Quality Management System.
 Erection procedure and precaution for material such as Alloy steel (P91, P22, P12, P11 etc.)
Stainless steel and Carbon steel.
 Ensuring material availability as per site requirements.
 Documentation on monthly, weekly and daily progress reports fit up reports co-ordination with
client/subcontractor to solve technical issues.
 Preparation of site deviation reports, close out of NCR activities, site observation
• Company : M/s, BHARATH HEAVY ELECTICAL LTD.
• Project : 2X600 MW THERMAL POWER PLANT
• Designation : ENGINEER (BOILER PRESSURE PARTS ERECTION)
• Duration : May 2009 to February2011
ROLES AND RESPONSIBILITES
 To handle the Entire Execution of Boiler pressure parts
 Erection sequence and inspection activities including erection and alignment of hanger rods and
headers, alignment of water wall panels and steam cooled panels, alignment activities of SH
coils, RH coils & steam cooled spacer tubes and its attachments.
 Coordination on the erection and pre assembly activities of horizontal Buck stays and Burner
panels.
 Alignment activities of air vent and drain lines in prior to air leak test and hydro test activities.
 Ensure availability and follow up of materials as per site requirements.
 Supervision of manpower of 150 workers
• Company : BHARATH OMAN REFINERY LTD
• Project : 3X33 MW (BHEL POWER PLANT ).
• Designation : JUNIOR ENGINEER.(DUCTING & STRUCTURE ERECTION)
• Duration : June 2008 to May 2009.
ROLES AND RESPONSIBILITES
 To handle boiler ducting & structural erection
 To prepare the Bill of materials for the drawing issued.
 Follow up the production activity in shop.
 To Handle the Stacker and Stacker cum Recamier
 Routing the process in fabrication according to the monthly dispatch target.
 Inspection of the job at all stages & preparing report for the corresponding job.
 Coordinating with customer for providing the job status & incase of any drawing clarification.
Certification
• ASNT LEVEL –II (PT, MT, RT, UT)
• Pro E
PERSONAL PROFILE
Father Name : Mr.G.GOVINDAN
Date of Birth : 15APRIL 1987
Marital Status : MARRIED
License : LMV
Nationality : Indian
Passport No : H6725566
Date of Issue : 18/06/2009
Date of Expiry : 17/06/2019
Languages Known : English, Tamil, Hindi & Malay.
DECLARATION
I hereby declare that all the information mentioned above is true and correct to best of my
knowledge and belief.
Date:
Yours sincerely,
Place: G.Paramasivam
I hereby declare that all the information mentioned above is true and correct to best of my
knowledge and belief.
Date:
Yours sincerely,
Place: G.Paramasivam

More Related Content

What's hot

TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015Terry Barwick
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
andi dipayadnya
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunities
Stephen Music
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
Tata
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael BowerMichael Bower
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1Prasad naik
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
andi dipayadnya
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
MOHAMMAD VASIL K
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone ResumeLagrone Andy
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zachary Maddox
 

What's hot (20)

TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunities
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael Bower
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
TKS Resume 2
TKS Resume 2TKS Resume 2
TKS Resume 2
 
wilson cv
wilson cvwilson cv
wilson cv
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone Resume
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
 
CV of Purushotham (1)
CV of Purushotham (1)CV of Purushotham (1)
CV of Purushotham (1)
 

Similar to paramasivam resume

Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical EngineerKathir Kumar
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMANSaif kharal
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
Arunkumar M A
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-Shyamal Sahu
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
surajit das
 
Ajay Kumar Resume
Ajay Kumar ResumeAjay Kumar Resume
Ajay Kumar ResumeAjay Kumar
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV Vel Pandi
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUMEzabur adam
 

Similar to paramasivam resume (20)

NEW MRP CV 2016
NEW MRP CV 2016NEW MRP CV 2016
NEW MRP CV 2016
 
nazeemres
nazeemresnazeemres
nazeemres
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineer
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 
MEPpdf.PDF
MEPpdf.PDFMEPpdf.PDF
MEPpdf.PDF
 
Ajay Kumar Resume
Ajay Kumar ResumeAjay Kumar Resume
Ajay Kumar Resume
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
amit
amitamit
amit
 
chayana
chayanachayana
chayana
 

paramasivam resume

  • 1. Resume Paramasivam govindan E-mail: paramesmech@gmail.com Mob- +601126452015 +919677811552. Career Profile To be in a challenging position in a progressive company, and to be a perfect professional and effective solution provider by applying my skill and knowledge. I would like to apply technology in innovative ways to solve problems in a better way, manage everything effectively and efficiently and improve the quality of human life. Academic credentials B.E Mechanical Engineering- May -2008 PSNA College of Engineering &Technology Kodhantaraman nagar Dindigul-624622 Tamilnadu India First class (65 %) (2009) Anna University Chennai. TOTAL EXPERIENCE: 6 YEARS PROJECTS HANDLED AT INDIA & ABROAD • Erection of 1X1000 MW super critical coal fired Boiler for TNB, ALSTOM at MANJUNG- IV,MALAYSIA.-14000TONS • Maintenance and shut down work of coal conveyor system for TNB ,REMACO at MANJUNG- I, II, III, MALAYSIA • Maintenance and shut down work of 1X1000 MW super critical coal fired Boiler for TNB ALSTOM at MANJUNG- IV,MALAYSIA • Erection of 2X 600 MW sub critical coal fired Mutiara Thermal Power plant( COASTAL ENERGEN ) EDAC Engineering Limited Tuticorin Tamilnadu,india • Erection of 2X 600 MW Boiler for North Chennai thermal power plant (BHEL ) at UB ENGINEERING LTD CHENNAI • Erection 3X 33 MW Boiler (BHARATH OMAN REFINERY LIMITED ) at M/S DOWEL ERECTORS PRIVATE LIMITED at Mathyapradesh BINA
  • 2. WORK EXPERIENCE • Company : M/s, EVERSENDAI ENGINEERING.SDN.BHD. MALAYSIA • Project : 1X1000 MW JANA MANJUNG SUPER CRITICAL BOILER • Designation : ENGINEER (BOILER STEEL STRUCTURE ERECTION) • Duration : JULY 2012 TO PRESENT ROLES AND RESPONSIBILITES  To handle the Entire Execution of conveyor system  To handle the Replace the pulley and bearing assembly  To handle pulley erection and proper alignment work  To handle the Replace the roller entire system  To handle the conveyor belt replacing work  To handle the Entire boiler structure erection work  To handle the erection of Boiler Ceiling Girder lifting  To handle the erection of APH structure  To handle the execution of Enclosure structure & Silencer  Maintain the sequence of Erection of BOILER STRUCTURES  To review construction drawings in advance for smooth work Execution  To prepare the every work before start applying the work permit (SWMS & HIRAC)  To prepare the every month Lifting gear inspection report  To prepare the DOSS inspection report  To prepare the bill of materials for the drawing issued  Inspection of the job at all stages & preparing report for the corresponding job  Experience in managing daily activities like material requisition, vendor document and follow up and coordination with other engineering discipline  Arrangement of Tools & Tackles for erection  Co-ordination with client for planning and schedule, Progress monitoring and Material Management  Measurement checking and clearing of contractor Bills / Invoice  Site mobilization, managing of site Labor, vendor development for site Material Requirements
  • 3. • Company : M/S EDAC ENGINEERING LTD. • Project : 2X 600MW THERMAL POWER PLANT • Designation : ENGINEER (PRESSURE PARTS ERECTION) • Duration : February 2011 to June 2012. ROLES AND RESPONSIBILITES  Engineering support and guidance for pressure parts erection, piping erection of boiler and fit up activities.  Execution of welding activities as per the Quality Management System.  Erection procedure and precaution for material such as Alloy steel (P91, P22, P12, P11 etc.) Stainless steel and Carbon steel.  Ensuring material availability as per site requirements.  Documentation on monthly, weekly and daily progress reports fit up reports co-ordination with client/subcontractor to solve technical issues.  Preparation of site deviation reports, close out of NCR activities, site observation • Company : M/s, BHARATH HEAVY ELECTICAL LTD. • Project : 2X600 MW THERMAL POWER PLANT • Designation : ENGINEER (BOILER PRESSURE PARTS ERECTION) • Duration : May 2009 to February2011 ROLES AND RESPONSIBILITES  To handle the Entire Execution of Boiler pressure parts  Erection sequence and inspection activities including erection and alignment of hanger rods and headers, alignment of water wall panels and steam cooled panels, alignment activities of SH coils, RH coils & steam cooled spacer tubes and its attachments.  Coordination on the erection and pre assembly activities of horizontal Buck stays and Burner panels.  Alignment activities of air vent and drain lines in prior to air leak test and hydro test activities.  Ensure availability and follow up of materials as per site requirements.  Supervision of manpower of 150 workers • Company : BHARATH OMAN REFINERY LTD • Project : 3X33 MW (BHEL POWER PLANT ). • Designation : JUNIOR ENGINEER.(DUCTING & STRUCTURE ERECTION) • Duration : June 2008 to May 2009.
  • 4. ROLES AND RESPONSIBILITES  To handle boiler ducting & structural erection  To prepare the Bill of materials for the drawing issued.  Follow up the production activity in shop.  To Handle the Stacker and Stacker cum Recamier  Routing the process in fabrication according to the monthly dispatch target.  Inspection of the job at all stages & preparing report for the corresponding job.  Coordinating with customer for providing the job status & incase of any drawing clarification. Certification • ASNT LEVEL –II (PT, MT, RT, UT) • Pro E PERSONAL PROFILE Father Name : Mr.G.GOVINDAN Date of Birth : 15APRIL 1987 Marital Status : MARRIED License : LMV Nationality : Indian Passport No : H6725566 Date of Issue : 18/06/2009 Date of Expiry : 17/06/2019 Languages Known : English, Tamil, Hindi & Malay. DECLARATION
  • 5. I hereby declare that all the information mentioned above is true and correct to best of my knowledge and belief. Date: Yours sincerely, Place: G.Paramasivam
  • 6. I hereby declare that all the information mentioned above is true and correct to best of my knowledge and belief. Date: Yours sincerely, Place: G.Paramasivam