Resume
Paramasivam govindan
E-mail: paramesmech@gmail.com
Mob- +601126452015
+919677811552.
Career Profile
To be in a challenging position in a progressive company, and to be a perfect
professional and effective solution provider by applying my skill and knowledge. I would like to
apply technology in innovative ways to solve problems in a better way, manage everything
effectively and efficiently and improve the quality of human life.
Academic credentials
B.E Mechanical Engineering- May -2008
PSNA College of Engineering &Technology
Kodhantaraman nagar Dindigul-624622
Tamilnadu India
First class (65 %) (2009) Anna University Chennai.
TOTAL EXPERIENCE: 6 YEARS
PROJECTS HANDLED AT INDIA & ABROAD
• Erection of 1X1000 MW super critical coal fired Boiler for TNB, ALSTOM at MANJUNG-
IV,MALAYSIA.-14000TONS
• Maintenance and shut down work of coal conveyor system for TNB ,REMACO at MANJUNG-
I, II, III, MALAYSIA
• Maintenance and shut down work of 1X1000 MW super critical coal fired Boiler for TNB
ALSTOM at MANJUNG- IV,MALAYSIA
• Erection of 2X 600 MW sub critical coal fired Mutiara Thermal Power plant( COASTAL
ENERGEN ) EDAC Engineering Limited Tuticorin Tamilnadu,india
• Erection of 2X 600 MW Boiler for North Chennai thermal power plant (BHEL ) at UB
ENGINEERING LTD CHENNAI
• Erection 3X 33 MW Boiler (BHARATH OMAN REFINERY LIMITED ) at M/S DOWEL
ERECTORS PRIVATE LIMITED at Mathyapradesh BINA
WORK EXPERIENCE
• Company : M/s, EVERSENDAI ENGINEERING.SDN.BHD. MALAYSIA
• Project : 1X1000 MW JANA MANJUNG SUPER CRITICAL BOILER
• Designation : ENGINEER (BOILER STEEL STRUCTURE ERECTION)
• Duration : JULY 2012 TO PRESENT
ROLES AND RESPONSIBILITES
 To handle the Entire Execution of conveyor system
 To handle the Replace the pulley and bearing assembly
 To handle pulley erection and proper alignment work
 To handle the Replace the roller entire system
 To handle the conveyor belt replacing work
 To handle the Entire boiler structure erection work
 To handle the erection of Boiler Ceiling Girder lifting
 To handle the erection of APH structure
 To handle the execution of Enclosure structure & Silencer
 Maintain the sequence of Erection of BOILER STRUCTURES
 To review construction drawings in advance for smooth work Execution
 To prepare the every work before start applying the work permit (SWMS & HIRAC)
 To prepare the every month Lifting gear inspection report
 To prepare the DOSS inspection report
 To prepare the bill of materials for the drawing issued
 Inspection of the job at all stages & preparing report for the corresponding job
 Experience in managing daily activities like material requisition, vendor document and follow up
and coordination with other engineering discipline
 Arrangement of Tools & Tackles for erection
 Co-ordination with client for planning and schedule, Progress monitoring and Material
Management
 Measurement checking and clearing of contractor Bills / Invoice
 Site mobilization, managing of site Labor, vendor development for site Material Requirements
• Company : M/S EDAC ENGINEERING LTD.
• Project : 2X 600MW THERMAL POWER PLANT
• Designation : ENGINEER (PRESSURE PARTS ERECTION)
• Duration : February 2011 to June 2012.
ROLES AND RESPONSIBILITES
 Engineering support and guidance for pressure parts erection, piping erection of boiler and fit
up activities.
 Execution of welding activities as per the Quality Management System.
 Erection procedure and precaution for material such as Alloy steel (P91, P22, P12, P11 etc.)
Stainless steel and Carbon steel.
 Ensuring material availability as per site requirements.
 Documentation on monthly, weekly and daily progress reports fit up reports co-ordination with
client/subcontractor to solve technical issues.
 Preparation of site deviation reports, close out of NCR activities, site observation
• Company : M/s, BHARATH HEAVY ELECTICAL LTD.
• Project : 2X600 MW THERMAL POWER PLANT
• Designation : ENGINEER (BOILER PRESSURE PARTS ERECTION)
• Duration : May 2009 to February2011
ROLES AND RESPONSIBILITES
 To handle the Entire Execution of Boiler pressure parts
 Erection sequence and inspection activities including erection and alignment of hanger rods and
headers, alignment of water wall panels and steam cooled panels, alignment activities of SH
coils, RH coils & steam cooled spacer tubes and its attachments.
 Coordination on the erection and pre assembly activities of horizontal Buck stays and Burner
panels.
 Alignment activities of air vent and drain lines in prior to air leak test and hydro test activities.
 Ensure availability and follow up of materials as per site requirements.
 Supervision of manpower of 150 workers
• Company : BHARATH OMAN REFINERY LTD
• Project : 3X33 MW (BHEL POWER PLANT ).
• Designation : JUNIOR ENGINEER.(DUCTING & STRUCTURE ERECTION)
• Duration : June 2008 to May 2009.
ROLES AND RESPONSIBILITES
 To handle boiler ducting & structural erection
 To prepare the Bill of materials for the drawing issued.
 Follow up the production activity in shop.
 To Handle the Stacker and Stacker cum Recamier
 Routing the process in fabrication according to the monthly dispatch target.
 Inspection of the job at all stages & preparing report for the corresponding job.
 Coordinating with customer for providing the job status & incase of any drawing clarification.
Certification
• ASNT LEVEL –II (PT, MT, RT, UT)
• Pro E
PERSONAL PROFILE
Father Name : Mr.G.GOVINDAN
Date of Birth : 15APRIL 1987
Marital Status : MARRIED
License : LMV
Nationality : Indian
Passport No : H6725566
Date of Issue : 18/06/2009
Date of Expiry : 17/06/2019
Languages Known : English, Tamil, Hindi & Malay.
DECLARATION
I hereby declare that all the information mentioned above is true and correct to best of my
knowledge and belief.
Date:
Yours sincerely,
Place: G.Paramasivam
I hereby declare that all the information mentioned above is true and correct to best of my
knowledge and belief.
Date:
Yours sincerely,
Place: G.Paramasivam

paramasivam resume

  • 1.
    Resume Paramasivam govindan E-mail: paramesmech@gmail.com Mob-+601126452015 +919677811552. Career Profile To be in a challenging position in a progressive company, and to be a perfect professional and effective solution provider by applying my skill and knowledge. I would like to apply technology in innovative ways to solve problems in a better way, manage everything effectively and efficiently and improve the quality of human life. Academic credentials B.E Mechanical Engineering- May -2008 PSNA College of Engineering &Technology Kodhantaraman nagar Dindigul-624622 Tamilnadu India First class (65 %) (2009) Anna University Chennai. TOTAL EXPERIENCE: 6 YEARS PROJECTS HANDLED AT INDIA & ABROAD • Erection of 1X1000 MW super critical coal fired Boiler for TNB, ALSTOM at MANJUNG- IV,MALAYSIA.-14000TONS • Maintenance and shut down work of coal conveyor system for TNB ,REMACO at MANJUNG- I, II, III, MALAYSIA • Maintenance and shut down work of 1X1000 MW super critical coal fired Boiler for TNB ALSTOM at MANJUNG- IV,MALAYSIA • Erection of 2X 600 MW sub critical coal fired Mutiara Thermal Power plant( COASTAL ENERGEN ) EDAC Engineering Limited Tuticorin Tamilnadu,india • Erection of 2X 600 MW Boiler for North Chennai thermal power plant (BHEL ) at UB ENGINEERING LTD CHENNAI • Erection 3X 33 MW Boiler (BHARATH OMAN REFINERY LIMITED ) at M/S DOWEL ERECTORS PRIVATE LIMITED at Mathyapradesh BINA
  • 2.
    WORK EXPERIENCE • Company: M/s, EVERSENDAI ENGINEERING.SDN.BHD. MALAYSIA • Project : 1X1000 MW JANA MANJUNG SUPER CRITICAL BOILER • Designation : ENGINEER (BOILER STEEL STRUCTURE ERECTION) • Duration : JULY 2012 TO PRESENT ROLES AND RESPONSIBILITES  To handle the Entire Execution of conveyor system  To handle the Replace the pulley and bearing assembly  To handle pulley erection and proper alignment work  To handle the Replace the roller entire system  To handle the conveyor belt replacing work  To handle the Entire boiler structure erection work  To handle the erection of Boiler Ceiling Girder lifting  To handle the erection of APH structure  To handle the execution of Enclosure structure & Silencer  Maintain the sequence of Erection of BOILER STRUCTURES  To review construction drawings in advance for smooth work Execution  To prepare the every work before start applying the work permit (SWMS & HIRAC)  To prepare the every month Lifting gear inspection report  To prepare the DOSS inspection report  To prepare the bill of materials for the drawing issued  Inspection of the job at all stages & preparing report for the corresponding job  Experience in managing daily activities like material requisition, vendor document and follow up and coordination with other engineering discipline  Arrangement of Tools & Tackles for erection  Co-ordination with client for planning and schedule, Progress monitoring and Material Management  Measurement checking and clearing of contractor Bills / Invoice  Site mobilization, managing of site Labor, vendor development for site Material Requirements
  • 3.
    • Company :M/S EDAC ENGINEERING LTD. • Project : 2X 600MW THERMAL POWER PLANT • Designation : ENGINEER (PRESSURE PARTS ERECTION) • Duration : February 2011 to June 2012. ROLES AND RESPONSIBILITES  Engineering support and guidance for pressure parts erection, piping erection of boiler and fit up activities.  Execution of welding activities as per the Quality Management System.  Erection procedure and precaution for material such as Alloy steel (P91, P22, P12, P11 etc.) Stainless steel and Carbon steel.  Ensuring material availability as per site requirements.  Documentation on monthly, weekly and daily progress reports fit up reports co-ordination with client/subcontractor to solve technical issues.  Preparation of site deviation reports, close out of NCR activities, site observation • Company : M/s, BHARATH HEAVY ELECTICAL LTD. • Project : 2X600 MW THERMAL POWER PLANT • Designation : ENGINEER (BOILER PRESSURE PARTS ERECTION) • Duration : May 2009 to February2011 ROLES AND RESPONSIBILITES  To handle the Entire Execution of Boiler pressure parts  Erection sequence and inspection activities including erection and alignment of hanger rods and headers, alignment of water wall panels and steam cooled panels, alignment activities of SH coils, RH coils & steam cooled spacer tubes and its attachments.  Coordination on the erection and pre assembly activities of horizontal Buck stays and Burner panels.  Alignment activities of air vent and drain lines in prior to air leak test and hydro test activities.  Ensure availability and follow up of materials as per site requirements.  Supervision of manpower of 150 workers • Company : BHARATH OMAN REFINERY LTD • Project : 3X33 MW (BHEL POWER PLANT ). • Designation : JUNIOR ENGINEER.(DUCTING & STRUCTURE ERECTION) • Duration : June 2008 to May 2009.
  • 4.
    ROLES AND RESPONSIBILITES To handle boiler ducting & structural erection  To prepare the Bill of materials for the drawing issued.  Follow up the production activity in shop.  To Handle the Stacker and Stacker cum Recamier  Routing the process in fabrication according to the monthly dispatch target.  Inspection of the job at all stages & preparing report for the corresponding job.  Coordinating with customer for providing the job status & incase of any drawing clarification. Certification • ASNT LEVEL –II (PT, MT, RT, UT) • Pro E PERSONAL PROFILE Father Name : Mr.G.GOVINDAN Date of Birth : 15APRIL 1987 Marital Status : MARRIED License : LMV Nationality : Indian Passport No : H6725566 Date of Issue : 18/06/2009 Date of Expiry : 17/06/2019 Languages Known : English, Tamil, Hindi & Malay. DECLARATION