Professional Experience Sr. Project Manager February 2014 – Present
Luminant, Martin Lake Mines
Responsible for the safe and compliant completion of all Capital and Special O&M
Construction Projects for all Martin Lake Mines.
• Responsible for numerous (5-10) projects at any given time ranging in budget
price from $25,000 to $2,000,000.
• Responsible for the overall safety of the project according to MSHA and OSHA
regulations. Ensure Safety is top priority. Utilize pre-job briefs and BBS
Observations as tools.
• Responsible for Environmental Compliance on each project per RCT, TCEQ,
and TxDOT regulations. 0 Notice of Violations during 3 year period. Perform
Project Evaluations during design and construction phase to ensure compliance
is met. Developed safety and environmental checklist as part of project initiation
phase that is now used company wide.
• Spend significant amount of time in the field having construction oversight on
each project. Certify project was built according to plans. Perform As-Builts for
each project.
• Design of haul roads, diversions, ponds and other various civil projects.
• Strive to ensure scope, schedule, and budget are on track for each project.
Have not had a major lapse on any project to date.
• Work closely with contractors and have excellent communication skills with
contractors to ensure job is completed in a safe manner, compliant, on
schedule, and within the budget.
• Utilize experienced resources to ensure a job is completed correctly and
efficiently.
• Develop detailed engineering estimates.
• Work through procurement to develop and conduct pre-bid meetings and pre-
construction meetings.
• Develop technical specifications to be included with detailed design plans used
in the bid process.
• Process contractor pay requests and change orders when necessary.
• Utilize Maximo software to create and manage work orders.
• Currently lead the Martin Lake Impoundment Inspection team to ensure all 250+
ponds at Martin Lake get inspected on time in order to stay compliant with RCT,
TCEQ and MSHA.
• Perform inspections on embankment ponds according to RCT, TCEQ and
MSHA requirements.
• Played a vital role in implementing Program Management Office (PMO) at the
Martin Lake Mines. This brought all stakeholders together to achieve a common
goal.
Mine Planning Supervisor September 2012 – February 2014
Luminant, Tatum Mine
Responsible for the overall Mine Planning at the Tatum Mine. (Surveying, Environmental,
Short & Long Range Planning, Environmental Compliance, and Reclamation Planning)
• Maintained a proactive attitude towards safety and ensured employees are
comfortable with their working conditions through the HPI and BBS processes.
• Ensured safe operations of contractors building ponds, structures, etc. by using
pre job briefs and BBS observations
• Completed Project Evaluation Forms to ensure safety and environmental
compliance on every project at the mine site.
• Designed haul roads, pipe/culvert sizing, pit sequencing, ground control plans
etc.
• Compiled AutoCAD maps and used 3D Dig to ensure compliance and to make
operations and productivity more efficient.
• Developed (through sound engineering) and ensure execution (operationally, by
having a presence in the field) of ground control plans against old mined out
works. This included range diagrams, pit sequencing, etc.
• Ensured environmental compliance and have achieved 0 NOV’s in the 1.5 years
I was in the role.
• Improved standardization and efficiency of mine planning process throughout
Martin Lake Complex.
• PE Exam Passed 10/25/13
Associate Engineer/Mine Planning Engineer April 2011- Sep. 2012
Luminant, Oak Hill and Tatum Mine
Responsible for surveying, red dirt planning, and dragline planning.
• Compiled daily reports and performed misc. survey jobs
• Red Dirt Planning – Compiled monthly mass balance for RCT approval and for
operations needs as required
• Mine Planning – Compiled weekly plan projections, 30-60-90 projections, misc.
AutoCAD and Carlson projects and end of week reports
• Operations - Rode around frequently with mine manager, operations manager
and operations foreman to ensure plan was accurate and to learn the operation
of mine and the procedures for correct supervising.
Intern/Civil Engineer/Project Manager May 2007-April 2011
Gary Burton Engineering, Tyler, TX
Aug. 2006 – May 2010 attended UT-Tyler – Worked 20hrs/wk and 16 credit hours
Project Engineering
• Designed public water and sewer systems
• Prepared contract documents and technical specifications
• Prepared drawings, permits and documents for regulatory agency approvals
• Prepared Emergency Action Plans for various sized dams
• Conducted field surveying with total station
• Construction Administration
• Assisted in coordination issues of work authorization and documentation
including change orders, design drawings, and as-built drawings
• Prepared, verified and/or updated pay requests and cost estimates
• Oversaw construction on water/sewer lines and water treatment plants
• Proficient in Microsoft Office products and AutoCAD
Andrew LaGrone
1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
Maintenance Worker May 2003-May 2007
Henderson ISD, Henderson, TX - Attended Henderson High School during this time
• Groundskeeper
• Assembled and repaired equipment
• Performed electrical work
Education/Certification
s
Professional Engineering Licensure PE 115819 December 2013
University of Texas at Tyler August 2006-May 2010
Bachelor of Science in Civil Engineering
• Affiliations
 Texas Society of Professional Engineers – 2013 - Current
 ASCE Associate member 2011
 ASCE, Student Chapter – Media Officer, 2009
 American Institute of Steel Construction, Student Chapter, 2008
 ASCE Concrete Canoe Competition – 2007-2009
• Continuing Education/Training
 2016 – MSHA Impoundment Inspector – Certified Instructor of Course
 2016 – Navarro College – Evaluating High Pressure, High Temperature
and Horizontal Oil Wells and Gas wells.
 2016 – Johnson and Pace – HEC-RAS 2D Modeling
Demonstration/Training Session
 2015 – MSHA Impoundment Inspector – Certified Instructor of Course
 2014 – MSHA Impoundment Inspector Training – Certified Inspector
 2014 – OSHA Trenching and Shoring Safety
 2013 – Surface Certification
 2011-Water and Wastewater Equipment Technology – TSPE
 2010-Dam Safety Workshop - TCEQ
 2010-Section Biannual Seminar - NE-WEAT
 2010-Back to Basics – TX-AWWA
 2010-Manhole Rehab Workshop – Standard Cement Materials, Inc.
 2010-Pipeline Emergency Response / Damage Prevention (Paradigm)
 2010 – Engineering Expo, Ethics (Kilgore College)
Kilgore Junior College June 2005 – May 2006
Received Academic Scholarship to attend
Henderson High School August 2001- May 2005
Software Training 3D Dig 2012 Dragline Simulation Training
Civil 3D 2015 Training
Carlson 2015 Training
3D Dig 2000 Dragline Simulation Training
AutoCAD Map 3D 2015 Training
Andrew LaGrone
1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
Andrew LaGrone
1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com

More Related Content

What's hot

Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
andi dipayadnya
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15 Mike Syslak
 
Chris doran resume 03 08-16
Chris doran resume 03 08-16Chris doran resume 03 08-16
Chris doran resume 03 08-16
Christopher Doran
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CVLeo Rosario
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST ResumeJose Muraira
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...Azhar Niazi
 
U pdated resume #7.pdf
U pdated resume #7.pdfU pdated resume #7.pdf
U pdated resume #7.pdf
Sonny Daigrepont
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy
 
Pete day resume 8 2010
Pete day resume 8 2010Pete day resume 8 2010
Pete day resume 8 2010Pete Day
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1andrew wellbelove
 

What's hot (20)

Ryan Arendse
Ryan ArendseRyan Arendse
Ryan Arendse
 
Steven Vukusic Resume
Steven Vukusic ResumeSteven Vukusic Resume
Steven Vukusic Resume
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
Chris doran resume 03 08-16
Chris doran resume 03 08-16Chris doran resume 03 08-16
Chris doran resume 03 08-16
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
 
2016 CBresume
2016 CBresume2016 CBresume
2016 CBresume
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...
 
Paul Lazarine Resume 10-24-2014
Paul Lazarine Resume 10-24-2014Paul Lazarine Resume 10-24-2014
Paul Lazarine Resume 10-24-2014
 
U pdated resume #7.pdf
U pdated resume #7.pdfU pdated resume #7.pdf
U pdated resume #7.pdf
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
 
Pete day resume 8 2010
Pete day resume 8 2010Pete day resume 8 2010
Pete day resume 8 2010
 
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
 
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUARCV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
 
Project Experience
Project ExperienceProject Experience
Project Experience
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 

Similar to Andrew LaGrone Resume

Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Ray Freiha
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedulesaieq
 
Resume of Christian Kuhasz
Resume of Christian KuhaszResume of Christian Kuhasz
Resume of Christian KuhaszChristian Kuhasz
 
Erica Anderson Resume
Erica Anderson ResumeErica Anderson Resume
Erica Anderson ResumeErica Hein
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum VitaeAndi Aris
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain
 
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015Terry Barwick
 
21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAESimon Norton
 

Similar to Andrew LaGrone Resume (20)

Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
LONNIE L
LONNIE LLONNIE L
LONNIE L
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Assarpour_Amir
Assarpour_AmirAssarpour_Amir
Assarpour_Amir
 
Resume of Christian Kuhasz
Resume of Christian KuhaszResume of Christian Kuhasz
Resume of Christian Kuhasz
 
Erica Anderson Resume
Erica Anderson ResumeErica Anderson Resume
Erica Anderson Resume
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
 
shahul updated resume
shahul updated resumeshahul updated resume
shahul updated resume
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
 
Z-FEBresume
Z-FEBresumeZ-FEBresume
Z-FEBresume
 
Mike C LeBlanc REV3
Mike C LeBlanc REV3Mike C LeBlanc REV3
Mike C LeBlanc REV3
 
21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE
 

Andrew LaGrone Resume

  • 1. Andrew LaGrone, P.E. 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com Objective To have a successful career in a leadership role in the project management, construction management, or mining industry. Professional Experience Sr. Project Manager February 2014 – Present Luminant, Martin Lake Mines Responsible for the safe and compliant completion of all Capital and Special O&M Construction Projects for all Martin Lake Mines. • Responsible for numerous (5-10) projects at any given time ranging in budget price from $25,000 to $2,000,000. • Responsible for the overall safety of the project according to MSHA and OSHA regulations. Ensure Safety is top priority. Utilize pre-job briefs and BBS Observations as tools. • Responsible for Environmental Compliance on each project per RCT, TCEQ, and TxDOT regulations. 0 Notice of Violations during 3 year period. Perform Project Evaluations during design and construction phase to ensure compliance is met. Developed safety and environmental checklist as part of project initiation phase that is now used company wide. • Spend significant amount of time in the field having construction oversight on each project. Certify project was built according to plans. Perform As-Builts for each project. • Design of haul roads, diversions, ponds and other various civil projects. • Strive to ensure scope, schedule, and budget are on track for each project. Have not had a major lapse on any project to date. • Work closely with contractors and have excellent communication skills with contractors to ensure job is completed in a safe manner, compliant, on schedule, and within the budget. • Utilize experienced resources to ensure a job is completed correctly and efficiently. • Develop detailed engineering estimates. • Work through procurement to develop and conduct pre-bid meetings and pre- construction meetings. • Develop technical specifications to be included with detailed design plans used in the bid process. • Process contractor pay requests and change orders when necessary. • Utilize Maximo software to create and manage work orders. • Currently lead the Martin Lake Impoundment Inspection team to ensure all 250+ ponds at Martin Lake get inspected on time in order to stay compliant with RCT, TCEQ and MSHA. • Perform inspections on embankment ponds according to RCT, TCEQ and MSHA requirements. • Played a vital role in implementing Program Management Office (PMO) at the Martin Lake Mines. This brought all stakeholders together to achieve a common goal. Mine Planning Supervisor September 2012 – February 2014 Luminant, Tatum Mine Responsible for the overall Mine Planning at the Tatum Mine. (Surveying, Environmental,
  • 2. Short & Long Range Planning, Environmental Compliance, and Reclamation Planning) • Maintained a proactive attitude towards safety and ensured employees are comfortable with their working conditions through the HPI and BBS processes. • Ensured safe operations of contractors building ponds, structures, etc. by using pre job briefs and BBS observations • Completed Project Evaluation Forms to ensure safety and environmental compliance on every project at the mine site. • Designed haul roads, pipe/culvert sizing, pit sequencing, ground control plans etc. • Compiled AutoCAD maps and used 3D Dig to ensure compliance and to make operations and productivity more efficient. • Developed (through sound engineering) and ensure execution (operationally, by having a presence in the field) of ground control plans against old mined out works. This included range diagrams, pit sequencing, etc. • Ensured environmental compliance and have achieved 0 NOV’s in the 1.5 years I was in the role. • Improved standardization and efficiency of mine planning process throughout Martin Lake Complex. • PE Exam Passed 10/25/13 Associate Engineer/Mine Planning Engineer April 2011- Sep. 2012 Luminant, Oak Hill and Tatum Mine Responsible for surveying, red dirt planning, and dragline planning. • Compiled daily reports and performed misc. survey jobs • Red Dirt Planning – Compiled monthly mass balance for RCT approval and for operations needs as required • Mine Planning – Compiled weekly plan projections, 30-60-90 projections, misc. AutoCAD and Carlson projects and end of week reports • Operations - Rode around frequently with mine manager, operations manager and operations foreman to ensure plan was accurate and to learn the operation of mine and the procedures for correct supervising. Intern/Civil Engineer/Project Manager May 2007-April 2011 Gary Burton Engineering, Tyler, TX Aug. 2006 – May 2010 attended UT-Tyler – Worked 20hrs/wk and 16 credit hours Project Engineering • Designed public water and sewer systems • Prepared contract documents and technical specifications • Prepared drawings, permits and documents for regulatory agency approvals • Prepared Emergency Action Plans for various sized dams • Conducted field surveying with total station • Construction Administration • Assisted in coordination issues of work authorization and documentation including change orders, design drawings, and as-built drawings • Prepared, verified and/or updated pay requests and cost estimates • Oversaw construction on water/sewer lines and water treatment plants • Proficient in Microsoft Office products and AutoCAD Andrew LaGrone 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
  • 3. Maintenance Worker May 2003-May 2007 Henderson ISD, Henderson, TX - Attended Henderson High School during this time • Groundskeeper • Assembled and repaired equipment • Performed electrical work Education/Certification s Professional Engineering Licensure PE 115819 December 2013 University of Texas at Tyler August 2006-May 2010 Bachelor of Science in Civil Engineering • Affiliations  Texas Society of Professional Engineers – 2013 - Current  ASCE Associate member 2011  ASCE, Student Chapter – Media Officer, 2009  American Institute of Steel Construction, Student Chapter, 2008  ASCE Concrete Canoe Competition – 2007-2009 • Continuing Education/Training  2016 – MSHA Impoundment Inspector – Certified Instructor of Course  2016 – Navarro College – Evaluating High Pressure, High Temperature and Horizontal Oil Wells and Gas wells.  2016 – Johnson and Pace – HEC-RAS 2D Modeling Demonstration/Training Session  2015 – MSHA Impoundment Inspector – Certified Instructor of Course  2014 – MSHA Impoundment Inspector Training – Certified Inspector  2014 – OSHA Trenching and Shoring Safety  2013 – Surface Certification  2011-Water and Wastewater Equipment Technology – TSPE  2010-Dam Safety Workshop - TCEQ  2010-Section Biannual Seminar - NE-WEAT  2010-Back to Basics – TX-AWWA  2010-Manhole Rehab Workshop – Standard Cement Materials, Inc.  2010-Pipeline Emergency Response / Damage Prevention (Paradigm)  2010 – Engineering Expo, Ethics (Kilgore College) Kilgore Junior College June 2005 – May 2006 Received Academic Scholarship to attend Henderson High School August 2001- May 2005 Software Training 3D Dig 2012 Dragline Simulation Training Civil 3D 2015 Training Carlson 2015 Training 3D Dig 2000 Dragline Simulation Training AutoCAD Map 3D 2015 Training Andrew LaGrone 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
  • 4. Andrew LaGrone 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com