1. MOHD. SAFFIUR RAHMAN
Passport No. H2645437, Mobile: 07389935703,
E-Mail: saffiur2011@gmail.com, saffiur2011@yahoo.in
Zeal to learn and seeking a position to utilize my abilities in the Mechanical Engineering
that offers Professional growth while being resourceful, innovative and flexible.
An Overview
Total 7.9 years working experience in Power Plant Erection &commissioning.
3.9 year experience with M/S SEPCO-1, BALCO (CHHATTISGARH) Mechanical Engineering
Dept. of 4X300MW Thermal Power Plant.
4 years experience with M/S POWER MECH PROJECTS LTD, Boiler Installation Dept. of
2X250MW
Completed B.E. (Mechanical) from Chouksey Engineering College Bilaspur, Guru GhasiDas
University, Bilaspur, Chhattisgarh in 2007.
Undergone vocational training at NTPC, Korba, (C.G.)
ASNT LEVEL II IN NDT (UT, PT, RT, MT, VT), from Trinity Bangalore.
Present Organisational Experience
Working with (EPC) SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION, in
BALCO since August’ 2011.
Designation : Deputy Manager (MECHANICAL ENGINEERING DEPT.)
Company Profile
This companies’ having 4X 300MW power plants Balco, CG.
Its 4X1025 TPH Sub-Critical PF Boiler (Harbin Boiler) and 4X300 MW Steam Turbine Generator sets
(Dong- fong).
Previous Organisational Experience
Working with POWER MECH PROJECTS LIMITED, IN KORBA since May’ 2007.
Designation : Boiler Installation Engineer
Job Profile
Complete Installation, Hydro test & Pre-Commissioning chemical cleaning of 4x300 MW
Boiler & Pre Boiler systems.
Experience in installing, testing and commissioning of BOP of 4x300 MW units’ i.e. CHP, Air
Compressors System • Fire Fighting System (CO2, Flooding Foam system, DVJB) Firefighting
pumps for hydrant &spray system• DM Plant (Pretreatment &Post Treatment Plant, horizontal
&vertical pumps, blower.) • Cooling Towers • FOPH (LDO & HFO) Fuel Oil Pump House •
SWAS Room, Dosing System • Electric Hoist.
2. Responsible for Piping erection operations and pipe support installation in accordance with
schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings.
Welding Inspection (Pressure parts, Piping & Structures)
Assist in preparation of test packages for Pneumatic tests and Hydrostatic tests and line check
& also assures that all joints are exposed for examination during the pressure test.
Ensure that all punch list items are resolved and that there is no prolongation of project.
Preparation of Daily, weekly and monthly performance reports.
Check & monitor the NDT.
Academia
B.E. in Mechanical Engineering with 68.10 % from Chouksey Engg. College in Guru Gahsidas
University Bilaspur (C.G.) in the year 2007
H.S.S.C with 60.00% in the year 2002 from CG Board Bhopal, Beacon English School, Korba, Chhattisgarh
S.S.C. with 59.6% in the year 2000 from MP Board Raipur, Beacon English School, Korba, Chhattisgarh
Vocational training
Organisation : NTPC, Korba, (C.G.)
Duration : 15 days
Department : Boiler & turbine
Description : The training has enabled the basics of Power Plant. During training I have Completed a
. Project file.
IT Skills
Operating Systems : Windows- 98, 2000, XP Professional, MS- Dos.
Pakages : MS-Word, MS-Power Point, MS-Excel.
Technical Skills : AutoCAD 2007,
Personal Dossier
Date of Birth : 30- Jan- 1985
Permanent Address : D/181 CSEB Colony, Darri Korba (west), Dist. - Korba, C.G.-495450
Languages Known : English & Hindi
Hobbies : Making friends.
Nationality : Indian
Declaration
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the
responsibility for the correctness of the above mentioned particulars.
Date: (Mohd. Saffiur Rahman)
Place: Korba (Chhattisgarh)