Kaizen Blitz: Paint Shop Layout
Alan Magner

Wednesday 27th July, 2011
Contact:
alanmagner@variancereduction.com
Agenda
1-day event to improve safety & housekeeping in the paint shop

Target
 Improve the housekeeping at the Paint Shop so the Fire Exit will always
be kept clear

Involved
 Mick Norton, Steve Cowling, Mohammed Riyaz

Results
 Fire Exit is kept clear
 Reduced walking distance looking for trolleys, and moving trolleys out
of the way
 All trolleys have a designated place, and are kept in their place
Before

After

Problem Statement
Access to the fire exit at the Paint Shop was blocked by trolleys and by inventory
Action
1 day kaizen blitz to improve safety – using 5S principles to improve housekeeping
and improved workflow, and employee engagement to sustain the changes
After: Storage for empty disc trolleys

After: Storage for empty trolleys

Problem Statement
 Paint shop has 20 trolleys – not enough room to store them
Action
 Made storage area for 8 disc trolleys that is 5m from the paint shop – used for
trolleys with the low use
 Made storage area in the paint shop for 6 empty trolleys that have high usage
After: Storage for painted product

After: Improved visuals & signs

Problem Statement
 When large discs are painted need space to store them – need a space where product won’t
be accidently touched or bumped
Action
 Made storage area for 1 trolley that is 3m from the paint shop – only used for trolleys with
painted product
 Improved visuals - Signs labelling each storage area
Before: Residue and dirt on floor

After: Place for inventory to be chromated

Problem Statement
 When picked parts are delivered to the paint shop for chromating, there is no dedicated place for them
 Floor was dirty
Action
 Allocated an inventory square for parts to be delivered to. Enough space between square & chromating
baths to allow easy transfer, pallet “off-square” to allow for a straight drive-in & drop for forklift drivers
 Paint shop floor was swept & mopped, dirt & residue was removed

Kaizen Blitz Paint shop layout Jul 2011

  • 1.
    Kaizen Blitz: PaintShop Layout Alan Magner Wednesday 27th July, 2011 Contact: alanmagner@variancereduction.com
  • 2.
    Agenda 1-day event toimprove safety & housekeeping in the paint shop Target  Improve the housekeeping at the Paint Shop so the Fire Exit will always be kept clear Involved  Mick Norton, Steve Cowling, Mohammed Riyaz Results  Fire Exit is kept clear  Reduced walking distance looking for trolleys, and moving trolleys out of the way  All trolleys have a designated place, and are kept in their place
  • 3.
    Before After Problem Statement Access tothe fire exit at the Paint Shop was blocked by trolleys and by inventory Action 1 day kaizen blitz to improve safety – using 5S principles to improve housekeeping and improved workflow, and employee engagement to sustain the changes
  • 4.
    After: Storage forempty disc trolleys After: Storage for empty trolleys Problem Statement  Paint shop has 20 trolleys – not enough room to store them Action  Made storage area for 8 disc trolleys that is 5m from the paint shop – used for trolleys with the low use  Made storage area in the paint shop for 6 empty trolleys that have high usage
  • 5.
    After: Storage forpainted product After: Improved visuals & signs Problem Statement  When large discs are painted need space to store them – need a space where product won’t be accidently touched or bumped Action  Made storage area for 1 trolley that is 3m from the paint shop – only used for trolleys with painted product  Improved visuals - Signs labelling each storage area
  • 6.
    Before: Residue anddirt on floor After: Place for inventory to be chromated Problem Statement  When picked parts are delivered to the paint shop for chromating, there is no dedicated place for them  Floor was dirty Action  Allocated an inventory square for parts to be delivered to. Enough space between square & chromating baths to allow easy transfer, pallet “off-square” to allow for a straight drive-in & drop for forklift drivers  Paint shop floor was swept & mopped, dirt & residue was removed