SlideShare a Scribd company logo
Osama Youseef Dwedar Electrical Design Engineer
Rev.2
Osama Youseef Fathy Dwedar
Electrical Design & Technical Study Engineer
Kharafi National (KN), Engineering & Tendering Department
Bachelor’s degree in Electrical Power & machines engineering
Tel: (002) 0122 0284984
: (002) 0100 6370113
Email: Eng_osamadwedar@hotmail.com
1984, Egyptian.BORN:
Single.MARITAL
STATUS:
English, Arabic (Mother tongue)LANGUAGES:
• B.Sc. Electrical Engineering, Power and Machine, Cairo University Cairo, Egypt,
June 2008, cumulative grade good, graduation project grade excellent.
• Currently working towards Master of Science degree from Cairo University.
EDUCATION:
• Eng. Osama Dwedar experience covers the project design, shop drawings,
technical calculations and specification preparation, MV infrastructural network,
street and outdoor lighting, follow up, value engineering, bid analysis,
supervision of construction works and commissioning of the electrical services
including transformer substation, electrical power networks, lighting, earthing,
lightning protection, fire alarm system, sound system, telephone system, security
and control system.
• Eng. Osama Dwedar have experience in cost estimation, and evaluate data in
order to determine the resources needed to create products and to finish projects
in the most efficient and profitable ways possible. These resources include time,
money, labor, services and equipment.
• Eng. Osama Dwedar have experience in designing industrial plants. Also he is
expert in preparing technical calculations like load flow analysis, short circuit
analysis, motors starting analysis, battery sizing, cable sizing , harmonic analysis,
transient stability analysis, optimal power flow analysis, protection relays
coordination and reliability assessment using the Electrical Transient Analyzer
Program (ETAP 11).
• Eng. Osama Dwedar has 6 years of experience in the project design and
executions of electrical installation. During his career he worked as a consultant
as well as a contractor. This diversification has a major contribution to Mr.
Dwedar excellence in the design of electrical works.
With Engineers Syndicate Sub Giza as trainer for ETAP power station
Software.
SUMMARY OF
CAPABILITIES
From Jun 2012
till now
Osama Youseef Dwedar Electrical Design Engineer
Rev.2
With KHARAFI NATIONAL (KN) Company as an Electrical Design &Technical
studies Engineer in Engineering Services Department for the following projects:
1. WEST DAMITTA POWER STATION, Damitta, Egypt.
Kharafi national company, In cooperation with Client Arab Republic of Egypt to build
sample electrical substation to can generate electrical power 500MVA. The project
consists of four Gas Turbine each one have 130MW, 15 KV and 4 step up Transformer
(125 MVA, 15220 KV) and two 220 KV GIS motor startup .The task concerned with
designing of electrical works and preparing material take off (MTO), electrical
calculation and M.V&L.V protective relay coordination manually and by ETAP power
station software and review the suppliers specs meeting the consultant specs.
2. Sylibia and Ardaiy waste water plant
Kharafi national company, in cooperation with Client state of Kuwait ministry of
public works to make extension of the waste water plant .The task concerned with
designing of electrical works and preparing electrical specification and calculation and
protective relay coordination manually and by ETAP power station software and
review the suppliers specs meeting the consultant specs and design service buildings
(lighting, power, low current, fire alarm).
3. 132/11 KV Substations at Jaber Al Ahmed – (Tender Phase)
Kharafi national company, Preparing tender documents for Client state of Kuwait
ministry of public works to make new 132/11 KV substation .The task concerned with
designing of electrical works and preparing electrical Documents and drawings and
load calculation and preparing MTO& RFQ for the project and review the suppliers
specs meeting the consultant specs or not.
4. West Qurna I Project 132/33KV Transmission & Distribution – (Tender
Phase)
Kharafi national company, Preparing tender documents for Client state of Iraq
ministry of public works to make new 132/33 KV substation .The task concerned with
designing of electrical works and preparing electrical Tender drawings and load
calculation and preparing MTO& RFQ for the project and review the suppliers specs
meeting the consultant specs or not .
5. Abu Rwash waste water treatment plant 2,000,000 m3/day – (Tender Phase)
Kharafi national company, Preparing tender documents for Client state of CAPW to
make extension of the waste water plant to treat 2,000,000m3/day .The task concerned
with Kharafi designing of electrical works (11KV subsation , low voltage subsation,
MV&LV cable routing and building services) and preparing electrical Tender
Documents and drawings and estimated electrical load consumption and preparing
MTO& RFQ for the project and review the suppliers specs meeting the consultant
specs or not .
From Oct 2011
till now
Osama Youseef Dwedar Electrical Design Engineer
Rev.2
With Elgammal industrial projects (GIP) Company as an Electrical Design
&Technical studies Engineer at Engineering Department for the following
projects:
1. Tourah Cement -EPAP II Project for line 8, Cairo, Egypt.
Elgammal industrial projects, in cooperation with Client Italcement Company and
World Bank to Conversion Electro Static filters to Bag House filters to removing
suspended particulates in the air and improvement the ambient. The project consists of
four huge bag filters (cooler bag filter, bypass bag filter, raw mill A and raw mill B)
each one have 1MW motor startup by 1.25 MW variable speed drive 12 pulse and this
drives fed from 3 winding transformers and the filter have small motors as screw
conveyor motors, rotary air valve motors, dampers and all instruments as speed
sensors, vibration sensors, thermocouple,……etc. The task concerned with designing
of process electrical works including modification of the existing medium voltage
switch gear (6.3 KV) and makes excitation for new cells to fed new VSD transformers
and MCCs, sizing of the medium voltage and low voltage cables. designing of 6.3KV
cables and 0.5KV cables infrastructural networks, motor control centers, distribution
boards, power feeders, distributed control system, automation and instrumentation
system including modification and programming of PLC,… etc with the supporting
technical calculations like 1- VSD and distribution transformer sizing calculation. 2-
load flow and voltage drop calculations, 3- short circuit calculations, 4- Motor starting
analysis, 5- Earthing and lightning protection conductor sizing calculations, 6- Cables
sizing calculations, 7- Protection relays coordination study by ETAP 7, 8- Standby
diesel generator sizing calculations, 9- preparing MTO & material submittal
2. Gas Conditioning Tower Feeding, Helwan, Egypt.
Elgammal industrial projects, in cooperation with Client Italcement Company to
feeding new gas conditioning tower. The project consists of three compressors
0.75MW and our scope modification of the existing medium voltage switch gear
6.3KV, sizing of new distribution transformers, re adjustment of the existing protection
relay by ETAP 7 to protect new transformers , sizing of the medium voltage and low
voltage cables, designing of instrumentation cables to transfer signals from transformer
and compressor to central control room (CCR) ., etc
3. Water substation Feeding, 5MW, Suez, Egypt.
Elgammal industrial projects, in cooperation with Client Italcement Company to
feeding Water substation. The project consists of four pumps 1MW and our scope
modification of the existing medium voltage switch gear 11KV, sizing of new
distribution transformers, re adjustment of the existing protection relay by ETAP 7 to
protect new transformers , sizing of the medium voltage and low voltage cables,
designing of instrumentation cables to transfer signals from transformer and pumps to
central control room (CCR) ., etc
From May 2011
Oct 2012
Osama Youseef Dwedar Electrical Design Engineer
Rev.2
With Allied Consultants Company as Electrical Design Engineer for the following
projects:
Designing of District Cooling Plants
1. Cairo Festival City District Cooling Plant, 25 MW , Al Futtaim real estate,
Cairo, Egypt.
Design documents for Contractor Gas Chill to enable bidding for design and build
Contract. The task concerned with designing 22KV and 3.3KV switchgear, power
transformers, distribution boards, power cables, lighting, fire alarm, security, earthing
and lightning protection system. Moreover, preparing technical calculations like 1-
transformer sizing calculations, 2- load flow and voltage drop calculations, 3- short
circuit calculations, 4- Chiller motor starting analysis, 5- Earthing and lightning
protection conductor sizing calculations, 6- Cables sizing calculations, 7- Protection
relays coordination study, 8- Standby diesel generator sizing calculations, 9- UPS and
Central battery systems sizing calculations, 10- cable ladder and tray sizing
calculations.
2. Mirdiff District Cooling Plant, 18 MW , Empower, Dubai, Emirates.
The task concerned with preparing tender documents, technical specifications, BOQ
and designing of HV switchgear, power transformers, MV soft starters panels,
distribution boards, power cables, LV motor control centers, lighting, small power, fire
alarm, security, earthing and lightning protection system.
3. Al-Qouz District Cooling Plant, 37 MW, Empower, Dubai, Emirates.
The task concerned with preparing tender documents, technical specifications, BOQ
and designing of HV switchgear, power transformers, MV soft starters panels,
distribution boards, power cables, LV motor control centers, lighting, small power, fire
alarm, security, earthing and lightning protection system.
4. Bahrain Bay Utilities District Cooling Plant, 45MW, Bahrain.
The task concerned with designing process and building services of electrical works
from EPC contract. The project is design and built with Contractor UNICORP
including cost estimate and shop drawings.
5. Bin Smikh Hotel (51 floors):
The task concerned with designing of Design Medium Voltage Network According to
Kahrmaa code and Design 3 distribution Substation in First Basement Floor & 27th
Floor and 51st Floor According to Kahrmaa code Design for all power activities
(lighting, sockets, power outlets) , Design light current systems (Fire Alarm, CCTV, &
P.Addresable Systems) Plans and SLD. preparing Panel Schedule and Power Single
Line Diagram (SLD). Prepare Bill of Quantity (BOQ)
Designing of industrial facilities :
6. 6. ARKAN Industrial Park, Al Ain, UAE.
A large industrial park for cement and related building products in Al Ain. Task
concerned with electrical services for several buildings including: 1- Head quarter, 2-
Shopping Mall, 3- Warehouses ( 1,2 &3 ), 4- Kitchen, 5- Laundry, 6- Mosque.
Complete electrical works including medium voltage switchgear, transformers, low
voltage distribution, lighting and telecom network, lightning protection etc.
From June 2008
till May 2011
Osama Youseef Dwedar Electrical Design Engineer
Rev.2
Designing of Hospitals and healthcare facilities:
7. Asfour Cardiac and Burn Hospital, Cairo, Egypt.
Basement and 7 floors with 500 beds including patient rooms, intensive care
wards, laboratories, operating theatres, etc. The task concerned with electrical
design with supporting calculations for all systems like, Lighting, power, medical
equipment power, isolating power transformer (IPS) and line isolation monitor
system, medical equipment earthing system (group 0, group 1, group 2), fire
alarm, nurse call and code blue system, telephone and data VOIP system, public
address system, medical staff paging system, master clock system, intercom
system, TV system, closed circuit television (CCTV) system, access control
system
8. Tamale Teaching Hospital, Tamale, Ghana.
The site for the Tamale Teaching Hospital is situated in the municipality
of Tamale in the north of Ghana. It consists of 200 beds including patient
rooms, intensive care wards, laboratories, operating theatres, etc. The task
concerned with electrical design with supporting calculations for all
systems
Practical Training:
12/2009-1/2010 Intern Engineer , Schneider electrical Egypt, Cairo, Egypt
Received advanced training in electrical networks consultant engineer
7/2007-8/2007 Intern Engineer , National Research Center, Cairo, Egypt
Received advanced training in the fields of electric machines and select topics in electric
power
8/2006-9/2006 Intern Engineer , (ELF) Industries, Cairo, Egypt
Interned for a month, where I came in contact with production techniques of lining
paper and floating paper
7/2006-8/2006 Intern Engineer , Shoubra ElKheima Power Station , Cairo,
Egypt
Learnt about mechanical and electrical components and equipment of steam units for
generation stations, in addition to operation techniques and basic maintenance
Computer Skills:
Experienced in a wide range of programming languages and applications, including:
• ETAP Power Station
• Visual Basic
• AutoCAD
• Microsoft Office
• Matlab
• Dialux
• CAlculx

More Related Content

What's hot

Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
Gensol Engineering Limited
 
DCSR ENERGY
DCSR ENERGYDCSR ENERGY
DCSR ENERGY
DCSR ENERGY
 
Dcsr.profile 2016
Dcsr.profile 2016Dcsr.profile 2016
Dcsr.profile 2016
Debasish Bhattacharya
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
Puneet Jaggi
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
Mahesh Narayanan
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
Prem Kumar
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
vineeth ravi
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
Ashish Verma
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
Patan Yahya Khan
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
Khadar Ali Shaik, P.Eng
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
MAHMOOD AHMED
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
Akram Mohamed
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
Partha Saradhi gudla
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
ROYAPPAN JOSEPH JESU RAJA
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
Kasangili Katongo
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
armando doria
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
john britto
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
SANDEEP KUMAR
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
Gensol Engineering Limited
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
AMIT BISWAS
 

What's hot (20)

Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
DCSR ENERGY
DCSR ENERGYDCSR ENERGY
DCSR ENERGY
 
Dcsr.profile 2016
Dcsr.profile 2016Dcsr.profile 2016
Dcsr.profile 2016
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 

Similar to osama dwedar ..

Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy
 
Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015
ALI ABD EL FATTAH
 
Hussein CV 2015
Hussein CV 2015Hussein CV 2015
Hussein CV 2015
Hussein El Wakil
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
sheik syedali
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
Hussein El Wakil
 
CV PF
CV PFCV PF
Eng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical EngineerEng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical Engineer
Ahmed Maher
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
satham mohamed
 
Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015 Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015
essam afifi
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
Krishnaprasad Keekan kamalaksha
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
Punnaivanam Paulpandy
 
Nazh cv rev.2
Nazh cv  rev.2Nazh cv  rev.2
Nazh cv rev.2
guest623234
 
Resume
ResumeResume
MAraziR-1 (1)
MAraziR-1 (1)MAraziR-1 (1)
MAraziR-1 (1)
M-M.Arazi Peng
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
Mohamed Farouk
 
Engr. sayed assawy
Engr. sayed assawyEngr. sayed assawy
Engr. sayed assawy
? ??? ?????? ??????
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
Zaheer Ahmed
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
Amarjeet kumar
 
Resume
ResumeResume
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
Wajid Ali Shah
 

Similar to osama dwedar .. (20)

Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015
 
Hussein CV 2015
Hussein CV 2015Hussein CV 2015
Hussein CV 2015
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
 
CV PF
CV PFCV PF
CV PF
 
Eng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical EngineerEng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical Engineer
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015 Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
Nazh cv rev.2
Nazh cv  rev.2Nazh cv  rev.2
Nazh cv rev.2
 
Resume
ResumeResume
Resume
 
MAraziR-1 (1)
MAraziR-1 (1)MAraziR-1 (1)
MAraziR-1 (1)
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
 
Engr. sayed assawy
Engr. sayed assawyEngr. sayed assawy
Engr. sayed assawy
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Resume
ResumeResume
Resume
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 

osama dwedar ..

  • 1. Osama Youseef Dwedar Electrical Design Engineer Rev.2 Osama Youseef Fathy Dwedar Electrical Design & Technical Study Engineer Kharafi National (KN), Engineering & Tendering Department Bachelor’s degree in Electrical Power & machines engineering Tel: (002) 0122 0284984 : (002) 0100 6370113 Email: Eng_osamadwedar@hotmail.com 1984, Egyptian.BORN: Single.MARITAL STATUS: English, Arabic (Mother tongue)LANGUAGES: • B.Sc. Electrical Engineering, Power and Machine, Cairo University Cairo, Egypt, June 2008, cumulative grade good, graduation project grade excellent. • Currently working towards Master of Science degree from Cairo University. EDUCATION: • Eng. Osama Dwedar experience covers the project design, shop drawings, technical calculations and specification preparation, MV infrastructural network, street and outdoor lighting, follow up, value engineering, bid analysis, supervision of construction works and commissioning of the electrical services including transformer substation, electrical power networks, lighting, earthing, lightning protection, fire alarm system, sound system, telephone system, security and control system. • Eng. Osama Dwedar have experience in cost estimation, and evaluate data in order to determine the resources needed to create products and to finish projects in the most efficient and profitable ways possible. These resources include time, money, labor, services and equipment. • Eng. Osama Dwedar have experience in designing industrial plants. Also he is expert in preparing technical calculations like load flow analysis, short circuit analysis, motors starting analysis, battery sizing, cable sizing , harmonic analysis, transient stability analysis, optimal power flow analysis, protection relays coordination and reliability assessment using the Electrical Transient Analyzer Program (ETAP 11). • Eng. Osama Dwedar has 6 years of experience in the project design and executions of electrical installation. During his career he worked as a consultant as well as a contractor. This diversification has a major contribution to Mr. Dwedar excellence in the design of electrical works. With Engineers Syndicate Sub Giza as trainer for ETAP power station Software. SUMMARY OF CAPABILITIES From Jun 2012 till now
  • 2. Osama Youseef Dwedar Electrical Design Engineer Rev.2 With KHARAFI NATIONAL (KN) Company as an Electrical Design &Technical studies Engineer in Engineering Services Department for the following projects: 1. WEST DAMITTA POWER STATION, Damitta, Egypt. Kharafi national company, In cooperation with Client Arab Republic of Egypt to build sample electrical substation to can generate electrical power 500MVA. The project consists of four Gas Turbine each one have 130MW, 15 KV and 4 step up Transformer (125 MVA, 15220 KV) and two 220 KV GIS motor startup .The task concerned with designing of electrical works and preparing material take off (MTO), electrical calculation and M.V&L.V protective relay coordination manually and by ETAP power station software and review the suppliers specs meeting the consultant specs. 2. Sylibia and Ardaiy waste water plant Kharafi national company, in cooperation with Client state of Kuwait ministry of public works to make extension of the waste water plant .The task concerned with designing of electrical works and preparing electrical specification and calculation and protective relay coordination manually and by ETAP power station software and review the suppliers specs meeting the consultant specs and design service buildings (lighting, power, low current, fire alarm). 3. 132/11 KV Substations at Jaber Al Ahmed – (Tender Phase) Kharafi national company, Preparing tender documents for Client state of Kuwait ministry of public works to make new 132/11 KV substation .The task concerned with designing of electrical works and preparing electrical Documents and drawings and load calculation and preparing MTO& RFQ for the project and review the suppliers specs meeting the consultant specs or not. 4. West Qurna I Project 132/33KV Transmission & Distribution – (Tender Phase) Kharafi national company, Preparing tender documents for Client state of Iraq ministry of public works to make new 132/33 KV substation .The task concerned with designing of electrical works and preparing electrical Tender drawings and load calculation and preparing MTO& RFQ for the project and review the suppliers specs meeting the consultant specs or not . 5. Abu Rwash waste water treatment plant 2,000,000 m3/day – (Tender Phase) Kharafi national company, Preparing tender documents for Client state of CAPW to make extension of the waste water plant to treat 2,000,000m3/day .The task concerned with Kharafi designing of electrical works (11KV subsation , low voltage subsation, MV&LV cable routing and building services) and preparing electrical Tender Documents and drawings and estimated electrical load consumption and preparing MTO& RFQ for the project and review the suppliers specs meeting the consultant specs or not . From Oct 2011 till now
  • 3. Osama Youseef Dwedar Electrical Design Engineer Rev.2 With Elgammal industrial projects (GIP) Company as an Electrical Design &Technical studies Engineer at Engineering Department for the following projects: 1. Tourah Cement -EPAP II Project for line 8, Cairo, Egypt. Elgammal industrial projects, in cooperation with Client Italcement Company and World Bank to Conversion Electro Static filters to Bag House filters to removing suspended particulates in the air and improvement the ambient. The project consists of four huge bag filters (cooler bag filter, bypass bag filter, raw mill A and raw mill B) each one have 1MW motor startup by 1.25 MW variable speed drive 12 pulse and this drives fed from 3 winding transformers and the filter have small motors as screw conveyor motors, rotary air valve motors, dampers and all instruments as speed sensors, vibration sensors, thermocouple,……etc. The task concerned with designing of process electrical works including modification of the existing medium voltage switch gear (6.3 KV) and makes excitation for new cells to fed new VSD transformers and MCCs, sizing of the medium voltage and low voltage cables. designing of 6.3KV cables and 0.5KV cables infrastructural networks, motor control centers, distribution boards, power feeders, distributed control system, automation and instrumentation system including modification and programming of PLC,… etc with the supporting technical calculations like 1- VSD and distribution transformer sizing calculation. 2- load flow and voltage drop calculations, 3- short circuit calculations, 4- Motor starting analysis, 5- Earthing and lightning protection conductor sizing calculations, 6- Cables sizing calculations, 7- Protection relays coordination study by ETAP 7, 8- Standby diesel generator sizing calculations, 9- preparing MTO & material submittal 2. Gas Conditioning Tower Feeding, Helwan, Egypt. Elgammal industrial projects, in cooperation with Client Italcement Company to feeding new gas conditioning tower. The project consists of three compressors 0.75MW and our scope modification of the existing medium voltage switch gear 6.3KV, sizing of new distribution transformers, re adjustment of the existing protection relay by ETAP 7 to protect new transformers , sizing of the medium voltage and low voltage cables, designing of instrumentation cables to transfer signals from transformer and compressor to central control room (CCR) ., etc 3. Water substation Feeding, 5MW, Suez, Egypt. Elgammal industrial projects, in cooperation with Client Italcement Company to feeding Water substation. The project consists of four pumps 1MW and our scope modification of the existing medium voltage switch gear 11KV, sizing of new distribution transformers, re adjustment of the existing protection relay by ETAP 7 to protect new transformers , sizing of the medium voltage and low voltage cables, designing of instrumentation cables to transfer signals from transformer and pumps to central control room (CCR) ., etc From May 2011 Oct 2012
  • 4. Osama Youseef Dwedar Electrical Design Engineer Rev.2 With Allied Consultants Company as Electrical Design Engineer for the following projects: Designing of District Cooling Plants 1. Cairo Festival City District Cooling Plant, 25 MW , Al Futtaim real estate, Cairo, Egypt. Design documents for Contractor Gas Chill to enable bidding for design and build Contract. The task concerned with designing 22KV and 3.3KV switchgear, power transformers, distribution boards, power cables, lighting, fire alarm, security, earthing and lightning protection system. Moreover, preparing technical calculations like 1- transformer sizing calculations, 2- load flow and voltage drop calculations, 3- short circuit calculations, 4- Chiller motor starting analysis, 5- Earthing and lightning protection conductor sizing calculations, 6- Cables sizing calculations, 7- Protection relays coordination study, 8- Standby diesel generator sizing calculations, 9- UPS and Central battery systems sizing calculations, 10- cable ladder and tray sizing calculations. 2. Mirdiff District Cooling Plant, 18 MW , Empower, Dubai, Emirates. The task concerned with preparing tender documents, technical specifications, BOQ and designing of HV switchgear, power transformers, MV soft starters panels, distribution boards, power cables, LV motor control centers, lighting, small power, fire alarm, security, earthing and lightning protection system. 3. Al-Qouz District Cooling Plant, 37 MW, Empower, Dubai, Emirates. The task concerned with preparing tender documents, technical specifications, BOQ and designing of HV switchgear, power transformers, MV soft starters panels, distribution boards, power cables, LV motor control centers, lighting, small power, fire alarm, security, earthing and lightning protection system. 4. Bahrain Bay Utilities District Cooling Plant, 45MW, Bahrain. The task concerned with designing process and building services of electrical works from EPC contract. The project is design and built with Contractor UNICORP including cost estimate and shop drawings. 5. Bin Smikh Hotel (51 floors): The task concerned with designing of Design Medium Voltage Network According to Kahrmaa code and Design 3 distribution Substation in First Basement Floor & 27th Floor and 51st Floor According to Kahrmaa code Design for all power activities (lighting, sockets, power outlets) , Design light current systems (Fire Alarm, CCTV, & P.Addresable Systems) Plans and SLD. preparing Panel Schedule and Power Single Line Diagram (SLD). Prepare Bill of Quantity (BOQ) Designing of industrial facilities : 6. 6. ARKAN Industrial Park, Al Ain, UAE. A large industrial park for cement and related building products in Al Ain. Task concerned with electrical services for several buildings including: 1- Head quarter, 2- Shopping Mall, 3- Warehouses ( 1,2 &3 ), 4- Kitchen, 5- Laundry, 6- Mosque. Complete electrical works including medium voltage switchgear, transformers, low voltage distribution, lighting and telecom network, lightning protection etc. From June 2008 till May 2011
  • 5. Osama Youseef Dwedar Electrical Design Engineer Rev.2 Designing of Hospitals and healthcare facilities: 7. Asfour Cardiac and Burn Hospital, Cairo, Egypt. Basement and 7 floors with 500 beds including patient rooms, intensive care wards, laboratories, operating theatres, etc. The task concerned with electrical design with supporting calculations for all systems like, Lighting, power, medical equipment power, isolating power transformer (IPS) and line isolation monitor system, medical equipment earthing system (group 0, group 1, group 2), fire alarm, nurse call and code blue system, telephone and data VOIP system, public address system, medical staff paging system, master clock system, intercom system, TV system, closed circuit television (CCTV) system, access control system 8. Tamale Teaching Hospital, Tamale, Ghana. The site for the Tamale Teaching Hospital is situated in the municipality of Tamale in the north of Ghana. It consists of 200 beds including patient rooms, intensive care wards, laboratories, operating theatres, etc. The task concerned with electrical design with supporting calculations for all systems Practical Training: 12/2009-1/2010 Intern Engineer , Schneider electrical Egypt, Cairo, Egypt Received advanced training in electrical networks consultant engineer 7/2007-8/2007 Intern Engineer , National Research Center, Cairo, Egypt Received advanced training in the fields of electric machines and select topics in electric power 8/2006-9/2006 Intern Engineer , (ELF) Industries, Cairo, Egypt Interned for a month, where I came in contact with production techniques of lining paper and floating paper 7/2006-8/2006 Intern Engineer , Shoubra ElKheima Power Station , Cairo, Egypt Learnt about mechanical and electrical components and equipment of steam units for generation stations, in addition to operation techniques and basic maintenance Computer Skills: Experienced in a wide range of programming languages and applications, including: • ETAP Power Station • Visual Basic • AutoCAD • Microsoft Office • Matlab • Dialux • CAlculx