- 1 - Dec.-2016
AHMED MAHER HADDAD
Kuwait (+965) 90026867 - (+965) 51625060
Egypt (+2) 01010887476
E-mail: Maher_mcc1@yahoo.com & 258maher@gmail.com
Summary
A Creative and Motivated Electrical Engineer with 13 years Experience in MEP field,
B.SC. Of Power and Electrical Machines Engineering - Cairo University and Working
at The Arab Contractors Company and Member of the Kuwait Society of Engineers.
Professional Experience
Current Job:- Electrical Engineer at Jaber Al Ahmad Al Jaber Al Sabah Hospital Project, Kuwait.
(March 2007 - till now): The Arab contractors Osman Ahmed Osman & Co.
Working over 10 years at The Arab Contractors Company and its branches (In & out of Egypt) as
following:-
Work in KUWAIT From Dec.2010 Till Now
Jaber Al Ahmad Al Jaber Al Sabah Hospital Project, Kuwait.
- Client : Ministry of Public work (MPW - Kuwait)
- Consultant: Langdon Wilson International in association with Gulf Consultant (LWI/GC).
- Employer: Join Venture (J.V) of Arab Contractors & Kuwait Arab Contractors.
Description of the project:
This Project is The Largest Medical Center in the Middle East with Total Cost 1000 Million USD
and consist of an over 1165 bed. The Hospital Project include various buildings, parking and other
structures & The plot area of this Project is approximately 225,000 m2
.
Job Description & responsibilities:
 Electro-mechanical site Engineer (Approved Electrical Engineer from MPW) responsible
for the following:
- Supervision of the MEP Installations at site and coordinating the same with all trades at site.
- Checking site man power rates, skills to achieve the target jobs as per the program.
- Preparing inspection checklists and Handling the consultant approval for the electrical trades.
- Checking the materials arrived to site with the approved submittals or approved samples.
- Assist in creation of overall project plans and schedules, monitors activates and progress.
- Interpret construction drawings and studies the contract documents and applicable standers or
specification prior to execution of any jobs.
- Handling Testing, Commissioning and startup of systems.
- 2 - Dec.-2016
All previous Items been applied on
 80 tr. 1600 KVA Dray type
 40 generator 2.75 MVA.
 6 cooling Tower.
 5 Chiller 4800 TR.
 5 Boiler 10000 LT /6000 KW.
 6 Steam Boiler 6000 KW.
 97 Elevator
 Laundry and Kitchen Equipment.
 Interior/Exterior lighting,
 Wiring devices(sockets and switches),
 Wires, Cables,
 Fire alarm system,
 Access Control,
 Audio Visual and Nurse Call Systems
 Telephone/Data, CCTV, MATV, Master
Clock systems,
 Pumps for Underground water tanks, medical gas plant, permanent dewatering system,
underground fuel tanks, sewage & west water systems,….etc.
Projects in Egypt From March 2007 Till Nov.2010.
1.Military seryaqus raw water pump station.
Design, shop drawing work, supplying of (R.M.U, transformers, pump station MCC,
cables and earthing systems) and installation supervision.
2.Helwan west water treatment plant ”contract (5)”, Helwan.
Design review, Specifications and technical offers studying for supplying of 15 MCC,
preparing the tender, shop drawing review and installation supervision.
3.GABAL SHESHA raw water pump station, Aswan.
Design review, shop drawing work and technical study for supplying (Main switch
board, pump station MCC, bus duct system and submarine cables) and installation
supervision.
4. 240 village need for water.
Make all the electrical Design Drawings, calculation sheets and specifications
documents for AL DABAYBIA , GANZOR and TAMA water treatment plants.
5. Mina Abdullah water treatment plant in Kuwait.
Contribute the tender electrical documents study.
6. Azzour water treatment plant in Kuwait.
Contribute the tender electrical documents study.
7. SHK. KHALIFA hospital in Ajman , Dubai
- 3 - Dec.-2016
Design review for the electrical system.
8.Portos , Sayda & El Kratin west water pump station , Giza.
Specifications and technical offers studying for supplying of all electrical works,
Design review and preparing the tender.
9.Ezbet El Lahm west water pump station, Domiat.
Specifications and technical offers studying for supplying of all electrical works,
Design review and preparing the tender.
10. New Cairo city boosters.
Design review and Technical offers Study for supplying of MV synch. Panel.
11. British School
Shop drawing for Power sockets & lighting for senior building.
12. Relocation of Military factories.
As built drawings for data and telephones.
13. Cleopatra Plaza tower in Alexandria.
Shop drawing for lighting and fire alarm.
14. Abdin presidential palace.
Shop drawing for power, sockets, Cable rooting and Cable trays systems.
15. El kobba presidential palace.
Shop drawing for power appliances & sockets systems.
16. El Marg water treatment plant.
Control system technical offers Study.
17. The development and agriculture credit Bank – El Dokki branch.
As built drawings for power , sockets , lighting and cable tray systems.
Technical office experience
All the previous years’ experience work not only on the field of the site work projects but also in
Technical office such below mentioned:-
 Preparation /Reviewing technical submittals for Electrical works.
 Preparation /Reviewing for shop drawings & as built for Electrical works.
 Co-ordinate with other trades to achieve a coordinated Electrical works.
 Preparation/ reviewing of Operation and maintenance manuals.
 Follow up progress meeting with the suppliers/ Subcontractors /consultant /client.
 Reviewing/ follow up the payment for the Electrical works.
 Supervision and coordination of multiple stakeholders / subcontractors.
 Solving problems with arch and civil works even need re-design.
 Follow up the equipment delivery status to mitigate any delay and follow up with supplier.
 Preparation/ reviewing material take off.
 Following up the project schedule program, updates and relation to work progress.
 Claims break down related to Electrical works.
 Handling the RFI’s with the consultant and correspondences from/to subcontractors.
- 4 - Dec.-2016
 Inquiries, letter of intent and local purchasing orders.
 Evaluation for vendors.
 Design/ design review for Electrical systems as per standards and codes.
 (July 2005 - till Dec. 2006: Heliopolis co. for chemical industries.
 Engineer in maintenance Dept.
 (Feb. 2004 - till July. 2004: Working in Computer Company.
 Computer Maintenance & Technical Support Engineer.
 
Training
- “Electrical Network Consultant Engineer” course in Schneider Electric Egypt.
- Newly Engineer courses in Arab contractor’s institute.
- Training in SHAKER Consultancy Group for control & instrumentation technology.
- Training in Helwan for mineral instrumentations, Helwan.
- Training in New and Renewable Energy Authority (NREA).
Education
1998-2003 Bachelor of Power and Electrical Machines Engineering - (B.Sc. 2003)
Cairo University - Cairo - Egypt. Average grade: 70 %.
Skills
- Language: fluent in Arabic and English, understanding Dutch
- Computer knowledge: Windows, MS Office, Internet, AutoCAD, Ecodial, Calculux and dialux.
Personal Information
 Date of Birth : 25th
, August , 1981
 Place of Birth : El Bagor - Monofya, Egypt.
 Nationality : Egyptian.
 Marital Status : married.
 Religion : Muslim.
 Military Status : Served.
* References will be furnished upon request
Contract No. SPA/213
Contractor's Staff Approval
Required as per Contract Submitted
SINo Designation
No.
Required
Candidate
13
Lead Engineer ·1
1 Eng. Amrr Naguib
Civil/ Archit ecture
14
lead Engineer -2
1 Eng. Khalid Attia
Civil/ Architecture
15 Civil Engineer 6 Eng. Mohamed Orner
Eng. Hany Hashim
Eng. Ahmed Marey ~
Eng.Mohamad El Shehaby
Eng . Hesham Hasnen X
Eng . Emad Helmy
16 l ead HVAC Engineer 1 Eng .Hamdy Mohamad Reda
17 Lead M e<h Engineer 1 Eng Sugukutty M Kuruvilla
18 HVAC Engineer 3 Eng: Mohammed Abdul Mateen
Eng. Mohammed Shadab Hussain
Eng. Tanweer Ali Syed
19 Mech Engineer 3 Eng. Shrnod Abraham
Eng. Sabu Joseph
Eng. Mahboob Basha
20 Irrigation and Water Displays Engin eer 1 [ng. Yaser Ahmad Bahnasy
21 l ead High Voltage Engineer 1 Eng. Bassam Taha
22 Hrgh Voltage Engineer 3 Eng. Ahmad Mahar Hadad
Eng. Ayman M. HaJazr Mohamad
Eng. Hatem Abdel hamid Abdou
23 Lead Low Voltage Engineer 1 Eng. Ma_gdy Mohamad Raslan
24 Low Vo ltage Engineer 3 Eng. Amir Mohamad Ismail
Eng. Ahmed Hussein M ohamed
Eng. Khalid Mohamad Awad
25 Lead Surveyor 1 Eng. Elsafy Refaey
Langdon Wilson lntenatlonal /Gulf Consult
Current Status
Replacement or Existing
Replacing Eng.Refat Zaki AI Sayed
Replacing Eng.Ashraf Sayed Abbas
Replacing Eng.Ahmed Shafeek
Replacing Eng.Belal Aldessoky Saleh
Replacing Eng.Sameh Ibrahim Ahmed
Replacing Eng.Mohamad Hafez
Replacing Eng.Abdulla Yehyia Salem
Replacing Eng. Mostafa Mashour
Replacing Eng. SanJayJatn
Replacrng Eng. Hamdy Mohamed Reda
Exrsting
Replacing Eng. Hatem Abdul M oshen
Replacing Eng. Tarun Keswani
Existing
Exrstrng
Replacing Eng. Jamaluddin Kadir
NEW
Existing
Existing
Exrstrng
Replacing Eng. Ahmed Mohamed Saeed
Existing
Existing
Replacing Eng. Joby Punnen
EXISting
Replacing Mr. M amdouh Yosef
Jaber AI Ahmad AI Jaber AI Sab~h Hosplta
Pakcage 2 Complete Buildrngs and Externa Work<
Consultant comments{ R~mmendabons
Recommended for Approval
Recommended for Approval
Recommended for Approval
Recommended for Approval
Recom mended for Approval
Recommended for Approval
Recommended for Approval
Recommended for Approval
Recommended for Approval
Recommended for Approval
Approved by MPW
Recommended 'or approval
Recommended 'or approval
Approved by MPW
Approved by MPW
Recommended for approval
Recommended for Approval
Approved by MPW
Approved by MPW
Approved by MPW
Recommended for approval
Approved by MPW
Approved by MPW
Recom mended for Approval
Approved by MPW
Recom mended for approval
2 of 4

Eng. Ahmed Maher - Electrical Engineer

  • 1.
    - 1 -Dec.-2016 AHMED MAHER HADDAD Kuwait (+965) 90026867 - (+965) 51625060 Egypt (+2) 01010887476 E-mail: Maher_mcc1@yahoo.com & 258maher@gmail.com Summary A Creative and Motivated Electrical Engineer with 13 years Experience in MEP field, B.SC. Of Power and Electrical Machines Engineering - Cairo University and Working at The Arab Contractors Company and Member of the Kuwait Society of Engineers. Professional Experience Current Job:- Electrical Engineer at Jaber Al Ahmad Al Jaber Al Sabah Hospital Project, Kuwait. (March 2007 - till now): The Arab contractors Osman Ahmed Osman & Co. Working over 10 years at The Arab Contractors Company and its branches (In & out of Egypt) as following:- Work in KUWAIT From Dec.2010 Till Now Jaber Al Ahmad Al Jaber Al Sabah Hospital Project, Kuwait. - Client : Ministry of Public work (MPW - Kuwait) - Consultant: Langdon Wilson International in association with Gulf Consultant (LWI/GC). - Employer: Join Venture (J.V) of Arab Contractors & Kuwait Arab Contractors. Description of the project: This Project is The Largest Medical Center in the Middle East with Total Cost 1000 Million USD and consist of an over 1165 bed. The Hospital Project include various buildings, parking and other structures & The plot area of this Project is approximately 225,000 m2 . Job Description & responsibilities:  Electro-mechanical site Engineer (Approved Electrical Engineer from MPW) responsible for the following: - Supervision of the MEP Installations at site and coordinating the same with all trades at site. - Checking site man power rates, skills to achieve the target jobs as per the program. - Preparing inspection checklists and Handling the consultant approval for the electrical trades. - Checking the materials arrived to site with the approved submittals or approved samples. - Assist in creation of overall project plans and schedules, monitors activates and progress. - Interpret construction drawings and studies the contract documents and applicable standers or specification prior to execution of any jobs. - Handling Testing, Commissioning and startup of systems.
  • 2.
    - 2 -Dec.-2016 All previous Items been applied on  80 tr. 1600 KVA Dray type  40 generator 2.75 MVA.  6 cooling Tower.  5 Chiller 4800 TR.  5 Boiler 10000 LT /6000 KW.  6 Steam Boiler 6000 KW.  97 Elevator  Laundry and Kitchen Equipment.  Interior/Exterior lighting,  Wiring devices(sockets and switches),  Wires, Cables,  Fire alarm system,  Access Control,  Audio Visual and Nurse Call Systems  Telephone/Data, CCTV, MATV, Master Clock systems,  Pumps for Underground water tanks, medical gas plant, permanent dewatering system, underground fuel tanks, sewage & west water systems,….etc. Projects in Egypt From March 2007 Till Nov.2010. 1.Military seryaqus raw water pump station. Design, shop drawing work, supplying of (R.M.U, transformers, pump station MCC, cables and earthing systems) and installation supervision. 2.Helwan west water treatment plant ”contract (5)”, Helwan. Design review, Specifications and technical offers studying for supplying of 15 MCC, preparing the tender, shop drawing review and installation supervision. 3.GABAL SHESHA raw water pump station, Aswan. Design review, shop drawing work and technical study for supplying (Main switch board, pump station MCC, bus duct system and submarine cables) and installation supervision. 4. 240 village need for water. Make all the electrical Design Drawings, calculation sheets and specifications documents for AL DABAYBIA , GANZOR and TAMA water treatment plants. 5. Mina Abdullah water treatment plant in Kuwait. Contribute the tender electrical documents study. 6. Azzour water treatment plant in Kuwait. Contribute the tender electrical documents study. 7. SHK. KHALIFA hospital in Ajman , Dubai
  • 3.
    - 3 -Dec.-2016 Design review for the electrical system. 8.Portos , Sayda & El Kratin west water pump station , Giza. Specifications and technical offers studying for supplying of all electrical works, Design review and preparing the tender. 9.Ezbet El Lahm west water pump station, Domiat. Specifications and technical offers studying for supplying of all electrical works, Design review and preparing the tender. 10. New Cairo city boosters. Design review and Technical offers Study for supplying of MV synch. Panel. 11. British School Shop drawing for Power sockets & lighting for senior building. 12. Relocation of Military factories. As built drawings for data and telephones. 13. Cleopatra Plaza tower in Alexandria. Shop drawing for lighting and fire alarm. 14. Abdin presidential palace. Shop drawing for power, sockets, Cable rooting and Cable trays systems. 15. El kobba presidential palace. Shop drawing for power appliances & sockets systems. 16. El Marg water treatment plant. Control system technical offers Study. 17. The development and agriculture credit Bank – El Dokki branch. As built drawings for power , sockets , lighting and cable tray systems. Technical office experience All the previous years’ experience work not only on the field of the site work projects but also in Technical office such below mentioned:-  Preparation /Reviewing technical submittals for Electrical works.  Preparation /Reviewing for shop drawings & as built for Electrical works.  Co-ordinate with other trades to achieve a coordinated Electrical works.  Preparation/ reviewing of Operation and maintenance manuals.  Follow up progress meeting with the suppliers/ Subcontractors /consultant /client.  Reviewing/ follow up the payment for the Electrical works.  Supervision and coordination of multiple stakeholders / subcontractors.  Solving problems with arch and civil works even need re-design.  Follow up the equipment delivery status to mitigate any delay and follow up with supplier.  Preparation/ reviewing material take off.  Following up the project schedule program, updates and relation to work progress.  Claims break down related to Electrical works.  Handling the RFI’s with the consultant and correspondences from/to subcontractors.
  • 4.
    - 4 -Dec.-2016  Inquiries, letter of intent and local purchasing orders.  Evaluation for vendors.  Design/ design review for Electrical systems as per standards and codes.  (July 2005 - till Dec. 2006: Heliopolis co. for chemical industries.  Engineer in maintenance Dept.  (Feb. 2004 - till July. 2004: Working in Computer Company.  Computer Maintenance & Technical Support Engineer.   Training - “Electrical Network Consultant Engineer” course in Schneider Electric Egypt. - Newly Engineer courses in Arab contractor’s institute. - Training in SHAKER Consultancy Group for control & instrumentation technology. - Training in Helwan for mineral instrumentations, Helwan. - Training in New and Renewable Energy Authority (NREA). Education 1998-2003 Bachelor of Power and Electrical Machines Engineering - (B.Sc. 2003) Cairo University - Cairo - Egypt. Average grade: 70 %. Skills - Language: fluent in Arabic and English, understanding Dutch - Computer knowledge: Windows, MS Office, Internet, AutoCAD, Ecodial, Calculux and dialux. Personal Information  Date of Birth : 25th , August , 1981  Place of Birth : El Bagor - Monofya, Egypt.  Nationality : Egyptian.  Marital Status : married.  Religion : Muslim.  Military Status : Served. * References will be furnished upon request
  • 8.
    Contract No. SPA/213 Contractor'sStaff Approval Required as per Contract Submitted SINo Designation No. Required Candidate 13 Lead Engineer ·1 1 Eng. Amrr Naguib Civil/ Archit ecture 14 lead Engineer -2 1 Eng. Khalid Attia Civil/ Architecture 15 Civil Engineer 6 Eng. Mohamed Orner Eng. Hany Hashim Eng. Ahmed Marey ~ Eng.Mohamad El Shehaby Eng . Hesham Hasnen X Eng . Emad Helmy 16 l ead HVAC Engineer 1 Eng .Hamdy Mohamad Reda 17 Lead M e<h Engineer 1 Eng Sugukutty M Kuruvilla 18 HVAC Engineer 3 Eng: Mohammed Abdul Mateen Eng. Mohammed Shadab Hussain Eng. Tanweer Ali Syed 19 Mech Engineer 3 Eng. Shrnod Abraham Eng. Sabu Joseph Eng. Mahboob Basha 20 Irrigation and Water Displays Engin eer 1 [ng. Yaser Ahmad Bahnasy 21 l ead High Voltage Engineer 1 Eng. Bassam Taha 22 Hrgh Voltage Engineer 3 Eng. Ahmad Mahar Hadad Eng. Ayman M. HaJazr Mohamad Eng. Hatem Abdel hamid Abdou 23 Lead Low Voltage Engineer 1 Eng. Ma_gdy Mohamad Raslan 24 Low Vo ltage Engineer 3 Eng. Amir Mohamad Ismail Eng. Ahmed Hussein M ohamed Eng. Khalid Mohamad Awad 25 Lead Surveyor 1 Eng. Elsafy Refaey Langdon Wilson lntenatlonal /Gulf Consult Current Status Replacement or Existing Replacing Eng.Refat Zaki AI Sayed Replacing Eng.Ashraf Sayed Abbas Replacing Eng.Ahmed Shafeek Replacing Eng.Belal Aldessoky Saleh Replacing Eng.Sameh Ibrahim Ahmed Replacing Eng.Mohamad Hafez Replacing Eng.Abdulla Yehyia Salem Replacing Eng. Mostafa Mashour Replacing Eng. SanJayJatn Replacrng Eng. Hamdy Mohamed Reda Exrsting Replacing Eng. Hatem Abdul M oshen Replacing Eng. Tarun Keswani Existing Exrstrng Replacing Eng. Jamaluddin Kadir NEW Existing Existing Exrstrng Replacing Eng. Ahmed Mohamed Saeed Existing Existing Replacing Eng. Joby Punnen EXISting Replacing Mr. M amdouh Yosef Jaber AI Ahmad AI Jaber AI Sab~h Hosplta Pakcage 2 Complete Buildrngs and Externa Work< Consultant comments{ R~mmendabons Recommended for Approval Recommended for Approval Recommended for Approval Recommended for Approval Recom mended for Approval Recommended for Approval Recommended for Approval Recommended for Approval Recommended for Approval Recommended for Approval Approved by MPW Recommended 'or approval Recommended 'or approval Approved by MPW Approved by MPW Recommended for approval Recommended for Approval Approved by MPW Approved by MPW Approved by MPW Recommended for approval Approved by MPW Approved by MPW Recom mended for Approval Approved by MPW Recom mended for approval 2 of 4