Hussein Ali Hussein El Wakil has 15 years of experience in the field of Electrical Engineering for power plant and
Construction.
Objective Senior Electrical Engineer
Current
employment
Senior Electrical Power Engineer in engineering, construction and
commissioning in power plant field (generation system, high Voltage,
,Medium power and low voltage)
Working on PGESCo ( Power Generation Engineering and Service
Company ) Consultant company of electrical power plant (Electrical
Power Station)
From December 2007 till now
For the following projects:
Wassit thermal power plant phase I &II 4x330 + 2x610 MW (in IRAQ).
Salah El Din thermal Power plant 2x630 MW (in IRAQ).
Al Anbar combined cycle Power plant 1620MW (in IRAQ).
Giza North combined cycle Power plant 3x750 MW (in EGYPT).
Abu Qir thermal power plant 2x650 MW (in EGYPT).
El-Atf combined cycle power plant 750 MW (in EGYPT).
Sidi-Krir combined cycle power plant 750 MW (in EGYPT).
Cairo north combined cycle power plant 2x750 MW (in EGYPT).
Provide technical support to El-Suez (1x650 MW)
Provide technical support to El Shabab and West Damietta power plant.
Senior electrical engineer :
o Engineering, Construction, Testing and Commissioning engineer.
Having Management skills.
Performing all electrical technical tasks.
Performing all testing and commissioning tasks.
Reviewing and give the required approval for vendor designs, calculations, documents
and drawings.
Performing the readiness review process for several power plant.
Preparing the project technical specifications and bid evaluation.
Performing the evaluation of contractor offers against Owner specifications, standards
and meet Owner requirements.
High awareness of all electrical standards IEEE, IEC, NEMA and NFPA.
Performing Co-ordination with Owner, Contractors and Vendors via (meetings,
conference calls, and emails).
Performing internal Co-ordination and communication among all disciplines and team
work.
Performing Detailed Discipline Personnel Forecast.
Reviewing and checking work of subordinate engineers.
Senior design engineer in engineering department for 8 years
Performing several engineering tasks (Design and Review) as following:
• Sizing the Main and Aux transformer (power transformer).
• Sizing the IPB (ISO Phase Bus).
• Sizing the DC and UPS.
• Sizing the Emergency Diesel Generators.
• Sizing all type of cables (High current, Low voltage and Low current).
• Sizing the Medium voltage cable.
• Perform the MTO (for all cable types and cable trays).Review the Switchgear and load
center sizing and short circuit.
• Review the generator protections setting and function.
• Review the relay setting calculation for switchgear and power transformer.
• Design and review for all power system, lighting system, grounding, lightning system
and low current systems.
• Review and give the approval of contractor and vendor designs, calculation and
drawings
Senior Site engineer (Construction, testing and commissioning)for 7 years
• Generator and Excitation System
• Main, Auxiliary and Station service transformers.
• Generator Circuit Breaker
• Protections systems for generator, transformer and switchgear
• Medium voltage Switchgear
• Load center (LC) and Motor control center (MCC)
• UPS and DC System
• Earthing, Lightning and cathodic protection system
• Cable trays, duct bank and Conduits
• Lighting system, socket and Low current system (telephone, fire alarm, CCTV,
network and paging)
• All Cable type (MV, LV and Control cable)
• Performing all required Co-ordination with Owner, Contractors and Vendors
Electrical testing and Commissioning Engineer “site engineer”
♦ Working on CEPC “Cairo Electricity Production Company”
Cairo north combined cycle power station 1500 MW
From June 2004 to November 2007
Electrical engineer for the following tasks:
4x 250 MW Gas turbine generators for Cairo north power station project.
2x 250 MW Steam turbine generator for combined cycle
Power transformers of 340, 337,314, 24 and 22 MVA
Medium Voltage Switchgear, Load Center and Motor Control Centre.
DC and UPS system
Electric drives, pumps and motors.
Medium and Low Voltage Cables.
ISO Phase Bus (IPB)
Power, lighting, grounding, low current system (telephone, network, paging, fire
alarm), and cathodic protection system
‫٭٭‬ Factory Inspection according to project specification standards (ANSI,ASME
,IEC,IEEE) equivalent for each of the following :
2 of (400V-2000A) MCC switch boards, at Electro-Gorge factory.
Distribution Panels board at MEMCO factory.
ISO Phase Bus (IPB) Of Steam Unit at ARAB STEEL .CO (EL-SWEEDY factory).
Medium and low voltage cables in (EL- SWEEDY factory).
Medium and low voltage cables in (EL- GIZA factory).
Medium voltage switchgear at ABB factory
‫٭٭‬‫٭‬ Site inspection for installation and commissioning according to
project specification for the following :
Generator (G.E )
Excitation System (G.E & ALSTOM)
Generator Circuit Breaker (AREVA)
Power transformers 338, 340 and 24 MV A (ABB) & (AREVA) and their protections
Medium switch-gear (ABB) & (SHNIDER) & (Electro-Gorge) and their control
circuits.
Load center (LC) and Motor control centre (MCC) (ABB) & (Electro-Gorge) and
their protection and control circuits.
UPS and DC System
Earthing System, Cable trays, Conduits, Construction Power System and Electric
package installation, Lighting system, Low current system (telephone, network,
Paging) and cathodic protection system.
work
experience
3- Technical office manager engineer (design and management) in
System-Plus company From 7/2002 to 6/2004 for the following project :
RESIDENCE & FARM OF HH AMBASSADOR– AHMED QUTTAN ELMANSORIA–
GIZA
SAFIR ZAMALIC –HOTEL.
SOFETIL HOTEL –SHARM EL- SHEIK.
INTERCONTENENTAL HOTEL –SHARM EL- SHEIK
EL SHARBATELY MOSQUE
AND MANY OTHER PROJECT
Work
experience
4- Installation engineer in elevator company From 9/2001 to 7/2002 for
Many project
Work
experience
My experience for the following:
a) Electrical design and supervision for construction of all electrical
work (all medium and low voltage work)
a. MV/LV Power cables
b. Cable tray and bus way
c. Grounding and Earthing system
d. MV/LV Switchgear
e. Lighting and Socket system
b) Electrical design engineer ( Design of low current work)
a. Computer network system
b. Telephone system
c. Fire alarm system
d. Sound system
e. CCTV system
f. Security system
For the following projects :
1. Hospital project
2. Car service center project
3. Many malls project
4. Many land escape project
5. Many factory project
6. Many buildings and villas project
7. Many domestic project
8. Many mosques project
9. Many shops
c) Electrical and control engineer (Establishing and supervision for
computer and fiber network)
For the following projects :
a. Cairo university “El Fayoum university” Branch
b. Head Office of Multinational companies
c. Egypt Air - Sharm El-Sheikh
d) working as part time in engineering consultant office:
1. Hospitals project
2. Car services project
3. Malls project
4. Mosques project
5. Domestics project
Training
courses ON SHURE TRAINING
• PGESCO TRAINING FOR SOFTWARE: INFO-WORK, MICRO STATION,
BLOCK DRAW AND SETROUTE.
• PGESCO TRAINING FOR SOFTWARE: (EARTHING SYSTEM AND
CATHODIC PROTECTION SYSTEM).
• CAIRO ELECTRICITY PRODUCTION COMPANY: (GAS TURBINE
PRINCIPLES AND SUPPORT SYSTEMS).
• HITACHI / CONISYS CONSORTIUM :( GENERATOR CIRCIUT BREAKER AND
MAIN, AUXILIARY TRANSFORMER).
• CEGELEC CO: (OPERATION AND MAINTENANCE OF ALSTOM AREVA –
PROTECTION SYSTEM.
• CEGELEC CO: (OPERATION AND MAINTENANCE OF DC AND UPS).
• GENERAL ELECTRIC CO: (OPERATION AND MAINTENANCE OF
EXCITATION SYSTEM AND PROTECTION).
• NEM CO: (HRSG INSTRUMENTATION MAINTENANCE).
• INITEC CO: (PROTECTION OF TRANSFORMER).
• INITEC CO: (MEDUIM VOLTAGE, LOAD CENTRE AND ITS PROTECTIONS,
DC AND UPS SYSTEM.
• SCHEIDER and ABB: (MEDUIM VOLTAGE, LOAD CENTRE AND ITS
PROTECTIONS.
• SHAKER GROUP CONSULTANT: DESGINE AND SHOP DRAWING.
OFF SHURE TRAINING
• NEM CO: (HRSG INSTRUMENTATION MAINTENANCE). ON HOLAND AND
GERMANY FOR THREE WEEKS
Education
Bachelor Of Electric Power Engineering,
AIN SHAMS UNIVERSITY
Graduation Grade : good
Graduation year : 2001
Project : Dynamic performance of three phase induction motor using
. computer simulation
Grade : Distinction
Languages Arabic : Excellent spoken and written (mother tongue)
English : very good spoken and written
Computers
skills
WINDOWS /INTERNET/ OFFICE.
MATLAB & AUTOCAD& DIALUX & ETAP.
Nationality
Egyptian
Marital Status
Married
Military status
Finished

More Related Content

What's hot

CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911Ahmed Atallah
 
IRJET- Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET-  	  Design Photovoltaic System with Constant Output using SEPIC ConverterIRJET-  	  Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET- Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET Journal
 
hassan1 Electrical Engineer
hassan1 Electrical Engineerhassan1 Electrical Engineer
hassan1 Electrical EngineerHASSAN MANSOUR
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_originalAHMED DIAA
 
Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...
Mahesh Chandra Manav
 
Engr. sayed assawy
Engr. sayed assawyEngr. sayed assawy
Engr. sayed assawy
? ??? ?????? ??????
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 

What's hot (20)

CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
 
IRJET- Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET-  	  Design Photovoltaic System with Constant Output using SEPIC ConverterIRJET-  	  Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET- Design Photovoltaic System with Constant Output using SEPIC Converter
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
hassan1 Electrical Engineer
hassan1 Electrical Engineerhassan1 Electrical Engineer
hassan1 Electrical Engineer
 
cv-electrician
cv-electriciancv-electrician
cv-electrician
 
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
 
osama dwedar ..
osama dwedar ..osama dwedar ..
osama dwedar ..
 
DESIGN
DESIGNDESIGN
DESIGN
 
Olkhovskiy_Resume_2016_1
Olkhovskiy_Resume_2016_1Olkhovskiy_Resume_2016_1
Olkhovskiy_Resume_2016_1
 
Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1
 
Ahmad Ismail Resume jan2015
Ahmad Ismail Resume jan2015Ahmad Ismail Resume jan2015
Ahmad Ismail Resume jan2015
 
JAWED ALI
JAWED ALIJAWED ALI
JAWED ALI
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_original
 
Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...
 
Engr. sayed assawy
Engr. sayed assawyEngr. sayed assawy
Engr. sayed assawy
 
CV electrician
CV electricianCV electrician
CV electrician
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Mohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque ResumeMohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque Resume
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 

Viewers also liked

Evaluation
Evaluation Evaluation
Evaluation
Beth Geldard
 
Schedule for atricle
Schedule for atricle Schedule for atricle
Schedule for atricle
Beth Geldard
 
2 the vegan beth marked
2 the vegan beth marked 2 the vegan beth marked
2 the vegan beth marked
Beth Geldard
 
Dutch Homelessness Strategy - The Key Role of Local Authorities
Dutch Homelessness Strategy - The Key Role of Local AuthoritiesDutch Homelessness Strategy - The Key Role of Local Authorities
Dutch Homelessness Strategy - The Key Role of Local Authorities
FEANTSA
 
Building the Business Case for Attribution Guide
Building the Business Case for Attribution GuideBuilding the Business Case for Attribution Guide
Building the Business Case for Attribution Guide
Rakuten Marketing
 
Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...
Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...
Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...
Actiplay (Groupe ConcoursMania)
 
Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09
Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09
Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09smotycka
 
Att leva i sanningen i en sanningsfientlig värld
Att leva i sanningen i en sanningsfientlig världAtt leva i sanningen i en sanningsfientlig värld
Att leva i sanningen i en sanningsfientlig värld
Lars Gunther
 
E-Learning Business Proposal
E-Learning Business ProposalE-Learning Business Proposal
E-Learning Business Proposal
haussmannmatthew
 
Borang pencapaian individu pafa
Borang pencapaian individu pafaBorang pencapaian individu pafa
Borang pencapaian individu pafa
mohd nazar
 
Social protection: A pathway for sectorial integration of nutrition
Social protection: A pathway for sectorial integration of nutritionSocial protection: A pathway for sectorial integration of nutrition
Social protection: A pathway for sectorial integration of nutrition
Sahel and West Africa Club
 
10 signs you need business management software.
10 signs you need business management software.10 signs you need business management software.
10 signs you need business management software.
Domo
 
Forrester Report: The Total Economic Impact of Domo
Forrester Report: The Total Economic Impact of DomoForrester Report: The Total Economic Impact of Domo
Forrester Report: The Total Economic Impact of Domo
Domo
 
The European Tobacco Products Directive
The European Tobacco Products DirectiveThe European Tobacco Products Directive
The European Tobacco Products Directive
UCT ICO
 
Packaging ppt
Packaging pptPackaging ppt
Packaging ppt
Shraddha Kurdekar
 

Viewers also liked (16)

Evaluation
Evaluation Evaluation
Evaluation
 
Schedule for atricle
Schedule for atricle Schedule for atricle
Schedule for atricle
 
2 the vegan beth marked
2 the vegan beth marked 2 the vegan beth marked
2 the vegan beth marked
 
Dutch Homelessness Strategy - The Key Role of Local Authorities
Dutch Homelessness Strategy - The Key Role of Local AuthoritiesDutch Homelessness Strategy - The Key Role of Local Authorities
Dutch Homelessness Strategy - The Key Role of Local Authorities
 
Building the Business Case for Attribution Guide
Building the Business Case for Attribution GuideBuilding the Business Case for Attribution Guide
Building the Business Case for Attribution Guide
 
Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...
Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...
Conférence I 7 astuces pour collecter, réactiver et transformer vos prospects...
 
Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09
Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09
Solena Technology & Bio Energy Platform Usaid&Usea 01 Sept09
 
Att leva i sanningen i en sanningsfientlig värld
Att leva i sanningen i en sanningsfientlig världAtt leva i sanningen i en sanningsfientlig värld
Att leva i sanningen i en sanningsfientlig värld
 
敦群學院-SharePoint精英計畫-系統管理-Day 3
敦群學院-SharePoint精英計畫-系統管理-Day 3敦群學院-SharePoint精英計畫-系統管理-Day 3
敦群學院-SharePoint精英計畫-系統管理-Day 3
 
E-Learning Business Proposal
E-Learning Business ProposalE-Learning Business Proposal
E-Learning Business Proposal
 
Borang pencapaian individu pafa
Borang pencapaian individu pafaBorang pencapaian individu pafa
Borang pencapaian individu pafa
 
Social protection: A pathway for sectorial integration of nutrition
Social protection: A pathway for sectorial integration of nutritionSocial protection: A pathway for sectorial integration of nutrition
Social protection: A pathway for sectorial integration of nutrition
 
10 signs you need business management software.
10 signs you need business management software.10 signs you need business management software.
10 signs you need business management software.
 
Forrester Report: The Total Economic Impact of Domo
Forrester Report: The Total Economic Impact of DomoForrester Report: The Total Economic Impact of Domo
Forrester Report: The Total Economic Impact of Domo
 
The European Tobacco Products Directive
The European Tobacco Products DirectiveThe European Tobacco Products Directive
The European Tobacco Products Directive
 
Packaging ppt
Packaging pptPackaging ppt
Packaging ppt
 

Similar to Hussein CV 2016 OCTOBER

Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CValaa ibrahim
 
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.VAHMED DIAA
 
Joseph 2016
Joseph 2016Joseph 2016
Joseph 2016
Joseph Saad
 
Joseph 2016
Joseph 2016Joseph 2016
Joseph 2016
Joseph Saad
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Hamada's cv
Hamada's cvHamada's cv
Hamada's cv
Hamada Farag
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nicolae Vasiliu
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BEmirza gulrez
 
Electrical Design Engineer
Electrical Design EngineerElectrical Design Engineer
Electrical Design Engineermohamed ateeq
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
Khalid Eltahir
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016Khadar Ali Shaik,P.Eng
 

Similar to Hussein CV 2016 OCTOBER (20)

Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.V
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Joseph 2016
Joseph 2016Joseph 2016
Joseph 2016
 
Joseph 2016
Joseph 2016Joseph 2016
Joseph 2016
 
PM Ahmed Abdelhady CV
PM Ahmed Abdelhady CVPM Ahmed Abdelhady CV
PM Ahmed Abdelhady CV
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
Eng Kamran zfp
Eng Kamran zfpEng Kamran zfp
Eng Kamran zfp
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Hamada's cv
Hamada's cvHamada's cv
Hamada's cv
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BE
 
Electrical Design Engineer
Electrical Design EngineerElectrical Design Engineer
Electrical Design Engineer
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 

Hussein CV 2016 OCTOBER

  • 1. Hussein Ali Hussein El Wakil Senior/ Lead Electrical Engineer SARAYA EL KOBA, ZYTOON- CAIRO Mobile no : 010 666 210 28; 012 891 621 50 Hussein Ali Hussein El Wakil has 15 years of experience in the field of Electrical Engineering for power plant and Construction. Objective Senior Electrical Engineer Current employment Senior Electrical Power Engineer in engineering, construction and commissioning in power plant field (generation system, high Voltage, ,Medium power and low voltage) Working on PGESCo ( Power Generation Engineering and Service Company ) Consultant company of electrical power plant (Electrical Power Station) From December 2007 till now For the following projects: Wassit thermal power plant phase I &II 4x330 + 2x610 MW (in IRAQ). Salah El Din thermal Power plant 2x630 MW (in IRAQ). Al Anbar combined cycle Power plant 1620MW (in IRAQ). Giza North combined cycle Power plant 3x750 MW (in EGYPT). Abu Qir thermal power plant 2x650 MW (in EGYPT). El-Atf combined cycle power plant 750 MW (in EGYPT). Sidi-Krir combined cycle power plant 750 MW (in EGYPT). Cairo north combined cycle power plant 2x750 MW (in EGYPT). Provide technical support to El-Suez (1x650 MW) Provide technical support to El Shabab and West Damietta power plant. Senior electrical engineer : o Engineering, Construction, Testing and Commissioning engineer. Having Management skills. Performing all electrical technical tasks. Performing all testing and commissioning tasks. Reviewing and give the required approval for vendor designs, calculations, documents and drawings.
  • 2. Performing the readiness review process for several power plant. Preparing the project technical specifications and bid evaluation. Performing the evaluation of contractor offers against Owner specifications, standards and meet Owner requirements. High awareness of all electrical standards IEEE, IEC, NEMA and NFPA. Performing Co-ordination with Owner, Contractors and Vendors via (meetings, conference calls, and emails). Performing internal Co-ordination and communication among all disciplines and team work. Performing Detailed Discipline Personnel Forecast. Reviewing and checking work of subordinate engineers. Senior design engineer in engineering department for 8 years Performing several engineering tasks (Design and Review) as following: • Sizing the Main and Aux transformer (power transformer). • Sizing the IPB (ISO Phase Bus). • Sizing the DC and UPS. • Sizing the Emergency Diesel Generators. • Sizing all type of cables (High current, Low voltage and Low current). • Sizing the Medium voltage cable. • Perform the MTO (for all cable types and cable trays).Review the Switchgear and load center sizing and short circuit. • Review the generator protections setting and function. • Review the relay setting calculation for switchgear and power transformer. • Design and review for all power system, lighting system, grounding, lightning system and low current systems. • Review and give the approval of contractor and vendor designs, calculation and drawings Senior Site engineer (Construction, testing and commissioning)for 7 years • Generator and Excitation System • Main, Auxiliary and Station service transformers. • Generator Circuit Breaker • Protections systems for generator, transformer and switchgear • Medium voltage Switchgear • Load center (LC) and Motor control center (MCC) • UPS and DC System • Earthing, Lightning and cathodic protection system • Cable trays, duct bank and Conduits • Lighting system, socket and Low current system (telephone, fire alarm, CCTV, network and paging) • All Cable type (MV, LV and Control cable) • Performing all required Co-ordination with Owner, Contractors and Vendors
  • 3. Electrical testing and Commissioning Engineer “site engineer” ♦ Working on CEPC “Cairo Electricity Production Company” Cairo north combined cycle power station 1500 MW From June 2004 to November 2007 Electrical engineer for the following tasks: 4x 250 MW Gas turbine generators for Cairo north power station project. 2x 250 MW Steam turbine generator for combined cycle Power transformers of 340, 337,314, 24 and 22 MVA Medium Voltage Switchgear, Load Center and Motor Control Centre. DC and UPS system Electric drives, pumps and motors. Medium and Low Voltage Cables. ISO Phase Bus (IPB) Power, lighting, grounding, low current system (telephone, network, paging, fire alarm), and cathodic protection system ‫٭٭‬ Factory Inspection according to project specification standards (ANSI,ASME ,IEC,IEEE) equivalent for each of the following : 2 of (400V-2000A) MCC switch boards, at Electro-Gorge factory. Distribution Panels board at MEMCO factory. ISO Phase Bus (IPB) Of Steam Unit at ARAB STEEL .CO (EL-SWEEDY factory). Medium and low voltage cables in (EL- SWEEDY factory). Medium and low voltage cables in (EL- GIZA factory). Medium voltage switchgear at ABB factory ‫٭٭‬‫٭‬ Site inspection for installation and commissioning according to project specification for the following : Generator (G.E ) Excitation System (G.E & ALSTOM) Generator Circuit Breaker (AREVA) Power transformers 338, 340 and 24 MV A (ABB) & (AREVA) and their protections Medium switch-gear (ABB) & (SHNIDER) & (Electro-Gorge) and their control circuits.
  • 4. Load center (LC) and Motor control centre (MCC) (ABB) & (Electro-Gorge) and their protection and control circuits. UPS and DC System Earthing System, Cable trays, Conduits, Construction Power System and Electric package installation, Lighting system, Low current system (telephone, network, Paging) and cathodic protection system. work experience 3- Technical office manager engineer (design and management) in System-Plus company From 7/2002 to 6/2004 for the following project : RESIDENCE & FARM OF HH AMBASSADOR– AHMED QUTTAN ELMANSORIA– GIZA SAFIR ZAMALIC –HOTEL. SOFETIL HOTEL –SHARM EL- SHEIK. INTERCONTENENTAL HOTEL –SHARM EL- SHEIK EL SHARBATELY MOSQUE AND MANY OTHER PROJECT Work experience 4- Installation engineer in elevator company From 9/2001 to 7/2002 for Many project Work experience My experience for the following: a) Electrical design and supervision for construction of all electrical work (all medium and low voltage work) a. MV/LV Power cables b. Cable tray and bus way c. Grounding and Earthing system d. MV/LV Switchgear e. Lighting and Socket system b) Electrical design engineer ( Design of low current work) a. Computer network system b. Telephone system
  • 5. c. Fire alarm system d. Sound system e. CCTV system f. Security system For the following projects : 1. Hospital project 2. Car service center project 3. Many malls project 4. Many land escape project 5. Many factory project 6. Many buildings and villas project 7. Many domestic project 8. Many mosques project 9. Many shops c) Electrical and control engineer (Establishing and supervision for computer and fiber network) For the following projects : a. Cairo university “El Fayoum university” Branch b. Head Office of Multinational companies c. Egypt Air - Sharm El-Sheikh d) working as part time in engineering consultant office: 1. Hospitals project 2. Car services project 3. Malls project 4. Mosques project 5. Domestics project
  • 6. Training courses ON SHURE TRAINING • PGESCO TRAINING FOR SOFTWARE: INFO-WORK, MICRO STATION, BLOCK DRAW AND SETROUTE. • PGESCO TRAINING FOR SOFTWARE: (EARTHING SYSTEM AND CATHODIC PROTECTION SYSTEM). • CAIRO ELECTRICITY PRODUCTION COMPANY: (GAS TURBINE PRINCIPLES AND SUPPORT SYSTEMS). • HITACHI / CONISYS CONSORTIUM :( GENERATOR CIRCIUT BREAKER AND MAIN, AUXILIARY TRANSFORMER). • CEGELEC CO: (OPERATION AND MAINTENANCE OF ALSTOM AREVA – PROTECTION SYSTEM. • CEGELEC CO: (OPERATION AND MAINTENANCE OF DC AND UPS). • GENERAL ELECTRIC CO: (OPERATION AND MAINTENANCE OF EXCITATION SYSTEM AND PROTECTION). • NEM CO: (HRSG INSTRUMENTATION MAINTENANCE). • INITEC CO: (PROTECTION OF TRANSFORMER). • INITEC CO: (MEDUIM VOLTAGE, LOAD CENTRE AND ITS PROTECTIONS, DC AND UPS SYSTEM. • SCHEIDER and ABB: (MEDUIM VOLTAGE, LOAD CENTRE AND ITS PROTECTIONS. • SHAKER GROUP CONSULTANT: DESGINE AND SHOP DRAWING. OFF SHURE TRAINING • NEM CO: (HRSG INSTRUMENTATION MAINTENANCE). ON HOLAND AND GERMANY FOR THREE WEEKS
  • 7. Education Bachelor Of Electric Power Engineering, AIN SHAMS UNIVERSITY Graduation Grade : good Graduation year : 2001 Project : Dynamic performance of three phase induction motor using . computer simulation Grade : Distinction Languages Arabic : Excellent spoken and written (mother tongue) English : very good spoken and written Computers skills WINDOWS /INTERNET/ OFFICE. MATLAB & AUTOCAD& DIALUX & ETAP. Nationality Egyptian Marital Status Married Military status Finished