SlideShare a Scribd company logo
1. Briefly discuss key challenges that lndian manufacturing corporate are facing in manufacturing and related operations. How can these be tackled? List some management initiatives and policies which can be used in this regard.(14)<br />2.(a) A company wants to set-up an engineering prefabrication unit, near Delhi, say, within 300 kms. What possible locations should be preferred and why? Give only precise reasons.(7)<br />(b) A factory's receiving dock would despatch parts to seven areas in the plant, shown in the matrix as 1-7. The receiving dock can be located at either A or B in the facility. The number of loads per month is shown in brackets while the distance in metres to A and B is given in parameters. Unit -, cost of movement is Rs. 10 per metre. Which position is best - A or B? Why?<br />A1B(90)234(60)(30)(50)[A:l, B:2][A:2, B:1]567(40)(90)(70)[A:2, B:2][A:2, B:2]<br />Departments 1, 3 and 6 are equidistant from A and B.(7)<br />3. (a) Briefly discuss one quality management technique that would ensure quality at design stage. (7)<br />(b) A manufacture of ball-bearings has the specifications for diameter as 245 mm ± .85 mm. The process planning department proposed two processes - A and B for manufacturing the ball bearings. After extensive pilot runs, the processes were statistically stabilised. The performance of the two processes is tabulated as follows:<br />The production department wants to know which of these processes is suitable for commercialisation. Compute relevant measures and give appropriate recommendations to the production department.<br />(7)<br />4.<br />(a) 'What are the performance measurement metrics for a line layout? Mention and formulate at least four. (4)<br />(b) A manufacturing organisation is in the process of<br />assessing the usefulness of SPT and EDD rules for the purpose of scheduling four jobs on a machine. The table that follows shows the information pertaining to the processing time and due dates for the jobs. Assuming that release time of all jobs is zero, compute the relevant performance measures and comment.<br />Job No.Process TimeDue Date(days)(days from now)1462792<br />5.<br />(a) What does 'Six-sigma' approach to quality referto ? How it can' be accomplished?(7)<br />(b) A time study analyst wants to estimate the time required to perform a certain job. A preliminary study yielded a mean of 6.4 minutes and a standard deviation of 2.1 minutes. The desired confidence level is 95%. How many observations will be needed if the desired maximum error is :<br />(i) ::i: 10% of the sample mean<br />(ii) One-half minute<br />(7)<br />6.<br />A centinuous review system has been designed for an item OIl the basis of following information:<br />Annual demand<br />10,000 units<br />Unit Cost<br />Rs.5<br />Inventory carrying cost<br />20%<br />Ordering cost per order<br />Rs. 200<br />Lead Time<br />1 week<br />Safety Stock<br />2000 units<br />An average ?afety stock of 2000 units was maintained throughout the year. After one .year, it was observed that the system was developed on wrong data. Instead the correct data were as fa 110ws :<br />Annual demand<br />12,000 units<br />Unit Cost<br />Rs.4.00<br />Ordering cost per order<br />Rs. 400<br />. L ad Time<br />0.5 week<br />Desired Safety Stock<br />1,000 units<br />Inventory carrying costs were same. Determine extra<br />variable costs incurred due to wrong estimation and<br />'. .<br />design of inventory system.(14)<br />7.<br />(a) Briefly discuss types of wastes considered in<br />a production system operationalising JIT.<br />with<br />reference' to<br />(4)<br />(b) A paint manufacturing company uses 3400'kgs of<br />a chemical dye per year. Currently, the firm purchases 300 kgs per order and at Rs. 3 per kg. The manufacturing firm incurs a cost of Rs. 100 each time an order is put and assigns an annual<br />holding cost of 17%. The supplier has just offered that orders of 1000 kgs or more will be filled at . a price of Rs. 2 per kg.<br />(i) Determine the order size that wi]! m 1111J1l1S< the total cost.<br />Annual demand<br />: 1,00,000Iitres<br />. <br />Inventory carrying costs<br />. Rs. 20 per litre per year<br />Ordering (set up) cost<br />: Rs. 10,000 per order<br />Rate of production<br />: 4,00,000 litres per year<br />Working days<br />. 300 days/year<br />(8)<br />8.<br />'>.<br />(a) How is product design different from servIce<br />. .<br />design? Consider an organized reta:il outlet,<br />and identify its different attributes from the perspective of customers. With the help of Quality Function Deployment (QFD), show how these customer attributes can be translated into realistic<br />possibilities.<br />(10)<br />(b) An analyst has been asked to prepare an estimate of time that a lathe operator spends adjusting the machine with a 90% confidence interval based on previous experience, the analyst believes the proportions will be approx. 30. percent. If the analyst uses a sample of 400 observations, what is the maximum possible error that wi Il be associated with the estimate?(4)<br />
Operations management past papers
Operations management past papers
Operations management past papers
Operations management past papers
Operations management past papers

More Related Content

What's hot

Operations strategy
Operations strategy Operations strategy
Operations strategy
Petre Vane
 
Inventory management
Inventory managementInventory management
Inventory management
Shreeshail Tumbagi
 
Operation Management
Operation ManagementOperation Management
Operation Management
kifluchekole1
 
Manufacturing strategy
Manufacturing strategy Manufacturing strategy
Manufacturing strategy
Prashant Tripathi
 
Process selection
Process selectionProcess selection
Process selection
niranjansagar123
 
Process planning (lesson 1)
Process planning (lesson 1)Process planning (lesson 1)
Process planning (lesson 1)
Hari Vignesh R
 
Layout
LayoutLayout
Layout
mubarak2009
 
Objectives of supply chain management
Objectives of supply chain managementObjectives of supply chain management
Objectives of supply chain management
DENNY OTTARACKAL
 
Methods Of plant Location
Methods Of plant LocationMethods Of plant Location
Methods Of plant Location
AyusmanSahu
 
MRP exercises
MRP exercisesMRP exercises
MRP exercises
Lucia Garrido
 
Facility & Layout Design Case Study
Facility & Layout Design Case StudyFacility & Layout Design Case Study
Facility & Layout Design Case StudyNilam Kabra
 
Cisco supply chain
Cisco supply chainCisco supply chain
Cisco supply chain
Neha Arya
 
Process layout
Process layoutProcess layout
Process layout
no
 
Costs associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASIC
Costs associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASICCosts associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASIC
Costs associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASIC
Srishti Bhardwaj
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement pptLizzette Danan
 
Value Of Information
Value Of InformationValue Of Information
Value Of Information3abooodi
 
Manufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project pptManufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project ppt
Deepak Joshi
 

What's hot (20)

Operations strategy
Operations strategy Operations strategy
Operations strategy
 
Inventory management
Inventory managementInventory management
Inventory management
 
Operation Management
Operation ManagementOperation Management
Operation Management
 
Manufacturing strategy
Manufacturing strategy Manufacturing strategy
Manufacturing strategy
 
Process selection
Process selectionProcess selection
Process selection
 
Process planning (lesson 1)
Process planning (lesson 1)Process planning (lesson 1)
Process planning (lesson 1)
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Layout
LayoutLayout
Layout
 
Objectives of supply chain management
Objectives of supply chain managementObjectives of supply chain management
Objectives of supply chain management
 
Methods Of plant Location
Methods Of plant LocationMethods Of plant Location
Methods Of plant Location
 
MRP exercises
MRP exercisesMRP exercises
MRP exercises
 
Ch 1
Ch 1Ch 1
Ch 1
 
Facility & Layout Design Case Study
Facility & Layout Design Case StudyFacility & Layout Design Case Study
Facility & Layout Design Case Study
 
Facility location
Facility locationFacility location
Facility location
 
Cisco supply chain
Cisco supply chainCisco supply chain
Cisco supply chain
 
Process layout
Process layoutProcess layout
Process layout
 
Costs associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASIC
Costs associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASICCosts associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASIC
Costs associated with inventories, ABC, VED, HML, FSN, SDE, SOS, XYZ, MBASIC
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Value Of Information
Value Of InformationValue Of Information
Value Of Information
 
Manufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project pptManufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project ppt
 

Similar to Operations management past papers

Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016
powellabril
 
(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx
marilynnhoare
 
Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016Joseph Konnully
 
ACCT 346 Enhance teaching - tutorialrank.com
ACCT 346 Enhance teaching - tutorialrank.comACCT 346 Enhance teaching - tutorialrank.com
ACCT 346 Enhance teaching - tutorialrank.com
LeoTolstoy13
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
NsbmUcd
 
ACCT 346 Effective Communication/tutorialrank.com
 ACCT 346 Effective Communication/tutorialrank.com ACCT 346 Effective Communication/tutorialrank.com
ACCT 346 Effective Communication/tutorialrank.com
jonhson248
 
ACC 560 Education Specialist / snaptutorial.com
ACC 560 Education Specialist / snaptutorial.comACC 560 Education Specialist / snaptutorial.com
ACC 560 Education Specialist / snaptutorial.com
McdonaldRyan128
 
Om important part b questions for all 5 units for all subjects
Om important part b questions for all 5 units for all subjectsOm important part b questions for all 5 units for all subjects
Om important part b questions for all 5 units for all subjects
srenth10
 
Acc 560 Exceptional Education / snaptutorial.com
Acc 560  Exceptional Education / snaptutorial.comAcc 560  Exceptional Education / snaptutorial.com
Acc 560 Exceptional Education / snaptutorial.com
Davis139
 
Acc 560 Enhance teaching / snaptutorial.com
Acc 560  Enhance teaching / snaptutorial.comAcc 560  Enhance teaching / snaptutorial.com
Acc 560 Enhance teaching / snaptutorial.com
HarrisGeorg43
 
ACC 560 Exceptional Education - snaptutorial.com
ACC 560   Exceptional Education - snaptutorial.comACC 560   Exceptional Education - snaptutorial.com
ACC 560 Exceptional Education - snaptutorial.com
DavisMurphyB25
 
Acct 434 week 4 midterm exam (devry)
Acct 434 week 4 midterm exam (devry)Acct 434 week 4 midterm exam (devry)
Acct 434 week 4 midterm exam (devry)
slicespiece
 
ACCT 346 Education Specialist / snaptutorial.com
 ACCT 346 Education Specialist / snaptutorial.com ACCT 346 Education Specialist / snaptutorial.com
ACCT 346 Education Specialist / snaptutorial.com
stevesonz110
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
Mahesh Chandra Sharma
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
MustafaElAkkad
 
Bba ii cost and management accounting u 3.2 job and batch costing
Bba ii cost and management accounting u 3.2 job and batch costingBba ii cost and management accounting u 3.2 job and batch costing
Bba ii cost and management accounting u 3.2 job and batch costing
Rai University
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
amitymbaassignment
 
Acc 560 Effective Communication / snaptutorial.com
Acc 560 Effective Communication / snaptutorial.comAcc 560 Effective Communication / snaptutorial.com
Acc 560 Effective Communication / snaptutorial.com
Baileyu
 
ACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.comACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.com
McdonaldRyan181
 
ACC 560 Education Organization -- snaptutorial.com
ACC 560   Education Organization -- snaptutorial.comACC 560   Education Organization -- snaptutorial.com
ACC 560 Education Organization -- snaptutorial.com
DavisMurphyB91
 

Similar to Operations management past papers (20)

Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016
 
(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx
 
Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016
 
ACCT 346 Enhance teaching - tutorialrank.com
ACCT 346 Enhance teaching - tutorialrank.comACCT 346 Enhance teaching - tutorialrank.com
ACCT 346 Enhance teaching - tutorialrank.com
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
 
ACCT 346 Effective Communication/tutorialrank.com
 ACCT 346 Effective Communication/tutorialrank.com ACCT 346 Effective Communication/tutorialrank.com
ACCT 346 Effective Communication/tutorialrank.com
 
ACC 560 Education Specialist / snaptutorial.com
ACC 560 Education Specialist / snaptutorial.comACC 560 Education Specialist / snaptutorial.com
ACC 560 Education Specialist / snaptutorial.com
 
Om important part b questions for all 5 units for all subjects
Om important part b questions for all 5 units for all subjectsOm important part b questions for all 5 units for all subjects
Om important part b questions for all 5 units for all subjects
 
Acc 560 Exceptional Education / snaptutorial.com
Acc 560  Exceptional Education / snaptutorial.comAcc 560  Exceptional Education / snaptutorial.com
Acc 560 Exceptional Education / snaptutorial.com
 
Acc 560 Enhance teaching / snaptutorial.com
Acc 560  Enhance teaching / snaptutorial.comAcc 560  Enhance teaching / snaptutorial.com
Acc 560 Enhance teaching / snaptutorial.com
 
ACC 560 Exceptional Education - snaptutorial.com
ACC 560   Exceptional Education - snaptutorial.comACC 560   Exceptional Education - snaptutorial.com
ACC 560 Exceptional Education - snaptutorial.com
 
Acct 434 week 4 midterm exam (devry)
Acct 434 week 4 midterm exam (devry)Acct 434 week 4 midterm exam (devry)
Acct 434 week 4 midterm exam (devry)
 
ACCT 346 Education Specialist / snaptutorial.com
 ACCT 346 Education Specialist / snaptutorial.com ACCT 346 Education Specialist / snaptutorial.com
ACCT 346 Education Specialist / snaptutorial.com
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
 
Bba ii cost and management accounting u 3.2 job and batch costing
Bba ii cost and management accounting u 3.2 job and batch costingBba ii cost and management accounting u 3.2 job and batch costing
Bba ii cost and management accounting u 3.2 job and batch costing
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Acc 560 Effective Communication / snaptutorial.com
Acc 560 Effective Communication / snaptutorial.comAcc 560 Effective Communication / snaptutorial.com
Acc 560 Effective Communication / snaptutorial.com
 
ACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.comACCT 346Education Redefined / snaptutorial.com
ACCT 346Education Redefined / snaptutorial.com
 
ACC 560 Education Organization -- snaptutorial.com
ACC 560   Education Organization -- snaptutorial.comACC 560   Education Organization -- snaptutorial.com
ACC 560 Education Organization -- snaptutorial.com
 

More from Kinshook Chaturvedi (20)

Working and functions_of_rbi[1]
Working and functions_of_rbi[1]Working and functions_of_rbi[1]
Working and functions_of_rbi[1]
 
Role of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_financeRole of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_finance
 
Mutual funds
Mutual fundsMutual funds
Mutual funds
 
Iifcl ppt
Iifcl pptIifcl ppt
Iifcl ppt
 
Basel ii norms.ppt
Basel ii norms.pptBasel ii norms.ppt
Basel ii norms.ppt
 
Retail banking pres
Retail banking presRetail banking pres
Retail banking pres
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
 
Mfi dfi
Mfi dfiMfi dfi
Mfi dfi
 
Management of np as imt
Management of np as imtManagement of np as imt
Management of np as imt
 
Life insurance in india final raja
Life insurance in india final rajaLife insurance in india final raja
Life insurance in india final raja
 
Financial inclusion
Financial inclusionFinancial inclusion
Financial inclusion
 
Corporate banking v2
Corporate banking v2Corporate banking v2
Corporate banking v2
 
Corporate banking latest
Corporate banking latestCorporate banking latest
Corporate banking latest
 
Financial mgt exercises
Financial mgt exercisesFinancial mgt exercises
Financial mgt exercises
 
Csac10[1].p
Csac10[1].pCsac10[1].p
Csac10[1].p
 
Csac08[1].p
Csac08[1].pCsac08[1].p
Csac08[1].p
 
Csac05[1].p
Csac05[1].pCsac05[1].p
Csac05[1].p
 
Csac14[1].p
Csac14[1].pCsac14[1].p
Csac14[1].p
 
Csac06[1].p
Csac06[1].pCsac06[1].p
Csac06[1].p
 
Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)
 

Recently uploaded

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 

Recently uploaded (20)

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 

Operations management past papers

  • 1. 1. Briefly discuss key challenges that lndian manufacturing corporate are facing in manufacturing and related operations. How can these be tackled? List some management initiatives and policies which can be used in this regard.(14)<br />2.(a) A company wants to set-up an engineering prefabrication unit, near Delhi, say, within 300 kms. What possible locations should be preferred and why? Give only precise reasons.(7)<br />(b) A factory's receiving dock would despatch parts to seven areas in the plant, shown in the matrix as 1-7. The receiving dock can be located at either A or B in the facility. The number of loads per month is shown in brackets while the distance in metres to A and B is given in parameters. Unit -, cost of movement is Rs. 10 per metre. Which position is best - A or B? Why?<br />A1B(90)234(60)(30)(50)[A:l, B:2][A:2, B:1]567(40)(90)(70)[A:2, B:2][A:2, B:2]<br />Departments 1, 3 and 6 are equidistant from A and B.(7)<br />3. (a) Briefly discuss one quality management technique that would ensure quality at design stage. (7)<br />(b) A manufacture of ball-bearings has the specifications for diameter as 245 mm ± .85 mm. The process planning department proposed two processes - A and B for manufacturing the ball bearings. After extensive pilot runs, the processes were statistically stabilised. The performance of the two processes is tabulated as follows:<br />The production department wants to know which of these processes is suitable for commercialisation. Compute relevant measures and give appropriate recommendations to the production department.<br />(7)<br />4.<br />(a) 'What are the performance measurement metrics for a line layout? Mention and formulate at least four. (4)<br />(b) A manufacturing organisation is in the process of<br />assessing the usefulness of SPT and EDD rules for the purpose of scheduling four jobs on a machine. The table that follows shows the information pertaining to the processing time and due dates for the jobs. Assuming that release time of all jobs is zero, compute the relevant performance measures and comment.<br />Job No.Process TimeDue Date(days)(days from now)1462792<br />5.<br />(a) What does 'Six-sigma' approach to quality referto ? How it can' be accomplished?(7)<br />(b) A time study analyst wants to estimate the time required to perform a certain job. A preliminary study yielded a mean of 6.4 minutes and a standard deviation of 2.1 minutes. The desired confidence level is 95%. How many observations will be needed if the desired maximum error is :<br />(i) ::i: 10% of the sample mean<br />(ii) One-half minute<br />(7)<br />6.<br />A centinuous review system has been designed for an item OIl the basis of following information:<br />Annual demand<br />10,000 units<br />Unit Cost<br />Rs.5<br />Inventory carrying cost<br />20%<br />Ordering cost per order<br />Rs. 200<br />Lead Time<br />1 week<br />Safety Stock<br />2000 units<br />An average ?afety stock of 2000 units was maintained throughout the year. After one .year, it was observed that the system was developed on wrong data. Instead the correct data were as fa 110ws :<br />Annual demand<br />12,000 units<br />Unit Cost<br />Rs.4.00<br />Ordering cost per order<br />Rs. 400<br />. L ad Time<br />0.5 week<br />Desired Safety Stock<br />1,000 units<br />Inventory carrying costs were same. Determine extra<br />variable costs incurred due to wrong estimation and<br />'. .<br />design of inventory system.(14)<br />7.<br />(a) Briefly discuss types of wastes considered in<br />a production system operationalising JIT.<br />with<br />reference' to<br />(4)<br />(b) A paint manufacturing company uses 3400'kgs of<br />a chemical dye per year. Currently, the firm purchases 300 kgs per order and at Rs. 3 per kg. The manufacturing firm incurs a cost of Rs. 100 each time an order is put and assigns an annual<br />holding cost of 17%. The supplier has just offered that orders of 1000 kgs or more will be filled at . a price of Rs. 2 per kg.<br />(i) Determine the order size that wi]! m 1111J1l1S< the total cost.<br />Annual demand<br />: 1,00,000Iitres<br />. <br />Inventory carrying costs<br />. Rs. 20 per litre per year<br />Ordering (set up) cost<br />: Rs. 10,000 per order<br />Rate of production<br />: 4,00,000 litres per year<br />Working days<br />. 300 days/year<br />(8)<br />8.<br />'>.<br />(a) How is product design different from servIce<br />. .<br />design? Consider an organized reta:il outlet,<br />and identify its different attributes from the perspective of customers. With the help of Quality Function Deployment (QFD), show how these customer attributes can be translated into realistic<br />possibilities.<br />(10)<br />(b) An analyst has been asked to prepare an estimate of time that a lathe operator spends adjusting the machine with a 90% confidence interval based on previous experience, the analyst believes the proportions will be approx. 30. percent. If the analyst uses a sample of 400 observations, what is the maximum possible error that wi Il be associated with the estimate?(4)<br />