Operator training is critical in
transitioning project upgrades to
operation with minimum disruption
Juan Jorge
Aurecon Regional Manager – South America
Project Value Still Being Destroyed!
• Many corporations have implemented front end loading studies
• Despite recent improvements in front end loading only 2.5% of projects meet
budget and schedule targets (PWC 2012)
• 69% of projects don’t make budget
• 57% of projects don’t make schedule
• Current measures are not totally effective!
Up to 30% of project value being
destroyed in project delivery!
Value Depletion Due to Poor
Operational Readiness (Deloitte)
Critical Issues in Operational Support
• Operational, financial and risk assumptions surrounding the existing operation may not be
valid after the upgrade.
• A requirement to continue production while the upgrades are carried out.
• Interfacing with existing equipment requires additional effort with regard to the position and
condition of existing plant.
• Matching the performance (and current condition) of existing equipment, or modifying its
operating regime, to ensure that it can support the performance of the new plant being
installed.
• Translating Original Equipment Manufacturer (OEM) manuals into a format which is
acceptable to operations personnel and aligned to CMMS.
• Interfacing with current operational restrictions, statutory requirements.
• Aligning with and supporting the cultural and behavioural expectations of the operation
A Systematic Approach
• Operational readiness must be linked to each project stage
• Operational elements must be assessed and prioritised
Identification of Focus Areas
• A targeted audit tool can be used to assess weaknesses and omissions
• Operational elements must be assessed and prioritised for targeted delivery
Functional Elements of Targeted Areas
• Targeted areas from the audit will need to organised into functional elements
Systems and operator training developed to meet industry standards
Elements Divided into Deliverables
• The functional elements can be further broken down into deliverables
• Operations person responsible for each deliverable identified (RACI)
• Appropriate persons trained in relevant elements
Importance of Experienced Coaches
• Focus on knowledge transfer not rote learning
• Focus on experienced trainers who can provide
practical examples
• Training needs to be practical and tailored to
culture and stage of operator development
• Trainers who can use the principles of
knowledge transfer and not just learning
methods
Importance of Operator Involvement
• Operator understanding of the design basis and operational principles
used in design;
• Planned upgrade maintenance needs and regimes understood so that
down time for “trial and error” is minimised;
• The design provides for efficient operational requirements and
maintenance by taking such requirements into account
• Operators have “ownership” of the final design and installation through
understanding and participating in the design decisions, and inevitable
trade-offs between costs and “nice-to-haves”.
Change Control – Systems and People
• Essential link between engineering and operational stages
• Normally poorly done
• Change register should provide link between design phase and operational phase
• Can use an independent committee to vet changes notices
• Change management processes for people aligned to project phases and the “new
state”
Case Study 1 – Coal Mine Indonesia
 Good upgrade planning/ engineering and
debottlenecking
X Let Down by lack of operator re-training and new
operating systems for upgraded facilities
Case Study 1 – Coal Mine Indonesia
Situation
•Established open cut coal mine Required increase in throughput from
17Mtpa to 35Mtpa
•Debottlenecking required to eliminate production restrictions
•Debottlenecking involved cooperation with OEMs
•13 km Overland Conveyor (OLC) was upgraded through speed increase to
8.7m/s
•Main commissioning / operational issue was instability in the OLC
•Operators had not been trained in the operating differences with respect to
new conveyor
Case Study 1 – Coal Mine Indonesia
What happened in practice
•Ramping up to full operational throughput rate loading onto the OLC
•Dealing with OLC instabilities when they start to occur
What would have been better
•Planning and management of maintenance shutdowns to minimise the time
between starting and stopping the OLC
•Management of stockpiling and machines at the mine and port to maximise
utilisation and minimise starting and stopping of the conveyor
Case Study 1 – Coal Mine Indonesia
Outcomes – Lessons Learned
•Output increased to the upgrade capacity over an extended six month
period
•Shutdowns and planned maintenance function could have been much more
organised pre-commissioning of the OLC
•Additional modelling and further training on how the OLC affected
operations downstream would have led to a more rapid improvement
•Change of operational approach over time to direct load coal from crusher
to ship as much of the time as possible for maximum efficiency
Situation
•Greenfield coal fired 1400MW power
station in Malaysia
•Requirement to commission plant over a
short time
•Company requirement to develop a new
operating culture – similar to a self directed
team style
•Operator selection not based on any
previous power station experience
Training and mentoring leading to fast track
commissioning and ramp up to operations
Case Study 2 – Jimah Power Station
Case Study 2 – Jimah Power Station
Solution
•The operators trained in power station operation in
four separate sessions
•The operators engaged early during construction
process
• The operators and maintenance personnel were heavily involved in the writing
and translation of the OEM manuals and in deciding operating methodology
• External assistance was used as required to overview the team development
of policy and procedures and to assist in commissioning
• A mentoring program was established and it was withdrawn gradually as
• competencies and culture grew
Case Study 2 –Jimah Power Station
Outcome
•Commissioning of the station took place to schedule and with no major
mishaps
•The operating culture has grown under the mentoring scheme
•Reviews were carried out for the first few years to assess progress and
ensure embedding
•The degree of mentoring has been cut back to occasional visits to provide
targeted development
Case Study 3 –Nickel Mine Koniambo
Situation
•Greenfield fluidised bed power station in New
Caledonia
•Operating personnel selected from local
population – requirement to move to self
sufficiency
•External assistance in framing operating
procedures into ESI Generation Training Package
•Local personnel part of the team developing
procedures and training for start up
Maximised benefit of local personnel through up
skilling in advance of commissioning and proactive
knowledge transfer programme
Case Study 3 –Nickel Mine Koniambo
Solution
•External assistance in building the training
framework and training requirements
•External consultants worked with local
personnel well ahead of commissioning to
develop the work packages
•Training packages were delivered with external
assistance
•External ongoing support on a required basis to
support the work
Case Study 3 –Nickel Mine Koniambo
Outcomes
•Maximised the rate and extent of knowledge transfer from expatriate staff
to internal staff and enable self-sufficiency
•Cultural differences, language, attitudes, numeracy and literacy
requirements were identified and the staff development process tailored to
suit
•Rapid local engagement and self-sufficiency
•Value-for-money in terms of set up and through-life-support
•Integrated operations processes and procedures
Conclusions
Brownfield upgrades require systematic and integrated operational readiness to optimise
results:
•Well-defined framework outlining the essential elements of operational support and the
interface with the project delivery stages.
•Auditing tool to assess weaknesses in operational aspects of the project
•A strong operational support system with the necessary.
•Strong integrated lead teams and disciplined change processes.
•Systems must be flexible and they must cater for the prevailing or desired workplace culture,
level of maturity and organisational structure.
•The operational support mechanism must span the entire project timeframe and they must
continue to support the operational staff post implementation.

More Related Content

What's hot

إدارة القيمة المكتسبة Earned Value Management
إدارة القيمة المكتسبة Earned Value Managementإدارة القيمة المكتسبة Earned Value Management
إدارة القيمة المكتسبة Earned Value Management
Abdelrahman Elsheikh PMOC,PMP,CBAP,RMP,ACP,SP,MCITP,ITIL
 
Altus exertus-specification
Altus exertus-specificationAltus exertus-specification
Altus exertus-specification
patel170591
 
2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West Equipment2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West Equipment
Eagle West Cranes JB
 
REVISI_Action Plan HSE CV. MPT 2023.pptx
REVISI_Action Plan HSE CV. MPT 2023.pptxREVISI_Action Plan HSE CV. MPT 2023.pptx
REVISI_Action Plan HSE CV. MPT 2023.pptx
FeniPerdana
 
Roles And Responsibilities Of First Line Maintenance Supervisor
Roles And Responsibilities Of First Line Maintenance SupervisorRoles And Responsibilities Of First Line Maintenance Supervisor
Roles And Responsibilities Of First Line Maintenance Supervisor
bheinsius
 
Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projects
Fernando Remolina, PMP
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
BnBn25
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
Ship construction ders_notu_sevilay_can
Ship construction ders_notu_sevilay_canShip construction ders_notu_sevilay_can
Ship construction ders_notu_sevilay_canSevilay Can
 
ORALS
ORALSORALS
Shipyard layout improvement
Shipyard layout improvementShipyard layout improvement
Shipyard layout improvement
Nikhil Ambattuparambil Gopi
 
Dasar keselamatan pengoperasian forklift
Dasar keselamatan pengoperasian forkliftDasar keselamatan pengoperasian forklift
Dasar keselamatan pengoperasian forklift
pkppk
 
Scaffold presentation westfields
Scaffold presentation westfieldsScaffold presentation westfields
Scaffold presentation westfields
Moses Kartey
 
Lifeboatppt
LifeboatpptLifeboatppt
Lifeboatppt
Palani Rajeshwar
 
Gemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer Elemanlar
Gemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer ElemanlarGemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer Elemanlar
Gemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer Elemanlar
Denizcilik ve Gemi Mühendisliği
 
Basic lifting rigging module 02
Basic lifting rigging module 02Basic lifting rigging module 02
Basic lifting rigging module 02
dafit43424
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125ennioeni
 
Cranes -
Cranes - Cranes -
Ktf standard
Ktf standardKtf standard
Ktf standard
ANA ISABEL R.R.
 

What's hot (20)

إدارة القيمة المكتسبة Earned Value Management
إدارة القيمة المكتسبة Earned Value Managementإدارة القيمة المكتسبة Earned Value Management
إدارة القيمة المكتسبة Earned Value Management
 
Altus exertus-specification
Altus exertus-specificationAltus exertus-specification
Altus exertus-specification
 
2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West Equipment2 Person Man Basket Brochure - Eagle West Equipment
2 Person Man Basket Brochure - Eagle West Equipment
 
REVISI_Action Plan HSE CV. MPT 2023.pptx
REVISI_Action Plan HSE CV. MPT 2023.pptxREVISI_Action Plan HSE CV. MPT 2023.pptx
REVISI_Action Plan HSE CV. MPT 2023.pptx
 
Roles And Responsibilities Of First Line Maintenance Supervisor
Roles And Responsibilities Of First Line Maintenance SupervisorRoles And Responsibilities Of First Line Maintenance Supervisor
Roles And Responsibilities Of First Line Maintenance Supervisor
 
Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projects
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Ship construction ders_notu_sevilay_can
Ship construction ders_notu_sevilay_canShip construction ders_notu_sevilay_can
Ship construction ders_notu_sevilay_can
 
ORALS
ORALSORALS
ORALS
 
Pid checklist
Pid checklistPid checklist
Pid checklist
 
Shipyard layout improvement
Shipyard layout improvementShipyard layout improvement
Shipyard layout improvement
 
Dasar keselamatan pengoperasian forklift
Dasar keselamatan pengoperasian forkliftDasar keselamatan pengoperasian forklift
Dasar keselamatan pengoperasian forklift
 
Scaffold presentation westfields
Scaffold presentation westfieldsScaffold presentation westfields
Scaffold presentation westfields
 
Lifeboatppt
LifeboatpptLifeboatppt
Lifeboatppt
 
Gemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer Elemanlar
Gemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer ElemanlarGemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer Elemanlar
Gemi İnşaatı - 05 - Tekne Kaplama, Posta, Güverte ve Diğer Elemanlar
 
Basic lifting rigging module 02
Basic lifting rigging module 02Basic lifting rigging module 02
Basic lifting rigging module 02
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125
 
Cranes -
Cranes - Cranes -
Cranes -
 
Ktf standard
Ktf standardKtf standard
Ktf standard
 

Similar to Operational Readiness and Importance of Operator Training

Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019
GSE Systems, Inc.
 
Transitioning from Project to Operations in CSG to LNG
Transitioning from Project to Operations in CSG to LNGTransitioning from Project to Operations in CSG to LNG
Transitioning from Project to Operations in CSG to LNG
Kai Eberspaecher
 
Construction Management in Developing Countries, Lecture 8
Construction Management in Developing Countries, Lecture 8Construction Management in Developing Countries, Lecture 8
Construction Management in Developing Countries, Lecture 8
Hari Krishna Shrestha
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_ResumeSean Hougham
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
Advisian
 
Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
Anuraj Panicker
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Mohamed Sajid Maqba
 
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdfThe study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
RuhiRangwala1
 
Presentationresume minggu 1
Presentationresume minggu 1Presentationresume minggu 1
Presentationresume minggu 1giriscoots
 
Operations management
Operations managementOperations management
Operations management
Dr Sathaiah Manimuthu
 
Basics of maintenance processes
Basics of maintenance processesBasics of maintenance processes
Basics of maintenance processes
GangaSumanth
 

Similar to Operational Readiness and Importance of Operator Training (20)

Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019
 
Transitioning from Project to Operations in CSG to LNG
Transitioning from Project to Operations in CSG to LNGTransitioning from Project to Operations in CSG to LNG
Transitioning from Project to Operations in CSG to LNG
 
LanningJeffreyresumerev
LanningJeffreyresumerevLanningJeffreyresumerev
LanningJeffreyresumerev
 
Construction Management in Developing Countries, Lecture 8
Construction Management in Developing Countries, Lecture 8Construction Management in Developing Countries, Lecture 8
Construction Management in Developing Countries, Lecture 8
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
Resume
ResumeResume
Resume
 
RMV1
RMV1RMV1
RMV1
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
Abhinav Aditya
Abhinav AdityaAbhinav Aditya
Abhinav Aditya
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016
 
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdfThe study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
 
Presentationresume minggu 1
Presentationresume minggu 1Presentationresume minggu 1
Presentationresume minggu 1
 
Resume
ResumeResume
Resume
 
Manoj kulkarni.docx
Manoj kulkarni.docxManoj kulkarni.docx
Manoj kulkarni.docx
 
Operations management
Operations managementOperations management
Operations management
 
Basics of maintenance processes
Basics of maintenance processesBasics of maintenance processes
Basics of maintenance processes
 

Recently uploaded

PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 

Recently uploaded (20)

PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 

Operational Readiness and Importance of Operator Training

  • 1. Operator training is critical in transitioning project upgrades to operation with minimum disruption Juan Jorge Aurecon Regional Manager – South America
  • 2. Project Value Still Being Destroyed! • Many corporations have implemented front end loading studies • Despite recent improvements in front end loading only 2.5% of projects meet budget and schedule targets (PWC 2012) • 69% of projects don’t make budget • 57% of projects don’t make schedule • Current measures are not totally effective!
  • 3. Up to 30% of project value being destroyed in project delivery! Value Depletion Due to Poor Operational Readiness (Deloitte)
  • 4. Critical Issues in Operational Support • Operational, financial and risk assumptions surrounding the existing operation may not be valid after the upgrade. • A requirement to continue production while the upgrades are carried out. • Interfacing with existing equipment requires additional effort with regard to the position and condition of existing plant. • Matching the performance (and current condition) of existing equipment, or modifying its operating regime, to ensure that it can support the performance of the new plant being installed. • Translating Original Equipment Manufacturer (OEM) manuals into a format which is acceptable to operations personnel and aligned to CMMS. • Interfacing with current operational restrictions, statutory requirements. • Aligning with and supporting the cultural and behavioural expectations of the operation
  • 5. A Systematic Approach • Operational readiness must be linked to each project stage • Operational elements must be assessed and prioritised
  • 6. Identification of Focus Areas • A targeted audit tool can be used to assess weaknesses and omissions • Operational elements must be assessed and prioritised for targeted delivery
  • 7. Functional Elements of Targeted Areas • Targeted areas from the audit will need to organised into functional elements Systems and operator training developed to meet industry standards
  • 8. Elements Divided into Deliverables • The functional elements can be further broken down into deliverables • Operations person responsible for each deliverable identified (RACI) • Appropriate persons trained in relevant elements
  • 9. Importance of Experienced Coaches • Focus on knowledge transfer not rote learning • Focus on experienced trainers who can provide practical examples • Training needs to be practical and tailored to culture and stage of operator development • Trainers who can use the principles of knowledge transfer and not just learning methods
  • 10. Importance of Operator Involvement • Operator understanding of the design basis and operational principles used in design; • Planned upgrade maintenance needs and regimes understood so that down time for “trial and error” is minimised; • The design provides for efficient operational requirements and maintenance by taking such requirements into account • Operators have “ownership” of the final design and installation through understanding and participating in the design decisions, and inevitable trade-offs between costs and “nice-to-haves”.
  • 11. Change Control – Systems and People • Essential link between engineering and operational stages • Normally poorly done • Change register should provide link between design phase and operational phase • Can use an independent committee to vet changes notices • Change management processes for people aligned to project phases and the “new state”
  • 12. Case Study 1 – Coal Mine Indonesia  Good upgrade planning/ engineering and debottlenecking X Let Down by lack of operator re-training and new operating systems for upgraded facilities
  • 13. Case Study 1 – Coal Mine Indonesia Situation •Established open cut coal mine Required increase in throughput from 17Mtpa to 35Mtpa •Debottlenecking required to eliminate production restrictions •Debottlenecking involved cooperation with OEMs •13 km Overland Conveyor (OLC) was upgraded through speed increase to 8.7m/s •Main commissioning / operational issue was instability in the OLC •Operators had not been trained in the operating differences with respect to new conveyor
  • 14. Case Study 1 – Coal Mine Indonesia What happened in practice •Ramping up to full operational throughput rate loading onto the OLC •Dealing with OLC instabilities when they start to occur What would have been better •Planning and management of maintenance shutdowns to minimise the time between starting and stopping the OLC •Management of stockpiling and machines at the mine and port to maximise utilisation and minimise starting and stopping of the conveyor
  • 15. Case Study 1 – Coal Mine Indonesia Outcomes – Lessons Learned •Output increased to the upgrade capacity over an extended six month period •Shutdowns and planned maintenance function could have been much more organised pre-commissioning of the OLC •Additional modelling and further training on how the OLC affected operations downstream would have led to a more rapid improvement •Change of operational approach over time to direct load coal from crusher to ship as much of the time as possible for maximum efficiency
  • 16. Situation •Greenfield coal fired 1400MW power station in Malaysia •Requirement to commission plant over a short time •Company requirement to develop a new operating culture – similar to a self directed team style •Operator selection not based on any previous power station experience Training and mentoring leading to fast track commissioning and ramp up to operations Case Study 2 – Jimah Power Station
  • 17. Case Study 2 – Jimah Power Station Solution •The operators trained in power station operation in four separate sessions •The operators engaged early during construction process • The operators and maintenance personnel were heavily involved in the writing and translation of the OEM manuals and in deciding operating methodology • External assistance was used as required to overview the team development of policy and procedures and to assist in commissioning • A mentoring program was established and it was withdrawn gradually as • competencies and culture grew
  • 18. Case Study 2 –Jimah Power Station Outcome •Commissioning of the station took place to schedule and with no major mishaps •The operating culture has grown under the mentoring scheme •Reviews were carried out for the first few years to assess progress and ensure embedding •The degree of mentoring has been cut back to occasional visits to provide targeted development
  • 19. Case Study 3 –Nickel Mine Koniambo Situation •Greenfield fluidised bed power station in New Caledonia •Operating personnel selected from local population – requirement to move to self sufficiency •External assistance in framing operating procedures into ESI Generation Training Package •Local personnel part of the team developing procedures and training for start up Maximised benefit of local personnel through up skilling in advance of commissioning and proactive knowledge transfer programme
  • 20. Case Study 3 –Nickel Mine Koniambo Solution •External assistance in building the training framework and training requirements •External consultants worked with local personnel well ahead of commissioning to develop the work packages •Training packages were delivered with external assistance •External ongoing support on a required basis to support the work
  • 21. Case Study 3 –Nickel Mine Koniambo Outcomes •Maximised the rate and extent of knowledge transfer from expatriate staff to internal staff and enable self-sufficiency •Cultural differences, language, attitudes, numeracy and literacy requirements were identified and the staff development process tailored to suit •Rapid local engagement and self-sufficiency •Value-for-money in terms of set up and through-life-support •Integrated operations processes and procedures
  • 22. Conclusions Brownfield upgrades require systematic and integrated operational readiness to optimise results: •Well-defined framework outlining the essential elements of operational support and the interface with the project delivery stages. •Auditing tool to assess weaknesses in operational aspects of the project •A strong operational support system with the necessary. •Strong integrated lead teams and disciplined change processes. •Systems must be flexible and they must cater for the prevailing or desired workplace culture, level of maturity and organisational structure. •The operational support mechanism must span the entire project timeframe and they must continue to support the operational staff post implementation.