Corporate presentation of Technoton products by Wagencontrol - EU representative of the company. What solutions we offer and how they can benefit for different types of fleets. http://wagencontrol.eu/home/
Reefer Tracking - Knowledge is Power: The Analytical AdvantageORBCOMM Inc.
ORBCOMM’s Chris Corlee participated in the panel at the 2015 Refrigerated Division of the Truckload Carrier Association (TCA) that discussed how trailer tracking can increase the bottom line.
This presentation provides a sneak peek of some of the upcoming changes to ReeferTrak that will not only wow customers but also provide the tools and data needed to analyze reefer performance including:
• Individual shipment and trip level analysis
• Temperature ranges, set point, reefer mode of operation
• Fuel theft events by location and time period
• Refuel transactions and invoice comparison
• Vendor, customer and driver actions and compliance
• Geofence entry and exit details
Corporate presentation of Technoton products by Wagencontrol - EU representative of the company. What solutions we offer and how they can benefit for different types of fleets. http://wagencontrol.eu/home/
Reefer Tracking - Knowledge is Power: The Analytical AdvantageORBCOMM Inc.
ORBCOMM’s Chris Corlee participated in the panel at the 2015 Refrigerated Division of the Truckload Carrier Association (TCA) that discussed how trailer tracking can increase the bottom line.
This presentation provides a sneak peek of some of the upcoming changes to ReeferTrak that will not only wow customers but also provide the tools and data needed to analyze reefer performance including:
• Individual shipment and trip level analysis
• Temperature ranges, set point, reefer mode of operation
• Fuel theft events by location and time period
• Refuel transactions and invoice comparison
• Vendor, customer and driver actions and compliance
• Geofence entry and exit details
Nafta Starter Kit is an automation solution for single petrol station covering control of the forecourt equipment and point of sale. It includes single copy of NaftaPOS software and PTS forecourt controller box.
Identify which devices are already integrated
Add new devices out of the ABB Device Library
Synchronize Fieldbus Builder FF library and Object Type Structure
Handle different versions and update the FF library
ORBCOMM Reefer Integration with PeopleNet In-Cab SolutionsORBCOMM Inc.
PeopleNet’s integration with ORBCOMM’s asset tracking solutions allows drivers to monitor the status warnings and alarms of up to three temperature zones in refrigerated trailers.
We are increasingly getting enquiries for a robust, MID compliant metering solution, for tenant billing and departmental cost allocation. Our MODBUS wireless metering solution coupled with our cloud based Realtime-Online(tm) billing module, is the perfect solution. Low impact, quick and simple install, comprehensive reporting suite, very competitive price. Come and find out more at Smart IoT London - 21/22 March Excel London. (free to attend).
Configure application code in Function Block Application Diagram.
Use Function Blocks and Signals
Configure H1 Scheduler
Download the configuration and verify live data
LoadMaster and ORBCOMM: Integrated Dispatch and Asset Tracking ORBCOMM Inc.
McLeod Software’s integration with ORBCOMM’s asset tracking solutions provides carriers a centralized view of the location of their assets as well as the ability to:
- Monitor critical cargo temperatures and sensors
- Receive alarm events
- Prevent spoilage claims
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)shyamies11
Availability Based Tariff was implemented in India in 2002-03. This presentation includes the chloronological sequence of events that led to the implementation of ABT . This also introduced a new concept of UI (Unscheduled Interchange) to rein in the wide excursion of grid frequency beyond the acceptable limits by imposition of fiscal disincentives for grid indiscipline by any regional or intra-regional entity
Nafta Starter Kit is an automation solution for single petrol station covering control of the forecourt equipment and point of sale. It includes single copy of NaftaPOS software and PTS forecourt controller box.
Identify which devices are already integrated
Add new devices out of the ABB Device Library
Synchronize Fieldbus Builder FF library and Object Type Structure
Handle different versions and update the FF library
ORBCOMM Reefer Integration with PeopleNet In-Cab SolutionsORBCOMM Inc.
PeopleNet’s integration with ORBCOMM’s asset tracking solutions allows drivers to monitor the status warnings and alarms of up to three temperature zones in refrigerated trailers.
We are increasingly getting enquiries for a robust, MID compliant metering solution, for tenant billing and departmental cost allocation. Our MODBUS wireless metering solution coupled with our cloud based Realtime-Online(tm) billing module, is the perfect solution. Low impact, quick and simple install, comprehensive reporting suite, very competitive price. Come and find out more at Smart IoT London - 21/22 March Excel London. (free to attend).
Configure application code in Function Block Application Diagram.
Use Function Blocks and Signals
Configure H1 Scheduler
Download the configuration and verify live data
LoadMaster and ORBCOMM: Integrated Dispatch and Asset Tracking ORBCOMM Inc.
McLeod Software’s integration with ORBCOMM’s asset tracking solutions provides carriers a centralized view of the location of their assets as well as the ability to:
- Monitor critical cargo temperatures and sensors
- Receive alarm events
- Prevent spoilage claims
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)shyamies11
Availability Based Tariff was implemented in India in 2002-03. This presentation includes the chloronological sequence of events that led to the implementation of ABT . This also introduced a new concept of UI (Unscheduled Interchange) to rein in the wide excursion of grid frequency beyond the acceptable limits by imposition of fiscal disincentives for grid indiscipline by any regional or intra-regional entity
The new stringent MiFID II regulatory technical standards (RTS) is top of mind for Banks, venues, and participants. One of the areas of major concern and confusion are the new regulatory technical standards (RTS) for trade transaction record management and reporting for trades made to venues that support high speed trading i.e., almost all electronic trades. The new MiFID II RTS standards require all parties involved in a trade to capture, record, maintain and report all information related to the transaction life-cycle with precise time-stamps accurately synchronised to the world time standard - UTC (Coordinated Universal Time). Existing systems cannot do this.
The reason the regulator wants to do this is to be able to retrospectively recreate the sequence of market actions that led to a particular market condition (possibly abusive behaviour) and forensically verify who did what, how markets reacted, and who is to blame.
It is very difficult to meet these new MiFID II regulatory technical standards (RTS) and may cost many millions of dollars to replace or retrofit the existing trading systems with this new capability. In addition, they will incur the ongoing costs of remaining compliant amid changes in their technology and amid future regulatory requirements. The banks and venues are concerned that even if they spend this money, their implementations may not meet the requirements and intention of (MiFID II) the new regulations, and failure to be compliant may result in significant fines.
Corvil is introducing a novel new solution that addresses this problem - it is able to meet these new MIFID II requirements for UTC-synchronised trade transaction record management without requiring a retrofit or re-architecture of trading platform components.
Case Study: Responsive Networks with Closed Loop AutomationKiran Sirupa
A leading financial services provider that delivers real-time information to global banks needed to introduce network capacity management, performance and latency optimization, predictive analytics, network assurance, and SLA compliance. They wanted to build a platform to collect streaming telemetry from multi-vendor network devices, build network analytics and generate insights.
In this case study, Anuta's ATOM software platform introduces closed-loop automation for L2-L7 devices from Cisco, Arista and Juniper using docker micro-services in Google Cloud Platform.
Interconnection Capital Share
Country
(Arabic Alphabetical Order)
Percentage%
United Arab Emirates 15.40
Kingdom of Bahrain 9.00
Kingdom of Saudi Arabia 31.60
Sultanate of Oman 5.60
State of Qatar 11.70
State of Kuwait 26.70
TOTAL 100.00
Based on the 1990 Project Study it was determined that the
share of the cost of the interconnection will be the present
worth of the capacity savings.
Similar to Operational Aspects of Real Time Market in India (20)
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Leading Change strategies and insights for effective change management pdf 1.pdf
Operational Aspects of Real Time Market in India
1. Implementation and
Operational aspects of
Real Time Market in India
P.K.Agarwal, Director, Market Operations
28th April 2020 Introduction to Real Time Elecricity Market 1
2. Outline
• Different Markets in India
• RTM in Indian Context - challenges
• Operation timeline of markets
• Typical data flow in RTM
• Status of Preparedness
Introduction to Real Time Elecricity Market 28th April 2020 2
3. Grid
Operation in
Market
Environment
Electricity Markets are Designed to provide reliable
electricity at least cost to the consumers
Tools & Markets in India to achieve least cost:-
• For User of the Grid:-
• Day Ahead Market.
• Intraday/contingency Market
• Choice of Revision of schedules
• Real Time Market
• For Grid Operators
• RRAS – Ancillary Service
• SCED – Security Constraint Economic Despatch for cost
Optimization
• AGC - Automatic Generation Control - Automatic
• For Both, User as well operator
• DSM – To manage last minute Inadvertent Deviation
4. RTM in India
is Unique
has
Challenges
28th April 2020 Introduction to Real Time Elecricity Market 4
RTM is Centralized balancing market in
decentralized system of scheduling.
• Schedules are made at RLDCs by SLDCs- RTM is operated
centrally at NLDC
• For every RTM, Schedules from five RLDCs are brought to NLDC.
• Calculations done at NLDC for balance margin
• Coordination with PX for RTM results.
• Running of Ancillary (RRAS and SCED
• After consolidation, schedules are sent back to RLDCs for
dissemination to SLDC and other stake holders.
RTM Market clearing is done by Px not by system
operator
• Bids/Offers called by Px - Margins calculated by NLDC- clearing
engine run by Px results to NLDC for further processing.
• Many numbers of data exchange within very tight timeline
5. Market Operational Timelines
5
2245 2300 2345 0000 0015 0030 0045 0100
RTM
Auction 1
RTM
Clearing
2315 2330
RRAS
RRAS +
SCED
28th April 2020 Introduction to Real Time Elecricity Market
2245 0000
Delivery Period
0030
Day Ahead Market
As per market timeline
Intra-day / Contingency
As per market timeline
Right to Revision of Schedule
For period 000-0030 end here
Day Ahead Period Real Real Time period
RTM for period
0000 to 0030
RRAS & SCED for
period
0000 to 0030
Gate Closure
Margins to Px
Schedulepreparationand
communicationforperiod
0000to0030
RTM and Optimization for
delivery period 0000 to 0030
DSM DSM
AGC AGC
Next RTM and Optimization for
delivery period 0030 to 0100
Next Delivery
Period
6. SR
NR
IEX
Typical Data transfer between NLDC, RLDCs and Power Exchanges
ER
NER
WR
DAM and RTM
processing
OUT INMain
Standby
PXIL
NLDC Server
Scheduling
System
RLDC Scheduling Software
PX Servers
Power Exchanges
ATC Processing
Margin
7. RTM ATC Calculation Module - Typical
By 0600 hrs
NLDC Upload link wise,
area wise TTC,RM,ATC
(ATC=TTC-RM)
Margin Calculation for DAM
Margin = ATC - (LTA+MTOA+STOA
Schedules) on each corridor, area,
region
LTA, MTOA to be as per
entitlements
By 1000 hrs RLDCs to
declare Region
wise and corridor wise ATC
margin using entitlements, LTA,
MTOA, STOA
Allocation of margins to
power exchanges as per
existing practice
By 0800hrs.
RLDCs to declare foreseen
capabilities of ISGS basedon
entitlements
Receipt of final trade from
power exchanges and
incorporation in schedule
by RLDCs
By 1800 hrs;
Issuance of Rev0 schedule
by RLDCs
Real Time ATC
Margin
Updation
Allocation of margin to
power exchanges based
on methodology at
Annexure-1
(Each run of RTM)
RLDCs processes Day
ahead / Contingency
bilateral applications
through STOA software
MarginsforDA/
Contingency
Bilateral
DAM Engine
Residual
margin
after DA /
Contingenc
y bilateral
processing
Receipt of final trade from
power exchanges and
incorporation in schedule
by RLDCs
(Each run of RTM)
Calculation of left-over margin
Incorporation
of RTM trade
in schedule
by RLDCs
RTM Engine
Margin
s
PXDAMTrade
Margin for RTM
PXRTMTrade
STOA Software
28th April 2020 7Introduction to Real Time Elecricity Market
8. Preparedness
Status
28th April 2020 Introduction to Real Time Elecricity Market 8
New scheduling application developed for all RLDCs/NLDC.
RTM Workshops conducted in all the regions involving stakeholders
of the region for discussing regulations, daft procedure.
Meeting with both Px – For finalizing methodology.
Data flow test between RLDCs and NLDC test servers going on.
Data exchange API with Px and scheduling software under data
exchange test.
Plan under preparation for doing mock/shifting scheduling to new
systems.
RTM engine developed – under test – integrated test to be done
9. 28th April 2020 Introduction to Real Time Elecricity Market 9