1. Curriculum vitae
Name: Nooruldeen Nawfal Najm Al-hamdani
Nationality: Iraqi
Date of Birth: 17th of October 1989
Religion: Muslim
Sex: Male
Sociological status: Married
Passport No: G1691803
Address: Iraq / Basrah / Alrobat zone
Iraqi Mobile: 009647815661988 - 009647711927233
Email: noornawfal52@gmail.com
Education:
1. Certificate of General Secondary Education in 2007 Rate of 92% -
Secondary school for Boys – Basrah
2. B.Sc. civil engineering for the year 2011- Engineering College – Basrah
University – Iraq Rate of medium
2. Training courses:
1. Training course in English language development
2. Training course in computer skills (M.S. Office)
3. Course in software engineering using AutoCAD
4. Course in working safety
Skills:
• Work on projects and follow up the implementation of all stages of the
work and credits
• Follow-up management of the workers and their leadership
• Ability to work and cooperate as a team
• Preparation of technical studies - economic projects
• Calculate costs and guess prices
• Follow-up product prices and business in the local market
• Ability to work in difficult conditions and harsh
• The skill of using computer
• Computer science skills (Microsoft Office & Auto Cad)
3. Jobs:
1. Following and monitor the specifications for the work of public to the
Iraqi standard specifications and to the Iraq Ministries, departments
2. Following and monitor the terms of the contract of Civil Engineering
Constructions (FIDIC)
3. I want to work in any fields in the scope of civil engineering as an
engineer and I have great desire to exercise the scientific information in
the practical application
4. From 14/7/2011 to 23/3/2012 I worked in sports city in basrah with
anwar sura company
First I worked in pile department (pore and drilled piles) then from
25/10/2011 to 23/3/2012 I worked in secondary stadium dep. (structural
built) as a site Eng.
5. From 24/3/2012 to 1/3/013 I worked in rumaila gas power plant station
in power engineering World Company as a QA/QC Inspector
My work as QC engineer divided into two parts:
The First part is office work prepare all drawings and supervision on
the project And prepare all related documents: method of statement,
Execution plan, Construction procedure in EPCC contract under
supervision of Hyundai Engineering Company Make all documents
related to RFI and QCP
The second part is site work contains Surveillance and check all
part of the work before submit Check Request.
4. 6. From 1l3l2013 to this date I am working in rumaila gas power plant
station in power engineering world company as a site engineer.
7. From 4/11/2013 to 1/1/2014 I worked in aswar Lebnan Company in
Shatt-Al Arab hospital as a site Eng.
8. From 2/1/2014 I worked with israr al Iraq company in abu_alkhaseeb
school
The school contains of three buildings administration, classrooms and
bathroom.
I was responsible for all civil work from earth work and foundation,
column, three floors and built brick wall, plastering, painting and roof
finishing by pre-cast tiles.
9. From 19/2/2015 to 15/3/2015 I worked with al marahb company
the project was re-constructed basrah-baghdad road at al-hartha
district.
I was responsible for casting the road by dividing it to sections
before pavement and backfilling with Sub-base material type A and
compaction to 90 % of Maximum dry Modified Procter Density also I
was responsible for storm sewage network.
10. From 15/3/2015 to 10/6/2015 I am working with israr Al Iraq
Company in al-zreji school as a project manager.
11. From 20/6/2015 to this date I am working with Al-ratbaa
Company in West Qurna1 in Main Outfall Drain project as a QA/QC
Inspector. And have approval from Saipems QC Manger to work as
QA/QC Inspector.
5. Sajer Iraq Oil Services, General Trading,
Contracting & Transport LLC
La Petite Maison Hotel- Al Riyadh Dist,
Block 908 - Street 1, 10001,
Baghdad, Republic of Iraq.
Mob.: +964 7809 201098
www.sajer.com
Letter N. LTR-SJ-RATBA'A-CIV-M075-0196
Contract No. 872767 - West Qurna I Project
o.1_;..u..J1J l.;t-11..?.-~ ~~
t'WI Jilli.; ~WI i.:.i':l_;L'WI_; o.J4"l!I_; ~I i.:oi...i..i.=..11
u":i.:i)I if"' - ~I 4,1J.l..iS
1,10001 t JW. -908 ~
JIJl.ll- Jl..li,i
+964 7809 201098 : J:!l/.JA
www.sajer.com
Ghassan Hussein
Project Manager
RATBA'A Contracting Co. LLC
PO. Box. 87646, ZIP 42001 Ashar
Basra, Iraq
03 September, 2015
Subject: CV's of proposed QC Inspectors - approval thereof
Dear Sir,
With reference to RATBA'A letter No. 872767-RTl-SJI-LET-0190 and following the
interviews, the proposed candidates Ali Abduljabbar Jumaah and Noor Al-Dieen
Nawfal are conditionally approved as QC inspectors for MOD project under
RATB'A.
If the performance of the candidates are not found satisfactory at any time, then
this approval will be revoked.
This is for RATBA'A information and further action.
Response require: No
Attachment: None
~/
CC: PM/ PMC I SM I CM/ FEM I FPCM I FQM I FEM I CA
Sajer Iraq LLC is a subsidiary of Saipem S.p.A
Best regards,
LTR-SJ-RATBA'A-CIV-M075-0196 Page 1 of 1