1. PERSONAL RESUME
MOHD FIKRI BIN ABD GHANI
920426-05-5255
CURRENT ADDRESS
ADDRESS: LOT 15956 KG SESAPAN KELUBI JLN SEREMBAN, 43700
BERANANG, SELANGOR D.E.
TEL (MOBILE): 019-6447479/013-6217248
E-MAIL: fikriwelder@yahoo.com
PERSONAL PARTICULARS
AGE: 24 YEARS OLD DATE OF BIRTH : 26 APPRIL 1992
NATIONALITY:MALAYSIAN GENDER : MALE
MARITAL STATUS:SINGLE IC NO. :920426-05-5255
RELIGION :ISLAM LANGUAGE : MALAY/ENGLISH
HEIGHT/WEIGHT:170CM/ HEALTH : EXELLENT
HOBBY:FOTBALL, BOWLING AND
FISHING
EDUCATIONAL BACKGROUND
4-A) INSTITUTE: PUSAT PEMBANGUNAN KEMAHIRAN TERENGGANU (TESDEC)
B) FIELD OF STUDY / TRADE: PROGRAM KIMPALAN TINGGI 6GC
C) YEARS: MAY 2014-JULY2014
D) QUALIFICATION: 6G COMBINATION
3-A) INSTITUTE: AKEDEMI BINAAN MALAYSIA WILAYAH TIMUR
B) FIELD OF STUDY / TRADE: WELDING
C) YEARS: MARCH 2011
D) QUALIFICATION: 5G SELULOS
2-A) INSTITUTE: GIAT MARA SEREMBAN
B) FIELD OF STUDY / TRADE: WELDING
C) YEARS: JUNE-DISEMBER 2010
D) QUALIFICATION: 6G SMAW
2. 1- A) INSTITUTE: S.M. TEKNIK PORT DICKSON
B) FIELD OF STUDY / TRADE: WELDING
C) YEARS: 2008/2009
D) QUALIFICATION: PIPE 1G AND 2G
PROFESSIONAL CERTIFICATE.
Sijil WELDING PROFESIONAL – GIAT MARA
CERT WELDING 3G CSWIP
CERT WELDING 6GC CSWIP
CERT Penetration Test – IWICC TWI.
COURSE ATTENDANCE.
Penetration Test – Courese Attendance – IWICC TWI.
Magnetic Particle Testing – Course Attendance – TWI-ABM-JOHOR BHARU
LANGUAGE SKILLS
LANGUAGE SPOKEN WRITTEN
MALAY EXCELLENT EXCELLENT
ENGLISH MEDIUM MEDIUM
WORK EXPERIENCES
5-A) YEAR: JANUARY 2015 UNTIL
B) COMPANY NAME: CASTWELL INDUSTRIES (M) SDN BHD
LOT 5212, BALAKONG JAYA INDUSTRIAL PARK, 43300, SERI KEMBANGAN,
SELANGOR, BUKIT ANGKAT, 43300 KAJANG, SELANGOR, MALAYSIA
C) POSITION: WELDER
4-A) YEAR: JANUARY 2013 UNTIL DECEMBER 2014
B) COMPANY NAME: BINASCAPE SDN BHDNO.8, LATITUDE ,JALANSUBANG 7,
TAMAN PERINDUTRIANSUBANG,47600 SUBANGJAYA, SELANGOR D.E.
D) POSITION: WELDER
3-A) YEAR: JUNE 2012 UNTIL DECEMBER 2012
B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU.
(VESSEL TANK)
C) SUBCONT NAME: SIXTY SIX ENERGY SDN BHD
D) POSITION: WELDER
2-A) YEAR: JANUARY 2012 UNTIL JUNE 2012
B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU.
(VESSEL TANK)
C) SUBCONT NAME: SIXTY SIX ENERGY SDN BHD
D) POSITION: WELDER
3. 1-A) YEAR: APRIL 2011 UNTIL DECEMBER 2011
B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU.
(VESSEL TANK)
C) SUBCONT NAME: BICARA SEPAKAT SDN BHD
D) POSITION : WELDER
SKILL/KNOWLEDGE
01.APPLY SAFETY PRACTICES AND PROCEDURES
02.READ DRAWINGS(VESSEL TANK) AND SPECIFICATION
03.MANAGE MATERIALS AND CONSUMABLES
04.PERFORM THERMAL AND MECHANICAL CUTTING
05.PREPARE JOINTS/MATERIALS FOR WELDING
06.PERFORM WELDING USING SMAW PROCESS
(2F,1G,3G,6G, 6GR & FITTING PROJECT)
07.PERFORM QUALITY CONTROL/INSPETION
08. KNOWLEDGE OF COMPUTER AND INTERNET
-MICROSOFT WORDS, EXCEL AND POWER POINT
OTHER
-WELDING SAW 1G
-PLASMA CUTTING
-OXY CUTTING
-FLUX CORE 1G
To perform inspection all incoming material, to understand acceptance.
To know and understand all project specification, testing procedure and NDT.
procedure, BOM list and inspection required as state on ITP.
Perform traceability inspection and perform visual inspection for any incoming
material, Inconel thickness check, hardness check before and after PWHT (King
brinell, Hardness rock well) and dimension check with hand on equipment (Vanier
caliper, bore gauge, internal and external micrometer, etc).
Witnessing on hydrostatic test, gas static test, hydraulic static test, assemble, NDT (MT,
PT, PMI) and functional test as project procedure requirement and specification.
Request for Radiographic Testing and Dye Penetrant Testing on the completed
welding joint.
To raise NCR (Non Conformant Report) with detail report and technical report if
found any abnormal/reject issue, make sure the rework perform as per disposition
from engineer and upload related document, inspection report on SAP system.
Perform final inspection, prepared MCCR (Mechanical Completion Check Record) and
complete with client signed off for official release of product.
Review final document compilation, mill certificate, NDT report, Test Chart, NCR,
Load Test and related document before hand over to Document Controller.
Monitoring and inspect cladding overlay at production welding workshop
To communicate with engineer and project team regarding quality issue.
To make sure all equipment use for inspection in good condition and valid calibrated.
To make sure working area at safe condition before perform work and inspection.
Support Welding Quality Department for witnessing PQR, WQT and other section
related with quality.
4. STRENGTH
• CAN DO THE JOB PROPERLY
• ABLE TO PERFORM WORK WITHOUT FREQUENT MONITORING
• ABLE TO WORK UNDER PRESSURE
• ABLE TO WORK OVERTIME (URGENT)
REFERENCES
BINASCAPE SDN BHD
NO.8, LATITUDE ,JALANSUBANG 7,
TAMAN PERINDUTRIANSUBANG,
47600 SUBANGJAYA, SELANGOR D.E.
NO TEL: 03-80819205/06/07
CASTWELL INDUSTRIES (M) SDN BHD
LOT 5212, BALAKONG JAYA INDUSTRIAL PARK, 43300, SERI KEMBANGAN,
SELANGOR, BUKIT ANGKAT, 43300 KAJANG, SELANGOR, MALAYSIA
NO TEL: +603-8961 8233