SlideShare a Scribd company logo
1 of 4
PERSONAL RESUME
MOHD FIKRI BIN ABD GHANI
920426-05-5255
CURRENT ADDRESS
ADDRESS: LOT 15956 KG SESAPAN KELUBI JLN SEREMBAN, 43700
BERANANG, SELANGOR D.E.
TEL (MOBILE): 019-6447479/013-6217248
E-MAIL: fikriwelder@yahoo.com
PERSONAL PARTICULARS
AGE: 24 YEARS OLD DATE OF BIRTH : 26 APPRIL 1992
NATIONALITY:MALAYSIAN GENDER : MALE
MARITAL STATUS:SINGLE IC NO. :920426-05-5255
RELIGION :ISLAM LANGUAGE : MALAY/ENGLISH
HEIGHT/WEIGHT:170CM/ HEALTH : EXELLENT
HOBBY:FOTBALL, BOWLING AND
FISHING
EDUCATIONAL BACKGROUND
4-A) INSTITUTE: PUSAT PEMBANGUNAN KEMAHIRAN TERENGGANU (TESDEC)
B) FIELD OF STUDY / TRADE: PROGRAM KIMPALAN TINGGI 6GC
C) YEARS: MAY 2014-JULY2014
D) QUALIFICATION: 6G COMBINATION
3-A) INSTITUTE: AKEDEMI BINAAN MALAYSIA WILAYAH TIMUR
B) FIELD OF STUDY / TRADE: WELDING
C) YEARS: MARCH 2011
D) QUALIFICATION: 5G SELULOS
2-A) INSTITUTE: GIAT MARA SEREMBAN
B) FIELD OF STUDY / TRADE: WELDING
C) YEARS: JUNE-DISEMBER 2010
D) QUALIFICATION: 6G SMAW
1- A) INSTITUTE: S.M. TEKNIK PORT DICKSON
B) FIELD OF STUDY / TRADE: WELDING
C) YEARS: 2008/2009
D) QUALIFICATION: PIPE 1G AND 2G
PROFESSIONAL CERTIFICATE.
 Sijil WELDING PROFESIONAL – GIAT MARA
 CERT WELDING 3G CSWIP
 CERT WELDING 6GC CSWIP
 CERT Penetration Test – IWICC TWI.

COURSE ATTENDANCE.
 Penetration Test – Courese Attendance – IWICC TWI.
 Magnetic Particle Testing – Course Attendance – TWI-ABM-JOHOR BHARU
LANGUAGE SKILLS
LANGUAGE SPOKEN WRITTEN
MALAY EXCELLENT EXCELLENT
ENGLISH MEDIUM MEDIUM
WORK EXPERIENCES
5-A) YEAR: JANUARY 2015 UNTIL
B) COMPANY NAME: CASTWELL INDUSTRIES (M) SDN BHD
LOT 5212, BALAKONG JAYA INDUSTRIAL PARK, 43300, SERI KEMBANGAN,
SELANGOR, BUKIT ANGKAT, 43300 KAJANG, SELANGOR, MALAYSIA
C) POSITION: WELDER
4-A) YEAR: JANUARY 2013 UNTIL DECEMBER 2014
B) COMPANY NAME: BINASCAPE SDN BHDNO.8, LATITUDE ,JALANSUBANG 7,
TAMAN PERINDUTRIANSUBANG,47600 SUBANGJAYA, SELANGOR D.E.
D) POSITION: WELDER
3-A) YEAR: JUNE 2012 UNTIL DECEMBER 2012
B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU.
(VESSEL TANK)
C) SUBCONT NAME: SIXTY SIX ENERGY SDN BHD
D) POSITION: WELDER
2-A) YEAR: JANUARY 2012 UNTIL JUNE 2012
B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU.
(VESSEL TANK)
C) SUBCONT NAME: SIXTY SIX ENERGY SDN BHD
D) POSITION: WELDER
1-A) YEAR: APRIL 2011 UNTIL DECEMBER 2011
B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU.
(VESSEL TANK)
C) SUBCONT NAME: BICARA SEPAKAT SDN BHD
D) POSITION : WELDER
SKILL/KNOWLEDGE
01.APPLY SAFETY PRACTICES AND PROCEDURES
02.READ DRAWINGS(VESSEL TANK) AND SPECIFICATION
03.MANAGE MATERIALS AND CONSUMABLES
04.PERFORM THERMAL AND MECHANICAL CUTTING
05.PREPARE JOINTS/MATERIALS FOR WELDING
06.PERFORM WELDING USING SMAW PROCESS
(2F,1G,3G,6G, 6GR & FITTING PROJECT)
07.PERFORM QUALITY CONTROL/INSPETION
08. KNOWLEDGE OF COMPUTER AND INTERNET
-MICROSOFT WORDS, EXCEL AND POWER POINT
OTHER
-WELDING SAW 1G
-PLASMA CUTTING
-OXY CUTTING
-FLUX CORE 1G
 To perform inspection all incoming material, to understand acceptance.
 To know and understand all project specification, testing procedure and NDT.
procedure, BOM list and inspection required as state on ITP.
 Perform traceability inspection and perform visual inspection for any incoming
material, Inconel thickness check, hardness check before and after PWHT (King
brinell, Hardness rock well) and dimension check with hand on equipment (Vanier
caliper, bore gauge, internal and external micrometer, etc).
 Witnessing on hydrostatic test, gas static test, hydraulic static test, assemble, NDT (MT,
PT, PMI) and functional test as project procedure requirement and specification.
 Request for Radiographic Testing and Dye Penetrant Testing on the completed
welding joint.
 To raise NCR (Non Conformant Report) with detail report and technical report if
found any abnormal/reject issue, make sure the rework perform as per disposition
from engineer and upload related document, inspection report on SAP system.
 Perform final inspection, prepared MCCR (Mechanical Completion Check Record) and
complete with client signed off for official release of product.
 Review final document compilation, mill certificate, NDT report, Test Chart, NCR,
Load Test and related document before hand over to Document Controller.
Monitoring and inspect cladding overlay at production welding workshop
 To communicate with engineer and project team regarding quality issue.
 To make sure all equipment use for inspection in good condition and valid calibrated.
 To make sure working area at safe condition before perform work and inspection.
 Support Welding Quality Department for witnessing PQR, WQT and other section
related with quality.
STRENGTH
• CAN DO THE JOB PROPERLY
• ABLE TO PERFORM WORK WITHOUT FREQUENT MONITORING
• ABLE TO WORK UNDER PRESSURE
• ABLE TO WORK OVERTIME (URGENT)
REFERENCES
BINASCAPE SDN BHD
NO.8, LATITUDE ,JALANSUBANG 7,
TAMAN PERINDUTRIANSUBANG,
47600 SUBANGJAYA, SELANGOR D.E.
NO TEL: 03-80819205/06/07
CASTWELL INDUSTRIES (M) SDN BHD
LOT 5212, BALAKONG JAYA INDUSTRIAL PARK, 43300, SERI KEMBANGAN,
SELANGOR, BUKIT ANGKAT, 43300 KAJANG, SELANGOR, MALAYSIA
NO TEL: +603-8961 8233

More Related Content

What's hot

Panduan menulis laporan
Panduan menulis laporanPanduan menulis laporan
Panduan menulis laporanCikgu Bibi
 
Akta 514 Keselamatan dan Kesihatan Pekerja
Akta 514 Keselamatan dan Kesihatan PekerjaAkta 514 Keselamatan dan Kesihatan Pekerja
Akta 514 Keselamatan dan Kesihatan PekerjaAhmad Nazib
 
Surat perjanjian perkongsian
Surat perjanjian perkongsianSurat perjanjian perkongsian
Surat perjanjian perkongsianhafisah262
 
Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...
Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...
Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...Fatin Aminah Abdul Latif
 
Surat Kebenaran Bawa Kereta
Surat Kebenaran Bawa KeretaSurat Kebenaran Bawa Kereta
Surat Kebenaran Bawa Keretarosedainty
 
Contoh Surat Pengurangan bayar bil air
Contoh Surat Pengurangan bayar bil airContoh Surat Pengurangan bayar bil air
Contoh Surat Pengurangan bayar bil airpjjmalaysia
 
Slide penyediaan rp penuh (Rancangan Perniagaan)
Slide penyediaan rp penuh (Rancangan Perniagaan) Slide penyediaan rp penuh (Rancangan Perniagaan)
Slide penyediaan rp penuh (Rancangan Perniagaan) Said Hafiz
 
PEMOTONGAN PLASMA PPT.pptx
PEMOTONGAN PLASMA PPT.pptxPEMOTONGAN PLASMA PPT.pptx
PEMOTONGAN PLASMA PPT.pptxAzah111
 
Surat setuju terima tawaran perlantikan dg41
Surat setuju terima tawaran perlantikan dg41Surat setuju terima tawaran perlantikan dg41
Surat setuju terima tawaran perlantikan dg41Nadzari Baharom
 
Asas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya Elektrik
Asas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya ElektrikAsas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya Elektrik
Asas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya ElektrikNorrazman Zaiha Zainol
 
Unit 3: Pencegahan Kebakaran
Unit 3: Pencegahan KebakaranUnit 3: Pencegahan Kebakaran
Unit 3: Pencegahan Kebakaranmokhtar
 
surat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industrisurat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industriXiao Doubles
 
CONTOH PROFILE SYARIKAT
CONTOH PROFILE SYARIKATCONTOH PROFILE SYARIKAT
CONTOH PROFILE SYARIKATRahsia Anggun
 
Kecemasan Kebakaran & Prosedur Pengosongan
Kecemasan Kebakaran & Prosedur PengosonganKecemasan Kebakaran & Prosedur Pengosongan
Kecemasan Kebakaran & Prosedur PengosonganAhmad Aidil Nasir
 
Dokumen 132017 contoh bq
Dokumen 132017 contoh bqDokumen 132017 contoh bq
Dokumen 132017 contoh bqNoorHaliza4
 
Kesalahan papan tanda
Kesalahan papan tandaKesalahan papan tanda
Kesalahan papan tandaHanaazizol
 

What's hot (20)

Panduan menulis laporan
Panduan menulis laporanPanduan menulis laporan
Panduan menulis laporan
 
Akta 514 Keselamatan dan Kesihatan Pekerja
Akta 514 Keselamatan dan Kesihatan PekerjaAkta 514 Keselamatan dan Kesihatan Pekerja
Akta 514 Keselamatan dan Kesihatan Pekerja
 
Surat perjanjian perkongsian
Surat perjanjian perkongsianSurat perjanjian perkongsian
Surat perjanjian perkongsian
 
Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...
Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...
Slide taklimat kemasukan ke kolej vokasional 2021 ( oleh: En Shahril Anuar Bi...
 
Surat Kebenaran Bawa Kereta
Surat Kebenaran Bawa KeretaSurat Kebenaran Bawa Kereta
Surat Kebenaran Bawa Kereta
 
Contoh Surat Pengurangan bayar bil air
Contoh Surat Pengurangan bayar bil airContoh Surat Pengurangan bayar bil air
Contoh Surat Pengurangan bayar bil air
 
Slide penyediaan rp penuh (Rancangan Perniagaan)
Slide penyediaan rp penuh (Rancangan Perniagaan) Slide penyediaan rp penuh (Rancangan Perniagaan)
Slide penyediaan rp penuh (Rancangan Perniagaan)
 
Rancangan Perniagaan
Rancangan PerniagaanRancangan Perniagaan
Rancangan Perniagaan
 
HIRARC
HIRARCHIRARC
HIRARC
 
PEMOTONGAN PLASMA PPT.pptx
PEMOTONGAN PLASMA PPT.pptxPEMOTONGAN PLASMA PPT.pptx
PEMOTONGAN PLASMA PPT.pptx
 
Surat setuju terima tawaran perlantikan dg41
Surat setuju terima tawaran perlantikan dg41Surat setuju terima tawaran perlantikan dg41
Surat setuju terima tawaran perlantikan dg41
 
Topik 2 hazard dan risiko
Topik 2 hazard dan risikoTopik 2 hazard dan risiko
Topik 2 hazard dan risiko
 
Asas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya Elektrik
Asas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya ElektrikAsas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya Elektrik
Asas Keselamatan dalam Kerja Elektrik: Modul 3 - Bahaya Elektrik
 
Unit 3: Pencegahan Kebakaran
Unit 3: Pencegahan KebakaranUnit 3: Pencegahan Kebakaran
Unit 3: Pencegahan Kebakaran
 
surat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industrisurat mohon maaf menolak tawaran latihan industri
surat mohon maaf menolak tawaran latihan industri
 
Contoh Resume in English
Contoh Resume in EnglishContoh Resume in English
Contoh Resume in English
 
CONTOH PROFILE SYARIKAT
CONTOH PROFILE SYARIKATCONTOH PROFILE SYARIKAT
CONTOH PROFILE SYARIKAT
 
Kecemasan Kebakaran & Prosedur Pengosongan
Kecemasan Kebakaran & Prosedur PengosonganKecemasan Kebakaran & Prosedur Pengosongan
Kecemasan Kebakaran & Prosedur Pengosongan
 
Dokumen 132017 contoh bq
Dokumen 132017 contoh bqDokumen 132017 contoh bq
Dokumen 132017 contoh bq
 
Kesalahan papan tanda
Kesalahan papan tandaKesalahan papan tanda
Kesalahan papan tanda
 

Viewers also liked

SCE1014 Amali 1 - Larutan Piawai
SCE1014 Amali 1 - Larutan PiawaiSCE1014 Amali 1 - Larutan Piawai
SCE1014 Amali 1 - Larutan PiawaiNurul Ashakirin
 
09038_Flud_ASME Sec IX_WPQ
09038_Flud_ASME Sec IX_WPQ09038_Flud_ASME Sec IX_WPQ
09038_Flud_ASME Sec IX_WPQmathew flud
 
Tips for delivering a successful events
Tips for delivering a successful eventsTips for delivering a successful events
Tips for delivering a successful eventsCini Mathew
 
The 5 Most Expensive Transfers of All-time (2011)
The 5 Most Expensive Transfers of All-time (2011) The 5 Most Expensive Transfers of All-time (2011)
The 5 Most Expensive Transfers of All-time (2011) Shekhar Ibhrampurkar
 
Gerencia de proyectos
Gerencia de proyectos Gerencia de proyectos
Gerencia de proyectos jose Nausan
 
Creating a Positive Learning Environment
Creating a Positive Learning EnvironmentCreating a Positive Learning Environment
Creating a Positive Learning Environmentstanbridge
 
Procedures in Planning and Conducting Maintenance
Procedures in Planning and Conducting MaintenanceProcedures in Planning and Conducting Maintenance
Procedures in Planning and Conducting MaintenanceAlvin Gabejan
 
Power point kimpalan (2)
Power point kimpalan (2)Power point kimpalan (2)
Power point kimpalan (2)Asyraf Iqbal
 
Front cover unedited photos
Front cover unedited photosFront cover unedited photos
Front cover unedited photosBritneyam
 
Flood in Pakistan 2010 - part 1
Flood in Pakistan 2010 - part 1 Flood in Pakistan 2010 - part 1
Flood in Pakistan 2010 - part 1 Nubia **
 
Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...
Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...
Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...Neil Keane
 
Rsl sains sem 1svm 2016
Rsl sains sem 1svm  2016Rsl sains sem 1svm  2016
Rsl sains sem 1svm 2016Harzana Harun
 

Viewers also liked (20)

Report amali kimpalan
Report amali kimpalanReport amali kimpalan
Report amali kimpalan
 
Kimpalan 2
Kimpalan 2Kimpalan 2
Kimpalan 2
 
SCE1014 Amali 1 - Larutan Piawai
SCE1014 Amali 1 - Larutan PiawaiSCE1014 Amali 1 - Larutan Piawai
SCE1014 Amali 1 - Larutan Piawai
 
09038_Flud_ASME Sec IX_WPQ
09038_Flud_ASME Sec IX_WPQ09038_Flud_ASME Sec IX_WPQ
09038_Flud_ASME Sec IX_WPQ
 
System Unit (E-Learning)
System Unit (E-Learning)System Unit (E-Learning)
System Unit (E-Learning)
 
Tips for delivering a successful events
Tips for delivering a successful eventsTips for delivering a successful events
Tips for delivering a successful events
 
Procter & gamble
Procter & gambleProcter & gamble
Procter & gamble
 
The 5 Most Expensive Transfers of All-time (2011)
The 5 Most Expensive Transfers of All-time (2011) The 5 Most Expensive Transfers of All-time (2011)
The 5 Most Expensive Transfers of All-time (2011)
 
Gerencia de proyectos
Gerencia de proyectos Gerencia de proyectos
Gerencia de proyectos
 
Creating a Positive Learning Environment
Creating a Positive Learning EnvironmentCreating a Positive Learning Environment
Creating a Positive Learning Environment
 
Procedures in Planning and Conducting Maintenance
Procedures in Planning and Conducting MaintenanceProcedures in Planning and Conducting Maintenance
Procedures in Planning and Conducting Maintenance
 
Power point kimpalan (2)
Power point kimpalan (2)Power point kimpalan (2)
Power point kimpalan (2)
 
Front cover unedited photos
Front cover unedited photosFront cover unedited photos
Front cover unedited photos
 
Ppt kimpalan
Ppt kimpalanPpt kimpalan
Ppt kimpalan
 
Flood in Pakistan 2010 - part 1
Flood in Pakistan 2010 - part 1 Flood in Pakistan 2010 - part 1
Flood in Pakistan 2010 - part 1
 
Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...
Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...
Presentation to NCCA Computer Science Seminar. Dublin Castle, Ireland. 21st F...
 
Kimpalan
KimpalanKimpalan
Kimpalan
 
Kimpalan Arka
Kimpalan ArkaKimpalan Arka
Kimpalan Arka
 
Rsl sains sem 1svm 2016
Rsl sains sem 1svm  2016Rsl sains sem 1svm  2016
Rsl sains sem 1svm 2016
 
Aerodynamics
AerodynamicsAerodynamics
Aerodynamics
 

Similar to RESUME FIKRI 2014 WELDER (1) (1)

Similar to RESUME FIKRI 2014 WELDER (1) (1) (20)

CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
MOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUMEMOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUME
 
CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015
 
Rahmad Hidayat CV Update_2
Rahmad Hidayat CV Update_2Rahmad Hidayat CV Update_2
Rahmad Hidayat CV Update_2
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
Sakil-resume
Sakil-resumeSakil-resume
Sakil-resume
 
Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016
 
MHB-QESH-2015
MHB-QESH-2015MHB-QESH-2015
MHB-QESH-2015
 
API 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTION
API 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTIONAPI 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTION
API 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTION
 
CV Summary Achmat Munib ( up dated Feb 18 2015)
CV Summary  Achmat Munib  ( up dated Feb 18  2015)CV Summary  Achmat Munib  ( up dated Feb 18  2015)
CV Summary Achmat Munib ( up dated Feb 18 2015)
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
NEW UPDATE RESUME
NEW UPDATE RESUMENEW UPDATE RESUME
NEW UPDATE RESUME
 
MHB-QEHS-2016
MHB-QEHS-2016MHB-QEHS-2016
MHB-QEHS-2016
 
nsrpcv
nsrpcvnsrpcv
nsrpcv
 
Zafar
ZafarZafar
Zafar
 
Zafar
ZafarZafar
Zafar
 
Hassby's CV 2015
Hassby's CV 2015Hassby's CV 2015
Hassby's CV 2015
 
Irfan Resume
Irfan ResumeIrfan Resume
Irfan Resume
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 

RESUME FIKRI 2014 WELDER (1) (1)

  • 1. PERSONAL RESUME MOHD FIKRI BIN ABD GHANI 920426-05-5255 CURRENT ADDRESS ADDRESS: LOT 15956 KG SESAPAN KELUBI JLN SEREMBAN, 43700 BERANANG, SELANGOR D.E. TEL (MOBILE): 019-6447479/013-6217248 E-MAIL: fikriwelder@yahoo.com PERSONAL PARTICULARS AGE: 24 YEARS OLD DATE OF BIRTH : 26 APPRIL 1992 NATIONALITY:MALAYSIAN GENDER : MALE MARITAL STATUS:SINGLE IC NO. :920426-05-5255 RELIGION :ISLAM LANGUAGE : MALAY/ENGLISH HEIGHT/WEIGHT:170CM/ HEALTH : EXELLENT HOBBY:FOTBALL, BOWLING AND FISHING EDUCATIONAL BACKGROUND 4-A) INSTITUTE: PUSAT PEMBANGUNAN KEMAHIRAN TERENGGANU (TESDEC) B) FIELD OF STUDY / TRADE: PROGRAM KIMPALAN TINGGI 6GC C) YEARS: MAY 2014-JULY2014 D) QUALIFICATION: 6G COMBINATION 3-A) INSTITUTE: AKEDEMI BINAAN MALAYSIA WILAYAH TIMUR B) FIELD OF STUDY / TRADE: WELDING C) YEARS: MARCH 2011 D) QUALIFICATION: 5G SELULOS 2-A) INSTITUTE: GIAT MARA SEREMBAN B) FIELD OF STUDY / TRADE: WELDING C) YEARS: JUNE-DISEMBER 2010 D) QUALIFICATION: 6G SMAW
  • 2. 1- A) INSTITUTE: S.M. TEKNIK PORT DICKSON B) FIELD OF STUDY / TRADE: WELDING C) YEARS: 2008/2009 D) QUALIFICATION: PIPE 1G AND 2G PROFESSIONAL CERTIFICATE.  Sijil WELDING PROFESIONAL – GIAT MARA  CERT WELDING 3G CSWIP  CERT WELDING 6GC CSWIP  CERT Penetration Test – IWICC TWI.  COURSE ATTENDANCE.  Penetration Test – Courese Attendance – IWICC TWI.  Magnetic Particle Testing – Course Attendance – TWI-ABM-JOHOR BHARU LANGUAGE SKILLS LANGUAGE SPOKEN WRITTEN MALAY EXCELLENT EXCELLENT ENGLISH MEDIUM MEDIUM WORK EXPERIENCES 5-A) YEAR: JANUARY 2015 UNTIL B) COMPANY NAME: CASTWELL INDUSTRIES (M) SDN BHD LOT 5212, BALAKONG JAYA INDUSTRIAL PARK, 43300, SERI KEMBANGAN, SELANGOR, BUKIT ANGKAT, 43300 KAJANG, SELANGOR, MALAYSIA C) POSITION: WELDER 4-A) YEAR: JANUARY 2013 UNTIL DECEMBER 2014 B) COMPANY NAME: BINASCAPE SDN BHDNO.8, LATITUDE ,JALANSUBANG 7, TAMAN PERINDUTRIANSUBANG,47600 SUBANGJAYA, SELANGOR D.E. D) POSITION: WELDER 3-A) YEAR: JUNE 2012 UNTIL DECEMBER 2012 B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU. (VESSEL TANK) C) SUBCONT NAME: SIXTY SIX ENERGY SDN BHD D) POSITION: WELDER 2-A) YEAR: JANUARY 2012 UNTIL JUNE 2012 B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU. (VESSEL TANK) C) SUBCONT NAME: SIXTY SIX ENERGY SDN BHD D) POSITION: WELDER
  • 3. 1-A) YEAR: APRIL 2011 UNTIL DECEMBER 2011 B) COMPANY/ PROJECT: MSET ENGINEERING CORPORATION KERTEH, TERENGGANU. (VESSEL TANK) C) SUBCONT NAME: BICARA SEPAKAT SDN BHD D) POSITION : WELDER SKILL/KNOWLEDGE 01.APPLY SAFETY PRACTICES AND PROCEDURES 02.READ DRAWINGS(VESSEL TANK) AND SPECIFICATION 03.MANAGE MATERIALS AND CONSUMABLES 04.PERFORM THERMAL AND MECHANICAL CUTTING 05.PREPARE JOINTS/MATERIALS FOR WELDING 06.PERFORM WELDING USING SMAW PROCESS (2F,1G,3G,6G, 6GR & FITTING PROJECT) 07.PERFORM QUALITY CONTROL/INSPETION 08. KNOWLEDGE OF COMPUTER AND INTERNET -MICROSOFT WORDS, EXCEL AND POWER POINT OTHER -WELDING SAW 1G -PLASMA CUTTING -OXY CUTTING -FLUX CORE 1G  To perform inspection all incoming material, to understand acceptance.  To know and understand all project specification, testing procedure and NDT. procedure, BOM list and inspection required as state on ITP.  Perform traceability inspection and perform visual inspection for any incoming material, Inconel thickness check, hardness check before and after PWHT (King brinell, Hardness rock well) and dimension check with hand on equipment (Vanier caliper, bore gauge, internal and external micrometer, etc).  Witnessing on hydrostatic test, gas static test, hydraulic static test, assemble, NDT (MT, PT, PMI) and functional test as project procedure requirement and specification.  Request for Radiographic Testing and Dye Penetrant Testing on the completed welding joint.  To raise NCR (Non Conformant Report) with detail report and technical report if found any abnormal/reject issue, make sure the rework perform as per disposition from engineer and upload related document, inspection report on SAP system.  Perform final inspection, prepared MCCR (Mechanical Completion Check Record) and complete with client signed off for official release of product.  Review final document compilation, mill certificate, NDT report, Test Chart, NCR, Load Test and related document before hand over to Document Controller. Monitoring and inspect cladding overlay at production welding workshop  To communicate with engineer and project team regarding quality issue.  To make sure all equipment use for inspection in good condition and valid calibrated.  To make sure working area at safe condition before perform work and inspection.  Support Welding Quality Department for witnessing PQR, WQT and other section related with quality.
  • 4. STRENGTH • CAN DO THE JOB PROPERLY • ABLE TO PERFORM WORK WITHOUT FREQUENT MONITORING • ABLE TO WORK UNDER PRESSURE • ABLE TO WORK OVERTIME (URGENT) REFERENCES BINASCAPE SDN BHD NO.8, LATITUDE ,JALANSUBANG 7, TAMAN PERINDUTRIANSUBANG, 47600 SUBANGJAYA, SELANGOR D.E. NO TEL: 03-80819205/06/07 CASTWELL INDUSTRIES (M) SDN BHD LOT 5212, BALAKONG JAYA INDUSTRIAL PARK, 43300, SERI KEMBANGAN, SELANGOR, BUKIT ANGKAT, 43300 KAJANG, SELANGOR, MALAYSIA NO TEL: +603-8961 8233