1. Anil Kumar MOB : +919654830535/+91 8375085937
anilmallik003@gmail.com
Flat no 02, 1st
floor , A1/91,Birla Farms ,Chhatterpur
New Delhi,Pin-110074
Seeking assignments in Transmission & Distribution line / installation & commissioning/Operations & Maintenance with
a growth oriented organization in Power & infra industry
Skill Summary:
Experience of over 7.2 years in Quality Assurance & Field Quality, Material inspection, Vendor Assessment/Development for various items used in T &D.
Operations, Project Execution & Maintenance of substation work, Transformer ,HT panel installation & commissioning work and construction work & Planning.
Vendor inspection, familiar with Indian Standards(IS), Inspection of material( Level-1, Level-2,Level-3,Level 4) inspection carried out instead of client(PGCIL) or
(Rites) & joint inspection with client Acceptance Test, Type Test with inspection of as per specification of material
Experience in Electrical Design , Erection, Testing & Commissioning at various 66KV at 3.5 MVAR Capacitor Bank, 33/11KV,66/11KV New
Substation , 33KV line,11KVline, (5-10 MVA) PTRs Augmentation. Additional S/S,33KV Bays Extension, quality Assurance (Material Inspection, Assessment of
Factory, Site inspection).
Gained experience in Vendor Premises Inspection,Factory Assessment, Erection, Testing & commissioning For LA, CT, PT, ISOLATOR, VCB CIRCUIT BREAKER,
Transformer & Electrical–Panel.
Experienced in activities regarding testing, Material Inspection of supplier, Factory Assessment of supplier of 66/11KV, 33/11KV Transformer 100M/200MVA,and
CT, PT, 33/11KV VCB Circuits , LT Cable ABC Cable (95 sqmm,120sqmm, 300 sqmm), LTDB Boxes Breaker(25 KVA,63KVA,100KVA) & control panel. NUT
BOLT( Size10mm,12mm,16mm,20mm), Heat String Cable Termination Kit,LED Bulb(KW),LT cable(up to 400 sqmm), Conductors (ASCR,AAC,&AAAC)
Academic Qualification: -
Pursuing PGEM- Marketing (Executive MBA) from IMT Ghaziabad, 2016-2017 Batch
B.E. (Electrical & Electronics) from Shirdi Sai Engineering College, Bangalore, under M/s Visveswaraya Technological University, Bangalore in June 2009.
IT Skills: Familiar with Indian Std, Electrical AutoCAD 2D and ETAP Software, Primavera, Ms Project software.
KEY RESPONSIBILITIES AREA
Quality Assurance
Joint inspection with client (NTPC & PGCIL)
Preparing manufacturing Quality plan /QMS document and maintain MIS and prepare the Test Report.
Vendor Assessment & Development
Pre-Dispatch Inspection of various items as per manufacturing Plan ,Guaranteed technical Particulars, drawing & indian standard
Project Co-ordinate & Material Management.
Knowledge of Indian Standards./BIS,ISO & GTP .
Professional Accomplishments: - 7.2 Years of Experience
Godrej & Boyce Mfg. Co. Ltd ,Mumbai.
Designation: Astt Project Manger (Quality )
Working since: 13 Apr’15 to till date
Project: BRGF(I,II) Project, RGGVY Project Plane-13,A-RPDRP Punjab, PGCIL(RGGVY Plan-12)
Client:-PSPCL,NBPDCL,SBPDCL, MPKVVCl, DHBVN, PGCIL
Ensure the quality of material regarding vendor inspected premises as per the IS, design standards, Preparation of Project progress reports, Assessment Evaluation
of supplier premises
Preparation of IMs Documentation & ,Material inspection tracking sheet, IMS Training
Liaison with the Government bodies & ensures the inspected material Level-2,Level-3 material instead of client.
Ensure the BOQ quantity inspection at the Vendor Premises as per IS- Standard of new 11 KV Line & 33 KV Lines, LT Line of distribution system.
Ensure the BOQ of maintenance & Erection of Line & Substation of Distribution system (33 /11 KV) & all supported report.
Site Co-ordination, Execution of work as per the Design/Drawing & Material Quality Assurance Plan.
NTPC Electric Supply Company Ltd.
Engineer (Quality Assurance & Inspection). My association with NTPC is an endless learning phase involving activities of Pre-Dispatch Inspections, Field Quality
Audits, capability assessment of sub-vendors and material Tracking and Project coordination.
Pre-dispatch Inspection: - I am responsible for inspecting of all type of HV and LV Cables,), Transformers, CTs-PTs, Insulators, Ring Main Unit, Package substation,
Vacuum Circuit Breakers, Switch gears items, Energy Meter, Conductors (ASCR, AAC, and AAAC), PSC and Steel tubular Poles, all structural MS material and
Hardware line items which are used in 220/33 kV, 33/11 kV substations as per Indian Standards, Drawings, GTP, NESCL TS and MQP/SQP.
Field Quality Audits: - In addition to the Material Inspection, I often had to go for field audits at various regions for checking the progress and ensure quality work at site
Sub-Vendor Assessment: - Assessment and development of sub-vendors/ manufacturers is pivotal from the point of view of enjoying a congenial supply chain
relationship. Making the supplier quality conscious and customer focused is one of the main objectives while developing the sub-vendor. Supply experience, and site
2. performance is also validated to make a comprehensive study about his capabilities.
Third Party Inspection: - I was actively and predominantly involved in third party inspections for (PGCIL) Power Grid Corporation of India limited as per REC's 3-
Tier Quality Management System for items such as Conductor, Distribution Transformer, Energy Meter, Poles and Insulators.
BHARAT ELECTRICAL CONTRACTORS & MFRS. PVT.LTD,SANGLI
Designation: Assistant..Project In charge
Working since: Oct’12 to Apr’14
Client : M.P.K.V.V.C.L(M.P.Pachim Kshetra vidyut Vitran CO.Ltd)
Project: 33/11KV New S/S/, Augmentation (3 to5 to10)MVA, 33KVline ,11KV line, Additional S/S,New 11KV DTR
The nature of the job included communication of daily/weekly/monthly plans to the execution team, monitoring actual progress, delay analysis, proposing corrective
actions, site coordination, material reconciliation, vendor follow ups, Client correspondence,
Keep proper records of the contractor’s activity and work progress as per survey.
Strictly monitor the progress of work for timely completion of the project.
Preparing monthly & weekly progress reports.
Proper records of vendor Approval &vendor Inspection Call raised & inspection premises ensure the quality.
Proper Cross Check of RA Bill & Price variation Bill.
Erection, Planning Commissioning & Testing Supply ofmaterials for construction Project Management
Communication with client & client Correspondence
Interface co-ordination like GTP Drawings Approval, Vendor Approval. Raised inspection Call
Preparation of RA Bill.
Preparation of 33/11 KV Substation survey report and Feeder Separation HT line Survey Report.
ABB LTD (Bangalore)
Duration: Feb’11to Oct’2012
Client: Getco (Gujarat Electrical Transmission Corporation Limited)
Designation: Site Manger
Project: 3.5 MVAR capacitor Bank various at 66/11KV at GETCO utilities
Erection ,Planning Commissioning & Testing ofHT switch gear as well as LT switch gear of main VCB panel for 3.5 MVAR capacitor Banks at various 66kv S/s
Commissioning & controlling operation of HT 11 KV panel & LT Panel, Sync panel, control relay panel.
Proper commissioning of CT,PT, operating Relay setting & mechanism in 11KV VCB Panel.
Coordinating with cross functional executives, Switch-gear equipment suppliers, Vendors & Mechanical engineers while managing subcontractor's installation and
commissioning personnel on site.
Providing Technical clarification with sub-suppliers and service providers, liaising closely with consultants & site representative.
Prepare single line diagrams and monitor compliance of the document as per technical standards and guidelines.
Correspondance of Vendors & Preparation of Bill
Records maintenance of all activity and Progress Report on daily basis.
Supervision of daily execution work while assuring project delivery as per time plan.
Power-tech Pvt. Ltd., Ghaziabad
Designation: Project Engineer
Duration: Jun’09 till Jan’11
Client: Indian Oil Corporation Ltd.
Project: 66/6.6 KV New Substation
Erection, Testing, Commissioning along with Unloading, Inspection, Verification, Storage and Handing over of 2 Bay 66/11 KV Switch yard at Viramgam , Gujarat.
Preparation of Measurement book & R.A. Bill.
Construction of type of earthling Philosophies Neutral earthing, spike earthling.
Preparation of Cable schedule and cable Routine, Material inspection receipt Certificate, ensure the Readiness of Material
Installation of 66/11KV S/s including civil work, Erection ,Testing, Commissioning at various Equipment .
Client: Delhi International Airport Pvt. Ltd.
Project: Indoor 11KV/420 V New Substation indoor substation
Vendor inspection, Erection, Testing and Commissioning of 11kV S/S.
Preparation of Pit Earthing Schedule, 11kv VFD panel installation & LV switchgear setting.
Installation of Power T/F, Testing ofPower T/F rating 2.5 MVA dry type t/f,
Supply & installation of 11KV indoor Substation, Testing & Commissioning for standby 3 phase Motor
Repair & Maintenance of 66/11 KV, 2 MVA, 2.5MVAR transformer at main power house.
Achievements:
Best employee of the Quarter for successful and quick implementation of PPHV (3.5Mvar) Capacitor Bank project various at 66/11KV Substation
Rewarded for Math’s, Science quiz competition, Athletics Inter-college competition.
3. Declaration: I hereby certify that the particulars given by me in curriculum vitae are correct to best of my knowledge and belief.