Welcome and ORCID Status Update
NYC ORCID Meet-up, 16 January 2014

Laurel L. Haak, PhD
	

Executive Director, ORCID
	

L.Haak@orcid.org
	

http://orcid.org/0000-0001-5109-3700
	


Contact Info: p. +1-301-922-9062 a. 10411 Motor City Drive, Suite 750, Bethesda, MD 20817 USA	


orcid.org
Welcome!
• 
• 
• 
• 
• 
• 
• 
• 
• 
• 

American Institute of Physics
Autism Speaks
Columbia University
Cornell University
Elsevier
Memorial Sloan Kettering (host)
Modern Language Association
Nature Publishing
New York Botanical Garden
New York University

14 January 2014

• 
• 
• 
• 
• 
• 
• 
• 
• 
• 

North Shore LIJ
Population Council
Rockefeller University
Princeton University
Rutgers University
SmartSimple
SSRN
Stonybrook University
Thomson Reuters
Wildlife Conservation Society

orcid.org	


2
Agenda
3:30
4:00
4:10
4:20

Arrive and check-in
Welcome and ORCID introduction. Laure Haak, Executive Director, ORCID
Technical updates. Laura Paglione, Technical Director, ORCID
Lightning presentations by current ORCID integrators (5 min each)
•  Tara Packer, Nature Publishing Group
•  Lisa McLaughlin, American Institute of Physics
•  Michael Habib, Elsevier
•  Gregg Gordon, Social Science Research Network
•  Chris Heid, Thomson Reuters
•  Theodora Bakker, NYU Langone Medical Center
•  Ed Clayton, Autism Speaks
5:00 Informal small group discussions and networking
6:00 Reception at MSKCC faculty club
7:15 Pay-as-you-go dinner, MAYA Restaurant, 1191 First Avenue (at 65th street)

14 January 2014

orcid.org	


3
v ORCID is an independent non-profit organization
supported by member fees
v We provide a Registry of unique identifiers for
researchers, and APIs for the community to embed
identifiers in research systems and workflows
v Data marked public by researchers is published
annually by ORCID under a CC0 waiver
v ORCID code is available on our GitHub open
source repository
v Our next Outreach meeting is May 21, in Chicago,
and will focus on university integration. Join us!
14 January 2014

orcid.org	


4
Interoperability
v ORCID works collaboratively with the research
community to ensure use and adoption of
research information exchange standards

14 January 2014

orcid.org	


5
Broad international usage
Country	
  
USA	
  
China	
  
Portugal	
  
UK	
  
India	
  
Spain	
  
Italy	
  
Brazil	
  
Germany	
  
Japan	
  
Australia	
  
France	
  
Canada	
  
Iran	
  
Russia	
  
South	
  Korea	
  
Turkey	
  
Sweden	
  
Malaysia	
  
Netherlands	
  
Taiwan	
  
Egypt	
  
Poland	
  
Switzerland	
  
Mexico	
  
Saudi	
  Arabia	
  
Belgium	
  
Vietnam	
  
Greece	
  

•  34 countries >10,000
unique visitors
•  81 countries >1,000
unique visitors
•  Registry supports
multiple character sets
•  Content in Spanish,
French, English, and
Chinese (adding Korean,
Japanese, Portuguese,
and Russian in 2014)

14 January 2014

orcid.org	


Visits	
  
332565	
  
212481	
  
131093	
  
113296	
  
112432	
  
93900	
  
80711	
  
77422	
  
74793	
  
69047	
  
57510	
  
55830	
  
45546	
  
39556	
  
38532	
  
37923	
  
32356	
  
30727	
  
28622	
  
28557	
  
28438	
  
25212	
  
20026	
  
19773	
  
19695	
  
14594	
  
14321	
  
13912	
  
13865	
  

%	
  
16%	
  
10%	
  
6%	
  
5%	
  
5%	
  
4%	
  
4%	
  
4%	
  
3%	
  
3%	
  
3%	
  
3%	
  
2%	
  
2%	
  
2%	
  
2%	
  
2%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  
1%	
  

6
Registrations growing steadily
	
  500,000	
  	
  
	
  450,000	
  	
  
	
  400,000	
  	
  
	
  350,000	
  	
  

ORCID has issued over
485,000 identifiers since our
launch in October 2012

	
  300,000	
  	
  

Member	
  Creator	
  
	
  250,000	
  	
  

Website	
  
	
  200,000	
  	
  

Trusted	
  party	
  
	
  150,000	
  	
  
	
  100,000	
  	
  
	
  50,000	
  	
  
	
  -­‐	
  	
  	
  	
  
Oct	
  

14 January 2014

Nov	
  

Dec	
  

Jan	
  

Feb	
  

Mar	
  

Apr	
  

May	
  

orcid.org	


Jun	
  

Jul	
  

Aug	
  

Sep	
  

Oct	
  

Nov	
  

Dec	
  

7
113 members and growing
Publishing*

AIP$Publishing,$AIRITI,$Aries,$Atlas,$Cactus,$Copernicus,$EBSCO,$Elsevier,$EDP$Sciences,$
eJournal$Press,$eLife,$Epistemio,$Flooved,$Hindawi,$InfraFM$Academic$Publishing,$Jnl$Bone$
and$Joint$Surgery,$Karger,$Landes$Bioscience,$National$Academy$of$Sciences,$Nature,$
Oxford$University$Press,$Peerage$of$Science,$PLOS,$RNAi,$ScienceOpen,$Springer,$Taylor$&$
Francis,$Wiley,$Wolters$Kluwer$
Associations* American$Astronomical$Soc,$American$Chemical$Soc,$ACSESS,$AAAS,$American$Geophysical$
Union,$American$Mathematical$Soc,$American$Psychological$Assn,$American$Physical$Soc,$
American$Soc$Microbiology,$American$Soc$Civil$Engineers,$Assn$Computing$Machinery,$
Electrochemical$Society,$IEEE,$IOP,$Modern$Language$Assn,$OSA,$Royal$Soc$Chemistry,$Soc$
Neuroscience$
Funders*
Autism$Speaks,$US$Department$of$Energy,$US$Food$and$Drug$Administration,$Japan$
Science$and$Technology$Agency,$Qatar$National$Research$Foundation,$US$National$
Institutes$of$Health,$UK$National$Institute$of$Health$Research,$Wellcome$Trust$
Universities* Boston$Univ,$CalTech,$Cambridge$Univ,$Chalmers$Univ$Technology,$Charles$Darwin$Univ,$
and*Research* Chinese$Academy$of$Sciences$Library,$CERN,$Cornell$Univ,$EMBL$(EBI),$FHCRC,$Glasgow$
Organizations* Univ,$Harvard$Univ,$IFPRI,$KACST,$KISTI,$Consorcio$Madroño,$MIT,$MSKCC,$National$
Institute$of$Informatics,$National$Taiwan$Univ$College$of$Medicine,$National$Taiwan$
Normal$Univ,$NYU$Langone$Medical$Center,$Oxford$University,$Purdue$Univ,$Riga$
Technical$Univ,$SUNYFStonybrook,$Texas$A&M$Univ,$Univ.$Cadiz,$Univ$Carlos$III$de$Madrid,$
Univ$Oviedo,$Univ$Zaragoza,$Univ$College$London,$Univ$Colorado,$Univ$Hong$Kong,$Univ$
Kansas,$Univ$Manchester,$Univ$Michigan,$Univ$Missouri,$Univ$Politécnica$Madrid,$Univ$
Washington$
Repositories* Altmetric,$Association$of$Users$of$Ukranian$Research$and$Academic$Network,$Australian$
and*Profile* National$Data$Service,$AVEDAS,$British$Library,$Copyright$Clearance$Center,$CrossRef,$
Systems*
DataCite,$F1000$Research,$Faculty$of$1000,$figshare,$Impact$Story,$Knode,$M2Community,$
OCLC,$PubMed$Europe$(EBI),$Symplectic,$Thomson$Reuters,$Überresearch,$$

!

Repositories
and Profile
Systems

Universities and
Research Orgs

Publishers

Associations

Funders

EMEA
37%

Americas
50%

AsiaPac
13%

8
Technical Update
NYC ORCID Meet-up	

	

January 16, 2014	

Laura Paglione
Start Here	

 	


Technical Director, ORCID
	


L.Paglione@ORCID.org
	

http://orcid.org/0000-0003-3188-6273
	

Contact Info: p. +1-301-922-9062 a. 10411 Motor City Drive, Suite 750, Bethesda, MD 20817 USA	


orcid.org
Some Background
aka, a quick catch-up for those who are new…

Registering & Signing in

15 January 2014

orcid.org	


2
Getting Started

15 January 2014

orcid.org	


3
Getting Started

15 January 2014

orcid.org	


4
Getting Started

15 January 2014

orcid.org	


5
Getting Started

15 January 2014

orcid.org	


6
Getting Started

First Name
Last Name
Email
Password

Privacy &
Communications
Preferences

15 January 2014

orcid.org	


7
Getting Started
Welcome	 to	 the	 
ORCID	 Registry!
•  Verify your email address
•  Here’s your ORCID iD:
fier

denti
nt i
rsiste
d pe
ue an
er

Uniq
n u mb
RI

dig it
TP U
d

16 a s HT
an dar
sse d
O st
Expre
ith IS
le w
patib
Co m

• 
• 
• 
• 
15 January 2014

orcid.org	


Image credit: RaHuL Rodriguez, ccBY-SA 2.0, Oct 5, 2012
http://www.flickr.com/photos/92963434@N03/9162677329

8
Some Background
The ORCID Record

15 January 2014

orcid.org	


9
The ORCID Record
Contains:
ç Biographical Data

ç Education Data
ç Employment Data
ç Works Data

15 January 2014

orcid.org	


10
The ORCID Record
Biographical
Data

Include
Multiple è
Names

15 January 2014

orcid.org	


11
The ORCID Record
Education Data
Employment Data

Organization
list from è
Ringgold
(an ISNI Registrar)

15 January 2014

orcid.org	


12
The ORCID Record
Works Data

Classifications  metadata
fields consistent w/CASRAI

Translated titles 
language support

Import Wizards:
•  ANDS Registry
•  CrossRef Metadata Search
•  DataCite Metadata Store
•  Europe PubMed Central
•  ResearcherID
•  Scopus
•  ISNI

Structured citations
in BibTeX
15 January 2014

orcid.org	


13
Some Background
Key Concepts

15 January 2014

orcid.org	


14
User privacy

● Information in an ORCID Record has a privacy setting,
which can be set by the account owner.

Accessible by :
Anyone

Account Owner, Trusted
Organization(s)

Account Owner

● Account information (settings, permissions) is accessible by
the account owner

15 January 2014

orcid.org	


15
ORCID APIs
•  Public API
•  No token or registration needed
•  Can only READ PUBLIC data
•  Can not EDIT or APPEND

•  Member API
•  Registration and token needed
•  With permission, can READ LIMITED data
•  With permission, can EDIT  APPEND to Records
•  Institutions can CREATE Records for employees
15 January 2014

orcid.org	


16
External Identifiers
•  When possible, include identifiers from other systems.
•  DOIs, ISNIs, PubMed IDs, Education/ employment unique
IDs, grant numbers, etc
•  Each item can have multiple external identifiers, allowing
cross-linking

•  GOALS:
•  Unambiguously associate a person (ORCID iD) to their
activities (by external IDs)
•  Link disparate systems together through the ORCID iD
•  Provide a reference to a primary source for metadata
15 January 2014

orcid.org	


17
Planned for 2014
Disclaimer: Our hopes for 2014,
though, as with all forward-looking statements,
change is possible…

15 January 2014

orcid.org	


Image credit: webtreats, ccBY 2.0, Jun 25, 2010
http://www.flickr.com/photos/webtreatsetc/4732922099/

18
Funding

●  In Sandbox (use
● 
● 
● 
15 January 2014

orcid.org	


?funding at the
end of the URL)
Funding agencies list
coordinated with
FundRef
Metadata fields
consistent with
CASRAI dictionary
Will include Funding
import wizards

19
Other things

●  Account delegation – researchers can designate others to
manage their ORCID record
●  Multiple assertions – organizations may contribute
● 
● 
● 

information to ORCID records to add or strengthen
claims
Localize site into more languages
Custom claim emails for organizations creating iDs
Ability to send messages to researchers through the
Registry

15 January 2014

orcid.org	


20
More information

●  Our website: http://orcid.org
●  Membership: http://orcid.org/about/membership
●  Integrating iD: http://orcid.org/organizations/integrators
●  Subscribe to our blog http://orcid.org/newsletter/subscriptions
●  Follow us on Twitter @ORCID_Org
Thank you

Laura Paglione
Technical Director, ORCID
L.Paglione@ORCID.org
http://orcid.org/0000-0003-3188-6273
15 January 2014

orcid.org	


22
NPG Implementation of ORCID!
Tara Packer and Vrushali Potdar!
Author  Referee Services!
Nature Publishing Group!
!
ORCID Meet up New York!
January 16 2014!
ORCID
Collection

Open Researcher and Contributor Identifier Workflow

Registration Process

Manuscript Submission

User creates
and validates
an ORCID

ORCID stored in
Manuscript
Tracking
System*

ORCID
Into Production

Upon Acceptance Only

Production

ORCID Recorded in the DB
* eJournalPress

Note: Typesetters are
instructed to extract
ORCIDs and input into
article xml

ORCID
stored into
article XML file

Web Production

ORCID displayed on html version of
published article

ORCID
Transfer to 3rd
Party

ORCID
Publication

ORCID into
Article File

Typesetters

Note: Production
systems do not ingest
ORCIDs at this time,
rather the xml file is
stored with article files
and used by our
typesetters

Third Party Systems
(Crossref, PubMed
etc.)

2

Vrushali Potdar| NPG Author  Referee Services, June 2013
AIP Publishing’s ORCID Implementation

Lisa McLaughlin, Director Publishing Operations
16	
  January	
  2014	
  
AIP Publishing’s ORCID Implementation

•  AIPP is in the process of becoming a registered ORCID
member.
•  Planning to implement ORCID in our peer review system ⎯
Q1 2014.
•  Will be utilizing the eJournalPress ORCID workflow:
–  During submission, authors can create a new ORCID or
link to an existing ORCID.
–  Editors can search the peer review database using
ORCID.
–  ORCIDs will be visible to staff and editors in the system.
•  Pending policy decisions :
–  Should corresponding authors be required to create or
supply an ORCID? What about co-authors and reviewers?
–  Should we enable the ability for users to login to the peer
review system using their ORCID?
Gregg_Gordon@SSRN.Com
@SSRN
SSRNblog.com
ORCID INTEGRATION AT THOMSON
REUTERS
Web of Science

•  ORCID iDs linked to Researcher ID accounts have been merged to relevant
WoS records
•  Ready to receive and display ORCID iDs for any record when provided by
publisher
•  Ability to search for WoS records using ORCID iD and other author identifiers

InCites

•  Users may store an ORCID iD with their profile
•  Ability to create an author dataset (RPP) off of a researcher’s ORCID iD
•  Future enhancements include making ORCID creation an automated task upon
InCites profile registration.

Converis

•  Look up a researcher’s ORCID iD via first/last name for purposes of associating
it with their profile
•  Display of researcher’s ORCID iD with link to their ORCID profile
•  Search for and import publications via researcher’s ORCID iD

ResearcherID

ScholarOne

•  Register for an ORCID iD or link an existing iD with your account from
ResearcherID
•  Bi-directional data exchange: Profiles and Publications
•  Display a link to the user's ORCID account on their ResearcherID profile
•  Display a link to the user's ResearcherID profile on their ORCID record
•  Register for an ORCID iD or associate an existing iD with your account from
ScholarOne
•  Authentication of users’ ORCID iDs via the ORCID API
•  Population of ScholarOne registration form with data from a user’s ORCID
ORCID	
  Faculty	
  Data	
  Project	
  
ORCID Integration

Pre-Award
• 

• 
• 

All new applicants (PIs, Mentors, and
Co-Investigators) will be required to
provide ORCID identifiers
Validating new users
Biosketch development/updates

Funding Agencies

Post-Award
• 
• 
• 
• 
• 

Reporting of new publications and funding
streams
Pre-populated progress reports
Acknowledgement of funding
Management of investigator profiles
Monitoring of Return on Investment/Public
ORCID profiles

Publishing Groups

© 2013 Autism Speaks Inc. Autism Speaks and Autism Speaks It’s Time To Listen  Design are registered trademarks owned by Autism Speaks Inc. All rights reserved.

New York Area ORCID Meet-up_20140116

  • 1.
    Welcome and ORCIDStatus Update NYC ORCID Meet-up, 16 January 2014 Laurel L. Haak, PhD Executive Director, ORCID L.Haak@orcid.org http://orcid.org/0000-0001-5109-3700 Contact Info: p. +1-301-922-9062 a. 10411 Motor City Drive, Suite 750, Bethesda, MD 20817 USA orcid.org
  • 2.
    Welcome! •  •  •  •  •  •  •  •  •  •  American Institute ofPhysics Autism Speaks Columbia University Cornell University Elsevier Memorial Sloan Kettering (host) Modern Language Association Nature Publishing New York Botanical Garden New York University 14 January 2014 •  •  •  •  •  •  •  •  •  •  North Shore LIJ Population Council Rockefeller University Princeton University Rutgers University SmartSimple SSRN Stonybrook University Thomson Reuters Wildlife Conservation Society orcid.org 2
  • 3.
    Agenda 3:30 4:00 4:10 4:20 Arrive and check-in Welcomeand ORCID introduction. Laure Haak, Executive Director, ORCID Technical updates. Laura Paglione, Technical Director, ORCID Lightning presentations by current ORCID integrators (5 min each) •  Tara Packer, Nature Publishing Group •  Lisa McLaughlin, American Institute of Physics •  Michael Habib, Elsevier •  Gregg Gordon, Social Science Research Network •  Chris Heid, Thomson Reuters •  Theodora Bakker, NYU Langone Medical Center •  Ed Clayton, Autism Speaks 5:00 Informal small group discussions and networking 6:00 Reception at MSKCC faculty club 7:15 Pay-as-you-go dinner, MAYA Restaurant, 1191 First Avenue (at 65th street) 14 January 2014 orcid.org 3
  • 4.
    v ORCID is anindependent non-profit organization supported by member fees v We provide a Registry of unique identifiers for researchers, and APIs for the community to embed identifiers in research systems and workflows v Data marked public by researchers is published annually by ORCID under a CC0 waiver v ORCID code is available on our GitHub open source repository v Our next Outreach meeting is May 21, in Chicago, and will focus on university integration. Join us! 14 January 2014 orcid.org 4
  • 5.
    Interoperability v ORCID works collaborativelywith the research community to ensure use and adoption of research information exchange standards 14 January 2014 orcid.org 5
  • 6.
    Broad international usage Country   USA   China   Portugal   UK   India   Spain   Italy   Brazil   Germany   Japan   Australia   France   Canada   Iran   Russia   South  Korea   Turkey   Sweden   Malaysia   Netherlands   Taiwan   Egypt   Poland   Switzerland   Mexico   Saudi  Arabia   Belgium   Vietnam   Greece   •  34 countries >10,000 unique visitors •  81 countries >1,000 unique visitors •  Registry supports multiple character sets •  Content in Spanish, French, English, and Chinese (adding Korean, Japanese, Portuguese, and Russian in 2014) 14 January 2014 orcid.org Visits   332565   212481   131093   113296   112432   93900   80711   77422   74793   69047   57510   55830   45546   39556   38532   37923   32356   30727   28622   28557   28438   25212   20026   19773   19695   14594   14321   13912   13865   %   16%   10%   6%   5%   5%   4%   4%   4%   3%   3%   3%   3%   2%   2%   2%   2%   2%   1%   1%   1%   1%   1%   1%   1%   1%   1%   1%   1%   1%   6
  • 7.
    Registrations growing steadily  500,000      450,000      400,000      350,000     ORCID has issued over 485,000 identifiers since our launch in October 2012  300,000     Member  Creator    250,000     Website    200,000     Trusted  party    150,000      100,000      50,000      -­‐         Oct   14 January 2014 Nov   Dec   Jan   Feb   Mar   Apr   May   orcid.org Jun   Jul   Aug   Sep   Oct   Nov   Dec   7
  • 8.
    113 members andgrowing Publishing* AIP$Publishing,$AIRITI,$Aries,$Atlas,$Cactus,$Copernicus,$EBSCO,$Elsevier,$EDP$Sciences,$ eJournal$Press,$eLife,$Epistemio,$Flooved,$Hindawi,$InfraFM$Academic$Publishing,$Jnl$Bone$ and$Joint$Surgery,$Karger,$Landes$Bioscience,$National$Academy$of$Sciences,$Nature,$ Oxford$University$Press,$Peerage$of$Science,$PLOS,$RNAi,$ScienceOpen,$Springer,$Taylor$&$ Francis,$Wiley,$Wolters$Kluwer$ Associations* American$Astronomical$Soc,$American$Chemical$Soc,$ACSESS,$AAAS,$American$Geophysical$ Union,$American$Mathematical$Soc,$American$Psychological$Assn,$American$Physical$Soc,$ American$Soc$Microbiology,$American$Soc$Civil$Engineers,$Assn$Computing$Machinery,$ Electrochemical$Society,$IEEE,$IOP,$Modern$Language$Assn,$OSA,$Royal$Soc$Chemistry,$Soc$ Neuroscience$ Funders* Autism$Speaks,$US$Department$of$Energy,$US$Food$and$Drug$Administration,$Japan$ Science$and$Technology$Agency,$Qatar$National$Research$Foundation,$US$National$ Institutes$of$Health,$UK$National$Institute$of$Health$Research,$Wellcome$Trust$ Universities* Boston$Univ,$CalTech,$Cambridge$Univ,$Chalmers$Univ$Technology,$Charles$Darwin$Univ,$ and*Research* Chinese$Academy$of$Sciences$Library,$CERN,$Cornell$Univ,$EMBL$(EBI),$FHCRC,$Glasgow$ Organizations* Univ,$Harvard$Univ,$IFPRI,$KACST,$KISTI,$Consorcio$Madroño,$MIT,$MSKCC,$National$ Institute$of$Informatics,$National$Taiwan$Univ$College$of$Medicine,$National$Taiwan$ Normal$Univ,$NYU$Langone$Medical$Center,$Oxford$University,$Purdue$Univ,$Riga$ Technical$Univ,$SUNYFStonybrook,$Texas$A&M$Univ,$Univ.$Cadiz,$Univ$Carlos$III$de$Madrid,$ Univ$Oviedo,$Univ$Zaragoza,$Univ$College$London,$Univ$Colorado,$Univ$Hong$Kong,$Univ$ Kansas,$Univ$Manchester,$Univ$Michigan,$Univ$Missouri,$Univ$Politécnica$Madrid,$Univ$ Washington$ Repositories* Altmetric,$Association$of$Users$of$Ukranian$Research$and$Academic$Network,$Australian$ and*Profile* National$Data$Service,$AVEDAS,$British$Library,$Copyright$Clearance$Center,$CrossRef,$ Systems* DataCite,$F1000$Research,$Faculty$of$1000,$figshare,$Impact$Story,$Knode,$M2Community,$ OCLC,$PubMed$Europe$(EBI),$Symplectic,$Thomson$Reuters,$Überresearch,$$ ! Repositories and Profile Systems Universities and Research Orgs Publishers Associations Funders EMEA 37% Americas 50% AsiaPac 13% 8
  • 9.
    Technical Update NYC ORCIDMeet-up January 16, 2014 Laura Paglione Start Here Technical Director, ORCID L.Paglione@ORCID.org http://orcid.org/0000-0003-3188-6273 Contact Info: p. +1-301-922-9062 a. 10411 Motor City Drive, Suite 750, Bethesda, MD 20817 USA orcid.org
  • 10.
    Some Background aka, aquick catch-up for those who are new… Registering & Signing in 15 January 2014 orcid.org 2
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
    Getting Started First Name LastName Email Password Privacy & Communications Preferences 15 January 2014 orcid.org 7
  • 16.
    Getting Started Welcome to the ORCID Registry! •  Verify your email address •  Here’s your ORCID iD: fier denti nt i rsiste d pe ue an er Uniq n u mb RI dig it TP U d 16 a s HT an dar sse d O st Expre ith IS le w patib Co m •  •  •  •  15 January 2014 orcid.org Image credit: RaHuL Rodriguez, ccBY-SA 2.0, Oct 5, 2012 http://www.flickr.com/photos/92963434@N03/9162677329 8
  • 17.
    Some Background The ORCIDRecord 15 January 2014 orcid.org 9
  • 18.
    The ORCID Record Contains: çBiographical Data ç Education Data ç Employment Data ç Works Data 15 January 2014 orcid.org 10
  • 19.
    The ORCID Record Biographical Data Include Multipleè Names 15 January 2014 orcid.org 11
  • 20.
    The ORCID Record EducationData Employment Data Organization list from è Ringgold (an ISNI Registrar) 15 January 2014 orcid.org 12
  • 21.
    The ORCID Record WorksData Classifications metadata fields consistent w/CASRAI Translated titles language support Import Wizards: •  ANDS Registry •  CrossRef Metadata Search •  DataCite Metadata Store •  Europe PubMed Central •  ResearcherID •  Scopus •  ISNI Structured citations in BibTeX 15 January 2014 orcid.org 13
  • 22.
    Some Background Key Concepts 15January 2014 orcid.org 14
  • 23.
    User privacy ● Information inan ORCID Record has a privacy setting, which can be set by the account owner. Accessible by : Anyone Account Owner, Trusted Organization(s) Account Owner ● Account information (settings, permissions) is accessible by the account owner 15 January 2014 orcid.org 15
  • 24.
    ORCID APIs •  PublicAPI •  No token or registration needed •  Can only READ PUBLIC data •  Can not EDIT or APPEND •  Member API •  Registration and token needed •  With permission, can READ LIMITED data •  With permission, can EDIT APPEND to Records •  Institutions can CREATE Records for employees 15 January 2014 orcid.org 16
  • 25.
    External Identifiers •  Whenpossible, include identifiers from other systems. •  DOIs, ISNIs, PubMed IDs, Education/ employment unique IDs, grant numbers, etc •  Each item can have multiple external identifiers, allowing cross-linking •  GOALS: •  Unambiguously associate a person (ORCID iD) to their activities (by external IDs) •  Link disparate systems together through the ORCID iD •  Provide a reference to a primary source for metadata 15 January 2014 orcid.org 17
  • 26.
    Planned for 2014 Disclaimer:Our hopes for 2014, though, as with all forward-looking statements, change is possible… 15 January 2014 orcid.org Image credit: webtreats, ccBY 2.0, Jun 25, 2010 http://www.flickr.com/photos/webtreatsetc/4732922099/ 18
  • 27.
    Funding ●  In Sandbox(use ●  ●  ●  15 January 2014 orcid.org ?funding at the end of the URL) Funding agencies list coordinated with FundRef Metadata fields consistent with CASRAI dictionary Will include Funding import wizards 19
  • 28.
    Other things ●  Accountdelegation – researchers can designate others to manage their ORCID record ●  Multiple assertions – organizations may contribute ●  ●  ●  information to ORCID records to add or strengthen claims Localize site into more languages Custom claim emails for organizations creating iDs Ability to send messages to researchers through the Registry 15 January 2014 orcid.org 20
  • 29.
    More information ●  Ourwebsite: http://orcid.org ●  Membership: http://orcid.org/about/membership ●  Integrating iD: http://orcid.org/organizations/integrators ●  Subscribe to our blog http://orcid.org/newsletter/subscriptions ●  Follow us on Twitter @ORCID_Org
  • 30.
    Thank you Laura Paglione TechnicalDirector, ORCID L.Paglione@ORCID.org http://orcid.org/0000-0003-3188-6273 15 January 2014 orcid.org 22
  • 31.
    NPG Implementation ofORCID! Tara Packer and Vrushali Potdar! Author Referee Services! Nature Publishing Group! ! ORCID Meet up New York! January 16 2014!
  • 32.
    ORCID Collection Open Researcher andContributor Identifier Workflow Registration Process Manuscript Submission User creates and validates an ORCID ORCID stored in Manuscript Tracking System* ORCID Into Production Upon Acceptance Only Production ORCID Recorded in the DB * eJournalPress Note: Typesetters are instructed to extract ORCIDs and input into article xml ORCID stored into article XML file Web Production ORCID displayed on html version of published article ORCID Transfer to 3rd Party ORCID Publication ORCID into Article File Typesetters Note: Production systems do not ingest ORCIDs at this time, rather the xml file is stored with article files and used by our typesetters Third Party Systems (Crossref, PubMed etc.) 2 Vrushali Potdar| NPG Author Referee Services, June 2013
  • 33.
    AIP Publishing’s ORCIDImplementation Lisa McLaughlin, Director Publishing Operations 16  January  2014  
  • 34.
    AIP Publishing’s ORCIDImplementation •  AIPP is in the process of becoming a registered ORCID member. •  Planning to implement ORCID in our peer review system ⎯ Q1 2014. •  Will be utilizing the eJournalPress ORCID workflow: –  During submission, authors can create a new ORCID or link to an existing ORCID. –  Editors can search the peer review database using ORCID. –  ORCIDs will be visible to staff and editors in the system. •  Pending policy decisions : –  Should corresponding authors be required to create or supply an ORCID? What about co-authors and reviewers? –  Should we enable the ability for users to login to the peer review system using their ORCID?
  • 35.
  • 36.
    ORCID INTEGRATION ATTHOMSON REUTERS Web of Science •  ORCID iDs linked to Researcher ID accounts have been merged to relevant WoS records •  Ready to receive and display ORCID iDs for any record when provided by publisher •  Ability to search for WoS records using ORCID iD and other author identifiers InCites •  Users may store an ORCID iD with their profile •  Ability to create an author dataset (RPP) off of a researcher’s ORCID iD •  Future enhancements include making ORCID creation an automated task upon InCites profile registration. Converis •  Look up a researcher’s ORCID iD via first/last name for purposes of associating it with their profile •  Display of researcher’s ORCID iD with link to their ORCID profile •  Search for and import publications via researcher’s ORCID iD ResearcherID ScholarOne •  Register for an ORCID iD or link an existing iD with your account from ResearcherID •  Bi-directional data exchange: Profiles and Publications •  Display a link to the user's ORCID account on their ResearcherID profile •  Display a link to the user's ResearcherID profile on their ORCID record •  Register for an ORCID iD or associate an existing iD with your account from ScholarOne •  Authentication of users’ ORCID iDs via the ORCID API •  Population of ScholarOne registration form with data from a user’s ORCID
  • 37.
  • 38.
    ORCID Integration Pre-Award •  •  •  All newapplicants (PIs, Mentors, and Co-Investigators) will be required to provide ORCID identifiers Validating new users Biosketch development/updates Funding Agencies Post-Award •  •  •  •  •  Reporting of new publications and funding streams Pre-populated progress reports Acknowledgement of funding Management of investigator profiles Monitoring of Return on Investment/Public ORCID profiles Publishing Groups © 2013 Autism Speaks Inc. Autism Speaks and Autism Speaks It’s Time To Listen Design are registered trademarks owned by Autism Speaks Inc. All rights reserved.