MOVING BED BIOFILM REACTOR PROCESS
• No suspended growth
• Uses biofilm carriers that allow for the presence of attached growth.
• Space Efficient
• Expandable Capacity
• Flexibility in Reactor Configuration
• Allows for nitrification, denitrification, and BOD removal
• Typically a retrofit solution.
Pre-DN AER AER POST-DN RE-AIR WAS
CLARIFIER
MeOH
IMLR
MBBR Process Schematic
INTEGRATED FIXED-FILM ACTIVATED SLUDGE
PROCESS
• Fixed-film process
• Combines benefits of an MBBR with an activated sludge process
• Suspended growth and attached growth
• Higher bacterial concentration
• Increases rate of contaminant degradation
• Typically a retrofit solution.
WAS
CLARIFIER
PRE-DN AER AER POST-DN RE-AIR
IMLR MeOH
IFAS Process Schematic
WHAT ARE BIOFILM CARRIERS?
1985
MBBR
IFAS
1990
Nitrogen and
the North Sea
1st Installation
1995
Lillehammer
WWTP
1ST US Installation
Industrial
2000
70th Municipal
Installation
Water down, ON
Demonstration
2005 2010
1St US
Installation
Municipal
1st US Installation
More than 500
Installations
More than 600
Installations
-15 US
Installations
CHRONOLOGY OF MBBR & IFAS SYSTEMS
1985 1990 1995 2000 2005 2010
Hydraulic
events with
media loss
Broomfield WRF, US
Raisio WWTP, Finland
Groton WWTP, US
Mamaroneck WWTP, US
Hooksett WWTP, US
CHRONOLOGY OF HYDRAULIC FALIURES
BROOMFIELD, COLORADO
• Plant is comprised of preliminary, primary, and advanced secondary treatment processes.
• Effluent then undergoes disinfection.
• Advanced Secondary Treatment with an IFAS-based process.
• i.e. free moving biofilm carriers
• Large hydraulic load due to a storm and snow melt event in 2002.
• Pipe in between the bioreactor and the secondary clarifier was undersized.
• Biofilm carriers were discharged to Big Dry Creek.
• Plant was upgraded in 2004 (after upsizing the inadequate pipe). Extra biofilm carriers
were added to the reactor as part of an effort to double plant capacity.
RAISIO, FINLAND
• Plant is comprised of preliminary, primary, and advanced secondary treatment processes.
• Advanced Secondary Treatment with an IFAS-based process.
• i.e. free moving biofilm carriers
• Multiple hydraulic failures caused biofilm carrier loss (discharged into Baltic Sea).
• First failure occurred because flat screen walls in the bioreactor were too low.
• Walls were heightened to mitigate loss of biofilm carriers.
• Second failure occurred due to the fouling of the flat retention screen.
• Biofilm carriers were broken by the mechanical mixing process in the anoxic
reactors.
• The flat screens were replaced by cylindrical screen to prevent future faliures.
GROTON, CONNECTICUT
• Plant is comprised of preliminary, primary, and advanced secondary treatment processes.
• Effluent then undergoes disinfection
• Advanced Secondary Treatment was upgraded to a IFAS-based process.
• i.e. free moving biofilm carriers
• Various hydraulic failures caused biofilm carrier loss (discharged into the Thames River).
• First failure occurred because cylindrical retention screens caved in.
• A plate was welded to the outside of the screen to provide structural stability.
• Second failure occurred when cylindrical screens were dislodged due to excessive uplift
forces
• Third failure was caused by hydrostatic forces that resulted in the collapse of the
cylindrical screens.
• Likely due to a rapid rise in the water level in part due to screen blinding.
GROTON, CONNECTICUT
Cylindrical Retention Screens on Guide Rails
HOOKSETT, NEW HAMPSHIRE
• Plant is comprised of preliminary, primary, and advanced secondary treatment processes.
• Effluent then undergoes disinfection
• In March of 2011 there was unpermitted discharge of 250,000 – 300,000 gallons of
inadequately treated wastewater.
• 25% of the biofilm carries at the facility were discharged into the Merrimack River.
• Combination of a heavy rain event and biofilm carriers blocking retention screens to
reduce the hydraulic through-put of the screen.
• Expansive media coverage.
HOOKSETT, NEW HAMPSHIRE
Biofilm Carriers on New England Beach
MAMARONECK, NEW YORK
• Advanced Secondary Treatment was upgraded to a IFAS-based process.
• i.e. free moving biofilm carriers
• Hydraulic failure occurred during plant start-up.
• Plastic biofilm carriers escaped the reactor and moved into the secondary tank that had
not yet been retrofitted for the IFAS improvement (i.e. no retention screens)
• The biofilm carries flowed through the secondary tank and discharged into the ocean.
• The carries had not yet been used but they had been placed in the sewage
tank.
• Since the failure occurred retention screens have been implemented in the system.
• Expansive media coverage.
MAMARONECK, NEW YORK
Carrier Clean Up along Long Island Coast
OVERVIEW OF FAILURES
• Flat Retention Screen
• Screen is blocked, minimizing hydraulic throughput
• Cylindrical Retention Screen
• Screen is blocked, minimizing hydraulic throughput
• Structural Failure
CONCLUSION
• All hydraulic failures occurred in IFAS systems
• All hydraulic failures occurred during system construction, when controls have been
offline, or in situations where conditions were not within the operating range of the
system.
• Data shows that hydraulic failures can be mitigated through proper design and the
implementation of conservative controls.
• In essence the hydraulic failures can be solved through the use of good engineering
judgement.
REFERENCES
• Boltz, Joshua P., William R. Leaf, James P. McQuarrie, Adrienne Menniti, and Glen T.
Daigger. "Overcoming Hydraulic Limitations of the Integrated Fixed-film Activated Sludge
and Moving Bed Biofilm Reactor Process." Florida Water Resources Jounal (January,
2012): 22-32. Print.
• City and County of Broomfield, Colorado. Rep. Black & Veatch Corporation, n.d. Web.
<http://www.nfrwqpa.org/pdf/Approved_Utility_Plans/Broomfield%202011%20Wastewater
%20Utility%20Plan.pdf>.
• Dyson, John. "Nutrient Removal - What Is Available for Municipal Utilities?" WaterWorld.
PennWell Corporation, n.d. Web. 25 Mar. 2013.
<http://www.waterworld.com/articles/print/volume-27/issue-8/departments/wwema-
corner/nutrient-removal-what-is-available-for-municipal-utilities.html>.
• Yeon, H. J., et al. "Comparison of Attached Growth Process with Suspended Growth
Process." 60 (December, 2011): n. pag. WORLD ACADEMY OF SCIENCE,
ENGINEERING AND TECHNOLOGY. Web.
<http://www.waset.org/journals/waset/v60/v60-122.pdf>.

More Related Content

What's hot

IRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 ExpansionIRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 Expansion
American Society of Civil Engineers, Orange County Branch
 
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
James Robinson
 
ES&E Magazine - Mentone
ES&E Magazine - MentoneES&E Magazine - Mentone
ES&E Magazine - Mentone
Kevin Vieira
 
WPD-Case study-FINAL4
WPD-Case study-FINAL4WPD-Case study-FINAL4
WPD-Case study-FINAL4
Rees Westley
 
Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...
San Diego County Water Authority
 
I48076671
I48076671I48076671
I48076671
IJERA Editor
 

What's hot (6)

IRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 ExpansionIRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 Expansion
 
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
 
ES&E Magazine - Mentone
ES&E Magazine - MentoneES&E Magazine - Mentone
ES&E Magazine - Mentone
 
WPD-Case study-FINAL4
WPD-Case study-FINAL4WPD-Case study-FINAL4
WPD-Case study-FINAL4
 
Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...
 
I48076671
I48076671I48076671
I48076671
 

Similar to Nelson Perez-Jacome - IFAS and Moving Bed Biofilm Reactor

Olivier amiot reverse_osmosis
Olivier amiot reverse_osmosisOlivier amiot reverse_osmosis
Olivier amiot reverse_osmosis
Olivier AMIOT
 
WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...
WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...
WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...
Dubai Quality Group
 
Ballast Water Treatment Systems
Ballast Water Treatment SystemsBallast Water Treatment Systems
Ballast Water Treatment Systems
cmmindia2017
 
StormCon 2014
StormCon 2014StormCon 2014
StormCon 2014
Todd Wacome
 
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
glennmcgillivray
 
Constructed wetroof
Constructed wetroofConstructed wetroof
Constructed wetroof
Vineetha Vincent
 
Constructed wetroof
Constructed wetroofConstructed wetroof
Constructed wetroof
Vineetha Vincent
 
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATIONA SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
wle-ss
 
WSO and Profile Control Technology- Sinopec.ppt
WSO  and Profile Control Technology- Sinopec.pptWSO  and Profile Control Technology- Sinopec.ppt
WSO and Profile Control Technology- Sinopec.ppt
ali87sim
 
Cavitation based PI technology for Wastewater Treatment.pptx
Cavitation based PI technology for Wastewater Treatment.pptxCavitation based PI technology for Wastewater Treatment.pptx
Cavitation based PI technology for Wastewater Treatment.pptx
AishwaryaKN6
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
PRITI CHHATOI
 
Integrated Fixed-Film Activated Sludge (IFFAS)
Integrated Fixed-Film Activated Sludge (IFFAS)Integrated Fixed-Film Activated Sludge (IFFAS)
Integrated Fixed-Film Activated Sludge (IFFAS)
Ibrahim Jammal, ing. M.ing.
 
RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC)
RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC) RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC)
RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC)
Atul Garg
 
Marine Concrete
Marine Concrete Marine Concrete
Marine Concrete
Solcon Technologies LLP
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
Akshaya Mishra
 
Compactsolutionforcso
CompactsolutionforcsoCompactsolutionforcso
Compactsolutionforcso
Scott Henderson, PE ENV-SP
 
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANESA SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
iQHub
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampa
racr2s2
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampa
converde
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
Iouri Vaisman
 

Similar to Nelson Perez-Jacome - IFAS and Moving Bed Biofilm Reactor (20)

Olivier amiot reverse_osmosis
Olivier amiot reverse_osmosisOlivier amiot reverse_osmosis
Olivier amiot reverse_osmosis
 
WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...
WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...
WQD2011 – INNOVATION – SILVER WINNER – The Kanoo Group - Corrosion Protection...
 
Ballast Water Treatment Systems
Ballast Water Treatment SystemsBallast Water Treatment Systems
Ballast Water Treatment Systems
 
StormCon 2014
StormCon 2014StormCon 2014
StormCon 2014
 
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
 
Constructed wetroof
Constructed wetroofConstructed wetroof
Constructed wetroof
 
Constructed wetroof
Constructed wetroofConstructed wetroof
Constructed wetroof
 
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATIONA SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
A SPIN ON OILY WATER TREATMENT: TECHNIQUE FOR PRODUCED WATER APPLICATION
 
WSO and Profile Control Technology- Sinopec.ppt
WSO  and Profile Control Technology- Sinopec.pptWSO  and Profile Control Technology- Sinopec.ppt
WSO and Profile Control Technology- Sinopec.ppt
 
Cavitation based PI technology for Wastewater Treatment.pptx
Cavitation based PI technology for Wastewater Treatment.pptxCavitation based PI technology for Wastewater Treatment.pptx
Cavitation based PI technology for Wastewater Treatment.pptx
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
 
Integrated Fixed-Film Activated Sludge (IFFAS)
Integrated Fixed-Film Activated Sludge (IFFAS)Integrated Fixed-Film Activated Sludge (IFFAS)
Integrated Fixed-Film Activated Sludge (IFFAS)
 
RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC)
RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC) RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC)
RTV SILICONE HIGH VOLTAGE INSULATOR COATING (HVIC)
 
Marine Concrete
Marine Concrete Marine Concrete
Marine Concrete
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
Compactsolutionforcso
CompactsolutionforcsoCompactsolutionforcso
Compactsolutionforcso
 
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANESA SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
A SPIN ON OILY WATER TREATMENT: INCREASING THE PERFORMANCE OF MEMBRANES
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampa
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampa
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
 

Recently uploaded

ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 

Recently uploaded (20)

ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 

Nelson Perez-Jacome - IFAS and Moving Bed Biofilm Reactor

  • 1. By: Nelson Perez-Jacome OVERCOMING HYDRAULIC LIMITATIONS OF THE INTEGRATED FIXED-FILM ACTIVATED SLUDGE AND MOVING BED BIOFILM REACTOR PROCESS
  • 2. MOVING BED BIOFILM REACTOR PROCESS • No suspended growth • Uses biofilm carriers that allow for the presence of attached growth. • Space Efficient • Expandable Capacity • Flexibility in Reactor Configuration • Allows for nitrification, denitrification, and BOD removal • Typically a retrofit solution.
  • 3. Pre-DN AER AER POST-DN RE-AIR WAS CLARIFIER MeOH IMLR MBBR Process Schematic
  • 4. INTEGRATED FIXED-FILM ACTIVATED SLUDGE PROCESS • Fixed-film process • Combines benefits of an MBBR with an activated sludge process • Suspended growth and attached growth • Higher bacterial concentration • Increases rate of contaminant degradation • Typically a retrofit solution.
  • 5. WAS CLARIFIER PRE-DN AER AER POST-DN RE-AIR IMLR MeOH IFAS Process Schematic
  • 6. WHAT ARE BIOFILM CARRIERS?
  • 7. 1985 MBBR IFAS 1990 Nitrogen and the North Sea 1st Installation 1995 Lillehammer WWTP 1ST US Installation Industrial 2000 70th Municipal Installation Water down, ON Demonstration 2005 2010 1St US Installation Municipal 1st US Installation More than 500 Installations More than 600 Installations -15 US Installations CHRONOLOGY OF MBBR & IFAS SYSTEMS
  • 8. 1985 1990 1995 2000 2005 2010 Hydraulic events with media loss Broomfield WRF, US Raisio WWTP, Finland Groton WWTP, US Mamaroneck WWTP, US Hooksett WWTP, US CHRONOLOGY OF HYDRAULIC FALIURES
  • 9. BROOMFIELD, COLORADO • Plant is comprised of preliminary, primary, and advanced secondary treatment processes. • Effluent then undergoes disinfection. • Advanced Secondary Treatment with an IFAS-based process. • i.e. free moving biofilm carriers • Large hydraulic load due to a storm and snow melt event in 2002. • Pipe in between the bioreactor and the secondary clarifier was undersized. • Biofilm carriers were discharged to Big Dry Creek. • Plant was upgraded in 2004 (after upsizing the inadequate pipe). Extra biofilm carriers were added to the reactor as part of an effort to double plant capacity.
  • 10. RAISIO, FINLAND • Plant is comprised of preliminary, primary, and advanced secondary treatment processes. • Advanced Secondary Treatment with an IFAS-based process. • i.e. free moving biofilm carriers • Multiple hydraulic failures caused biofilm carrier loss (discharged into Baltic Sea). • First failure occurred because flat screen walls in the bioreactor were too low. • Walls were heightened to mitigate loss of biofilm carriers. • Second failure occurred due to the fouling of the flat retention screen. • Biofilm carriers were broken by the mechanical mixing process in the anoxic reactors. • The flat screens were replaced by cylindrical screen to prevent future faliures.
  • 11. GROTON, CONNECTICUT • Plant is comprised of preliminary, primary, and advanced secondary treatment processes. • Effluent then undergoes disinfection • Advanced Secondary Treatment was upgraded to a IFAS-based process. • i.e. free moving biofilm carriers • Various hydraulic failures caused biofilm carrier loss (discharged into the Thames River). • First failure occurred because cylindrical retention screens caved in. • A plate was welded to the outside of the screen to provide structural stability. • Second failure occurred when cylindrical screens were dislodged due to excessive uplift forces • Third failure was caused by hydrostatic forces that resulted in the collapse of the cylindrical screens. • Likely due to a rapid rise in the water level in part due to screen blinding.
  • 13. HOOKSETT, NEW HAMPSHIRE • Plant is comprised of preliminary, primary, and advanced secondary treatment processes. • Effluent then undergoes disinfection • In March of 2011 there was unpermitted discharge of 250,000 – 300,000 gallons of inadequately treated wastewater. • 25% of the biofilm carries at the facility were discharged into the Merrimack River. • Combination of a heavy rain event and biofilm carriers blocking retention screens to reduce the hydraulic through-put of the screen. • Expansive media coverage.
  • 14. HOOKSETT, NEW HAMPSHIRE Biofilm Carriers on New England Beach
  • 15. MAMARONECK, NEW YORK • Advanced Secondary Treatment was upgraded to a IFAS-based process. • i.e. free moving biofilm carriers • Hydraulic failure occurred during plant start-up. • Plastic biofilm carriers escaped the reactor and moved into the secondary tank that had not yet been retrofitted for the IFAS improvement (i.e. no retention screens) • The biofilm carries flowed through the secondary tank and discharged into the ocean. • The carries had not yet been used but they had been placed in the sewage tank. • Since the failure occurred retention screens have been implemented in the system. • Expansive media coverage.
  • 16. MAMARONECK, NEW YORK Carrier Clean Up along Long Island Coast
  • 17. OVERVIEW OF FAILURES • Flat Retention Screen • Screen is blocked, minimizing hydraulic throughput • Cylindrical Retention Screen • Screen is blocked, minimizing hydraulic throughput • Structural Failure
  • 18. CONCLUSION • All hydraulic failures occurred in IFAS systems • All hydraulic failures occurred during system construction, when controls have been offline, or in situations where conditions were not within the operating range of the system. • Data shows that hydraulic failures can be mitigated through proper design and the implementation of conservative controls. • In essence the hydraulic failures can be solved through the use of good engineering judgement.
  • 19. REFERENCES • Boltz, Joshua P., William R. Leaf, James P. McQuarrie, Adrienne Menniti, and Glen T. Daigger. "Overcoming Hydraulic Limitations of the Integrated Fixed-film Activated Sludge and Moving Bed Biofilm Reactor Process." Florida Water Resources Jounal (January, 2012): 22-32. Print. • City and County of Broomfield, Colorado. Rep. Black & Veatch Corporation, n.d. Web. <http://www.nfrwqpa.org/pdf/Approved_Utility_Plans/Broomfield%202011%20Wastewater %20Utility%20Plan.pdf>. • Dyson, John. "Nutrient Removal - What Is Available for Municipal Utilities?" WaterWorld. PennWell Corporation, n.d. Web. 25 Mar. 2013. <http://www.waterworld.com/articles/print/volume-27/issue-8/departments/wwema- corner/nutrient-removal-what-is-available-for-municipal-utilities.html>. • Yeon, H. J., et al. "Comparison of Attached Growth Process with Suspended Growth Process." 60 (December, 2011): n. pag. WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY. Web. <http://www.waset.org/journals/waset/v60/v60-122.pdf>.