n December 2002, the city of Toledo, Ohio, signed
a consent decree with the U.S. Environmental
Protection Agency (EPA) that required the city to update
its sewer and wastewater treatment facilities to stop wet
weather bypassing of untreated wastewater into the
Maumee River. To achieve regulatory compliance associated
with combined sewer overflow (CSO) events, it was
determined that the Bay View Wastewater Treatment Plant
(WWTP) must increase its total treatment capacity from
200 to 400 million gal per day (mgd), or approximately
5.3 times the average dry weather flow rate.1
Prior to the final design, pilot testing of high-rate clar-
ifier technologies was conducted from December 2002
to February 2003 to determine the feasibility of using
this technology to achieve the required effluent criteria
for both primary and CSO wastewaters. Based on the
results of the pilot study, the DensaDeg high-rate solids
contact clarifier, manufactured by Infilco Degremont,
Inc., was chosen for the full-scale installation.
Based on the design parameters, it was determined that
the facility would need six of these clarifiers. In November
2006, the construction of the largest high-rate clarification
system for CSO treatment was completed. The overall layout
can be seen in Figure 1, and a picture of the constructed
facility is shown in Figure 2. The maximum design capacity
for the facility is 232 mgd with each of the six high-rate
clarifiers having the capacity to treat 38.7 mgd at a surface
overflow rate of 47 gpm/ft2
.
The clarifier
The DensaDeg clarifier is a high-rate solids contact clarifier
that combines optimized flocculation, internal and external
sludge recirculation and lamellar settling to achieve very high
hydraulic loadings and treatment efficiencies. It is well proven
in the field of physical and chemical treatment of wastewater
and drinking water and has been employed for a wide range
of municipal and industrial applications.
The DensaDeg 2D-100 for physical and chemical treatment
of raw municipal wastewater, CSO and sanitary sewer over-
flows (SSO) combines coagulation, flocculation, static and
lamellar clarification, scum removal and sludge thickening in a
single treatment unit. Optimized flocculation and solids con-
tact through internal and external sludge recirculation pro-
duces dense floc with an extremely high settling rate (typical
design rates are 40 gpm/ft2
with the hydraulic capacity to
accommodate rise rates up to 60 gpm/ft2
, with a moderate
reduction in treatment efficiencies) without adding ballast
materials such as sand.
The process
Rapid mix. The first step in the clarifier process, coagula-
tion, takes place in a single vessel. A coagulant, either alu-
minum or iron salt, is injected directly into the inlet pipe, or if
possible, upstream in the feed channel. Mechanical mixers
cause an intense bulk fluid motion for coagulant dispersion
and mixing. The flow then passes to the reactor vessel.
Reactor vessel. The reactor vessel is where particle floc-
culation and densification occurs. The flocculation reaction is
optimized in the reactor vessel through the combined effects
of internal sludge recirculation, high solids concentration and
efficient mixing. A high concentration of solids is maintained
in the reactor through external recirculation of settled solids
from the clarifier/thickener vessel. Internal recirculation is
achieved through an axial flow impeller/draft tube arrange-
ment. Polymer, usually a high molecular weight anionic type,
is injected either directly beneath the impeller blades or in the
sludge recirculation line. Polymer aids in the flocculation and
densification of the coagulated particles.
Clarifier/thickener vessel. Quiescent conditions exist in
the clarifier/thickener vessel, where the dense floc particles
formed in the reactor vessel are allowed to settle and thick-
en. A circular, picket fence-type scraper mechanism collects
A look at the largest
high-rate clarification
system for CSO treatment
in North America
A Compact Solution
for CSO Treatment
FIGURE 1: Overall Layout – Bay View WWTP Wet Weather Facilities
FIGURE 2: Bay View WWTP – DensaDeg High Rate Clarifier Facility
16_EF_0807.qxd 8/3/07 5:43 PM Page 16
New “Reagentless” Residual Chlorine Monitor!
800-959-0299
610-917-0991 • FAX 610-917-0992
www.analyticaltechnology.com
New “Reagentless” Residual Chlorine Monitor!
Q45H Residual Chlorine systems utilize a direct
measuring polarographic sensor that does not
require the addition of chemical reagents. This
means no more costly reagents to purchase.
I Direct Measurement of Free or Combined
Chlorine Without Reagents
I Simple Constant -Head Flow Control
I Low Operating Cost
I Minimal Maintenance Required
I Optional pH Sensor For Dual Parameter
Monitoring and Free Chlorine Compensation
Q45H Residual Chlorine systems utilize a direct
measuring polarographic sensor that does not
require the addition of chemical reagents. This
means no more costly reagents to purchase.
I Direct Measurement of Free or Combined
Chlorine Without Reagents
I Simple Constant -Head Flow Control
I Low Operating Cost
I Minimal Maintenance Required
I Optional pH Sensor For Dual Parameter
Monitoring and Free Chlorine Compensation
Write in 342
ATI 6/6/06 7:58 AM Page 1
18 August 2007 • WWDmag.com • WATER & WASTES DIGEST
AQUA-AEROBIC SYSTEMS, INC.
P a r t n e r i n g f o r S o l u t i o n s
™
6306 N. Alpine Road • Rockford, IL 61111
PH 815.654.2501 • FX 815.654.2508
www.aqua-aerobic.com
:: Benefits
• Unique OptiFiber™ pile
cloth media
• Reuse quality effluent
• Higher solids loading
per ft2
of media
• Reduced backwash
water volume
• Higher hydraulic loadings
• Reduced footprint
• Less maintenance
• Disk and drum configurations
also available
:: Applications
• Municipal and Industrial
- Tertiary filtration
- Reuse/recycle
- Phosphorus removal
- New plants and retrofits
The AquaDiamond® filter offers the benefits of OptiFiber™ pile cloth
media filtration in a lower profile, diamond configuration. This filter
easily retrofits into existing traveling bridge sand filters while providing
higher hydraulic and solids loading rates in a smaller footprint.
Fox Metro Water Reclamation District, located in Oswego, Illinois
retrofitted three of its nine existing 16' x 112' traveling bridge sand
filters with 80' long AquaDiamond® cloth media filters to solve its
ongoing maintenance and performance issues. The three combined
AquaDiamond® filters provide a peak flow capacity of 72 MGD, which is
almost 2.5 times the hydraulic capacity of the original three sand filters,
within the same footprint. The AquaDiamond® filters have also proven
the ability to perform under higher solids loading conditions than the
sand filters, while backwashing less.
Fox Metro plans to install two additional AquaDiamond® filters in
2007, resulting in a total of five filters with a combined peak flow
capacity of 120 MGD.
:: Plant Profile
Smaller Footprint
::
::
Higher Capacity
Write in 706
Morris Pumps - Div. Yeomans Chicago Corp. - Aurora, IL USA
www.morrispumps.com
Heavy-Duty Engineered
Wastewater Pumping Systems
®
Write in 726 Write in 734
settled sludge into a center bottom hopper.
Thickened sludge (typically 20 to 40 g/L)
is pumped to a holding tank and then trans-
ferred directly to digesters or dewatering
facilities. Additional sludge thickening is
generally not required. A separate set of
recycle pumps return a portion of the
sludge to the reactor vessel.
Settled water then flows upward through
settling tubes where stray floc is removed.
The majority of the solids are removed from
the stream prior to entering the lamellar mod-
ules. The lamellar tubes act as polishers only
and are therefore not subject to clogging.
Final clarified effluent collects in a trough for
further downstream treatment or discharge.
Operational strategy
One of the unique features that the
DensaDeg facility provides is the ability to
treat both primary and CSO wastewaters.
In order to incorporate this flexibility of
operation, an operational guideline was
created for the Bay View WWTP. Based on
the incoming flow and status of the equal-
ization basin volume, multiple modes of
operation are available. The excess flows
can be directed to the high-rate clarifiers,
and effluent produced can then be sent to
the activated sludge system. Or, during
high flow events, HRC effluent can be
directed to the equalization basin, and
when the basin reaches design capacity,
the flow is then directed to the dedicated
wet weather disinfection system and
blended with the plant effluent from
the dry weather facilities before it is
discharged into the Maumee River. The
four main operational scenarios are
summarized in Table 1.
Performance testing
Based on the required operational flexibil-
ity of the Bay View WWTP, the performance
testing was formulated to simulate the vari-
ous operational scenarios. Each clarifier was
tested individually to assess performance.
Scenario Operational Strategies
Q = 0 to 130 mgd • All flow is treated by the dry
weather Bay View WWTP facilities.
Q = 130 to 190 mgd • Up to 160 mgd is treated by the dry
weather Bay View WWTP facilities;
• 30 mgd is directed to the high-
rate clarifier (HRC) facility—HRC
effluent is routed to the activated
sludge system;
Q > 190 mgd • Up to 160 mgd is treated by the dry
& Veq < Vtot weather Bay View WWTP facilities;
• Excess flow are directed to the
HRC facility;
• 30 mgd of HRC effluent is routed
to the activated sludge system;
• Remainder of effluent is dis-
charged to the equalization basin.
Q > 195 mgd • Up to 160 mgd is treated by the dry
& Veq = Vtot weather Bay View WWTP facilities;
• Excess flows are directed to the
HRC facility;
• 30 mgd of HRC effluent is routed
to the activated sludge system;
• Remainder of HRC effluent is
routed to disinfection and
blending with effluent from dry
weather Bay View WWTP.
Vtot = Total volume of equalization basin (25 million gal)
Veq = Volume of wastewater in the equalization basin at a given time
TABLE 1: Operational Strategy Summary
– Bay View WWTP
16_EF_0807.qxd 8/3/07 5:44 PM Page 18
WATER & WASTES DIGEST • WWDmag.com • August 2007 19
High Maintenance.
Some things just require more maintenance than others. Tanks are no different. Choose Aquastore®
and you get an exclusive glass-fused-to-steel bolted tank that is factory engineered to be the best.
Say good-bye to high maintenance construction, cracks, painting, corrosion and rust. A low maintenance
Aquastore is easily constructed, never needs repainting and delivers proven lifetime performance.
With Aquastore, you can be assured you will get the highest engineered quality, service and product
life in storage tanks. For more information visit www.aquastore.com or call 815-756-1551.
Low Maintenance.
© 2007. Aquastore is a registered trademark of Engineered Storage Products Company.
Glass Tanks with a Heart of Steel™
Tanks & Domes
Write in 705Write in 720
FIGURE 3: Typical Performance Test Run – TSS Removal Efficiency FIGURE 4: Typical Performance Test – Particulate CBOD Removal Efficiency
TSS CBOD Total P Influent TSS Effluent TSS Influent CBOD Effluent CBOD Influent Total P Effluent Total P
Primary treatment performance level 83% 54% 89% 121 17 116 50 2.9 0.29
Wet weather treatment performance level 1 79% 53% 86% 102 21 105 46 2.9 0.41
Wet weather treatment performance level 2 70% 46% 72% 96 29 90 52 2.5 0.53
*Concentrations are in mg/L
TABLE 2: Performance Test Summary - Average Removal Efficiencies and Average Concentrations*
16_EF_0807.qxd 8/3/07 5:44 PM Page 19
20 August 2007 • WWDmag.com • WATER & WASTES DIGEST
5300 Belmont Road • Downers Grove, IL 60515 • 630.969.4028 • info@sticontrols.com sticontrols.com
The Eclipse®
Model 705 Transmitter uses revolutionary Guided
Wave Radar technology providing unsurpassed accurate
measurement even in foam, varying media or applications
with coating and buildup. Eclipse transmitters are designed
for easy installation and configuration. The compact innova-
tive housing and display makes data easy to read. Guided
Wave Radar from STI is engineered to solve the challenges of
water and wastewater treatment environments.
Write in 716
1-877-4UMOYNO
www.moyno.com
Patented
• Quiet, clean
VFD controls
• Non-pulsating
flow
• Closed piping
system
• Compact heavy duty
Ultra-Drive®
gear joint design
• Optional slip injection system
• Twin screw feeder
• High-efficiency Ultra-Feed®
rotor
Moves a higher
percentage of solids
longer distances than
any other progressing
cavity pump!
Come see us at Booth #4037
Write in 717
Write in 718
The first level of performance testing
required the units to operate at a flow rate
of < 27 mgd (SOR = 32.9 gpm/ft2
), the sec-
ond level of testing required a flow rate of
31 mgd (SOR = 37.5 gpm/ft2
), and the third
level a flow rate of 38.7 mgd (SOR
= 47 gpm/ft2
).
During the testing of each performance
level, samples were taken during each hour
of operation to measure TSS, CBOD and
total phosphorus. Each clarifier was tested
for a six-hour period and figures 3 and 4 (
page 19) show representative runs for an
individual DensaDeg unit. Table 2 (page 19)
provides a summary of the average removal
efficiencies and average concentrations
achieved during of the full-scale perfor-
mance testing.
Conclusion
The system recently constructed at the
Bay View WWTP is the largest high-rate clar-
ification system for CSO treatment in North
America. As seen in the performance test
data, the DensaDeg can achieve removal
efficiencies in the range of 70 to 95% for
TSS, 55 to 70% for total CBOD and 70 to
95% for total phosphorus, while operating
at high surface overflow rates.
These full-scale results confirm those
achieved during the pilot testing and meet
the design requirements of the facility.
This demonstrates that based on the high-
rate design of the process, large CSO treat-
ment capacity can be achieved in a rela-
tively moderate site area (232 mgd within
a 43,500 ft2
area), thereby providing
municipalities with a compact solution
for CSO treatment.
References
Nitz, D. et al. (2004) Session 23: Wet
Weather Treatment Issues “Wet Weather
Treatment Pilot Testing: High Rate
Clarification and UV Disinfection in a Cold
Climate.” WEFTEC 2004, New Orleans, La.
K. Scott Henderson, P.E., is application
engineer at Infilco Degremont. He can be
reached at 804/756-7623 or by e-mail at
scott.henderson@infilcodegremont.com.
For more information, write in 1101 on this
issue’s Reader Service Card.
WWD
LEARN MORE
For additional articles on this topic, visit:
www.WWDmag.com/lm.cfm/wd080701
FIGURE 5: Sectional View of DendaDeg 2D-100
16_EF_0807.qxd 8/3/07 5:44 PM Page 20

More Related Content

What's hot

Sequencing batch reactors
Sequencing batch reactorsSequencing batch reactors
Sequencing batch reactorsGargi Asodariya
 
Instant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP PresentationInstant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP PresentationSuresh Kumar
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
James Robinson - Conventional Produced Water Training Course - Produced Water...
James Robinson - Conventional Produced Water Training Course - Produced Water...James Robinson - Conventional Produced Water Training Course - Produced Water...
James Robinson - Conventional Produced Water Training Course - Produced Water...James Robinson
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Noteswilliampatricklaw
 
Sequencing batch reactor ppt
Sequencing batch reactor pptSequencing batch reactor ppt
Sequencing batch reactor pptAshwini Ingale
 
Improvement of uf membrane performance
Improvement of uf membrane performanceImprovement of uf membrane performance
Improvement of uf membrane performancemauriciocabral2018
 
Technological Aadvances Hydraulic Fracture
Technological Aadvances Hydraulic FractureTechnological Aadvances Hydraulic Fracture
Technological Aadvances Hydraulic FractureJuan Carlos Bonapace
 
Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -Peter Godwin
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Iain McGregor
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboAnton Ricalovskis
 
Passive_Intake_Screens
Passive_Intake_ScreensPassive_Intake_Screens
Passive_Intake_ScreensChee Terng Lee
 
Southern_Peacehaven_2014
Southern_Peacehaven_2014Southern_Peacehaven_2014
Southern_Peacehaven_2014Iain McGregor
 
Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)Ludovic Renoux
 
Vaccirc web3-presentation
Vaccirc web3-presentationVaccirc web3-presentation
Vaccirc web3-presentationBaysgroup
 

What's hot (20)

Sequencing batch reactors
Sequencing batch reactorsSequencing batch reactors
Sequencing batch reactors
 
Instant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP PresentationInstant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP Presentation
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
James Robinson - Conventional Produced Water Training Course - Produced Water...
James Robinson - Conventional Produced Water Training Course - Produced Water...James Robinson - Conventional Produced Water Training Course - Produced Water...
James Robinson - Conventional Produced Water Training Course - Produced Water...
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Notes
 
Sequencing batch reactor ppt
Sequencing batch reactor pptSequencing batch reactor ppt
Sequencing batch reactor ppt
 
Concept of ems
Concept of emsConcept of ems
Concept of ems
 
Ssssss
SsssssSsssss
Ssssss
 
Improvement of uf membrane performance
Improvement of uf membrane performanceImprovement of uf membrane performance
Improvement of uf membrane performance
 
Technological Aadvances Hydraulic Fracture
Technological Aadvances Hydraulic FractureTechnological Aadvances Hydraulic Fracture
Technological Aadvances Hydraulic Fracture
 
Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -Advanced tailing separation process - Minewaste 2010 -
Advanced tailing separation process - Minewaste 2010 -
 
Treatment Options for Wastewaters Collected from On-Site Systems
Treatment Options for Wastewaters Collected from On-Site SystemsTreatment Options for Wastewaters Collected from On-Site Systems
Treatment Options for Wastewaters Collected from On-Site Systems
 
Final report cive 540 1
Final report cive 540 1Final report cive 540 1
Final report cive 540 1
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
 
Tigg Cansorb RX_Series Liquid Phase Adsorbers
Tigg Cansorb RX_Series Liquid Phase AdsorbersTigg Cansorb RX_Series Liquid Phase Adsorbers
Tigg Cansorb RX_Series Liquid Phase Adsorbers
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in Colombo
 
Passive_Intake_Screens
Passive_Intake_ScreensPassive_Intake_Screens
Passive_Intake_Screens
 
Southern_Peacehaven_2014
Southern_Peacehaven_2014Southern_Peacehaven_2014
Southern_Peacehaven_2014
 
Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)
 
Vaccirc web3-presentation
Vaccirc web3-presentationVaccirc web3-presentation
Vaccirc web3-presentation
 

Similar to Compactsolutionforcso

INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfPRITI CHHATOI
 
Hydro-Pod presentation v7- Final
Hydro-Pod presentation v7- FinalHydro-Pod presentation v7- Final
Hydro-Pod presentation v7- FinalMark Stanley
 
Ashu kumar ppt
Ashu kumar pptAshu kumar ppt
Ashu kumar pptAshu Kumar
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWGLA University
 
Industrialwastewatertreatment
IndustrialwastewatertreatmentIndustrialwastewatertreatment
Industrialwastewatertreatmentgayatri VISHWA
 
Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Chris Eberly, PE
 
04 Reclamation and Reuse of waste water
04 Reclamation and Reuse of waste water04 Reclamation and Reuse of waste water
04 Reclamation and Reuse of waste waterakashpadole
 
CR_Furnace_Tube_and_Pipeline_Pigging
CR_Furnace_Tube_and_Pipeline_PiggingCR_Furnace_Tube_and_Pipeline_Pigging
CR_Furnace_Tube_and_Pipeline_PiggingPaul Francis
 
BIOLOGY-REVERSE OSMOSIS
BIOLOGY-REVERSE OSMOSISBIOLOGY-REVERSE OSMOSIS
BIOLOGY-REVERSE OSMOSISalenashik
 
Olivier amiot reverse_osmosis
Olivier amiot reverse_osmosisOlivier amiot reverse_osmosis
Olivier amiot reverse_osmosisOlivier AMIOT
 
Sludge thickening and stabilization processes
Sludge thickening and stabilization processes  Sludge thickening and stabilization processes
Sludge thickening and stabilization processes Natthu Shrirame
 
ES&E Magazine - Mentone
ES&E Magazine - MentoneES&E Magazine - Mentone
ES&E Magazine - MentoneKevin Vieira
 
Brochure pas
Brochure pasBrochure pas
Brochure pastecompk
 
Zero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industriesZero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industriesSooraj Garg
 
Making Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian BasinMaking Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian BasinWilson Perumal and Company
 

Similar to Compactsolutionforcso (20)

INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
 
Hydro-Pod presentation v7- Final
Hydro-Pod presentation v7- FinalHydro-Pod presentation v7- Final
Hydro-Pod presentation v7- Final
 
Ashu kumar ppt
Ashu kumar pptAshu kumar ppt
Ashu kumar ppt
 
Engineered systems
Engineered systemsEngineered systems
Engineered systems
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOW
 
Industrialwastewatertreatment
IndustrialwastewatertreatmentIndustrialwastewatertreatment
Industrialwastewatertreatment
 
Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Dewatering containers v7 small rev1
Dewatering containers v7 small rev1
 
04 Reclamation and Reuse of waste water
04 Reclamation and Reuse of waste water04 Reclamation and Reuse of waste water
04 Reclamation and Reuse of waste water
 
CR_Furnace_Tube_and_Pipeline_Pigging
CR_Furnace_Tube_and_Pipeline_PiggingCR_Furnace_Tube_and_Pipeline_Pigging
CR_Furnace_Tube_and_Pipeline_Pigging
 
BIOLOGY-REVERSE OSMOSIS
BIOLOGY-REVERSE OSMOSISBIOLOGY-REVERSE OSMOSIS
BIOLOGY-REVERSE OSMOSIS
 
Olivier amiot reverse_osmosis
Olivier amiot reverse_osmosisOlivier amiot reverse_osmosis
Olivier amiot reverse_osmosis
 
Rapid sand filter
Rapid sand filterRapid sand filter
Rapid sand filter
 
Sludge thickening and stabilization processes
Sludge thickening and stabilization processes  Sludge thickening and stabilization processes
Sludge thickening and stabilization processes
 
ES&E Magazine - Mentone
ES&E Magazine - MentoneES&E Magazine - Mentone
ES&E Magazine - Mentone
 
Brochure pas
Brochure pasBrochure pas
Brochure pas
 
Final PPT
Final PPTFinal PPT
Final PPT
 
Zero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industriesZero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industries
 
ACE DYNAMICS etp
ACE DYNAMICS etpACE DYNAMICS etp
ACE DYNAMICS etp
 
Making Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian BasinMaking Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian Basin
 
Ccccc
CccccCcccc
Ccccc
 

Recently uploaded

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

Compactsolutionforcso

  • 1. EDITOR’SFOCUS By K. Scott Henderson 16 August 2007 • WWDmag.com • WATER & WASTES DIGEST I n December 2002, the city of Toledo, Ohio, signed a consent decree with the U.S. Environmental Protection Agency (EPA) that required the city to update its sewer and wastewater treatment facilities to stop wet weather bypassing of untreated wastewater into the Maumee River. To achieve regulatory compliance associated with combined sewer overflow (CSO) events, it was determined that the Bay View Wastewater Treatment Plant (WWTP) must increase its total treatment capacity from 200 to 400 million gal per day (mgd), or approximately 5.3 times the average dry weather flow rate.1 Prior to the final design, pilot testing of high-rate clar- ifier technologies was conducted from December 2002 to February 2003 to determine the feasibility of using this technology to achieve the required effluent criteria for both primary and CSO wastewaters. Based on the results of the pilot study, the DensaDeg high-rate solids contact clarifier, manufactured by Infilco Degremont, Inc., was chosen for the full-scale installation. Based on the design parameters, it was determined that the facility would need six of these clarifiers. In November 2006, the construction of the largest high-rate clarification system for CSO treatment was completed. The overall layout can be seen in Figure 1, and a picture of the constructed facility is shown in Figure 2. The maximum design capacity for the facility is 232 mgd with each of the six high-rate clarifiers having the capacity to treat 38.7 mgd at a surface overflow rate of 47 gpm/ft2 . The clarifier The DensaDeg clarifier is a high-rate solids contact clarifier that combines optimized flocculation, internal and external sludge recirculation and lamellar settling to achieve very high hydraulic loadings and treatment efficiencies. It is well proven in the field of physical and chemical treatment of wastewater and drinking water and has been employed for a wide range of municipal and industrial applications. The DensaDeg 2D-100 for physical and chemical treatment of raw municipal wastewater, CSO and sanitary sewer over- flows (SSO) combines coagulation, flocculation, static and lamellar clarification, scum removal and sludge thickening in a single treatment unit. Optimized flocculation and solids con- tact through internal and external sludge recirculation pro- duces dense floc with an extremely high settling rate (typical design rates are 40 gpm/ft2 with the hydraulic capacity to accommodate rise rates up to 60 gpm/ft2 , with a moderate reduction in treatment efficiencies) without adding ballast materials such as sand. The process Rapid mix. The first step in the clarifier process, coagula- tion, takes place in a single vessel. A coagulant, either alu- minum or iron salt, is injected directly into the inlet pipe, or if possible, upstream in the feed channel. Mechanical mixers cause an intense bulk fluid motion for coagulant dispersion and mixing. The flow then passes to the reactor vessel. Reactor vessel. The reactor vessel is where particle floc- culation and densification occurs. The flocculation reaction is optimized in the reactor vessel through the combined effects of internal sludge recirculation, high solids concentration and efficient mixing. A high concentration of solids is maintained in the reactor through external recirculation of settled solids from the clarifier/thickener vessel. Internal recirculation is achieved through an axial flow impeller/draft tube arrange- ment. Polymer, usually a high molecular weight anionic type, is injected either directly beneath the impeller blades or in the sludge recirculation line. Polymer aids in the flocculation and densification of the coagulated particles. Clarifier/thickener vessel. Quiescent conditions exist in the clarifier/thickener vessel, where the dense floc particles formed in the reactor vessel are allowed to settle and thick- en. A circular, picket fence-type scraper mechanism collects A look at the largest high-rate clarification system for CSO treatment in North America A Compact Solution for CSO Treatment FIGURE 1: Overall Layout – Bay View WWTP Wet Weather Facilities FIGURE 2: Bay View WWTP – DensaDeg High Rate Clarifier Facility 16_EF_0807.qxd 8/3/07 5:43 PM Page 16
  • 2. New “Reagentless” Residual Chlorine Monitor! 800-959-0299 610-917-0991 • FAX 610-917-0992 www.analyticaltechnology.com New “Reagentless” Residual Chlorine Monitor! Q45H Residual Chlorine systems utilize a direct measuring polarographic sensor that does not require the addition of chemical reagents. This means no more costly reagents to purchase. I Direct Measurement of Free or Combined Chlorine Without Reagents I Simple Constant -Head Flow Control I Low Operating Cost I Minimal Maintenance Required I Optional pH Sensor For Dual Parameter Monitoring and Free Chlorine Compensation Q45H Residual Chlorine systems utilize a direct measuring polarographic sensor that does not require the addition of chemical reagents. This means no more costly reagents to purchase. I Direct Measurement of Free or Combined Chlorine Without Reagents I Simple Constant -Head Flow Control I Low Operating Cost I Minimal Maintenance Required I Optional pH Sensor For Dual Parameter Monitoring and Free Chlorine Compensation Write in 342 ATI 6/6/06 7:58 AM Page 1
  • 3. 18 August 2007 • WWDmag.com • WATER & WASTES DIGEST AQUA-AEROBIC SYSTEMS, INC. P a r t n e r i n g f o r S o l u t i o n s ™ 6306 N. Alpine Road • Rockford, IL 61111 PH 815.654.2501 • FX 815.654.2508 www.aqua-aerobic.com :: Benefits • Unique OptiFiber™ pile cloth media • Reuse quality effluent • Higher solids loading per ft2 of media • Reduced backwash water volume • Higher hydraulic loadings • Reduced footprint • Less maintenance • Disk and drum configurations also available :: Applications • Municipal and Industrial - Tertiary filtration - Reuse/recycle - Phosphorus removal - New plants and retrofits The AquaDiamond® filter offers the benefits of OptiFiber™ pile cloth media filtration in a lower profile, diamond configuration. This filter easily retrofits into existing traveling bridge sand filters while providing higher hydraulic and solids loading rates in a smaller footprint. Fox Metro Water Reclamation District, located in Oswego, Illinois retrofitted three of its nine existing 16' x 112' traveling bridge sand filters with 80' long AquaDiamond® cloth media filters to solve its ongoing maintenance and performance issues. The three combined AquaDiamond® filters provide a peak flow capacity of 72 MGD, which is almost 2.5 times the hydraulic capacity of the original three sand filters, within the same footprint. The AquaDiamond® filters have also proven the ability to perform under higher solids loading conditions than the sand filters, while backwashing less. Fox Metro plans to install two additional AquaDiamond® filters in 2007, resulting in a total of five filters with a combined peak flow capacity of 120 MGD. :: Plant Profile Smaller Footprint :: :: Higher Capacity Write in 706 Morris Pumps - Div. Yeomans Chicago Corp. - Aurora, IL USA www.morrispumps.com Heavy-Duty Engineered Wastewater Pumping Systems ® Write in 726 Write in 734 settled sludge into a center bottom hopper. Thickened sludge (typically 20 to 40 g/L) is pumped to a holding tank and then trans- ferred directly to digesters or dewatering facilities. Additional sludge thickening is generally not required. A separate set of recycle pumps return a portion of the sludge to the reactor vessel. Settled water then flows upward through settling tubes where stray floc is removed. The majority of the solids are removed from the stream prior to entering the lamellar mod- ules. The lamellar tubes act as polishers only and are therefore not subject to clogging. Final clarified effluent collects in a trough for further downstream treatment or discharge. Operational strategy One of the unique features that the DensaDeg facility provides is the ability to treat both primary and CSO wastewaters. In order to incorporate this flexibility of operation, an operational guideline was created for the Bay View WWTP. Based on the incoming flow and status of the equal- ization basin volume, multiple modes of operation are available. The excess flows can be directed to the high-rate clarifiers, and effluent produced can then be sent to the activated sludge system. Or, during high flow events, HRC effluent can be directed to the equalization basin, and when the basin reaches design capacity, the flow is then directed to the dedicated wet weather disinfection system and blended with the plant effluent from the dry weather facilities before it is discharged into the Maumee River. The four main operational scenarios are summarized in Table 1. Performance testing Based on the required operational flexibil- ity of the Bay View WWTP, the performance testing was formulated to simulate the vari- ous operational scenarios. Each clarifier was tested individually to assess performance. Scenario Operational Strategies Q = 0 to 130 mgd • All flow is treated by the dry weather Bay View WWTP facilities. Q = 130 to 190 mgd • Up to 160 mgd is treated by the dry weather Bay View WWTP facilities; • 30 mgd is directed to the high- rate clarifier (HRC) facility—HRC effluent is routed to the activated sludge system; Q > 190 mgd • Up to 160 mgd is treated by the dry & Veq < Vtot weather Bay View WWTP facilities; • Excess flow are directed to the HRC facility; • 30 mgd of HRC effluent is routed to the activated sludge system; • Remainder of effluent is dis- charged to the equalization basin. Q > 195 mgd • Up to 160 mgd is treated by the dry & Veq = Vtot weather Bay View WWTP facilities; • Excess flows are directed to the HRC facility; • 30 mgd of HRC effluent is routed to the activated sludge system; • Remainder of HRC effluent is routed to disinfection and blending with effluent from dry weather Bay View WWTP. Vtot = Total volume of equalization basin (25 million gal) Veq = Volume of wastewater in the equalization basin at a given time TABLE 1: Operational Strategy Summary – Bay View WWTP 16_EF_0807.qxd 8/3/07 5:44 PM Page 18
  • 4. WATER & WASTES DIGEST • WWDmag.com • August 2007 19 High Maintenance. Some things just require more maintenance than others. Tanks are no different. Choose Aquastore® and you get an exclusive glass-fused-to-steel bolted tank that is factory engineered to be the best. Say good-bye to high maintenance construction, cracks, painting, corrosion and rust. A low maintenance Aquastore is easily constructed, never needs repainting and delivers proven lifetime performance. With Aquastore, you can be assured you will get the highest engineered quality, service and product life in storage tanks. For more information visit www.aquastore.com or call 815-756-1551. Low Maintenance. © 2007. Aquastore is a registered trademark of Engineered Storage Products Company. Glass Tanks with a Heart of Steel™ Tanks & Domes Write in 705Write in 720 FIGURE 3: Typical Performance Test Run – TSS Removal Efficiency FIGURE 4: Typical Performance Test – Particulate CBOD Removal Efficiency TSS CBOD Total P Influent TSS Effluent TSS Influent CBOD Effluent CBOD Influent Total P Effluent Total P Primary treatment performance level 83% 54% 89% 121 17 116 50 2.9 0.29 Wet weather treatment performance level 1 79% 53% 86% 102 21 105 46 2.9 0.41 Wet weather treatment performance level 2 70% 46% 72% 96 29 90 52 2.5 0.53 *Concentrations are in mg/L TABLE 2: Performance Test Summary - Average Removal Efficiencies and Average Concentrations* 16_EF_0807.qxd 8/3/07 5:44 PM Page 19
  • 5. 20 August 2007 • WWDmag.com • WATER & WASTES DIGEST 5300 Belmont Road • Downers Grove, IL 60515 • 630.969.4028 • info@sticontrols.com sticontrols.com The Eclipse® Model 705 Transmitter uses revolutionary Guided Wave Radar technology providing unsurpassed accurate measurement even in foam, varying media or applications with coating and buildup. Eclipse transmitters are designed for easy installation and configuration. The compact innova- tive housing and display makes data easy to read. Guided Wave Radar from STI is engineered to solve the challenges of water and wastewater treatment environments. Write in 716 1-877-4UMOYNO www.moyno.com Patented • Quiet, clean VFD controls • Non-pulsating flow • Closed piping system • Compact heavy duty Ultra-Drive® gear joint design • Optional slip injection system • Twin screw feeder • High-efficiency Ultra-Feed® rotor Moves a higher percentage of solids longer distances than any other progressing cavity pump! Come see us at Booth #4037 Write in 717 Write in 718 The first level of performance testing required the units to operate at a flow rate of < 27 mgd (SOR = 32.9 gpm/ft2 ), the sec- ond level of testing required a flow rate of 31 mgd (SOR = 37.5 gpm/ft2 ), and the third level a flow rate of 38.7 mgd (SOR = 47 gpm/ft2 ). During the testing of each performance level, samples were taken during each hour of operation to measure TSS, CBOD and total phosphorus. Each clarifier was tested for a six-hour period and figures 3 and 4 ( page 19) show representative runs for an individual DensaDeg unit. Table 2 (page 19) provides a summary of the average removal efficiencies and average concentrations achieved during of the full-scale perfor- mance testing. Conclusion The system recently constructed at the Bay View WWTP is the largest high-rate clar- ification system for CSO treatment in North America. As seen in the performance test data, the DensaDeg can achieve removal efficiencies in the range of 70 to 95% for TSS, 55 to 70% for total CBOD and 70 to 95% for total phosphorus, while operating at high surface overflow rates. These full-scale results confirm those achieved during the pilot testing and meet the design requirements of the facility. This demonstrates that based on the high- rate design of the process, large CSO treat- ment capacity can be achieved in a rela- tively moderate site area (232 mgd within a 43,500 ft2 area), thereby providing municipalities with a compact solution for CSO treatment. References Nitz, D. et al. (2004) Session 23: Wet Weather Treatment Issues “Wet Weather Treatment Pilot Testing: High Rate Clarification and UV Disinfection in a Cold Climate.” WEFTEC 2004, New Orleans, La. K. Scott Henderson, P.E., is application engineer at Infilco Degremont. He can be reached at 804/756-7623 or by e-mail at scott.henderson@infilcodegremont.com. For more information, write in 1101 on this issue’s Reader Service Card. WWD LEARN MORE For additional articles on this topic, visit: www.WWDmag.com/lm.cfm/wd080701 FIGURE 5: Sectional View of DendaDeg 2D-100 16_EF_0807.qxd 8/3/07 5:44 PM Page 20