Resume
Personal information:
Name: Alaa Ramadan Mohamed
Nationality: Egypt
Marital Status: married.
Military Status: Exempted.
Gende:Male
Date of birth: 1st March, 1977
Driving license: The End of License at 2019
Passport: Trial date at 2017
Permanent address: Saudi Arabia,Riyadh.
Mobile: +966569247834
Email address: ramadanalaa25@yahoo.com
Objectives:
Seeking a challenge and creative job as electrical instrumentation
engineer with a leading company where I can develop and utilize my
background and experience in the field of oil gas and water technologies.
.
Qualifications:
 Familiar with programming PLC and Microcontrollers.
 Familiar with PLC of Siemens & Schneider. Allen-Bradley, Omron.
 Ability to understanding any other type of PLC in a few days.
 Ability to setup project using PLC and /or microcontroller (Hardware &
programming)
 Familiar with calibration and adjustments, maintenance any brand type of
instruments, measuring device
 Very good in electronic circuit making (design& implementation).
 Familiar with microcontroller of Motorola (MC86HC705 J1A, C8A, B16)
 Familiar with microcontroller of microchip (PIC 16F84, 16F877)
 Familiar with Eagle software and Orcad.
Education:
 Bachelor’s degree in “ Automatic Control, Industrial Electronics & Electrical
Engineering “
 Faculty of Electronic Engineering,
 Menoufia University.
 Graduation Year: 2003
 Grade: good 65%.
 Graduation Project: Field programmable gate array (FPGA)
 Project Grade: Excellent
Languages:
 Arabic: Mother Tongue
 English: Very good
2
Work experience:
A:
Company Name: Metito Saudi Ltd.
Position: Electrical instrumentation team leader.
Period: May 2014 until now
B:
Company Name: Veolia Water Solutions and technologies
Position: Senior electrical instrumentation engineer
Period: January 2011 April 2014
C:
Company Name: SAUDI BEREFELD.(WETICO)
Position: Electrical instrumentation design engineer
Period: July 2008 Until December 2010
D:
Company Name: HANNA INSTRUMENTS EGYPT
Position: Instrumentation engineer
Period: July 2007 until June 2008
E:
Company Name: PEPSI COLA EGYPT
Position: Electrical engineer
Period: January 2004 until June 2007
Key responsibilities and duties:
 Review the project specs and compare with our compliance.
 Review the Process & Instrumentation Diagram (P&I), and the Process and Flow
Diagram (PFD).
 Review load list coming from project engineer (input should come through
transmittal as per Procedure)
 Electrical Design calculations as required to support the design.
 Electrical Project cost & budget control.
Preparation of Electrical FAT (Factory Acceptance Test) and SAT (Site Acceptance
Test) Documents
 Testing of Electrical System.
Supervision/Execution of Electrical FAT (Factory Acceptance Test) and SAT (Site
Acceptance Test)
 Supervision assistance of site Electrical activities as required during installation.
Provide expert technical support and guidance for all live projects and tenders for
Electrical requirements
 Support on preparation of project estimates and tenders for Electrical requirements.
 Sales support for Electrical requirements.
 Electrical Equipment procurement including preparation of required specification,
enquiry,
Quotation analysis, ordering & expediting
 The Scheduling Meeting will be held every month with projects and a date for the
issuance of the
 Documents required for the project will be agreed with the project engineer. The
same has to be
3
Complied with
 Check the schedule daily, provide feedback on the schedule accomplishment, and
request for Input well in advance in order to comply with the schedules
.
If any document above the requirement is required, then the design engineer shall
inform the Project engineer for the extra man hours on the budget & get the approval
from the supervisor
Before working on the same
 If revision is required, queries should be raised & get addressed before work starts
unless
Agreed with the supervisor
 To submit time sheet daily, extreme maximum two days span.
 Refer check list available for each type of document while you prepare the design
input for
Drafting & attach the check list with document transmittal in order to ensure
minimum
Documented review
 Prepare the document transmittal with engineering hours / drafting hours.
 E, I, C & A engineers should co-ordinate with E, I, C & A head for their drafting
needs.
 Provide feedback / input on assessment & any other development work to be done.
 Inform supervisor if you are asked to work on any task outside the scheduled
activities.
 Inform supervisor / coordinator if you are unable to attend the office or want to go
out for any Work including official.
 In the event of handover, the handover of project should contain as a minimum
drawing Completion status, drawing approval status, balance drawings list, Issues
holding drawings Completion, issues pending related to procurement & any other
issue with client /vendor.
 Control & Automation Project cost & budget control.
 Preparation of Control & Automation FAT (Factory Acceptance Test) and SAT (Site
Acceptance Test) documents.
 Testing of Control and Automation System.
 Supervision/Execution of Control and Automation FAT (Factory Acceptance Test)
and SAT (Site Acceptance Test).
 Supervision assistance of site Control & Automation activities as required during
installation.
 Provide expert technical support and guidance for all live projects and tenders for
Control and Automation requirements.
 Support on preparation of project estimates and tenders for Control and Automation
requirements.
 Sales support for Control and Automation requirements.
 Control & Automation Equipment procurement including preparation of required
specification.
 Enquiry, quotation analysis, ordering & expediting.
 Instrumentation Design calculations as required to support the design.
 Instrumentation Project cost & budget control.
 Preparation of Instrumentation FAT (Factory Acceptance Test) and SAT (Site
Acceptance Test) Documents.
 Testing of Instrumentation System.
 Support for Instrumentation requirements.
 Instrumentation Equipment procurement including preparation of required
specification, enquiry,
 Quotation analysis, ordering & expediting.
 Preparation of the following Drawings and Documents:
4
 Single Line Diagram.
 Power Requirements.
 Site Panel Location.
 Power Cable Routing Layout.
 Motor Data Sheet.
 Cable Book.
 Cable Calculation.
 Cable Schedule.
 Main Control Panel Drawing.
 MCC Drawing.
 Local Control Panel Wiring Diagram / Drawing Layout.
 Local Starter Panel Wiring Diagram / Drawing Layout.
 Push Button Wiring Diagram / Drawing Layout.
 Electrical Heat Dissipation.
 Electrical Skid Conduit Layout.
 Electrical Skid Cable Tray Layout.
 Electrical Plant Room Conduit Tray Layout.
 Electrical Plant Room Cable Tray Layout.
 Electrical Site Conduit Tray Layout.
 Electrical Site Cable Tray Layout.
 Electrical Grounding Layout.
 Electrical Interconnection Loop Diagram.
 Main Control Panel Drawing BOM.
 MCC Drawing BOM.
 Local Control Panel Wiring Diagram / Drawing Layout BOM.
 Local Starter Panel Wiring Diagram / Drawing Layout BOM.
 Push Button Wiring Diagram / Drawing Layout BOM.
 Main Control Panel Nameplates and Labels BOM.
 MCC Nameplates and Labels BOM.
 Local Control Panel Nameplates and Labels BOM.
 Local Starter Panel Nameplates and Labels BOM.
 Push Button Nameplates and Labels BOM.
 Electrical Pull Box Nameplates and
 Electrical Skid Conduit Layout BOM.
 Electrical Skid Cable Tray Layout BOM.
 Electrical Plant Room Conduit Tray Layout BOM.
 Electrical Plant Room Cable Tray Layout BOM.
 Electrical Site Conduit Tray Layout
 BOM.Electrical Site Cable Tray Layout BOM.
 Electrical Grounding BOM.
 Preparation of the following Drawings and Documents:
 Instrument Power Requirements.
 Site Instrument Panel Location.
 Instrument Location Layout.
 Instrument Schedule.
 Instrument Cable Routing Layout.
 Instrument Block Diagram.
 Auto Valve Schedule.
 Instrument Cable Calculation.
 Instrument Cable Schedule.
 Junction Box Wiring Diagram / Drawing Layout.
 Instrument Heat Dissipation.
 Instrument Skid Conduit Layout.
 Instrument Cable Tray Layout.
 Instrument Plant Room Conduit, Tray Layout.
 Instrument Plant Room Cable Tray Layout.
 Instrument Site Cable Tray Layout.
 Instrument Interconnection Loop Diagram.
 List of Set Points for Control Alarms & Shutdown.
5
 Instrument Installation Schedule.
 Instrument Hook-Up Drawing.
 Instrument Junction Box Interconnection Wiring.
 Instrument Data Sheet.
 Instruments Nameplates and Labels BOM for.
 Instrument Pull Box Nameplates and Labels BOM.
 Instrument Skid Cables, Conduit & Accessories BOM.
 Instrument Cable, Tray & Accessories BOM.
 Instrument Plant Room Cables, Conduit, Tray & Accessories BOM.
 Instrument Plant Room Cables, Tray & Accessories BOM.
 Instrument Site Cable, Conduit, Trays & Accessories BOM.
 Instrument Site Cables, Tray & Accessories BOM.
 Instrument Hook-Up BOM.
 Preparation of the following Drawings and Documents:
 System/Control Block Diagram.
 PLC Input and Output List.
 Cause and Efect Diagram.
 Control Philosophy/Narrative.
 Logic Diagram.
 PLC Program.
 Modbus Mapping List.
 SCADA/HMI Program/Graphics Development.
 PLC & Accessories BOM.
 SCADA/HMI & Accessories BOM.
 Control & Automation Design calculations as required to support the design.
Personal Skills:
 I can communicate well.
 Work in team.
 Making good presentation of my ideas.
 Good knowledge about scientific, problem solving.
 Decision making.
 Selling, customer service.
I hope that my qualification meet your
requirements
Signature
Eng: Alaa Ramadan

My resume 2015

  • 1.
    1 Resume Personal information: Name: AlaaRamadan Mohamed Nationality: Egypt Marital Status: married. Military Status: Exempted. Gende:Male Date of birth: 1st March, 1977 Driving license: The End of License at 2019 Passport: Trial date at 2017 Permanent address: Saudi Arabia,Riyadh. Mobile: +966569247834 Email address: ramadanalaa25@yahoo.com Objectives: Seeking a challenge and creative job as electrical instrumentation engineer with a leading company where I can develop and utilize my background and experience in the field of oil gas and water technologies. . Qualifications:  Familiar with programming PLC and Microcontrollers.  Familiar with PLC of Siemens & Schneider. Allen-Bradley, Omron.  Ability to understanding any other type of PLC in a few days.  Ability to setup project using PLC and /or microcontroller (Hardware & programming)  Familiar with calibration and adjustments, maintenance any brand type of instruments, measuring device  Very good in electronic circuit making (design& implementation).  Familiar with microcontroller of Motorola (MC86HC705 J1A, C8A, B16)  Familiar with microcontroller of microchip (PIC 16F84, 16F877)  Familiar with Eagle software and Orcad. Education:  Bachelor’s degree in “ Automatic Control, Industrial Electronics & Electrical Engineering “  Faculty of Electronic Engineering,  Menoufia University.  Graduation Year: 2003  Grade: good 65%.  Graduation Project: Field programmable gate array (FPGA)  Project Grade: Excellent Languages:  Arabic: Mother Tongue  English: Very good
  • 2.
    2 Work experience: A: Company Name:Metito Saudi Ltd. Position: Electrical instrumentation team leader. Period: May 2014 until now B: Company Name: Veolia Water Solutions and technologies Position: Senior electrical instrumentation engineer Period: January 2011 April 2014 C: Company Name: SAUDI BEREFELD.(WETICO) Position: Electrical instrumentation design engineer Period: July 2008 Until December 2010 D: Company Name: HANNA INSTRUMENTS EGYPT Position: Instrumentation engineer Period: July 2007 until June 2008 E: Company Name: PEPSI COLA EGYPT Position: Electrical engineer Period: January 2004 until June 2007 Key responsibilities and duties:  Review the project specs and compare with our compliance.  Review the Process & Instrumentation Diagram (P&I), and the Process and Flow Diagram (PFD).  Review load list coming from project engineer (input should come through transmittal as per Procedure)  Electrical Design calculations as required to support the design.  Electrical Project cost & budget control. Preparation of Electrical FAT (Factory Acceptance Test) and SAT (Site Acceptance Test) Documents  Testing of Electrical System. Supervision/Execution of Electrical FAT (Factory Acceptance Test) and SAT (Site Acceptance Test)  Supervision assistance of site Electrical activities as required during installation. Provide expert technical support and guidance for all live projects and tenders for Electrical requirements  Support on preparation of project estimates and tenders for Electrical requirements.  Sales support for Electrical requirements.  Electrical Equipment procurement including preparation of required specification, enquiry, Quotation analysis, ordering & expediting  The Scheduling Meeting will be held every month with projects and a date for the issuance of the  Documents required for the project will be agreed with the project engineer. The same has to be
  • 3.
    3 Complied with  Checkthe schedule daily, provide feedback on the schedule accomplishment, and request for Input well in advance in order to comply with the schedules . If any document above the requirement is required, then the design engineer shall inform the Project engineer for the extra man hours on the budget & get the approval from the supervisor Before working on the same  If revision is required, queries should be raised & get addressed before work starts unless Agreed with the supervisor  To submit time sheet daily, extreme maximum two days span.  Refer check list available for each type of document while you prepare the design input for Drafting & attach the check list with document transmittal in order to ensure minimum Documented review  Prepare the document transmittal with engineering hours / drafting hours.  E, I, C & A engineers should co-ordinate with E, I, C & A head for their drafting needs.  Provide feedback / input on assessment & any other development work to be done.  Inform supervisor if you are asked to work on any task outside the scheduled activities.  Inform supervisor / coordinator if you are unable to attend the office or want to go out for any Work including official.  In the event of handover, the handover of project should contain as a minimum drawing Completion status, drawing approval status, balance drawings list, Issues holding drawings Completion, issues pending related to procurement & any other issue with client /vendor.  Control & Automation Project cost & budget control.  Preparation of Control & Automation FAT (Factory Acceptance Test) and SAT (Site Acceptance Test) documents.  Testing of Control and Automation System.  Supervision/Execution of Control and Automation FAT (Factory Acceptance Test) and SAT (Site Acceptance Test).  Supervision assistance of site Control & Automation activities as required during installation.  Provide expert technical support and guidance for all live projects and tenders for Control and Automation requirements.  Support on preparation of project estimates and tenders for Control and Automation requirements.  Sales support for Control and Automation requirements.  Control & Automation Equipment procurement including preparation of required specification.  Enquiry, quotation analysis, ordering & expediting.  Instrumentation Design calculations as required to support the design.  Instrumentation Project cost & budget control.  Preparation of Instrumentation FAT (Factory Acceptance Test) and SAT (Site Acceptance Test) Documents.  Testing of Instrumentation System.  Support for Instrumentation requirements.  Instrumentation Equipment procurement including preparation of required specification, enquiry,  Quotation analysis, ordering & expediting.  Preparation of the following Drawings and Documents:
  • 4.
    4  Single LineDiagram.  Power Requirements.  Site Panel Location.  Power Cable Routing Layout.  Motor Data Sheet.  Cable Book.  Cable Calculation.  Cable Schedule.  Main Control Panel Drawing.  MCC Drawing.  Local Control Panel Wiring Diagram / Drawing Layout.  Local Starter Panel Wiring Diagram / Drawing Layout.  Push Button Wiring Diagram / Drawing Layout.  Electrical Heat Dissipation.  Electrical Skid Conduit Layout.  Electrical Skid Cable Tray Layout.  Electrical Plant Room Conduit Tray Layout.  Electrical Plant Room Cable Tray Layout.  Electrical Site Conduit Tray Layout.  Electrical Site Cable Tray Layout.  Electrical Grounding Layout.  Electrical Interconnection Loop Diagram.  Main Control Panel Drawing BOM.  MCC Drawing BOM.  Local Control Panel Wiring Diagram / Drawing Layout BOM.  Local Starter Panel Wiring Diagram / Drawing Layout BOM.  Push Button Wiring Diagram / Drawing Layout BOM.  Main Control Panel Nameplates and Labels BOM.  MCC Nameplates and Labels BOM.  Local Control Panel Nameplates and Labels BOM.  Local Starter Panel Nameplates and Labels BOM.  Push Button Nameplates and Labels BOM.  Electrical Pull Box Nameplates and  Electrical Skid Conduit Layout BOM.  Electrical Skid Cable Tray Layout BOM.  Electrical Plant Room Conduit Tray Layout BOM.  Electrical Plant Room Cable Tray Layout BOM.  Electrical Site Conduit Tray Layout  BOM.Electrical Site Cable Tray Layout BOM.  Electrical Grounding BOM.  Preparation of the following Drawings and Documents:  Instrument Power Requirements.  Site Instrument Panel Location.  Instrument Location Layout.  Instrument Schedule.  Instrument Cable Routing Layout.  Instrument Block Diagram.  Auto Valve Schedule.  Instrument Cable Calculation.  Instrument Cable Schedule.  Junction Box Wiring Diagram / Drawing Layout.  Instrument Heat Dissipation.  Instrument Skid Conduit Layout.  Instrument Cable Tray Layout.  Instrument Plant Room Conduit, Tray Layout.  Instrument Plant Room Cable Tray Layout.  Instrument Site Cable Tray Layout.  Instrument Interconnection Loop Diagram.  List of Set Points for Control Alarms & Shutdown.
  • 5.
    5  Instrument InstallationSchedule.  Instrument Hook-Up Drawing.  Instrument Junction Box Interconnection Wiring.  Instrument Data Sheet.  Instruments Nameplates and Labels BOM for.  Instrument Pull Box Nameplates and Labels BOM.  Instrument Skid Cables, Conduit & Accessories BOM.  Instrument Cable, Tray & Accessories BOM.  Instrument Plant Room Cables, Conduit, Tray & Accessories BOM.  Instrument Plant Room Cables, Tray & Accessories BOM.  Instrument Site Cable, Conduit, Trays & Accessories BOM.  Instrument Site Cables, Tray & Accessories BOM.  Instrument Hook-Up BOM.  Preparation of the following Drawings and Documents:  System/Control Block Diagram.  PLC Input and Output List.  Cause and Efect Diagram.  Control Philosophy/Narrative.  Logic Diagram.  PLC Program.  Modbus Mapping List.  SCADA/HMI Program/Graphics Development.  PLC & Accessories BOM.  SCADA/HMI & Accessories BOM.  Control & Automation Design calculations as required to support the design. Personal Skills:  I can communicate well.  Work in team.  Making good presentation of my ideas.  Good knowledge about scientific, problem solving.  Decision making.  Selling, customer service. I hope that my qualification meet your requirements Signature Eng: Alaa Ramadan