This document provides an installation guide and checklist for mechanical ventilation with heat recovery (MVHR) systems. It contains guidance on best practices for ductwork installation, unit fixing, electrical connection, system balancing and calibration, and customer handover. Installers are advised to complete the checklist for each installation to ensure proper installation and to provide performance data for the SAP assessment procedure. The checklist contains questions on topics like ductwork design, insulation, air tightness, unit mounting, electrical connection, air flow balancing, and customer instructions.
Your complete guide to cooling tower inspections so that you may have a deeper understanding of why inspections are so important. This step by step guide will reveal the process of what happens when a cooling tower inspection is completed, and what to expect afterwards.
Your complete guide to cooling tower inspections so that you may have a deeper understanding of why inspections are so important. This step by step guide will reveal the process of what happens when a cooling tower inspection is completed, and what to expect afterwards.
Anticipating freezing conditions and protecting buildings, equipment, and grounds against freeze damage is a vital part of a Facility Maintenance Program. A good freeze protection plan includes steps for inspection, preventative maintenance, and corrective maintenance prior to the beginning of cold weather conditions. This guide is designed to make the planning process easier for you.
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Palash Das
This slide is represent the HVAC design,qualification and operational approach. As we know HVAC is important system for maintaining clean room. This presentation is made based on the requirement of Pharmaceutical Industry. All parameter are considered based on the current guidelines aspect.
MREG-A and MREG-B are angle-way and straightway hand regulating valves, which act as normal stop valves in closed position.
The valves are available in two different versions – MREG-A and MREG-B designed for regulation purposes in liquid and expansion lines.
The valves are available in two different versions – MREG-A and MREG-B designed for regulation purposes in liquid and expansion lines.
The valves are designed to meet the strict quality requirements on refrigerating installations specified by the international classification societies and are carefully designed to present favourable flow conditions and accurate linear characteristics.
MREG-A and MREG-B are equipped with vented cap and internal back-seating enables replacement of the spindle seal whilst the valve is active, i.e. under pressure.
Defender smokehalt - V automatic overhead coiling fabric smoke curtainlyndaflintof
Fire alarm or smoke detector-activated, overhead coiling fabric smoke curtain. Self-closing without auxiliary power. For small and medium protected openings.
We have put together a simple guide for compliance with TGD Part F 2019 (ROI) for architects, engineers, contractors - What are the ventilation options to achieve compliance: MVHR, MEV, DCV, etc.
Anticipating freezing conditions and protecting buildings, equipment, and grounds against freeze damage is a vital part of a Facility Maintenance Program. A good freeze protection plan includes steps for inspection, preventative maintenance, and corrective maintenance prior to the beginning of cold weather conditions. This guide is designed to make the planning process easier for you.
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Palash Das
This slide is represent the HVAC design,qualification and operational approach. As we know HVAC is important system for maintaining clean room. This presentation is made based on the requirement of Pharmaceutical Industry. All parameter are considered based on the current guidelines aspect.
MREG-A and MREG-B are angle-way and straightway hand regulating valves, which act as normal stop valves in closed position.
The valves are available in two different versions – MREG-A and MREG-B designed for regulation purposes in liquid and expansion lines.
The valves are available in two different versions – MREG-A and MREG-B designed for regulation purposes in liquid and expansion lines.
The valves are designed to meet the strict quality requirements on refrigerating installations specified by the international classification societies and are carefully designed to present favourable flow conditions and accurate linear characteristics.
MREG-A and MREG-B are equipped with vented cap and internal back-seating enables replacement of the spindle seal whilst the valve is active, i.e. under pressure.
Defender smokehalt - V automatic overhead coiling fabric smoke curtainlyndaflintof
Fire alarm or smoke detector-activated, overhead coiling fabric smoke curtain. Self-closing without auxiliary power. For small and medium protected openings.
We have put together a simple guide for compliance with TGD Part F 2019 (ROI) for architects, engineers, contractors - What are the ventilation options to achieve compliance: MVHR, MEV, DCV, etc.
To save energy seal ducts. New code requirements will test ducts for air leakage. Find out the best way to seal your HVAC system whether it's a retrofit or a new system.
Prima Plus flue system installation instructionsSchiedel UK
Brochure from Schiedel. This forms part of our flue and chimney range and can be used with acknowledgement to Schiedel Chimney Systems Ltd. as well as a link to the original source at www.schiedel.com/uk
Schiedel's chimney flue range includes flue systems for residential and commercial applications. A typical flue installation includes steel chimney pipe or mineral pipe or module components from the heat source appliance (a stove, biomass or gas appliance for example) to it's termination point above the roof. Support is required for internal and external chimney systems.
Schiedel specialise in wood burning appliances and flues, which are a renewable way of avoiding constant gas or electricity usage when looking at a secondary heat source. Even heat pumps are problematic with severe temperature drops, so a secondary source is always needed.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
1. Standard Assessment Procedure 2005 – Appendix Q MVHR Installation Guide
Installation Guide and Checklist
Mechanical Ventilation with Heat Recovery
(Version – 11 February 2011)
The Electric Heating and Ventilation Association have developed this guidance and
checklist document in partnership with the Residential Ventilation Association
(a HEVAC association), BRE and EST.
NOTE: This guide and checklist has been superseded for dwellings assessed under
‘The Building Regulations 2010’, specifically SAP 2009 and Approved Documents L and
F. Completion of this document is therefore only required for dwellings assessed by
SAP 2005.
Customer Details
Customer Name:
Address:
Telephone Number:
Date of Installation:
Name of Lead Contractor:
Design Project Number:
It should be noted that this guidance is not intended to replace product
manufacturer installation instructions; it is a generic addition which defines good
practice. Installers are advised to complete this form for each installation and
keep a copy to provide to Building Control Officers in case requested.
2. Standard Assessment Procedure 2005 – Appendix Q MVHR Installation Guide
Page 2 of 6
Introduction
This document is to be used in support of the SAP Appendix Q scheme which provides
tested performance values for MVHR products.
Note that all checklist items must be answered YES in order for the SAP Appendix Q
test figures to be used in ‘As built’ SAP calculations. If any checklist items are answered
NO then SAP default figures must be used. Systems must be designed by a
manufacturer designer and sized correctly to qualify for SAP Appendix Q figures.
SECTION 1: INSTALLATION GUIDANCE
1. Ductwork Installation Decision
Yes, No or
N/A
Have the ducts been installed with as little air resistance and
leakages as possible (flexible ducts should be avoided)?
Note: Refer to HVCA DW/143 document ‘A Practical Guide to Ductwork Leakage
Testing’ for detailed guidance on air tightness. Rigid plastic ducting is
recommended and flexible duct should only be used in very short lengths and
mainly just to connect the ductwork to the units/diffusers or to overcome particular
obstructions.
If flexible ducting has been used, has it been pulled taut to minimise
system resistance?
Has the number of duct bends been minimised to ensure adequate
air flow and least resistance? Bends should have a minimum radius
at least the same as the diameter of the ducting used?
Refer to Figure 1 if using flexible ducting
Have the fans and ducting placed in unheated voids been insulated
to reduce the possibility of condensation forming (see notes below)?
Note: Ducts should be insulated with the equivalent of at least 25mm of insulating
material with a thermal conductivity of 0.04W/mK. Where a duct rises vertically it
may be necessary to fit a condensation trap in order to prevent backflow of any
moisture in the product. Insulation should be applied to both warm and cold air
ducts. Cold air ducts should be wrapped additionally with a vapour barrier outside
the insulation. Ducts with cold air running in warm environments will condense on
the outside of the duct.
Have recommended duct jointing collars and components been
used to ensure appropriate duct performance (duct runs should be
as air tight as possible)?
Note: All the joints should be sealed correctly either using duct tape or silicon.
3. Standard Assessment Procedure 2005 – Appendix Q MVHR Installation Guide
Page 3 of 6
Figure 1 Ductwork Visual Guide
Source: Approved Document F (England & Wales) 2006
2. Unit Fixing Decision
Yes, No or
N/A
Has the heat recovery unit been effectively insulated?
Note: If the unit is not pre-insulated then ensure additional insulation is installed
around the unit to minimise heat loss
Has the heat recovery unit been fixed to a stable element of the
building fabric (e.g. wall or floor) using manufacturer
recommended/supplied fixing brackets?
Has the condensation drain been fitted and the pipe insulated?
Have approved acoustic/anti-vibration mountings been used?
Note: Special attention is needed to avoid transmission and stress to duct joints
Has the unit been installed in a position that will permit access for
maintenance purposes?
Have all grilles or ductwork that penetrate the building’s air barrier,
as identified in the construction drawings, been sealed to ensure
continuity of the air barrier?
4. Standard Assessment Procedure 2005 – Appendix Q MVHR Installation Guide
Page 4 of 6
Figure 2 Sample Mounting Positions
3. Electrical Connection Decision
Yes, No or
N/A
Has the rating label been verified to establish suitability for the
installation strategy and whether an earth is required (e.g. voltage,
class I or II product status)?
Has a local isolator been provided to enable the unit to be isolated
for maintenance purposes?
Has the unit been fused in accordance with its power rating?
SECTION 2: COMMISSIONING GUIDANCE
5. Standard Assessment Procedure 2005 – Appendix Q MVHR Installation Guide
Page 5 of 6
1. System Balancing & Calibration Decision
Yes, No or
N/A
Has the air flow been checked using a proprietary device such as
an anemometer (recommended)?
Have the controls been set following a defined process?
Refer to figure 3 flow diagram
Have all distribution grilles been locked where possible to minimise
unapproved occupant adjustment?
Figure 3
Ensure all external and internal
windows and doors are closed
Set fan speed using manufacturer data
table
Set normal daytime air flow on extract
points starting at location furthest from
unit
Set normal daytime air flow on input
points starting at location furthest from
unit
Step 1
Step 2
Step 3
Step 4
Step 5
Set fan speed to boost and measure
extract rates at each location, adjust
fan speed setting as required to
achieve required flow
6. Standard Assessment Procedure 2005 – Appendix Q MVHR Installation Guide
Page 6 of 6
2. Handover and Control/Maintenance Advice Decision
Yes, No or
N/A
Has the customer been supplied with suitable documentation
detailing maintenance and operational requirements?
Has the customer been advised that opening windows is not
recommended during normal use in order to ensure the energy
efficient operation and performance of the balanced system?
Has the customer been advised not to seal natural air flows from
room to room (e.g. avoid door seals and thick pile carpets)
Has the customer been advised not to alter settings post-
commissioning?
Has the customer been advised to clean the filters as explained in
the manufacturer’s instructions?