Anticipating freezing conditions and protecting buildings, equipment, and grounds against freeze damage is a vital part of a Facility Maintenance Program. A good freeze protection plan includes steps for inspection, preventative maintenance, and corrective maintenance prior to the beginning of cold weather conditions. This guide is designed to make the planning process easier for you.
This document discusses Thermon's trace heating solutions for operating in Arctic and offshore environments. Thermon provides anti-icing and de-icing systems to ensure safety and operations on offshore oil and gas platforms, vessels, and infrastructure in harsh Arctic conditions down to -60°C. Their engineered solutions include winterization, temperature maintenance, and heating for areas like stairs, railings, hatches, helidecks, and walkways to prevent ice formation and allow safe access. Thermon designs projects using modeling and has products approved for hazardous areas to support exploration and production in the Arctic.
This document provides information on the Airius line of destratification fans. It summarizes their various models including dimensions, coverage areas, power consumption, noise levels, and applications for different ceiling heights. The fans work to equalize temperatures in a space through gentle recirculation of air, reducing the need for heating and cooling by 20-50% and saving on energy costs.
AHS Specialist Services is an engineering firm that specializes in the repair, refurbishment, replacement, and maintenance of ventilation and HVAC systems. They have considerable experience solving problems with ventilation equipment and designing, installing, and servicing efficient air handling units. The company offers services like condition assessments, emergency repairs, planned maintenance programs, and pressure testing to evaluate equipment performance and diagnose issues.
TMV3 Thermostatic Mixing Valves - Reliance Water Controls BrochureThorne & Derrick UK
The document provides information about thermostatic mixing valves (TMVs) and the TMV3 approval scheme in the UK. It discusses how the NHS specification D08 and the TMV3 scheme were created to improve safety by requiring independent testing of TMVs. The approval process for TMV3 is rigorous, involving extensive performance testing. The document also covers topics like recommended water temperatures, the risks of burns and Legionnaires' disease, and how fitting TMVs at points of use helps address both issues.
RWC, Reliance Water Controls - Thermostatic Mixing Valves Heatguard BF2-2Thorne & Derrick UK
This document provides information about thermostatic mixing valves (TMVs) and the risks of scalding from hot water. It discusses how TMVs help control hot water temperature to prevent burns, noting that 570 people are hospitalized yearly in the UK from scalding injuries, mostly children. The approval process for TMV2 valves is stringent to ensure they meet safety standards. Hot water burns occur quickly, with 3rd degree burns possible in just a few seconds at 60°C for adults and children. TMVs provide a solution by mixing hot and cold water to deliver a safe temperature of no more than 48°C at taps and outlets like baths.
Testo – The Strong Partner for Facility Managers.Lothar Zorn
Your advantages with Testo
Operating costs, user convenience, energy consumption: as a facility manager, you need to keep an eye on a number of things. So it is good to have a strong partner who supplies integrated solutions for your building management requirements.
You can find these solutions at Testo. Because the hightech company from the Black Forest has stood for precision measuring technology with innovative operability for 60 years. Measuring instruments from Testo are in use everywhere where it is important to save time and resources and to protect the environment and human health.
Whether it involves heating, HVAC, air conditioning, ventilation and refrigeration systems or electrical installations: you get measuring solutions for all building systems from a single source at Testo. Testo’s measuring instruments enable faster testing, more convenient maintenance and more efficient setting of systems. In addition, you ensure the thermal comfort level in indoor areas and early detection of mould, humidity, damage to buildings and energy losses thanks to thermography.
The range Testo offers is completed by a wide variety of services which make your work easier. From individual advice, along with repair and spare part services, via seminars and training, through to professional test equipment management – Testo is your strong partner for measuring solutions and services in facility management
This document summarizes a presentation on heat tracing standards, options, and application optimization. It discusses various heat tracing standards from Canada, the US, and Europe from the 1980s to present. It describes how the standards are related and what they address, including recent changes. The presentation covers type tests for heat tracing, methods to establish maximum sheath temperature, and controlled design approaches. It discusses future developments in standards, including harmonization efforts between IEEE 515 and IEC 60079-30. The document concludes by summarizing recent changes to the Canadian Electrical Code regarding heat tracing.
Thermon – Heat Tracing Cables (Self Regulating, Power Limiting, Constant Watt...Thorne & Derrick UK
Thermon provides complete heat tracing solutions for pipes, vessels, instrumentation, and other process equipment. They offer engineering, design, product selection, installation, training, commissioning, and maintenance services worldwide. Thermon has experience in industries like oil and gas, power generation, and chemical processing and can design customized systems to meet specific application needs.
This document discusses Thermon's trace heating solutions for operating in Arctic and offshore environments. Thermon provides anti-icing and de-icing systems to ensure safety and operations on offshore oil and gas platforms, vessels, and infrastructure in harsh Arctic conditions down to -60°C. Their engineered solutions include winterization, temperature maintenance, and heating for areas like stairs, railings, hatches, helidecks, and walkways to prevent ice formation and allow safe access. Thermon designs projects using modeling and has products approved for hazardous areas to support exploration and production in the Arctic.
This document provides information on the Airius line of destratification fans. It summarizes their various models including dimensions, coverage areas, power consumption, noise levels, and applications for different ceiling heights. The fans work to equalize temperatures in a space through gentle recirculation of air, reducing the need for heating and cooling by 20-50% and saving on energy costs.
AHS Specialist Services is an engineering firm that specializes in the repair, refurbishment, replacement, and maintenance of ventilation and HVAC systems. They have considerable experience solving problems with ventilation equipment and designing, installing, and servicing efficient air handling units. The company offers services like condition assessments, emergency repairs, planned maintenance programs, and pressure testing to evaluate equipment performance and diagnose issues.
TMV3 Thermostatic Mixing Valves - Reliance Water Controls BrochureThorne & Derrick UK
The document provides information about thermostatic mixing valves (TMVs) and the TMV3 approval scheme in the UK. It discusses how the NHS specification D08 and the TMV3 scheme were created to improve safety by requiring independent testing of TMVs. The approval process for TMV3 is rigorous, involving extensive performance testing. The document also covers topics like recommended water temperatures, the risks of burns and Legionnaires' disease, and how fitting TMVs at points of use helps address both issues.
RWC, Reliance Water Controls - Thermostatic Mixing Valves Heatguard BF2-2Thorne & Derrick UK
This document provides information about thermostatic mixing valves (TMVs) and the risks of scalding from hot water. It discusses how TMVs help control hot water temperature to prevent burns, noting that 570 people are hospitalized yearly in the UK from scalding injuries, mostly children. The approval process for TMV2 valves is stringent to ensure they meet safety standards. Hot water burns occur quickly, with 3rd degree burns possible in just a few seconds at 60°C for adults and children. TMVs provide a solution by mixing hot and cold water to deliver a safe temperature of no more than 48°C at taps and outlets like baths.
Testo – The Strong Partner for Facility Managers.Lothar Zorn
Your advantages with Testo
Operating costs, user convenience, energy consumption: as a facility manager, you need to keep an eye on a number of things. So it is good to have a strong partner who supplies integrated solutions for your building management requirements.
You can find these solutions at Testo. Because the hightech company from the Black Forest has stood for precision measuring technology with innovative operability for 60 years. Measuring instruments from Testo are in use everywhere where it is important to save time and resources and to protect the environment and human health.
Whether it involves heating, HVAC, air conditioning, ventilation and refrigeration systems or electrical installations: you get measuring solutions for all building systems from a single source at Testo. Testo’s measuring instruments enable faster testing, more convenient maintenance and more efficient setting of systems. In addition, you ensure the thermal comfort level in indoor areas and early detection of mould, humidity, damage to buildings and energy losses thanks to thermography.
The range Testo offers is completed by a wide variety of services which make your work easier. From individual advice, along with repair and spare part services, via seminars and training, through to professional test equipment management – Testo is your strong partner for measuring solutions and services in facility management
This document summarizes a presentation on heat tracing standards, options, and application optimization. It discusses various heat tracing standards from Canada, the US, and Europe from the 1980s to present. It describes how the standards are related and what they address, including recent changes. The presentation covers type tests for heat tracing, methods to establish maximum sheath temperature, and controlled design approaches. It discusses future developments in standards, including harmonization efforts between IEEE 515 and IEC 60079-30. The document concludes by summarizing recent changes to the Canadian Electrical Code regarding heat tracing.
Thermon – Heat Tracing Cables (Self Regulating, Power Limiting, Constant Watt...Thorne & Derrick UK
Thermon provides complete heat tracing solutions for pipes, vessels, instrumentation, and other process equipment. They offer engineering, design, product selection, installation, training, commissioning, and maintenance services worldwide. Thermon has experience in industries like oil and gas, power generation, and chemical processing and can design customized systems to meet specific application needs.
Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...Thorne & Derrick UK
The document provides information on CAREMIX® thermostatic taps, which are high performance taps approved for healthcare applications. It discusses the conflict between preventing legionella growth and preventing scalding injuries from hot water. The CAREMIX® range of thermostatic taps are designed to address this conflict by mixing hot and cold water to deliver a controlled temperature at the tap outlet. The document provides specifications and approval details for various taps in the CAREMIX® range suitable for use in healthcare facilities.
Solar Tempering Valve & Thermostatic Mixing Valve - Spec SheetThorne & Derrick UK
The document describes a solar tempering valve product that is designed for high flow solar water heating systems. The valve mixes hot and cold water to deliver tempered water at a constant temperature. Key features include withstanding extreme temperatures, high flow design, union connections for easy installation and servicing, strainers to protect internal components, and tamper-proof adjustment. The product range includes models suitable for high flow applications and domestic installations.
Thermojet is a Brazilian company that provides thermal engineering services globally. It has offices in Brazil, Argentina, Colombia, China, and represents Glass Service and Flammatec. Thermojet offers various thermal services including controlled drying and heating, cooling, refractory services, and more. It has extensive experience with over 10,000 heating services in various industries.
Heatguard Planar Group Thermostatic Mixing Valve - Spec SheetThorne & Derrick UK
The Heatguard Planar thermostatic mixing valves provide stable mixed water temperatures even under varying supply conditions thanks to two quick reaction wax thermostats. They offer optional adjustable or lockable temperature control and high flow rates for their class. The valves include 4in1 service fittings that provide isolation, filtration, and cross-flow prevention in a compact unit.
Water Matters - Who, What, Why, When & How of WRAS ApprovalThorne & Derrick UK
The document discusses the WRAS (Water Regulations Advisory Scheme) approval process required in the United Kingdom for manufacturers selling residential water treatment products. It addresses the who, what, when, why and how of obtaining WRAS approval. The who is WRAS, which publishes water regulations. Manufacturers selling in the UK must determine if WRAS approval is required. The what includes materials testing (BS6920) and possible mechanical testing. The when refers to submission deadlines. The why is that WRAS approval is needed for market access in the UK. The how is to contact an approved testing laboratory to start the approval process.
The Airius destratification system installed at Lush Retail Ltd's factory in Poole, Dorset significantly reduced heating costs and improved conditions. Heating costs decreased by over 60% after installation, from £26,638.83 pre-installation to £7,333.38 post-installation. This resulted in a return on investment of the £2,967.50 system cost within 26 days. Temperatures at floor level improved, allowing the heating system to function more efficiently and recirculate process heat for free heating.
This document summarizes guidelines for improving the energy efficiency of heat treatment furnaces to reduce their environmental impact. It discusses evaluating the furnace life cycle from material extraction to waste management. The main environmental issue with furnaces is their high energy consumption. Guidelines are provided for improving furnace design, heat treatment processes, process control, operating processes, and maintenance to increase energy efficiency. Adopting these measures can significantly reduce furnace energy usage and waste.
The document provides an introduction to air barrier systems, which control air leakage and moisture movement within building envelopes. It discusses the types of moisture movement that can occur and potential issues with uncontrolled moisture. It also outlines different product types for preventing moisture infiltration and design options. The document emphasizes that a successful air barrier installation requires addressing transitions, penetrations, substrate preparation, and installation sequencing.
Empteezy - Drum & IBC Storage, Spill Containment & Control - BrochureThorne & Derrick UK
The document provides information on selecting the appropriate absorbents for different applications from Empteezy. It includes a colour-coded selection guide that matches types of liquids to be absorbed with the right absorbent product. The guide includes absorbents for maintenance, oil selective, chemical and environmental applications. It also provides information on Empteezy's contained absorbents that are more effective at cleaning spills than traditional absorbents. Examples are given of absorbent pads, rolls, cushions, socks and booms that can be used for different spill situations. Contact details are provided to discuss specific site needs or arrange a site assessment.
This document provides an installation guide and checklist for mechanical ventilation with heat recovery (MVHR) systems. It contains guidance on best practices for ductwork installation, unit fixing, electrical connection, system balancing and calibration, and customer handover. Installers are advised to complete the checklist for each installation to ensure proper installation and to provide performance data for the SAP assessment procedure. The checklist contains questions on topics like ductwork design, insulation, air tightness, unit mounting, electrical connection, air flow balancing, and customer instructions.
AHS Specialist Services designs, installs, and maintains air handling units (AHUs) and HVAC systems. They offer refurbishment of aging ventilation equipment to extend its lifespan by 15 years through repairs, component replacements, and efficiency upgrades. Their services include surveys to advise on refurbishing or replacing AHUs, installation of new efficient equipment, and maintenance to prevent downtime and increase reliability.
The document outlines a strategic material management system for industrial projects. It discusses establishing principles for warehouse design, storage, and material handling. Key aspects include inspection of incoming materials, proper storage based on technical specifications, preservation methods, and proven issue processes like the LBID cycle to ensure on-time delivery. The overall goals are to efficiently manage material flows, support site operations, and improve quality, safety, and performance through an integrated strategic approach.
Technocracy Pvt. Ltd. offers precise drying test chambers for a wide range of applications such as drying, baking, and sterilizing. The chambers have adjustable digital temperature controllers that maintain optimum drying temperature with high circulating, low temperature air for efficient drying. Customized chambers can provide temperature shock testing by creating dramatic temperature changes to detect flaws in specimens. The chambers are manufactured with double walled insulated construction and programmable controllers.
This document provides an overview of an industrial services company called Team. It offers various specialized industrial services including leak repair, hot tapping, field machining, technical bolting, valve repair, and more. It operates over 115 locations worldwide and serves industries such as chemical, aerospace, automotive, government, steel, power generation, and others. The company was founded in 1973 and went public in 1980, and has over 3,500 trained technicians. It aims to provide quality, safety, and service for its industrial clients.
1. Testo offers precise measurement solutions for various applications in industry including research and development, project planning, production and quality assurance, cleanroom environments, maintenance, and storage and transport.
2. Testo instruments reliably measure parameters such as temperature, humidity, air flow velocity, pressure, and gas concentration to support industrial processes, improve product quality, and ensure system availability.
3. Testo provides portable instruments for on-site use as well as stationary monitoring systems for continuous process control and quality assurance through automated data collection and alerts.
This document is a curriculum vitae for Michael Juan Nortjé. It provides personal information such as his address, contact details, marital status, and languages spoken. It also outlines his educational qualifications and work history in maintenance roles for various companies from 1993 to the present. His roles have included maintenance fitter, coordinator, technician, and team leader. He has experience working with various machines and equipment. The CV highlights his technical skills, problem-solving abilities, and people skills for effectively handling maintenance issues. References are also provided.
Thermon Industrial Hazardous Area Trace Heating - General InformationThorne & Derrick UK
This document provides an overview comparison of three common types of heat tracing systems: thermal fluid, electric, and steam. It discusses the history and evolution of each system type and highlights some of their key merits and limitations. The document emphasizes that no single system is definitively best for every application and that factors like specific process requirements, energy efficiency, installation costs, and maintenance should all be considered when selecting a heat tracing solution.
Zeeshan Quddos is a highly experienced HSE Engineer with over 4 years of experience in various industries. He has expertise in health, safety, and environmental management, compliance, standards, and service delivery. Currently he works as an HSEQ Trainer/Advisor and has conducted trainings and implemented risk assessments for many companies.
The EuroMixer thermostatic mixing valve provides extremely stable mixed water temperatures under varying supply conditions. It has an adjustable or lockable temperature control and high flow rates suitable for 1 to 10 showers or taps. The valve comes with 4-in-1 service fittings that provide isolation, filtration, cross-flow prevention and a gauge port for testing in a compact unit. It is designed for use in group mixing applications like multiple outlet showers or basins.
We are manufacturers of Hot air oven or laboratory oven in India since 1990. Our laboratory oven are widely used
for day to day heating and drying applications performed in various laboratories.
The document discusses various topics related to process plant safety including material handling safety, chemical plant design, piping and instrumentation diagrams, control systems, alarms, equipment and piping design, passive and active protections, emergency shutdown systems, and inherent safety techniques. It provides details on factors to consider for safe material handling, guidelines for chemical plant layout and design, symbols used in P&IDs, designing alarm and control systems, and methods to build safety into chemical plant design.
Refrigeration natural disaster planning and recoveryMatthew Darby
What to think about when developing Business Continuity and Disaster Planning for you business for your commercial refrigeration systems. Includes what to do before a natural disaster, during and after a natural disaster to prepare commercial refrigeration systems to come through.
Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...Thorne & Derrick UK
The document provides information on CAREMIX® thermostatic taps, which are high performance taps approved for healthcare applications. It discusses the conflict between preventing legionella growth and preventing scalding injuries from hot water. The CAREMIX® range of thermostatic taps are designed to address this conflict by mixing hot and cold water to deliver a controlled temperature at the tap outlet. The document provides specifications and approval details for various taps in the CAREMIX® range suitable for use in healthcare facilities.
Solar Tempering Valve & Thermostatic Mixing Valve - Spec SheetThorne & Derrick UK
The document describes a solar tempering valve product that is designed for high flow solar water heating systems. The valve mixes hot and cold water to deliver tempered water at a constant temperature. Key features include withstanding extreme temperatures, high flow design, union connections for easy installation and servicing, strainers to protect internal components, and tamper-proof adjustment. The product range includes models suitable for high flow applications and domestic installations.
Thermojet is a Brazilian company that provides thermal engineering services globally. It has offices in Brazil, Argentina, Colombia, China, and represents Glass Service and Flammatec. Thermojet offers various thermal services including controlled drying and heating, cooling, refractory services, and more. It has extensive experience with over 10,000 heating services in various industries.
Heatguard Planar Group Thermostatic Mixing Valve - Spec SheetThorne & Derrick UK
The Heatguard Planar thermostatic mixing valves provide stable mixed water temperatures even under varying supply conditions thanks to two quick reaction wax thermostats. They offer optional adjustable or lockable temperature control and high flow rates for their class. The valves include 4in1 service fittings that provide isolation, filtration, and cross-flow prevention in a compact unit.
Water Matters - Who, What, Why, When & How of WRAS ApprovalThorne & Derrick UK
The document discusses the WRAS (Water Regulations Advisory Scheme) approval process required in the United Kingdom for manufacturers selling residential water treatment products. It addresses the who, what, when, why and how of obtaining WRAS approval. The who is WRAS, which publishes water regulations. Manufacturers selling in the UK must determine if WRAS approval is required. The what includes materials testing (BS6920) and possible mechanical testing. The when refers to submission deadlines. The why is that WRAS approval is needed for market access in the UK. The how is to contact an approved testing laboratory to start the approval process.
The Airius destratification system installed at Lush Retail Ltd's factory in Poole, Dorset significantly reduced heating costs and improved conditions. Heating costs decreased by over 60% after installation, from £26,638.83 pre-installation to £7,333.38 post-installation. This resulted in a return on investment of the £2,967.50 system cost within 26 days. Temperatures at floor level improved, allowing the heating system to function more efficiently and recirculate process heat for free heating.
This document summarizes guidelines for improving the energy efficiency of heat treatment furnaces to reduce their environmental impact. It discusses evaluating the furnace life cycle from material extraction to waste management. The main environmental issue with furnaces is their high energy consumption. Guidelines are provided for improving furnace design, heat treatment processes, process control, operating processes, and maintenance to increase energy efficiency. Adopting these measures can significantly reduce furnace energy usage and waste.
The document provides an introduction to air barrier systems, which control air leakage and moisture movement within building envelopes. It discusses the types of moisture movement that can occur and potential issues with uncontrolled moisture. It also outlines different product types for preventing moisture infiltration and design options. The document emphasizes that a successful air barrier installation requires addressing transitions, penetrations, substrate preparation, and installation sequencing.
Empteezy - Drum & IBC Storage, Spill Containment & Control - BrochureThorne & Derrick UK
The document provides information on selecting the appropriate absorbents for different applications from Empteezy. It includes a colour-coded selection guide that matches types of liquids to be absorbed with the right absorbent product. The guide includes absorbents for maintenance, oil selective, chemical and environmental applications. It also provides information on Empteezy's contained absorbents that are more effective at cleaning spills than traditional absorbents. Examples are given of absorbent pads, rolls, cushions, socks and booms that can be used for different spill situations. Contact details are provided to discuss specific site needs or arrange a site assessment.
This document provides an installation guide and checklist for mechanical ventilation with heat recovery (MVHR) systems. It contains guidance on best practices for ductwork installation, unit fixing, electrical connection, system balancing and calibration, and customer handover. Installers are advised to complete the checklist for each installation to ensure proper installation and to provide performance data for the SAP assessment procedure. The checklist contains questions on topics like ductwork design, insulation, air tightness, unit mounting, electrical connection, air flow balancing, and customer instructions.
AHS Specialist Services designs, installs, and maintains air handling units (AHUs) and HVAC systems. They offer refurbishment of aging ventilation equipment to extend its lifespan by 15 years through repairs, component replacements, and efficiency upgrades. Their services include surveys to advise on refurbishing or replacing AHUs, installation of new efficient equipment, and maintenance to prevent downtime and increase reliability.
The document outlines a strategic material management system for industrial projects. It discusses establishing principles for warehouse design, storage, and material handling. Key aspects include inspection of incoming materials, proper storage based on technical specifications, preservation methods, and proven issue processes like the LBID cycle to ensure on-time delivery. The overall goals are to efficiently manage material flows, support site operations, and improve quality, safety, and performance through an integrated strategic approach.
Technocracy Pvt. Ltd. offers precise drying test chambers for a wide range of applications such as drying, baking, and sterilizing. The chambers have adjustable digital temperature controllers that maintain optimum drying temperature with high circulating, low temperature air for efficient drying. Customized chambers can provide temperature shock testing by creating dramatic temperature changes to detect flaws in specimens. The chambers are manufactured with double walled insulated construction and programmable controllers.
This document provides an overview of an industrial services company called Team. It offers various specialized industrial services including leak repair, hot tapping, field machining, technical bolting, valve repair, and more. It operates over 115 locations worldwide and serves industries such as chemical, aerospace, automotive, government, steel, power generation, and others. The company was founded in 1973 and went public in 1980, and has over 3,500 trained technicians. It aims to provide quality, safety, and service for its industrial clients.
1. Testo offers precise measurement solutions for various applications in industry including research and development, project planning, production and quality assurance, cleanroom environments, maintenance, and storage and transport.
2. Testo instruments reliably measure parameters such as temperature, humidity, air flow velocity, pressure, and gas concentration to support industrial processes, improve product quality, and ensure system availability.
3. Testo provides portable instruments for on-site use as well as stationary monitoring systems for continuous process control and quality assurance through automated data collection and alerts.
This document is a curriculum vitae for Michael Juan Nortjé. It provides personal information such as his address, contact details, marital status, and languages spoken. It also outlines his educational qualifications and work history in maintenance roles for various companies from 1993 to the present. His roles have included maintenance fitter, coordinator, technician, and team leader. He has experience working with various machines and equipment. The CV highlights his technical skills, problem-solving abilities, and people skills for effectively handling maintenance issues. References are also provided.
Thermon Industrial Hazardous Area Trace Heating - General InformationThorne & Derrick UK
This document provides an overview comparison of three common types of heat tracing systems: thermal fluid, electric, and steam. It discusses the history and evolution of each system type and highlights some of their key merits and limitations. The document emphasizes that no single system is definitively best for every application and that factors like specific process requirements, energy efficiency, installation costs, and maintenance should all be considered when selecting a heat tracing solution.
Zeeshan Quddos is a highly experienced HSE Engineer with over 4 years of experience in various industries. He has expertise in health, safety, and environmental management, compliance, standards, and service delivery. Currently he works as an HSEQ Trainer/Advisor and has conducted trainings and implemented risk assessments for many companies.
The EuroMixer thermostatic mixing valve provides extremely stable mixed water temperatures under varying supply conditions. It has an adjustable or lockable temperature control and high flow rates suitable for 1 to 10 showers or taps. The valve comes with 4-in-1 service fittings that provide isolation, filtration, cross-flow prevention and a gauge port for testing in a compact unit. It is designed for use in group mixing applications like multiple outlet showers or basins.
We are manufacturers of Hot air oven or laboratory oven in India since 1990. Our laboratory oven are widely used
for day to day heating and drying applications performed in various laboratories.
The document discusses various topics related to process plant safety including material handling safety, chemical plant design, piping and instrumentation diagrams, control systems, alarms, equipment and piping design, passive and active protections, emergency shutdown systems, and inherent safety techniques. It provides details on factors to consider for safe material handling, guidelines for chemical plant layout and design, symbols used in P&IDs, designing alarm and control systems, and methods to build safety into chemical plant design.
Refrigeration natural disaster planning and recoveryMatthew Darby
What to think about when developing Business Continuity and Disaster Planning for you business for your commercial refrigeration systems. Includes what to do before a natural disaster, during and after a natural disaster to prepare commercial refrigeration systems to come through.
Mastering the Art of Water Heater Installation A Comprehensive Guide.pdfEco 1 Plumbing LLC
Water heaters are an essential component of any modern household, providing hot water for daily activities. However, water heater Installation is not a task to be taken lightly. This blog post serves as a comprehensive guide to water heater installation, offering insights, tips, and considerations for a successful and efficient installation process.
1. Choosing the Right Water Heater:
Before diving into the installation process, it's crucial to select the appropriate water heater for your needs. Consider factors such as the size of your household, hot water demand, energy efficiency ratings, and fuel type options (electric, gas, or tankless) to ensure optimal performance and cost-effectiveness.
The document discusses good operating practices and safety precautions for maintaining heat exchangers. It describes the tools and equipment needed, which are divided into working tools and safety equipment. Important safety practices include ensuring systems are shut down and isolated, draining heat exchangers before opening, and following confined space procedures. Preventative maintenance and troubleshooting responsibilities are also outlined.
Episode 34 : Project Execution Part (5)
•Large components – used suitable cranes, usually are leased/rent
– electronically controllable by remote control
•Medium/Smaller components
hoists or fork‐lifts are used
are ordered to the building site at an early stage and intermediately stored there.
‐If possible, at the same time, during the assembly of main components, the assembly of medium/smaller components will begin.
‐Subcontractor is required to provide suitable packaging or tarpaulin cover
(cover for vessel opening such as nozzle, by means of plastic caps)
SAJJAD KHUDHUR ABBAS
Ceo , Founder & Head of SHacademy
Chemical Engineering , Al-Muthanna University, Iraq
Oil & Gas Safety and Health Professional – OSHACADEMY
Trainer of Trainers (TOT) - Canadian Center of Human
Development
Episode 22 : PROJECT EXECUTION
•Large components – used suitable cranes, usually are leased/rent
– electronically controllable by remote control
•Medium/Smaller components
hoists or fork‐lifts are used
are ordered to the building site at an early stage and intermediately stored there.
‐If possible, at the same time, during the assembly of main components, the assembly of medium/smaller components will begin.
‐Subcontractor is required to provide suitable packaging or tarpaulin cover
(cover for vessel opening such as nozzle, by means of plastic caps)
SAJJAD KHUDHUR ABBAS
Chemical Engineering , Al-Muthanna University, Iraq
Oil & Gas Safety and Health Professional – OSHACADEMY
Trainer of Trainers (TOT) - Canadian Center of Human
Development
Hot Water Heat Tracing - Maintenance and Troubleshooting GuideThorne & Derrick UK
This document provides an overview of electric heat tracing systems and components, including cables, power connections, controls, insulation, and labels. It discusses testing cables after installation but before insulating, and performing final inspections which establish baseline measurements for ongoing maintenance. Troubleshooting tips are provided for issues like low/no heat, temperatures too high or low, and cold sections. Wet or damaged insulation is a common problem.
This document provides installation and maintenance instructions for self-regulating heater cable. It discusses product selection, receipt and storage of materials, installation procedures including cable attachment and routing, system components, insulation, thermostats, electrical requirements, testing, start-up, operation and maintenance, troubleshooting damaged products. The document contains diagrams to illustrate cable installation details on pipes, valves, elbows, hangers and supports.
This document provides installation and operation instructions for Autotrol Logix 764 control valves and Performa CV series water softening valves. It includes sections on safety, location selection, equipment installation, control and valve features, system specifications, programming options, service/maintenance, troubleshooting, and wiring/assembly diagrams. The document is intended to guide installers on setting up water softening systems using these Autotrol components.
Boiler recommissioning procedure after capital overhaul Manohar Tatwawadi
In a thermal power plant, boiler overhauling is generally done yearly. The presentation highlights the procedure for the re-commissioning of the boiler after capital overhaul.
The document is a bio-data for Nabakishor Sethi, who is applying for the position of Post-Mechanical Maintenance Manager. It outlines his academic and technical qualifications which include an ITI, diploma in mechanical engineering, and B.E. in mechanical engineering. It details his 20 years of work experience, most recently as Utility In-Charge at Al Safi Dairy, the largest dairy farm in the world. It provides a job profile describing his experience maintaining and operating HVAC, boiler, air compressor, and water treatment plant systems and equipment.
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage TanksSunMaxx Solar
This document provides an installation guide for StorMaxx CTEC Series water tanks. It includes requirements for the installation room and tank, descriptions of tank components like insulation, water casing, and electric heating elements. It also provides instructions for connecting a safety relief valve and technical specifications for various tank models.
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...fjsjfkskefmem
This document provides instructions for servicing the air conditioning and heating system and turbocharger on a 973C track loader with a C9 engine. It describes safety precautions when working on the refrigerant system and notes to keep all parts clean. Steps are outlined for removing and installing the turbocharger and exhaust manifold.
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...ujjfjkskekmme
The document provides instructions for servicing components of a 973C track loader powered by a C9 engine, including removing and installing the turbocharger, exhaust manifold, and air inlet heater. Safety precautions are outlined, such as wearing protective equipment when working with refrigerant or hot coolant, and ensuring all fluids are contained. The removal and installation procedures provide illustrations and specify tools needed and torque specifications.
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...ufjjjdjkkskme
The document provides instructions for servicing components of a 973C track loader powered by a C9 engine, including removing and installing the turbocharger, exhaust manifold, and air inlet heater. Safety precautions are outlined, such as keeping parts clean, containing fluids, and wearing protective equipment when working with refrigerant lines or hot coolant. Tools needed and step-by-step instructions are provided for removing, installing, and reassembling each component.
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...fujsefkskekmm
The document provides instructions for servicing components of a 973C track loader powered by a C9 engine, including removing and installing the turbocharger, exhaust manifold, and air inlet heater. Safety precautions are outlined, such as wearing protective equipment when working with refrigerant or hot coolant, and ensuring all fluids are contained. Removal and installation procedures provide step-by-step instructions and require the use of specific tools.
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...fjkskekdmmenm
This document provides instructions for servicing the air conditioning and heating system and turbocharger on a 973C track loader with a C9 engine. It describes safety precautions when working on the refrigerant system and notes to keep all parts clean. Steps are outlined for removing and installing the turbocharger and exhaust manifold.
- The document provides instructions for removing and installing a turbocharger and exhaust manifold on a Caterpillar 973C track loader.
- To remove the turbocharger, disconnect the hose, remove bolts and tubes, and lift the turbocharger off using lifting equipment.
- To install the turbocharger, apply anti-seize compound, lift the turbocharger into place using lifting equipment, and install and tighten the nuts.
- To remove the exhaust manifold, remove nuts and spacers from studs and remove the manifold and gaskets. To install, check studs, install new gaskets with tabs up, and assemble and position the manifold on the cylinder head.
This document provides instructions for servicing components of a Caterpillar 973C track loader powered by a C9 engine, including:
- Removing and installing the turbocharger, involving disconnecting hoses, removing nuts and bolts, and lifting the turbocharger.
- Removing and installing the exhaust manifold, which requires removing nuts and washers, disassembling the manifold, installing gaskets, and tightening nuts.
- Removing and installing the air inlet heater by disconnecting electrical connections, removing bolts, cleaning and applying primer and sealant to the heater.
This document provides instructions for servicing components of a Caterpillar 973C track loader powered by a C9 engine, including:
- Removing and installing the turbocharger, involving disconnecting hoses, removing nuts and bolts, and lifting the turbocharger.
- Removing and installing the exhaust manifold, which requires removing nuts and washers, disassembling the manifold, installing gaskets, and tightening nuts.
- Removing and installing the air inlet heater by disconnecting electrical connections, removing bolts, cleaning and applying primer and sealant to the heater.
Similar to BriskHeat Freeze Protection Planning Guide (20)
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTjpsjournal1
The rivalry between prominent international actors for dominance over Central Asia's hydrocarbon
reserves and the ancient silk trade route, along with China's diplomatic endeavours in the area, has been
referred to as the "New Great Game." This research centres on the power struggle, considering
geopolitical, geostrategic, and geoeconomic variables. Topics including trade, political hegemony, oil
politics, and conventional and nontraditional security are all explored and explained by the researcher.
Using Mackinder's Heartland, Spykman Rimland, and Hegemonic Stability theories, examines China's role
in Central Asia. This study adheres to the empirical epistemological method and has taken care of
objectivity. This study analyze primary and secondary research documents critically to elaborate role of
china’s geo economic outreach in central Asian countries and its future prospect. China is thriving in trade,
pipeline politics, and winning states, according to this study, thanks to important instruments like the
Shanghai Cooperation Organisation and the Belt and Road Economic Initiative. According to this study,
China is seeing significant success in commerce, pipeline politics, and gaining influence on other
governments. This success may be attributed to the effective utilisation of key tools such as the Shanghai
Cooperation Organisation and the Belt and Road Economic Initiative.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
A review on techniques and modelling methodologies used for checking electrom...nooriasukmaningtyas
The proper function of the integrated circuit (IC) in an inhibiting electromagnetic environment has always been a serious concern throughout the decades of revolution in the world of electronics, from disjunct devices to today’s integrated circuit technology, where billions of transistors are combined on a single chip. The automotive industry and smart vehicles in particular, are confronting design issues such as being prone to electromagnetic interference (EMI). Electronic control devices calculate incorrect outputs because of EMI and sensors give misleading values which can prove fatal in case of automotives. In this paper, the authors have non exhaustively tried to review research work concerned with the investigation of EMI in ICs and prediction of this EMI using various modelling methodologies and measurement setups.
ACEP Magazine edition 4th launched on 05.06.2024Rahul
This document provides information about the third edition of the magazine "Sthapatya" published by the Association of Civil Engineers (Practicing) Aurangabad. It includes messages from current and past presidents of ACEP, memories and photos from past ACEP events, information on life time achievement awards given by ACEP, and a technical article on concrete maintenance, repairs and strengthening. The document highlights activities of ACEP and provides a technical educational article for members.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
Introduction- e - waste – definition - sources of e-waste– hazardous substances in e-waste - effects of e-waste on environment and human health- need for e-waste management– e-waste handling rules - waste minimization techniques for managing e-waste – recycling of e-waste - disposal treatment methods of e- waste – mechanism of extraction of precious metal from leaching solution-global Scenario of E-waste – E-waste in India- case studies.
1. Freeze Protection Planning Guide
and Inventory Checklist
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
2. Introduction
Anticipating freezing conditions and protecting buildings, equipment, and grounds against freeze
damage is a vital part of a Facility Maintenance Program. A good freeze protection plan includes
steps for inspection, preventative maintenance, and corrective maintenance prior to the beginning of
cold weather conditions. This guide is designed to make the planning process easier for you.
Contact M.S. Jacobs at 800-348-0089 or visit www.msjacobs.com for all your Briskheat freeze
protection products.
Table of Contents
Introduction................................................................................................................................................................2
Section A: General Freeze Protection Preparation Steps..........................................................................................3
Section B: Testing and Periodic Inspection Record for Heating Cable ......................................................................6
Periodic Heating Cable Inspection Record .............................................................................................................6
Heating Cable Insulation Resistance Test...............................................................................................................7
Section C: Inventory Checklist for Pipe Lines and Valves That Need Heat................................................................8
Section D: Inventory Checklist for Containers Stored in Unheated Areas or Susceptible to Freezing......................9
Drums / Pails...........................................................................................................................................................9
Intermediate Bulk Containers (IBC) / Tote Tanks................................................................................................ 10
Gas Cylinders ....................................................................................................................................................... 10
Section E: Inventory Checklist for Large Permanent Tanks, Vessels, and Hoppers in Unheated Areas or
Susceptible to Freezing............................................................................................................................................ 11
Section F: Inventory Checklist for Roof and Gutter Deicing................................................................................... 12
Roofs that Need Heat..............................................................................................Error! Bookmark not defined.
Downspouts that Need Heat...................................................................................Error! Bookmark not defined.
Section G: Inventory Checklist for Personal Safety / Slip Prevention..................................................................... 13
Walkways Susceptible to Icy Conditions ............................................................................................................. 13
Stairs Susceptible to Icy Conditions..................................................................................................................... 14
Section H: Inventory Checklist for Damaged Heaters That Need to Be Replaced.................................................. 15
Section I: Inventory Checklist for Temporary De-icing Heaters ............................................................................. 16
HSTAT Heating Tapes with Adjustable Thermostat Control Order Sheet........................................................... 16
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
3. Section A: General Freeze Protection Preparation Steps
These are general freeze protection planning steps we found useful through research and personal maintenance
experience. These steps are not all-inclusive and we recommend that you consult a trained professional and
review your corporate policies and local /national codes prior to implementing your plan.
Item Assigned to
Date
Complete
Sign-off
□ Clean, service, and functionally test all heating systems.
□ Roof and gutter: Inspect, remove debris, and
patch/repair (if needed): roof drains, scuppers, canals,
gutters, down spouts before first frost. Inspect and
functionally test installed roof and gutter heat trace
system.
□ Identify and test main water supply cutoffs for each
facility. Ensure these areas are readily available to
emergency personnel responding to a freeze/thaw
incident.
□ Inspect wet-pipe sprinkler systems for areas susceptible
to freezing. Apply heat in susceptible areas.
□ Identify materials that are susceptible to freeze damage
in outside storage pads and unheated storage areas.
Develop plan to ensure these materials can be easily
heated and thawed to maintain production.
Tip: Think about materials that might be delivered
during the cold season in unheated vehicles. BriskHeat
offers plug-and-play portable heaters that easily wrap
around and heat drums, pails, and tanks to thaw frozen
or slow flowing materials.
□ Check and place antifreeze used in cooling systems as
necessary.
□ Protect heating system power and temperature controls
against inadvertent deactivation.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
4. Item Assigned to
Date
Complete
Sign-off
□ Drain and remove water from all seasonal cooling
systems (unless protected by heating tapes or
antifreeze).
□ Inspect, test, and stage portable auxiliary heaters.
□ Inspect conditions of all surface heaters such as heating
tapes, heating cable, drum heaters, IBC heaters, tank
heaters, and pipe heaters. Verify operation and
temperature settings and test ground-fault equipment
protection.
Tip: Look for damaged insulation on all exposed portions
of the power cord. If possible, check both ends of the
cord for loose connections. An exposed conductor may
come in contact with personnel during maintenance
activities resulting in sparks or injury.
□ Inspect, test, and repair heat trace heating cable located
on cooling tower supply and return lines.
□ Inspect and identify remaining water and air lines
susceptible to freezing. Install appropriate heat and
insulation.
Tip: Pay special attention to valves. This is a major
choke point and susceptible to damage. BriskHeat offers
a safe and effective flexible heating tape (HSTAT series)
that can be used as preventative maintenance or used to
thaw out a valve quickly. See section I for more
information.
□ For steam systems: Blow down drip legs, clean
strainers, test temperature sensing devices for
actuation of control valves and dampers, check steam
traps, control actuators/valves, face and bypass
dampers, linkages, and temperature controllers. Ensure
that a vacuum breaker is installed and in working order
on all preheat and heating coils which may be exposed
to freezing conditions.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
5. Item Assigned to
Date
Complete
Sign-off
□ For ventilation systems: Test and calibrate all
temperature sensing devices, and check operation of
valves, dampers, linkages, control actuators, and
temperature controllers.
□ Identify areas where personal safety is at risk due to icy
conditions. Develop a slip prevention maintenance
plan. See section G for ideas.
□ Identify control panels and electronic devices
susceptible to condensation. Install enclosure heaters
to prevent short-outs and corrosion.
□ Institute a facility-wide awareness plan to identify and
report any suspected problems with heating or other
cold weather protection equipment during the cold
season.
□ Have plan in place to remove temporary cold weather
protection items after the cold weather season.
Special Consideration: Hazardous Materials
• Ensure that all containers used for hazardous or toxic materials are properly stored, and inspect them
for deterioration prior to handling. If containers become brittle (due to the combination of chemical
attack, freezing temperatures, and ultraviolet light) they may break when moved.
• Liquids should not be permitted to remain in unheated process lines during periods when production
has been stopped. All lines should be drained and purged to prevent future line breakage due to
freezing temperatures.
• Ensure that piping, tanks, and valves in systems that carry hazardous or toxic substances are properly
insulated and/ or heated. Install heaters such as heating blankets, insulators, heating tapes, heating
jackets, and heating cable as appropriate.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
6. Section B: Testing and Periodic Inspection Record for Heating Cable
Periodic Heating Cable Inspection Record
Instructions:
1) One sheet per circuit. – This inspection form allows for up to five inspections to be compared for an individual
circuit.
2) Maintenance Check Frequency:
Freeze Protection Circuits: Prior to the first freeze
Temperature Maintenance Circuits: At least twice per year
Maintenance Check Date (Month/Year)
(mm/yy) (mm/yy) (mm/yy) (mm/yy) (mm/yy)
Visual inspection inside connection box
corrosion, moisture, etc.
Initial
Damage or cracks (leaks) in insulation
seals at valves, hangers, pumps, etc.
Initial
Heating cable properly connected and grounded.
Heating cable and connections insulated from
connection box.
Initial
Thermostat checked for moisture, corrosion,
set point, switch operation, and sensor damage.
Set Point
Initial
Megger tests performed at power connection
with both bus wires disconnected from power
wiring.
Reading
Initial
Circuit voltage at power connection. Reading
Circuit amperage after 5 minutes. Reading
Pipe temperature at time amps were measured. Reading
Watts/Ft.
Volts x Amps = w/ft.
feet
Watts/Ft.
Initial
All connections, boxes, and thermostats
have been resealed.
Initial
End seals, covered splices and tees marked on
insulation cladding.
Initial
Remarks & Comments
Circuit Number
Heater Type
Circuit Length
PeriodicInspectionRecordForm
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
7. Heating Cable Insulation Resistance Test
The insulation resistance test is used to check for damage to extruded jackets. Connections for the megger are
made as shown in Figures 1 & 2.
Figure 1
Note: Test should use at least a 500 VDC megger. Do not use a megger with an excess of 2500 VDC. Minimum acceptable
readings should be 20 megohms per circuit, regardless of length.
500 VDC MEGGER
Figure 2
A record should be kept of the readings taken from the time the cable is first installed on the pipe. A history of
the insulation resistance reading can be helpful in spotting moisture ingress into the electrical system by seeing
a gradual decline in the insulation resistance or physical damage to the heating cable (sharp decline in the
insulation resistance). See the previous page for a sample record.
FOR HEATING CABLES WITH
BRAID
Test from heating cable bus to braid
FOR HEATING CABLES WITH BRAID AND OUTER JACKET
Test A - (solid lines) from heating cable bus wires to braid.
Test B - (dotted lines) from braid to metal pipe.
500 VDC MEGGER
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
8. Section C: Inventory Checklist for Pipe Lines and Valves That Need Heat
Use this checklist to identify the pipe lines that need heat. Your local distributor or BriskHeat will help you
determine the proper type and amount of heating cable, insulation, and accessories necessary for your
application.
Pipe / Valve
Location
Where Heat is
Needed
Length of
Pipe / Size of
Valve Where
Heat is
Needed
O.D. of Pipe
/ Valve
Temperature
Required
Available
Voltage
Supply and
Circuit
Breaker Size
Hazardous
Location?
(Y/N)
If Yes,
Classification?
Insulation is
Needed?
(Y/N)
Insulation
Thickness?
Example of a Heating Cable Installation
Power Connection Kit - PLT-BC or LT-BC use with
cable power seal kit - LT-MP, LT-SP or LT-HSP.
End Seal – SLTE-2, LT-SE or LT-E
In-line splice under insulation (shown) -
LT-SS or LT-HSS. Above insulation -
Heater cable loopPLT-BS or LT-BS.
Tee splice under insulation (shown) - LT-ST or LT-HST
Above insulation - PLT-BY or LT-BY.
Pipe Clamps
Heater Cable
Fiberglass Tape Insulation
SLCBL: Self-Regulating Heating Cable SpeedTrace: Self-Regulating Heating Cable
Pre-Assembled with 30” Cord and Plug.
InsulLock®DS: Closed Cell Elastomeric
Thermal Insulation
Power Connection Kit
End Seal
In-line splice under insulation
Tee splice under insulation
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
9. Section D: Inventory Checklist for Containers Stored in Unheated Areas or Susceptible
to Freezing
Containers such as drums, pails, tote tank / IBCs, and gas cylinders contain materials that either freeze or need a
specific flow rate to maximize production. Utilizing a portable plug-and-play electrical surface heater on the
container prior to and during production is a cost-effective and simple way to thaw and improve the flow rate of
the material within the container.
Drums / Pails
Container Size
(Make a special note if the container will be
in a hazardous environment)
Qty of
Containers that
Need Heat
Container Outer
Material
(metal, plastic, etc.)
Available Voltage
Supply for Heater
(120V or 240V)
55 gallon (208 litre) drums / barrels
30 gallon (114 litre) drums / barrels
15 & 16 gallon (57 & 60 litre) pails
5 gallon (19 litre) pails
Tip: For faster heat-up, use multiple silicone rubber band heaters at one time or a full-coverage insulated drum heater.
Recommended Solutions:
• For Drums and Pails:
o DHCS series: Heavy-Duty Silicone Rubber Band Heater - Great all-purpose choice:
economical, moisture & chemical resistant and long lasting. Includes built-in
adjustable thermostat control. 120V model includes standard 3-prong (NEMA 5-
15) grounded plug.
o FGDH series: Full-Coverage Insulated Drum Heater - Fully insulated and more
wattage for faster and more energy-efficient heat-ups. Includes built-in digital
temperature controller. 120V model includes standard 3-prong (NEMA 5-15)
grounded plug.
DHCS: Heavy-Duty
Silicone Rubber Drum Heater
TOTE: Wrap-Around Tote Tank /
IBC Heater
GCW: Gas Cylinder Warmer FGDH: Full-Coverage
Insulated Drum Heater
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
10. Intermediate Bulk Containers (IBC) / Tote Tanks
Tank
Height
(Not including pallet
or support stand)
Tank
Length
Tank
Width
Qty
of Tanks that
Need Heat
Tank Outer
Material
(metal, plastic, caged,
etc.)
Available
Voltage Supply
for Heater
(120V or 240V)
Recommended Solution:
• For Tote Tanks / IBCs:
o TOTE series – Adjustable Wrap-Around Tote Tank / IBC Heater – Fully
insulated blanket heater wraps around tote tank / IBC without
contaminating or scorching your product. Adjustable straps allow it to fit
multiple container widths. Includes dual adjustable thermostat control:
50 to 160°F (10 to 71°C).
240V is recommended for fastest heat-up. It offers double the wattage (2880 watts)
compared to 120V version (1440 watts).
Do not forget the insulated top. It minimizes heat loss and improves heater efficiency.
Gas Cylinders
Cylinder
Diameter
Cylinder
Height
Qty of
Cylinders that
Need Heat
Hazardous Location?
(Y/N)
If Yes, Classification?
Available Voltage
Supply for Heater
(120V or 240V)
Recommended Solutions:
• For Gas Cylinder Warmers
o If Ordinary Location: GCW series- Ordinary Location Gas Cylinder Warmer –
2” (50mm) thick insulation and self-regulating heating element. No extra
temperature control necessary. 120V model includes standard 3-prong
(NEMA 5-15) grounded plug.
o If Hazardous-Area Location: HCW series- Hazardous-Area Gas Cylinder
Warmer – Same as above except it is suitable for Class I Division 1 Groups
B, C, and D. No plug is included.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
11. Section E: Inventory Checklist for Large Permanent Tanks, Vessels, and Hoppers in
Unheated Areas or Susceptible to Freezing
Use this checklist to identify the tanks, vessels, and hoppers that are susceptible to freezing. Your local
distributor or BriskHeat will help recommend exactly how much heat you need to prevent freezing or improve
flow as well as which style of heater, insulation, and temperature control is right for you.
Vessel Location
(Make a special note if
it is in a Hazardous
Location)
Vessel Type
(Cylindrical Tank,
Rectangular Tank,
Hopper, etc.)
Vessel Size
Vessel
Outer
Material
(metal, plastic,
etc.)
Content
Stored in
Vessel
Process
Temperature
Available
Voltage
Supply and
Circuit
Breaker Size
NEW! SRL-ADJ Series: Silicone Rubber Heating Blankets with Control.
True plug-and-play silicone rubber heating blanket with Built-in Adjustable
Thermostat Control. Many sizes to choose from. See BriskHeat product
catalog or visit www.briskheat.com for additional information.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
12. Section F: Inventory Checklist for Roof and Gutter Deicing
When gutters and downspouts freeze, major damage can occur to your building’s roof and façade. We
recommend roof and gutter self-regulating heating cable as the solution.
BriskHeat's SpeedTrace Roof & Gutter De-Icing Kits are designed to prevent the formation of ice Dams on
rooftops by using an electric self-regulating heating cable system. The heating cable melts away excessive ice
and snow from the roof, gutters, and downspouts to ensure proper draining.
Kits include: SpeedTrace Roof & Gutter Heating Cable (pre-assembled with 30” cord and plug), Heavy Duty Roof
Clips, Downspout Hanger Brackets, UV Resistant Cable Ties.
Measuring Heating Cable Length for Roof & Gutter De-Icing
Use the equation below to calculate heating cable length:
Cable Required for Roof = (R x M) + G + D
(R) Roof Edge Length (linear length of roof to protect)
(M) Multiplier from table below
(G) Gutter Length
(D) Downspout Length (x2 if heating cable returns back to gutter)
Roof
Overhang
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
13. Section G: Inventory Checklist for Personal Safety / Slip Prevention
Looking for a safer, cleaner, and better alternative to calcium chloride? Snow Melting Mats continuously melt
snow and ice, helping keep surfaces constantly clear and safe. They are portable and easy-to-install. These
durable rubber heating mats lie on top of existing surfaces. Simply plug them into any standard 120V or 240V
outlet. A GFCI is included.
Ideal for entranceways, stairs, loading docks, handicap ramps, rooftops, and freezer floors.
Walkways Susceptible to Icy Conditions
Walkway Location Walkway Length Walkway Width
Available Voltage
Supply for Heater
(120V or 240V)
Qty of Snow
Melting Mats
Needed
HTM: HeatTrak® Snow Melting Walkway Mats
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
14. Stairs Susceptible to Icy Conditions
Stair Location Stair Width Stair Length
# of Stairs in
Location
Available Voltage
Supply for Heater
(120V or 240V)
Ordered as a set: Indicate number of stairs per set at time of order. A set of stair mats is connected with 18” (45cm) long connector
cables.
HRT: HeatTrak® Snow Melting Stair Mats:
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
15. Section H: Inventory Checklist for Damaged Heaters That Need to Be Replaced
Use this checklist to identify any heaters that need to be replaced due to damage.
HeaterLocationHeaterTypeIssue
QtyofHeaters
thatNeedto
beReplaced
Heater
Size
Heater
Voltage
Heater
Wattage
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
16. Section I: Inventory Checklist for Temporary De-icing Heaters
It is always a good idea to have a few flexible multi-purpose heaters on hand in the event of emergency de-icing.
HSTAT flexible heating tapes with built-in adjustable temperature controls are ideal to prevent freezing or thaw
out frozen valves, pipes, and many other objects. Unlike dangerous blow torches, these heaters are safe, make
direct contact with the object to be heated, are moisture and chemical resistant, and can be run unsupervised.
Do not be left without a few of these lifesavers in the toolbox when freezing occurs.
HSTAT Heating Tapes with Adjustable Thermostat Control Order Sheet
Heating Tape
Width
Heating Tape
Length
Wattage
Part Number
(120V)
Part Number
(240V)
Qty of
Heaters Needed
1” (25mm) 2ft (0.6m) 144 HSTAT101002 HSTAT102002
1” (25mm) 4ft (1.2m) 288 HSTAT101004 HSTAT102004
1” (25mm) 6ft (1.8m) 432 HSTAT101006 HSTAT102006
1” (25mm) 8ft (2.4m) 576 HSTAT101008 HSTAT102008
1” (25mm) 10ft (3.1m) 720 HSTAT101010 HSTAT102010
Other widths and lengths are available upon request.
Tips:
• Circle Part Number to indicate voltage preference
• Have at least one of each size on hand so that you have the right size when you need it. Shorter lengths
are typically used for valves, bearings, pumps, and actuators. Longer lengths are typically used for pipe
runs.
• When estimating heating tape lengths, keep in mind that the heating tape cannot be overlapped upon
itself. That will cause damage to the heater.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com