RESUME
Personal Information
Name San Aung Gender Male
Date of Birth July/09/1970 Present Locus No.595/49, North Dagon Tsp. Yangon
Years of Work 18 years Email usaw2k@gmail.com
Education AGTI (EC) Major Electronics and Communication
Work Experience
 2013-2015 : Installation Subcontract from Elite Tech Manufacturing Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Team Leader
Training *Huawei Subcontract training at Elite Tech Manufacturing Co., Ltd.
Telenor EHS (Environment Health and Safety) ISO14001 EMS and OHSMS 18001.
HuaweiTransmission (ATN 910I)
HuaweiWireless (DBS 3900) for Node B.
Responsibilities General control all engineering activities, such as safety, equipment layout, equipment
installation, customer requirement photos, reporting and other information to improve
network with customer approval of equipment layout and installation.
Managing and supervision for the installation of
Huawei’s DWDM (OSN 8800) equipment.
ZTE BBU and RRU were swapped with HuaweiDBS 3900 equipment.
HuaweiATN (910) transmission.
Installation, commissioning and operation of generator and ATS.
Achievements Improve negotiation skill between customer, subcontractor and installation team.
Good coordination of work, cost and quality to finish within project target time.
Finished DWDM ( OSN 8800 ) 2 sites at Oak Twin and Taung Oo.
Finished swap 10 sites and dismantle 18 sites for the MPT swap project at Naypyitaw.
Finished swap 10 sites and 10 sites dismantle for the MPT swap project at Yangon.
Finished 7 sites for the installation, commissioning and operation of generator and ATS
(power plant) for the MPT expansion project at Naypyitaw.
 1.2.2014-1.8.2014 : Merry Mesh Network Integration Co.,Ltd.
Industry IP PAand IT
Country/City Myanmar/Yangon
Position Project Manager
Training Self-study on-line training for IP Network Audio System with iTC China brand.
Responsibilities Project management for Wi-Fi network in Yangon University.
Planning and negotiation with customer to get good quality and their required internet
access and services.
Planed suitable resources and provide to the customer implementation requirement.
Supervision and control of Sub-contractors, our engineer team and labours to comply
with the relevant conditions of the project requirement.
Project management of installation, configuration and operation of windows server
2008,TMG and Unifi controller software on the Dell R320 and installation of 24 ports switch
to get internet access via cable and Wi-Fi link in the whole Yangon University Campus.
2
Supervised and installed fiber installation at Yangon University Campus.
Installed and configured Unifi AP (Access Point) to get mobile Internet access by using
Wi-Fi link.
Supervision and cooperation of IPPAproject for the national guest house at Nay Pyi
Taw. Installed IPPA(IP Public Address) software,equipment and fiber at National guest
house in Nay Pyi Taw and project management in term of scope, time, quality and risk.
Achievements Project management, development, implementation and operation of IPPAand IT network.
Get good knowledge and experience of IPPAsystem and IT network.
Fiber installation experience.
Finished 52 Unifi AP Wi-Fi points and fiber installation atYangon University Campus.
Finished Wi-Fi network using with Windows server 2008 and TMG on Dell R320 server,
data switch and media converter.
Finished 2 Nos.of IP NetworkAudio Systems with 32 terminal points and fiber installation at
National guest house in Nay Pyi Taw.
 2000 - 3.6.2013 : Integrator Services Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Chief Engineer
Training *The Training course of Optical fiber transmission, RAD Megaplex MP-2200 and Alcatel
Omni PCX-4400 EPABX.
01 Nov - 12 Nov 2010
12 days SDH (Synchronous Digital Hierarchy) transmission theories and ECI fiber
transmission equipment’s advance training in Singapore for MOD, MPT,MEC,MRTV and
MWD fiber transmission network.
26 Feb - 28 Feb 2003
3 days RAD Megaplex MP-2200 data training in Singapore for MOD ISDN network.
17 Feb - 25 Feb 2003
9 days PDH,SDH basic transmission theories and ECI equipment installation and
operation training in Singapore for MOD fiber network.
20 Sept - 23 Sept 2002
Alcatel Omni PCX4400 PABXlocal training at CSW (Central Signal Workshop) in the
whole Myanmar country for MOD network.
10 Jun - 22 Jun 2001
Visited to Communic Asia 2001 at Singapore Expo and Eci equipment inspection.
05 Jun - 09 Jun 2001
5 days discussion of vest spectrum Microwave equipment in Malaysia.
12 days DWDM,IP, MPLS training at company office.
Responsibilities Project management of engineering activities such as equipment layout plan, overall
in-charge of power plants, assistanced and performed PDH, SDH fiber transmission network
planning, design, installation, commissioning and testing.
Made PAT (Provisional Acceptance Test).Made commissioning and testing of ECI fiber
transmission equipment, generator and ATS, EPABXequipment before sent those to the site.
Upgrade from STM-16 to STM-64 transmission of phase (4) project for MOD (military
of defense) fiber backbone network. Installation, commissioning, Operation and Maintenance
of ECI fiber transmission and power plants ( Gen sets,ATS and Rectifiers ) and ECI Syncom,
BroadGate, and XDM equipment for MOD, MPT,MRTV, MWD, and Special development
project Naypyitaw and MEC optical fiber network in the whole Myanmar country. Made site
3
planning, Installation progress, PAT and FAT for all equipment in MOD fiber project.
Project management of accommodation, food and beverage and equipment installation
of new MRTV TV and Radio, studio complex and transmitter Broadcasting Project in
Tatkone.
Installation, operation and maintenance of firewall and 3 Nos. of Cisco routers atYGN,
KSE and NPT for MWD On-Line Banking and UMEHLdata network.
Installation, commissioning, operation and maintenance of RAD Megaplex MP-2200,
2100 and Alcate Omini PCX-4400 EPABX100 lines, 200 lines and 1000 lines for MOD
voice and data network in the whole Myanmar country.
Give presentation and training of PDH and SDH fiber transmission theories and ECI
equipments installation, Alcatel Omni PCX4400 EPABXto our engineers and our customers
at Pyin Oo Lwin training school.
Achievements Get good experience of team leadership, management and cooperation.
Services and Hardware Delivery experience of fiber transmission and EPABX.
Good trainer experience of PDH,SDH and EPABXpresentation and training.
Finished MPT, MOD,MRTV, MWD and MEC transmission project with the installation over
250 Nos. of fiber transmission equipments and over 250 Nos. of generator & ATS.
Finished MOD project with the installation over 35 Nos. of EPABXequipment.
Finished MWD on-line banking project with 3 Nos. of Cisco (2800) routers and switches.
Finished new MRTV TV and radio studio complex at Tatkone for MTRV broadcasting.
 1998-2000 : Sky-Link Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Executive Engineer
Training *The Training course of GSM.
18 Dec -21 Dec 2000
4 days SIEMENS MN1707-7 BSS Delta Training BR4.0-5.0 at Sedona Hotel in
Myanmar for MPT’s GSM project.
I attended Information and Communication Networks Training Institute at Munich in
Germany for Yangon GSM project as the following SIEMENS GSM Training Courses.
11 Oct - 29 Oct 1999
19 days MN2582-5 SBS (Siemens Base Station) Network Element Management
OBR/BR4.0.
02 Nov - 10 Nov 1999
9 days MN1790 BSS (Base Station Subsystem) Radio Network Planning
11 Nov - 18 Nov 1999
8 days MN1736-5 SBS Performance Measurement
MN1789-5 SBS Radio Network Parameters
Responsibilities Supervised for the installation of shelters, towers, antennas and feeders in the first MPT
GSM project in Yangon and Mandalay.
Made site planning, radio network planning and design.
Installation, commissioning and operation of BTS, BSC and TRAU.
Some micro wave installation.
Installation, commissioning, testing and operation of rectifiers and BTS.
Installation progress report, drive test and made PAT and FAT for rectifier, BTS, BSC
and TRAU in Yangon MPT GSM project.
4
Achievements Experience of GSM Network especially power and radio.
On the job and oversea training with GSM network.
Finished MPT GSM project in Yangon with 18 BTS, 1 BSC, 4 TRAU and Rectifiers.
 12.7.1996-1998 : Comm Tech Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Engineer
Training On the job training of cabling and installation of RCS at company office.
Responsibilities Installation of Rectifier, antenna and feeder forAuto Radio Telephone System (ARTS)
project of MPT.
Production of 24 VDC auto voltage regulator power supply unit for ARTS phone and 24
VDC charger.
Installation of RCS for MPTARTS project.
Repaired and serviced for ARTS radio telephone and power supply.
Achievements Installation of rectifier, antenna and feeder forARTS system.
Experience of Radio for the ARTS system.
Can repair the ARTS radio Equipment and production of 24 VDC Power supply for ARTS
phone and 24 VDC charger.
Voluntary Experience
 27.7.2014-10.2.2015 : SawKhonYit Roadworks at (49) ward, North Dagon Tsp.
Industry Civil service
Country/City Myanmar/Yangon
Position Secretary (1)
Responsibilities Saw Khon Yit road’s roadworks
To finish roadworks before raining season. To established roadwork’s committee at ward.
Collection of fund for roadworks at ward. Managing and control of funds.
Requested and informed to Administration, and Civil servant of government to permit
roadworks of Saw Khon Yit road.
Achievements Saw Khon Yit road’s roadworks was finished.
Improvements of negotiation, dealing, other organization and volunteer skill.
Education
 1993-2005 :Yangon University ofDistant Education
Major Zoology
Degree BSC ( Zoology )
 1993-1995 : Mandalay Government Technical Institute
Major Electronics and communication
Degree AGTI ( EC )
Language
Myanmar Excellent written and oral skills
English Good written and oral skills

More Related Content

What's hot (20)

JGANESH-update
JGANESH-updateJGANESH-update
JGANESH-update
 
CV LUTFI DESTIAN
CV LUTFI DESTIANCV LUTFI DESTIAN
CV LUTFI DESTIAN
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Rassell Domnic Go - updated
Rassell Domnic Go - updatedRassell Domnic Go - updated
Rassell Domnic Go - updated
 
CV_ Sudhir
CV_ Sudhir CV_ Sudhir
CV_ Sudhir
 
Contact address
Contact addressContact address
Contact address
 
Rajbir Resume
Rajbir ResumeRajbir Resume
Rajbir Resume
 
KUNAL CV jan
KUNAL CV janKUNAL CV jan
KUNAL CV jan
 
Jhon CV
Jhon CVJhon CV
Jhon CV
 
AMIT _RESUME
AMIT _RESUMEAMIT _RESUME
AMIT _RESUME
 
deepak ResumePDF
deepak ResumePDFdeepak ResumePDF
deepak ResumePDF
 
AHMAD HUSSAIN CV
AHMAD HUSSAIN CVAHMAD HUSSAIN CV
AHMAD HUSSAIN CV
 
COnvergent Study of the Deployment of LTE technology based on the infrastruct...
COnvergent Study of the Deployment of LTE technology based on the infrastruct...COnvergent Study of the Deployment of LTE technology based on the infrastruct...
COnvergent Study of the Deployment of LTE technology based on the infrastruct...
 
List_of_Completed_Projects
List_of_Completed_ProjectsList_of_Completed_Projects
List_of_Completed_Projects
 
Resume kasi
Resume kasiResume kasi
Resume kasi
 
dipesh_resume
dipesh_resumedipesh_resume
dipesh_resume
 
Irfan Telecom new
Irfan Telecom newIrfan Telecom new
Irfan Telecom new
 
Zaid Musleh CV
Zaid Musleh CVZaid Musleh CV
Zaid Musleh CV
 
Linked In CV
Linked In CVLinked In CV
Linked In CV
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 

Similar to my Resume (20)

Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
 
resume
resumeresume
resume
 
sabry C.V UD-3
sabry C.V UD-3sabry C.V UD-3
sabry C.V UD-3
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
vimal resume
vimal resumevimal resume
vimal resume
 
resume Sheraz
resume Sherazresume Sheraz
resume Sheraz
 
Aung Paing Phyo CV
Aung Paing Phyo CVAung Paing Phyo CV
Aung Paing Phyo CV
 
Curriculum vitae_Anas Ijaz
Curriculum vitae_Anas IjazCurriculum vitae_Anas Ijaz
Curriculum vitae_Anas Ijaz
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
m.zaheer ali (1)
m.zaheer ali (1)m.zaheer ali (1)
m.zaheer ali (1)
 
Asif-Res-2015
Asif-Res-2015Asif-Res-2015
Asif-Res-2015
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
RADIOCOMUNICATION ENGINEER ENGLISH_2
RADIOCOMUNICATION ENGINEER  ENGLISH_2RADIOCOMUNICATION ENGINEER  ENGLISH_2
RADIOCOMUNICATION ENGINEER ENGLISH_2
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
Resume
ResumeResume
Resume
 
Muhammad Faisal
Muhammad Faisal Muhammad Faisal
Muhammad Faisal
 

my Resume

  • 1. 1 RESUME Personal Information Name San Aung Gender Male Date of Birth July/09/1970 Present Locus No.595/49, North Dagon Tsp. Yangon Years of Work 18 years Email usaw2k@gmail.com Education AGTI (EC) Major Electronics and Communication Work Experience  2013-2015 : Installation Subcontract from Elite Tech Manufacturing Co., Ltd. Industry Telecommunications Country/City Myanmar/Yangon Position Team Leader Training *Huawei Subcontract training at Elite Tech Manufacturing Co., Ltd. Telenor EHS (Environment Health and Safety) ISO14001 EMS and OHSMS 18001. HuaweiTransmission (ATN 910I) HuaweiWireless (DBS 3900) for Node B. Responsibilities General control all engineering activities, such as safety, equipment layout, equipment installation, customer requirement photos, reporting and other information to improve network with customer approval of equipment layout and installation. Managing and supervision for the installation of Huawei’s DWDM (OSN 8800) equipment. ZTE BBU and RRU were swapped with HuaweiDBS 3900 equipment. HuaweiATN (910) transmission. Installation, commissioning and operation of generator and ATS. Achievements Improve negotiation skill between customer, subcontractor and installation team. Good coordination of work, cost and quality to finish within project target time. Finished DWDM ( OSN 8800 ) 2 sites at Oak Twin and Taung Oo. Finished swap 10 sites and dismantle 18 sites for the MPT swap project at Naypyitaw. Finished swap 10 sites and 10 sites dismantle for the MPT swap project at Yangon. Finished 7 sites for the installation, commissioning and operation of generator and ATS (power plant) for the MPT expansion project at Naypyitaw.  1.2.2014-1.8.2014 : Merry Mesh Network Integration Co.,Ltd. Industry IP PAand IT Country/City Myanmar/Yangon Position Project Manager Training Self-study on-line training for IP Network Audio System with iTC China brand. Responsibilities Project management for Wi-Fi network in Yangon University. Planning and negotiation with customer to get good quality and their required internet access and services. Planed suitable resources and provide to the customer implementation requirement. Supervision and control of Sub-contractors, our engineer team and labours to comply with the relevant conditions of the project requirement. Project management of installation, configuration and operation of windows server 2008,TMG and Unifi controller software on the Dell R320 and installation of 24 ports switch to get internet access via cable and Wi-Fi link in the whole Yangon University Campus.
  • 2. 2 Supervised and installed fiber installation at Yangon University Campus. Installed and configured Unifi AP (Access Point) to get mobile Internet access by using Wi-Fi link. Supervision and cooperation of IPPAproject for the national guest house at Nay Pyi Taw. Installed IPPA(IP Public Address) software,equipment and fiber at National guest house in Nay Pyi Taw and project management in term of scope, time, quality and risk. Achievements Project management, development, implementation and operation of IPPAand IT network. Get good knowledge and experience of IPPAsystem and IT network. Fiber installation experience. Finished 52 Unifi AP Wi-Fi points and fiber installation atYangon University Campus. Finished Wi-Fi network using with Windows server 2008 and TMG on Dell R320 server, data switch and media converter. Finished 2 Nos.of IP NetworkAudio Systems with 32 terminal points and fiber installation at National guest house in Nay Pyi Taw.  2000 - 3.6.2013 : Integrator Services Co., Ltd. Industry Telecommunications Country/City Myanmar/Yangon Position Chief Engineer Training *The Training course of Optical fiber transmission, RAD Megaplex MP-2200 and Alcatel Omni PCX-4400 EPABX. 01 Nov - 12 Nov 2010 12 days SDH (Synchronous Digital Hierarchy) transmission theories and ECI fiber transmission equipment’s advance training in Singapore for MOD, MPT,MEC,MRTV and MWD fiber transmission network. 26 Feb - 28 Feb 2003 3 days RAD Megaplex MP-2200 data training in Singapore for MOD ISDN network. 17 Feb - 25 Feb 2003 9 days PDH,SDH basic transmission theories and ECI equipment installation and operation training in Singapore for MOD fiber network. 20 Sept - 23 Sept 2002 Alcatel Omni PCX4400 PABXlocal training at CSW (Central Signal Workshop) in the whole Myanmar country for MOD network. 10 Jun - 22 Jun 2001 Visited to Communic Asia 2001 at Singapore Expo and Eci equipment inspection. 05 Jun - 09 Jun 2001 5 days discussion of vest spectrum Microwave equipment in Malaysia. 12 days DWDM,IP, MPLS training at company office. Responsibilities Project management of engineering activities such as equipment layout plan, overall in-charge of power plants, assistanced and performed PDH, SDH fiber transmission network planning, design, installation, commissioning and testing. Made PAT (Provisional Acceptance Test).Made commissioning and testing of ECI fiber transmission equipment, generator and ATS, EPABXequipment before sent those to the site. Upgrade from STM-16 to STM-64 transmission of phase (4) project for MOD (military of defense) fiber backbone network. Installation, commissioning, Operation and Maintenance of ECI fiber transmission and power plants ( Gen sets,ATS and Rectifiers ) and ECI Syncom, BroadGate, and XDM equipment for MOD, MPT,MRTV, MWD, and Special development project Naypyitaw and MEC optical fiber network in the whole Myanmar country. Made site
  • 3. 3 planning, Installation progress, PAT and FAT for all equipment in MOD fiber project. Project management of accommodation, food and beverage and equipment installation of new MRTV TV and Radio, studio complex and transmitter Broadcasting Project in Tatkone. Installation, operation and maintenance of firewall and 3 Nos. of Cisco routers atYGN, KSE and NPT for MWD On-Line Banking and UMEHLdata network. Installation, commissioning, operation and maintenance of RAD Megaplex MP-2200, 2100 and Alcate Omini PCX-4400 EPABX100 lines, 200 lines and 1000 lines for MOD voice and data network in the whole Myanmar country. Give presentation and training of PDH and SDH fiber transmission theories and ECI equipments installation, Alcatel Omni PCX4400 EPABXto our engineers and our customers at Pyin Oo Lwin training school. Achievements Get good experience of team leadership, management and cooperation. Services and Hardware Delivery experience of fiber transmission and EPABX. Good trainer experience of PDH,SDH and EPABXpresentation and training. Finished MPT, MOD,MRTV, MWD and MEC transmission project with the installation over 250 Nos. of fiber transmission equipments and over 250 Nos. of generator & ATS. Finished MOD project with the installation over 35 Nos. of EPABXequipment. Finished MWD on-line banking project with 3 Nos. of Cisco (2800) routers and switches. Finished new MRTV TV and radio studio complex at Tatkone for MTRV broadcasting.  1998-2000 : Sky-Link Co., Ltd. Industry Telecommunications Country/City Myanmar/Yangon Position Executive Engineer Training *The Training course of GSM. 18 Dec -21 Dec 2000 4 days SIEMENS MN1707-7 BSS Delta Training BR4.0-5.0 at Sedona Hotel in Myanmar for MPT’s GSM project. I attended Information and Communication Networks Training Institute at Munich in Germany for Yangon GSM project as the following SIEMENS GSM Training Courses. 11 Oct - 29 Oct 1999 19 days MN2582-5 SBS (Siemens Base Station) Network Element Management OBR/BR4.0. 02 Nov - 10 Nov 1999 9 days MN1790 BSS (Base Station Subsystem) Radio Network Planning 11 Nov - 18 Nov 1999 8 days MN1736-5 SBS Performance Measurement MN1789-5 SBS Radio Network Parameters Responsibilities Supervised for the installation of shelters, towers, antennas and feeders in the first MPT GSM project in Yangon and Mandalay. Made site planning, radio network planning and design. Installation, commissioning and operation of BTS, BSC and TRAU. Some micro wave installation. Installation, commissioning, testing and operation of rectifiers and BTS. Installation progress report, drive test and made PAT and FAT for rectifier, BTS, BSC and TRAU in Yangon MPT GSM project.
  • 4. 4 Achievements Experience of GSM Network especially power and radio. On the job and oversea training with GSM network. Finished MPT GSM project in Yangon with 18 BTS, 1 BSC, 4 TRAU and Rectifiers.  12.7.1996-1998 : Comm Tech Co., Ltd. Industry Telecommunications Country/City Myanmar/Yangon Position Engineer Training On the job training of cabling and installation of RCS at company office. Responsibilities Installation of Rectifier, antenna and feeder forAuto Radio Telephone System (ARTS) project of MPT. Production of 24 VDC auto voltage regulator power supply unit for ARTS phone and 24 VDC charger. Installation of RCS for MPTARTS project. Repaired and serviced for ARTS radio telephone and power supply. Achievements Installation of rectifier, antenna and feeder forARTS system. Experience of Radio for the ARTS system. Can repair the ARTS radio Equipment and production of 24 VDC Power supply for ARTS phone and 24 VDC charger. Voluntary Experience  27.7.2014-10.2.2015 : SawKhonYit Roadworks at (49) ward, North Dagon Tsp. Industry Civil service Country/City Myanmar/Yangon Position Secretary (1) Responsibilities Saw Khon Yit road’s roadworks To finish roadworks before raining season. To established roadwork’s committee at ward. Collection of fund for roadworks at ward. Managing and control of funds. Requested and informed to Administration, and Civil servant of government to permit roadworks of Saw Khon Yit road. Achievements Saw Khon Yit road’s roadworks was finished. Improvements of negotiation, dealing, other organization and volunteer skill. Education  1993-2005 :Yangon University ofDistant Education Major Zoology Degree BSC ( Zoology )  1993-1995 : Mandalay Government Technical Institute Major Electronics and communication Degree AGTI ( EC ) Language Myanmar Excellent written and oral skills English Good written and oral skills