1. Amr Mahmoud Sabry Elsaadany
Mobile
(+20) 111/4004001
(+20) 111/7004149
Telephone
(+202)25565987
E-Mail
amr.saadany@gmail.com
Home Adress
44 mashroua nasser area 1 No. 10.
Helwan, Egypt.
Personal Details:
Gender: Male
Date of Birth: 4August 1984
Nationality: Egyptian
Marital Status: Single
Military Status: Postponed till 2012
Driving License: Valid
Cellular: +20111/4004001 , +20111/7004149
Telephone: +20-25565987
E-mail: amr.saadany@gmail.com
Languages: Arabic:Native
English: Very Good (listening,writing and speaking)
Objective:
I am looking forward to join telecommunication progressive stable organization following
latest technology which provide a Challenging Position, to demonstrate, develop my skills and
experience in the Telecommunication filed.
Education:
Cairo University-Faculty of Engineering, 2008
Bachelor, Communication and Electronics Department.
Final Year Grade: Good
Graduation Project: Recognition of English Mathematical Expressions.
Software Program / Matlab Platform.
Graduation Project Grade: Very Good.
Working Experience:
1
2. • LCC KSA Corporation - Egypt Branch May 2014 till Now
Work as a Project Team Leader for the following projects:
o Huawei MSAN Project with Telecom Egypt ( Position: Project Team Leader )..
Build teams and grant harmony between them.
Arrange technical training with the customer for All teams.
Draw the plans for the project that matching our targets.
Coordinate field teams and flow their progress and support them.
Collect and submit reports,documents & site folder documents.
Sites Quality Auditing and follow snags rectifications.
Send our updates, progress reports to customer.
Hold meetings inordrer to review project milestones and tracking our targets.
o Ericsson RollOut Project with Vodafone Egypt ( Position: Project Team
Leader).
Complete Installation for Ericsson Cabinets RBS6101,
RBS6102,BBS6102, RBS6601, SSC-02.
Review all Civil & Telecom missing items from site with teams.
Supervise installing Outdoor components ( RRU's with its all
connections and cabling),
Supervise Installing Indoor/cabinets with its Earthing and all its
accessories,
Power on the cabinet and systemize all internal cables and make sure
of all connections,
Configure 2G(900&1800).
Configure 3G(RBS6601).
Configure Traffic Node(TN6P,TN20P) and create required B2B
connections over all TX chain route.
Configure IPRAN or configure it as E1's circuits.
Double check configurations of 2G, 3G and IPRAN as well.
Integrate site and make it on air & guarantee management
reachability.
Clear All Site alarms or faults,
Perform Quality process procedures.
Ensure site readiness for acceptance,
o Ericsson Modrenization Project with Vodafone Egypt ( Position: Project
Team Leader).
Delivery reception procedures.
Check missing items and send mail with all Work
(Civil,Power&Telecom) missing,
Install or swap Outdoor components ( RRU's with its
TX/RX,Data,DC power connections and cabling),
Install the cabinet with its Earthing and all its accessories,
Power on the cabinet and systemize all internal cables and make sure
of all connections,
Configure 2G, 3G and IPRAN as well.
Integrate site and make it on air & guarantee management
reachability.
Clear All Site alarms or faults,
Perform Quality process procedures.
Ensure site readiness for acceptance,
2
3. o Alcatel WDM/SDH project with Telecom Egypt, worked as (Project Team
Leader).
Build work teams and grant harmony between them.
Arrange technical training with the customer for project teams
Draw the work plans for the project matching customer targets.
Draw work roles for each field team.
Coordinate field teams and flow their progress and support them.
Send requests to customer for more support periodically if needed.
Send our updates&progress reports to customer.
Receive notes/comments from customer and always keep them in
consideration.
• ZTE Corporation-Egypt Branch May 2010 till April 2014.
Worked as a ZTE Staff – Transmission Senior Engineer for the following projects:
o ZTE-IPDSLAM Trial Porject for Telecom Egypt: worked as “ Operation
and Acceptance Team Leader “
Installation of 5 IPDSLAMs and verify installation standards.
Configuring IPDSLAMs.
Test IPDSLAM services.
Performing quality assurance testing procedures.
Sign Acceptance documents with customer teams.
o ZTE-ONU/ MSAG Project for Telecom Egypt: worked as “ Project Team
Leader “
Project introduction
• NGN product (like ZXMSG5200 intergraded access media
gateway) support Voice calls, Broadband service and others
(ADSL,VDSL,…)for the PSTN Fixed network.
• System supports 100Mbps/FE & 1000Mbps/GE interfaces at the
IP network side, which are used as egresses for narrowband media
flow, H.248 protocol flow, network signal flow and broadband
data flow. These four data flows can be flexibly configured on any
uplink Ethernet port
• System supports networking with multiple SoftSwitch. When
many SoftSwitches are in an active/standby relation, the ZXMSG
5200 supports H.248,SIP polling registration. When an active
SoftSwitch fails, the SoftSwitch will contact a standby SoftSwitch
automatically and accepts its control
Installation and acceptance resposibilities.
• Performing all the installation and commisioning of the system
• Supervise the Subcontractors until finalize the installations
• Provide Technical support for the teams during installations.
• Perform integration and signaling initialization
• Installation labeling, testing and Quality of service
• Preparing acceptance documents and readiness of acceptance.
• Perfrom full H/W, S/W and services acceptance (RFA).
• Resolve Critical and major snags &Plan for follow up resolving
the minor snags
Quality Assurance responsibilities
• Performing quality assurance testing procedures
• Sign the documents
• Perfrom the Ready for service RFS
3
4. O&M reposnsibilities
• Handle Operation and maintenace of the system.
• Troublshooting problems after RFS.
• Troubleshooting and clear Alarms of cabinets.
• Monitoring the system, resolve problems and clear alarms.
• Perform workaround, plan and follow up permnent solutions
• Prepare icedent reports for the problems.
o ZTE-Microwave/Transmission Project for Etisalat Egypt: worked as
“ Project, FM, FO TL & BO Team Leader “.
Project introduction
• Installation of new MW link for New sites.
• Installation of MW links for New sites' expansions.
• Installation of MW links for Corporates and enterprises.
• SWAP MW links of other vendors (like NEC) with ZTE links.
Installation and commisioning responsibilities.
• Review the solution
• Assign teams responsibities and time plan
• Perform the LOS survey of MW links.
• Perform Sites survey actions.
• Get the Access Approval for sites survey or link installations.
• Prepare the DO of MW link and get its approval.
• Supervise the Subcontractors teams during delivering DO.
• Provide Technical support for teams during the installations.
• Performing commisioning and operating the system.
• Perform integration and signaling initialization
• Installation labeling, testing and Quality of service
• Preparing acceptance documents and readiness of acceptance
• Installing NMS Server/Clients of Transmission/MW system.
• IP/VLAN Planning of MW-NMS System.
• Managing the installed NEs from NMS Server/Clients.
• Perfrom HW, SW and services acceptance with Etisalat (RFA)
• Resolve Critical/major snags & follow up resolving minor ones
• Perform acceptance with Etisalat team
Quality Assurance and acceptance resposibilities
• Performing quality assurance testing procedures
• Sign Acceptance Doc. with correponding Teams of ET.
• Perfrom the Ready for service RFS.
O&M reposnsibilities
• Handle Operation and maintenace of the system.
• Troublshooting problems after the RFS.
• Troubleshooting and Maintenance of MW-NMS system.
• Troubleshooting and clear the Alarms of cabinets.
• Monitoring the system, resolve problems and clear alarm.
• Perform workaround, plan and follow up permnent solutions.
• Prepare incedent reports for the problems.
• Work as FM team to Clear Alarms of MW link in sites.
• Work as Team Leader of ZTE-TX-FO.
• Acts as Data Creation Team for new services Creation.
• Represents the ZTE-TX-BO of ZTE-MW Team.
• Reporting to ET/RollOut/TX Operation /TX Planning Teams.
4
5. • TTC Technology Company Jan.2010 to May 2010
Worked as a Software Developer for a Military simulator Project from Jan.2010 to May
2010.
• Giza Systems Company. July 2009 until Dec.2009
Worked as a Telecommunication Engineer from July 2009 until Dec.2009.
Training Courses and Skills:
GSM.
CCNA.
Juniper Networks Routing, sponsored by NTI.
OJRE-introductory-level AJRE-Advanced Level
Course Introduction JUNOS Policy
Juniper Networks Enterprise Routers BGP
JUNOS User Interfaces Enterprise Routing Policies
Installation and Initial Configuration Transitioning Between IGPs
Operational Monitoring and Maintenance JUNOS Services Overview
Routing Protocols and Policy Stateful Firewall and NAT
JUNOS Services IPSec VPNs
Miscellaneous Features Class of Service
Troubleshooting Branch Office Connectivity
Giza Systems Training.
NTI Technical CoursesAUC Soft Skills Program
Intro. to PSTNCommunication skills
Private Branch Exchange _PBXProfessional business writing
Intro. Voice Over IPIntro. to sales and Marketing
H.323 Protocol & SIP ProtocolIntro. to Quality
SDH & WDMHigh Impact Presentation skills
Intro. to Next Generation Network _NGNWorking in Teams
ATM NetworkCreative Thinking and Problem solving
Intro. to Frame RelayProject Management skills
MPLS TechnologySuccessful Meetings
MPLS -VPNIntro. to Business Process Management
Signaling System No.7 _SS7Time Management and Handling stress
Telecom Network ConceptsAction Plan
Computer Skills:
Computer: Linux Desktop,Windows 2000/XP, Internet Fundamentals, PC Hardware maintenance.
Applications: MS Office,Visio, Microsoft project.
Summer Training:
• Arabic Manufactoring Organization,ABECO.
Electronics Training-Military airplane workshop Training.
• Electricity Station,South of Cairo,Network Training Center.
Communication Concepts-SDH Training.
REFERENCES FURNISHED ACCORDING TO YOUR REQUEST
5