SlideShare a Scribd company logo
1 of 3
TABISH WADOODITABISH WADOODI
Mob: +971-565489118
Email: twadoodi@gmail.com
(Total Experience 2.7 yrs)
Aspiring Telecommunications ProfessionalAspiring Telecommunications Professional
Aspiring To Work In The Telecommunications Sector, With A Growing Organization That Offers A Challenging Environment
Where I Can Carve A Niche For Myself And Effectively Deliver Towards Contributing To The Organization’s Target &
Aspirations.
Professional ExperienceProfessional Experience
Working as A DT Engineer & post processor with LINKQUEST GLOBAL ( Abu Dhabi )
(November 2015 To Till Date)
Current Project : Alcatel 2G, 3G, 4G swapping Project
Project Title : Etisalat (Swap from Huawei to Ericsson)
Name Of The Organization : Alcatel/Nokia- Etisalat.LLC (UAE)
Description : Handle the tasks of using LTE technology to meet KPI standards of network systems.
Responsible for SCFT & CLOT for completion as part of project activity.
Involved in project management and handling the post processing for customer.
Providing technical support to the RF Engineers to make their working environment healthy.
Performed SSVs and Cluster drives for LTE WCDMA & GSM.
Carry out basic parameter checks such as RSRP, SINR, and Throughput during the Test.
Performing post processing for LTE, WCDMA & GSM SSVs with caring the RxLevel, RxQuality,
BCCH, Cell ID, RSCP, Ec/No, Scrambling Codes, RSRP, RSPQ, CINR, handovers, and route of DTs.
Previous Experience
Key Accountabilities
 Post process Drive logs- Verify, Analyze & Generate
 Analysis Of Hardware Alarms In Network And Making Action Plan To Get The Same Resolved.
 Proposal For New Parameter Changes In Network For Improving The Performance.
 Identify problems through hardware change, antenna change,. Addition of missing neighbors (which should
be defined for handover).
 Data Collection Cluster drives to Identity status of Site Coverage Area.
 3G & LTE data,voice call video call,multirab,R99 testing for verification of services.
Company : Pyro Telecommunication
Duration : (June’14 To July’ 15)
Name Of The Organization : Nokia- Vodafone(Maharastra)
Project Title : Maintenance & Improvement Of Existing Network Of Vodafone
Network Used : Vodafone
Description : This Project Is Undertaken To Maintain & Improve The Existing Network Of Vodafone
By Rf Drive Testing & Physically Optimizing A Cell Site Of The Network. and bench
mark in Kolhapur for 2g and 3g.
Design Tools : MapInfo 7.5,8.5 &,TEMS 13.0.1
Drive Testing Tools : TEMS ,10.0.5, 13.1.1, 15.3.4 , 16.1.2 , 16.3.2
Key Accountabilities : 1 Bench marking project in Kolhapur 2g and 3g .Got reward for the worked at
Kolhapur.
2. Got opportunity to work as Vodafone dedicated In Kolhapur. Customer complain,
optimization for KPI, DLQ, TRAFFIC DIP, OVERSHOOTING , HSO.
3. Learn about BTS work of ULTRA, FLEXY AND Multi Radio.
4. In drives all type of drives done. as cluster drive, run drive, migration drive, and all
testings.
5. IBS for in building sites.
6. Drive TRAI(telecom regularity authority of india) done in Nanded.
Name Of The Organization : Pyro Telecommunication .
(June 2014 to July 2015)
Project Title : Airtel 2G and WCDMA Project
(Drive Test,Optimization)
Network Used : Airtel ( Maharashtra)
Description : This Project Is Undertaken For Scft or Cluster Drive Test And Optimization. The
Network Of Airtel By Making static testing To All The Sector & Conducting Drive Test
By Making Short Call N Long Call And Making Reports Of The Drive Test Done &
Making PPt & Reports To The Customer .
7. Good experience of post processing.
Company : Telearena
telecommunication.
Duration : (Aug’15 To Oct’ 15)
Name Of The Organization : Ericssion- Idea (Maharastra)
Project Title : SCFT of 2g 3g sites
Description : Analyzing RF measurements (GSM and GPRS) and statistics in order to decide the
need of new sites either for traffic, coverage or quality.
Signal strength and quality analysis.
Optimizing the network by Physical Optimization.
Neighbors list optimization by adding potential & removing unnecessary neighbor’s
basis of raw data available from drive test result and using MIPT and Common tool.
Drive test for the Newly ON AIR sites.
Key Accountabilities
.
 Co-channel (C/I) and Adjacent channel (C/A) Interference analysis
 To find the causes of the call drops, blocked calls, handover failures, excessive handovers, poor quality, poor
C/I, interferences etc..To check the coverage of radio cell & compare it with coverage prediction. Verify the
down-link parameters e.g. RSCP, RSSI, EC/IO, CQI, Cell ID, LAC, defined by the operator planner.
 Post process Drive logs- Verify, Analyze & Generate Report
 Data Collection Cluster drives to Identity status of Site Coverage Area.
Educational And Professional DevelopmentEducational And Professional Development
B. Engineering. (Electronics & Communication Engineering) 2014
Jaipur National University(jaipur)
Class Xii (NIOS Board) 2010
Class X(CBSE BOARD)2006

More Related Content

What's hot (20)

Resume
ResumeResume
Resume
 
internship report 2012 (Propel Network Sdn.Bhd)
internship report 2012 (Propel Network Sdn.Bhd)internship report 2012 (Propel Network Sdn.Bhd)
internship report 2012 (Propel Network Sdn.Bhd)
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
Ashraf Ali
Ashraf AliAshraf Ali
Ashraf Ali
 
karunakar.u
karunakar.ukarunakar.u
karunakar.u
 
updated resume (1)
updated resume (1)updated resume (1)
updated resume (1)
 
Abhishek CV
Abhishek CVAbhishek CV
Abhishek CV
 
resume
resumeresume
resume
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 
mohammed iftequar hussain Telecom
mohammed iftequar hussain Telecommohammed iftequar hussain Telecom
mohammed iftequar hussain Telecom
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
Sunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDSunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATED
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 
Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resume
 
Musahid Resume
Musahid ResumeMusahid Resume
Musahid Resume
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
ANJUM CV-1
ANJUM CV-1ANJUM CV-1
ANJUM CV-1
 
INTERNSHIP REPORT PRESENTATION
INTERNSHIP REPORT PRESENTATIONINTERNSHIP REPORT PRESENTATION
INTERNSHIP REPORT PRESENTATION
 
Ahmet_Ondortoglu Resume
Ahmet_Ondortoglu ResumeAhmet_Ondortoglu Resume
Ahmet_Ondortoglu Resume
 

Viewers also liked

Viewers also liked (6)

Sumeet (Resume)
Sumeet (Resume)Sumeet (Resume)
Sumeet (Resume)
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_Resume
 
AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
new resume (1)
new resume (1)new resume (1)
new resume (1)
 
Harpreet Singh Resume
Harpreet Singh ResumeHarpreet Singh Resume
Harpreet Singh Resume
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 

Similar to Tabish resume (20)

CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)
 
CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_Hanif
 
Nitesh_CV
Nitesh_CVNitesh_CV
Nitesh_CV
 
Deepak patel
Deepak patelDeepak patel
Deepak patel
 
Devendra kumar tiwari
Devendra kumar tiwari Devendra kumar tiwari
Devendra kumar tiwari
 
Resume Alok
Resume AlokResume Alok
Resume Alok
 
syed mohsin ali Resume.
syed mohsin ali Resume.syed mohsin ali Resume.
syed mohsin ali Resume.
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Resume
ResumeResume
Resume
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
zia_mehdi_cv
zia_mehdi_cvzia_mehdi_cv
zia_mehdi_cv
 
Devender Kumar_CV
Devender Kumar_CVDevender Kumar_CV
Devender Kumar_CV
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
CV(M.Javed )
CV(M.Javed )CV(M.Javed )
CV(M.Javed )
 
Akash Tandon - Resume
Akash Tandon - ResumeAkash Tandon - Resume
Akash Tandon - Resume
 
Harshit Bhawsar Resume
Harshit Bhawsar ResumeHarshit Bhawsar Resume
Harshit Bhawsar Resume
 
Resume-3
Resume-3Resume-3
Resume-3
 
Resume-3
Resume-3Resume-3
Resume-3
 

Tabish resume

  • 1. TABISH WADOODITABISH WADOODI Mob: +971-565489118 Email: twadoodi@gmail.com (Total Experience 2.7 yrs) Aspiring Telecommunications ProfessionalAspiring Telecommunications Professional Aspiring To Work In The Telecommunications Sector, With A Growing Organization That Offers A Challenging Environment Where I Can Carve A Niche For Myself And Effectively Deliver Towards Contributing To The Organization’s Target & Aspirations. Professional ExperienceProfessional Experience Working as A DT Engineer & post processor with LINKQUEST GLOBAL ( Abu Dhabi ) (November 2015 To Till Date) Current Project : Alcatel 2G, 3G, 4G swapping Project Project Title : Etisalat (Swap from Huawei to Ericsson) Name Of The Organization : Alcatel/Nokia- Etisalat.LLC (UAE) Description : Handle the tasks of using LTE technology to meet KPI standards of network systems. Responsible for SCFT & CLOT for completion as part of project activity. Involved in project management and handling the post processing for customer. Providing technical support to the RF Engineers to make their working environment healthy. Performed SSVs and Cluster drives for LTE WCDMA & GSM. Carry out basic parameter checks such as RSRP, SINR, and Throughput during the Test. Performing post processing for LTE, WCDMA & GSM SSVs with caring the RxLevel, RxQuality, BCCH, Cell ID, RSCP, Ec/No, Scrambling Codes, RSRP, RSPQ, CINR, handovers, and route of DTs. Previous Experience
  • 2. Key Accountabilities  Post process Drive logs- Verify, Analyze & Generate  Analysis Of Hardware Alarms In Network And Making Action Plan To Get The Same Resolved.  Proposal For New Parameter Changes In Network For Improving The Performance.  Identify problems through hardware change, antenna change,. Addition of missing neighbors (which should be defined for handover).  Data Collection Cluster drives to Identity status of Site Coverage Area.  3G & LTE data,voice call video call,multirab,R99 testing for verification of services. Company : Pyro Telecommunication Duration : (June’14 To July’ 15) Name Of The Organization : Nokia- Vodafone(Maharastra) Project Title : Maintenance & Improvement Of Existing Network Of Vodafone Network Used : Vodafone Description : This Project Is Undertaken To Maintain & Improve The Existing Network Of Vodafone By Rf Drive Testing & Physically Optimizing A Cell Site Of The Network. and bench mark in Kolhapur for 2g and 3g. Design Tools : MapInfo 7.5,8.5 &,TEMS 13.0.1 Drive Testing Tools : TEMS ,10.0.5, 13.1.1, 15.3.4 , 16.1.2 , 16.3.2 Key Accountabilities : 1 Bench marking project in Kolhapur 2g and 3g .Got reward for the worked at Kolhapur. 2. Got opportunity to work as Vodafone dedicated In Kolhapur. Customer complain, optimization for KPI, DLQ, TRAFFIC DIP, OVERSHOOTING , HSO. 3. Learn about BTS work of ULTRA, FLEXY AND Multi Radio. 4. In drives all type of drives done. as cluster drive, run drive, migration drive, and all testings. 5. IBS for in building sites. 6. Drive TRAI(telecom regularity authority of india) done in Nanded. Name Of The Organization : Pyro Telecommunication . (June 2014 to July 2015) Project Title : Airtel 2G and WCDMA Project (Drive Test,Optimization) Network Used : Airtel ( Maharashtra) Description : This Project Is Undertaken For Scft or Cluster Drive Test And Optimization. The Network Of Airtel By Making static testing To All The Sector & Conducting Drive Test By Making Short Call N Long Call And Making Reports Of The Drive Test Done & Making PPt & Reports To The Customer .
  • 3. 7. Good experience of post processing. Company : Telearena telecommunication. Duration : (Aug’15 To Oct’ 15) Name Of The Organization : Ericssion- Idea (Maharastra) Project Title : SCFT of 2g 3g sites Description : Analyzing RF measurements (GSM and GPRS) and statistics in order to decide the need of new sites either for traffic, coverage or quality. Signal strength and quality analysis. Optimizing the network by Physical Optimization. Neighbors list optimization by adding potential & removing unnecessary neighbor’s basis of raw data available from drive test result and using MIPT and Common tool. Drive test for the Newly ON AIR sites. Key Accountabilities .  Co-channel (C/I) and Adjacent channel (C/A) Interference analysis  To find the causes of the call drops, blocked calls, handover failures, excessive handovers, poor quality, poor C/I, interferences etc..To check the coverage of radio cell & compare it with coverage prediction. Verify the down-link parameters e.g. RSCP, RSSI, EC/IO, CQI, Cell ID, LAC, defined by the operator planner.  Post process Drive logs- Verify, Analyze & Generate Report  Data Collection Cluster drives to Identity status of Site Coverage Area. Educational And Professional DevelopmentEducational And Professional Development B. Engineering. (Electronics & Communication Engineering) 2014 Jaipur National University(jaipur) Class Xii (NIOS Board) 2010 Class X(CBSE BOARD)2006