MOZAMBIQUE
Project monitoring trip report 31.8.-14.2013
The project monitoring trip to Maputo, Mozambique was realized between the 31st
of August and 14th
of
September, 2013. The project in question, Increasing the reading and writing capability of … , is realized by
a Maputo based NGO, Afortalecer. The trip was monitored by SYL:s representatives Johanna Ursin-Escobar
and Silja Palmujoki.
The objectives of the trip were to learn how the project has been launched, to see if there is need for any
changes in the project plan, to revise the indicators and to improve the partnership by getting to know each
other better.
The most important results of the monitoring trip where that the project has started but with fewer
activities than planned. The general atmosphere in the organization was optimistic, analytical and
conversational. As usual, the first year of project produced some delays in implementing the activities. The
bookshelves have been appropriately procured and calligraphy books acquired. Nevertheless, not all the
planned trainings for teachers and workshops for children have been realized. Some changes were made to
the activities with children´s workshops and parent´s participation (Activity 4), as well as their indicators.
Groups for storytelling and homework with parents were replaced with “learning cafés” and workshops
supported by university students. Changes in detail can be seen in the updated version of the project plan.
It was decided that in continuation Afortalecer will systemize their activities and will have a more
participatory outreach in different areas of their project. Some new formulas for activity monitoring were
also created. A timetable on the deadlines and activities for the rest of the year will be sent to Afortalecer
soon.
Programm
Day Time Event
31.8. 13.00- Flights Helsinki - Maputo
1.9. 14.00 Arriving to Maputo, accommodation
2.9. Morning
Afternoon
Program for monitoring trip
Introduction to current situation of Mozambique and the latest
news of Afortalecer
3.9. Morning
Afternoon
Discussing the budget with the accountant of Afortalecer, Olivia
Meeting with university students, meeting with the directorate of
Afortalecer discussing the project activities
4.9. Morning
Afternoon
Monitoring and evaluation training for Afortalecer staff by Johanna
Visit to Pedagogical University of Maputo
5.9. Morning
Afternoon
Visit to NGO Accodescha, the partner of Operation Days Work in
Finland
Visit to the project school Unidade 27, discussions with teachers,
parents and pupils
6.9. Morning Visit to the project school Filipe Samuel Magaia, discussion with
Afternoon
teachers, rector and parents
Meeting with the director of educational department of the city of
Maputo
7.9. FREE
8.9. FREE
9.9. Morning
Afternoon
Monitoring and evaluation training for Afortalecer staff by Johanna
Revision of project indicators
10.9. Morning
Afternoon
Revision of project indicators and reformulation of project
activities; visit to the embassy of Finland
Meeting with teacher training facilitator and the designer of the
book, meeting with university students
11.9. Morning
Afternoon
Revision of project indicator, discussing on the audit rules of
Ministry for Foreign Affairs
Workshop for pupils in Unidade 27 by university students
12.9. Morning
Afternoon
Meeting at KEPA, checking to do –list for the rest of the year 2013
Summarizing the results of project monitoring trip
13.9. 12.00- Flights Maputo - Helsinki
14.9. Arrival to Helsinki

More Related Content

Similar to Mos project monitoring_trip_report_2013

Project planning trip_report_mozambique (id 190)
Project planning trip_report_mozambique (id 190)Project planning trip_report_mozambique (id 190)
Project planning trip_report_mozambique (id 190)SYL
 
Report on the first transnational meeting to funchal
Report on the first transnational meeting to funchalReport on the first transnational meeting to funchal
Report on the first transnational meeting to funchalAna Hribar Beluhan
 
Agreements for andujar meeting
Agreements for andujar meetingAgreements for andujar meeting
Agreements for andujar meetinglaboursofhercules
 
Newsletter of Mallorca
Newsletter of MallorcaNewsletter of Mallorca
Newsletter of Mallorcaxristinakand
 
Agreements for catania meeting
Agreements  for catania meeting Agreements  for catania meeting
Agreements for catania meeting laboursofhercules
 
Hands On CLIL - Project Magazine nr. 1
Hands On CLIL - Project Magazine nr. 1Hands On CLIL - Project Magazine nr. 1
Hands On CLIL - Project Magazine nr. 1Helena Serdoura
 
Newsletter 2-word
Newsletter 2-wordNewsletter 2-word
Newsletter 2-wordCharo Cuart
 
CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...
CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...
CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...Chole Richard
 
21st Century Practices and Integration of ICT in Primary Education
21st Century Practices and Integration of ICT in Primary Education21st Century Practices and Integration of ICT in Primary Education
21st Century Practices and Integration of ICT in Primary EducationChole Richard
 
History of ip
History of ipHistory of ip
History of iprecitpi
 
Innoteach final info-newsletter_03-en-final-new
Innoteach final info-newsletter_03-en-final-newInnoteach final info-newsletter_03-en-final-new
Innoteach final info-newsletter_03-en-final-newITStudy Ltd.
 

Similar to Mos project monitoring_trip_report_2013 (20)

Project planning trip_report_mozambique (id 190)
Project planning trip_report_mozambique (id 190)Project planning trip_report_mozambique (id 190)
Project planning trip_report_mozambique (id 190)
 
Report on the first transnational meeting to funchal
Report on the first transnational meeting to funchalReport on the first transnational meeting to funchal
Report on the first transnational meeting to funchal
 
Agreements for andujar meeting
Agreements for andujar meetingAgreements for andujar meeting
Agreements for andujar meeting
 
Newsletter of Mallorca
Newsletter of MallorcaNewsletter of Mallorca
Newsletter of Mallorca
 
Summaryproject
SummaryprojectSummaryproject
Summaryproject
 
Summary project
Summary projectSummary project
Summary project
 
Summaryproject
SummaryprojectSummaryproject
Summaryproject
 
Slides c3.pptx 2019
Slides c3.pptx 2019Slides c3.pptx 2019
Slides c3.pptx 2019
 
Slides c3.pptx 2019
Slides c3.pptx 2019Slides c3.pptx 2019
Slides c3.pptx 2019
 
Agreements for catania meeting
Agreements  for catania meeting Agreements  for catania meeting
Agreements for catania meeting
 
Hands On CLIL - Project Magazine nr. 1
Hands On CLIL - Project Magazine nr. 1Hands On CLIL - Project Magazine nr. 1
Hands On CLIL - Project Magazine nr. 1
 
Croatia report (1)
Croatia   report (1)Croatia   report (1)
Croatia report (1)
 
Newsletter 2-word
Newsletter 2-wordNewsletter 2-word
Newsletter 2-word
 
Progetto Erasmus plus Ka2
Progetto Erasmus plus Ka2Progetto Erasmus plus Ka2
Progetto Erasmus plus Ka2
 
CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...
CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...
CAPACITY BUILDING WORKSHOP FOR TEACHERS IN 21ST CENTURY PRACTICES & INTEGRATI...
 
The Report
The ReportThe Report
The Report
 
21st Century Practices and Integration of ICT in Primary Education
21st Century Practices and Integration of ICT in Primary Education21st Century Practices and Integration of ICT in Primary Education
21st Century Practices and Integration of ICT in Primary Education
 
History of ip
History of ipHistory of ip
History of ip
 
Agreements of desenzano
Agreements of desenzano Agreements of desenzano
Agreements of desenzano
 
Innoteach final info-newsletter_03-en-final-new
Innoteach final info-newsletter_03-en-final-newInnoteach final info-newsletter_03-en-final-new
Innoteach final info-newsletter_03-en-final-new
 

More from SYL

Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013SYL
 
130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okm130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okmSYL
 
Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)SYL
 
130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslaki130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslakiSYL
 
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...SYL
 
SYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelustaSYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelustaSYL
 
Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013SYL
 
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)SYL
 
Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)SYL
 
Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)SYL
 
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenEka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenSYL
 
Eka vuosi ryhmäkeskustelut (id 2278)
Eka vuosi  ryhmäkeskustelut (id 2278)Eka vuosi  ryhmäkeskustelut (id 2278)
Eka vuosi ryhmäkeskustelut (id 2278)SYL
 
20130115 utufye
20130115 utufye20130115 utufye
20130115 utufyeSYL
 
Ensimmäinen vuosi tampere
Ensimmäinen vuosi tampereEnsimmäinen vuosi tampere
Ensimmäinen vuosi tampereSYL
 
Eka vuosi oy-sarenius-160113
Eka vuosi oy-sarenius-160113Eka vuosi oy-sarenius-160113
Eka vuosi oy-sarenius-160113SYL
 
Eka vuosi työpaja jy
Eka vuosi työpaja jyEka vuosi työpaja jy
Eka vuosi työpaja jySYL
 
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenEka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenSYL
 
FSF:s utlåtande om Nordic Master-programmen
FSF:s utlåtande om Nordic Master-programmenFSF:s utlåtande om Nordic Master-programmen
FSF:s utlåtande om Nordic Master-programmenSYL
 
SYL:n lausunto Nordic Master -ohjelmasta
SYL:n lausunto Nordic Master -ohjelmastaSYL:n lausunto Nordic Master -ohjelmasta
SYL:n lausunto Nordic Master -ohjelmastaSYL
 
Hyväksytty toimintasuunnitelma 2013 (id 2232)
Hyväksytty toimintasuunnitelma 2013 (id 2232)Hyväksytty toimintasuunnitelma 2013 (id 2232)
Hyväksytty toimintasuunnitelma 2013 (id 2232)SYL
 

More from SYL (20)

Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013
 
130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okm130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okm
 
Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)
 
130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslaki130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslaki
 
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
 
SYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelustaSYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelusta
 
Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013
 
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
 
Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)
 
Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)
 
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenEka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
 
Eka vuosi ryhmäkeskustelut (id 2278)
Eka vuosi  ryhmäkeskustelut (id 2278)Eka vuosi  ryhmäkeskustelut (id 2278)
Eka vuosi ryhmäkeskustelut (id 2278)
 
20130115 utufye
20130115 utufye20130115 utufye
20130115 utufye
 
Ensimmäinen vuosi tampere
Ensimmäinen vuosi tampereEnsimmäinen vuosi tampere
Ensimmäinen vuosi tampere
 
Eka vuosi oy-sarenius-160113
Eka vuosi oy-sarenius-160113Eka vuosi oy-sarenius-160113
Eka vuosi oy-sarenius-160113
 
Eka vuosi työpaja jy
Eka vuosi työpaja jyEka vuosi työpaja jy
Eka vuosi työpaja jy
 
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenEka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
 
FSF:s utlåtande om Nordic Master-programmen
FSF:s utlåtande om Nordic Master-programmenFSF:s utlåtande om Nordic Master-programmen
FSF:s utlåtande om Nordic Master-programmen
 
SYL:n lausunto Nordic Master -ohjelmasta
SYL:n lausunto Nordic Master -ohjelmastaSYL:n lausunto Nordic Master -ohjelmasta
SYL:n lausunto Nordic Master -ohjelmasta
 
Hyväksytty toimintasuunnitelma 2013 (id 2232)
Hyväksytty toimintasuunnitelma 2013 (id 2232)Hyväksytty toimintasuunnitelma 2013 (id 2232)
Hyväksytty toimintasuunnitelma 2013 (id 2232)
 

Mos project monitoring_trip_report_2013

  • 1. MOZAMBIQUE Project monitoring trip report 31.8.-14.2013 The project monitoring trip to Maputo, Mozambique was realized between the 31st of August and 14th of September, 2013. The project in question, Increasing the reading and writing capability of … , is realized by a Maputo based NGO, Afortalecer. The trip was monitored by SYL:s representatives Johanna Ursin-Escobar and Silja Palmujoki. The objectives of the trip were to learn how the project has been launched, to see if there is need for any changes in the project plan, to revise the indicators and to improve the partnership by getting to know each other better. The most important results of the monitoring trip where that the project has started but with fewer activities than planned. The general atmosphere in the organization was optimistic, analytical and conversational. As usual, the first year of project produced some delays in implementing the activities. The bookshelves have been appropriately procured and calligraphy books acquired. Nevertheless, not all the planned trainings for teachers and workshops for children have been realized. Some changes were made to the activities with children´s workshops and parent´s participation (Activity 4), as well as their indicators. Groups for storytelling and homework with parents were replaced with “learning cafés” and workshops supported by university students. Changes in detail can be seen in the updated version of the project plan. It was decided that in continuation Afortalecer will systemize their activities and will have a more participatory outreach in different areas of their project. Some new formulas for activity monitoring were also created. A timetable on the deadlines and activities for the rest of the year will be sent to Afortalecer soon. Programm Day Time Event 31.8. 13.00- Flights Helsinki - Maputo 1.9. 14.00 Arriving to Maputo, accommodation 2.9. Morning Afternoon Program for monitoring trip Introduction to current situation of Mozambique and the latest news of Afortalecer 3.9. Morning Afternoon Discussing the budget with the accountant of Afortalecer, Olivia Meeting with university students, meeting with the directorate of Afortalecer discussing the project activities 4.9. Morning Afternoon Monitoring and evaluation training for Afortalecer staff by Johanna Visit to Pedagogical University of Maputo 5.9. Morning Afternoon Visit to NGO Accodescha, the partner of Operation Days Work in Finland Visit to the project school Unidade 27, discussions with teachers, parents and pupils 6.9. Morning Visit to the project school Filipe Samuel Magaia, discussion with
  • 2. Afternoon teachers, rector and parents Meeting with the director of educational department of the city of Maputo 7.9. FREE 8.9. FREE 9.9. Morning Afternoon Monitoring and evaluation training for Afortalecer staff by Johanna Revision of project indicators 10.9. Morning Afternoon Revision of project indicators and reformulation of project activities; visit to the embassy of Finland Meeting with teacher training facilitator and the designer of the book, meeting with university students 11.9. Morning Afternoon Revision of project indicator, discussing on the audit rules of Ministry for Foreign Affairs Workshop for pupils in Unidade 27 by university students 12.9. Morning Afternoon Meeting at KEPA, checking to do –list for the rest of the year 2013 Summarizing the results of project monitoring trip 13.9. 12.00- Flights Maputo - Helsinki 14.9. Arrival to Helsinki