SlideShare a Scribd company logo
MOODYS.A.
21, Elvetias Str, 153 42 Agia Paraskevi, tel..: 210-6009040, Fax: 210-6009091, E-mail : info@moody.gr
THE INTERNATIONAL INSPECTION, PROCUREMENT, EXPEDITING AND QUALITY ASSURANCE ENGINEERS
WELDER/WELDING OPERATOR PERFORMANCE QUALIFICATION Eill-/JE-11
ANAe. 04
Certificate No: 20568100.319.370
Notified Body Ref No.:0656
Issued to (Company Name): ANTONIADIS N. & SIA O.E.
Test Conducted at: MEGALOPOLI-GREECE
Welder's Name: AVRAMIDIS THEODOROS
Stamp No I ID No: WR203
Welding Process(es) Used: GTAW+SMAW -PHOTO-
Type(s) of Process(es) Involved: MANUAL
Qualification Per: ASME IX: 2011
In Accordance With WPS No: MEK 1/12 of 08/01/2012
Supporting WPQR No: 18466/00.319.303 of 07/01/2012
TEST COUPON & WELDING DETAILS RANGE OF QUALIFICATION
No of Test Coupons Made: 1
Joint Type of Test Coupon(s): SINGLE- V GROOVE Qualified for: GROOVE & FILLET
Backing (Yes/No): NO (GTAW)/YES (SMAW) Qualified for:
WITHOUT, WITH {GTAW)
WITH(SMAW)
Backing Material: SFA 5.18-05/ ER70S-6
Material Spec.: SA 106 Gr. B
PNo.: 1 Qualified for: P Nos.: 1 + 15F + 34 + 41 + 49
Plate or Pipe: PIPE Qualified for: PLATE&PIPE
Test Specimen(s) Thickness: 11,13mm
Weld Deposit Thickness: 5,00mm (GTAW)
Qualified for:
Max. 10,00 mm (GTAW)
(Per Welding Process) 6,13 mm (SMAW) Max. 12,26 mm (SMAW)
Diameter Welded: 3" (88,9mm) Qualified for: O.D. 2!: 2 7/8" (73 mm)
Filler Metal Designation: SFA5.18-05/ER70S-6 (GTAW)
(Asme Spec. No/ Aws Class. No) SFA 5.1-04/ E 7018 (SMAW)
FNo.: 6 (GTAW), 4 (SMAW) Qualified for:
ALL F No 6 (GTAW)
F No 1 UP TO 4 (SMAW)
Filler Metal Product Form:
BARE (SOLID) WIRE (GTAW) Qualified for:
BARE OR METAL CORED
(GTAW&PAW) WIRE (GTAW)
Consumable Insert: N.A. Qualified for: WITHOUT
Flux Type (SAlt?: N.A.
Test Position(s): 6G Qualified for: ALL POSITIONS
Welding Progress: UPHILL Qualified for: UPHILL
Shielding Gas: ARGON (GTAW), N.A. (SMAW)
Type ofGas: INERT (GTAW), N.A. (SMAW)
Composition ofShielding Gas: 99,996% Ar (GTAW), N.A. (SMAW)
Backing Gas (Back Purging): N.A.
Type of Gas: N.A. Qualified for: WITH, WITHOUT
Composition ofBacking Gas: N.A.
Current: DC (GTAW & SMAW) Qualified for: DC (GTAW), ANY(SMAW)
Polarity: EN (GTAW), EP(SMAW) Qualified for: EN (GTAW), ANY (SMAW)
Transfer Mode:
Qualified for:
(GMAW &FCAW): - -
Direct/Remote Visual
Control: - Qualified for: -
(Machine Welding)
Automatic Voltage Control:
- Qualified for: -(Machine Welru;g)
Automatic Joint Tracking:
- Qualified for: - 1)/(Machine Welding)
~THIS INSPECTION HAS BEEN CARRIED OUT TO THE BEST OF OUR KNOWLEDGE AND ABILITY AND OUR RESPONSIBILITY IS LIMITED TO THE EXERCISE OF DUE CARI(...rdiD THE RESULTS CONCERN
'EkrxO<;
Ap. nurr.l03-3
ONLY THE ITEMS INSPECTED. THIS CERTIFICATE IS NOT INTENDED TO RELIEVE THE PARTIES CONCERNED FROM THEIR CONTRACTUAL OBLIGATIONS .
THE PRESENT REPORT CAN ONLY BE REPRODUCED IN ITS WHOLE ENTITY AND AFTER THE APPROVAL OF THE INSPECTION BODY AND THE CLIENT
Page 1 of3
MOODYS.A.
21, Elvetias Str, 153 42 Agia Paraskevi, tel..: 210-6009040, Fax: 210-6009091, E-mail : info@moody.e:r
THE INTERNATIONAL INSPECTION, PROCUREMENT, EXPEDITING AND QUALITY ASSURANCE ENGINEERS
WELDER/WELDING OPERATOR PERFORMANCE QUALIFICATION EIII-L1E-ll
ANA@. 04
Certificate No: 20568100.319.370
Notified Body Ref No.:0656
DESTRUCfiVE I NON-DESTRUCfiVE TESTS PERFORMED
Please Cross Out Voids Where Not Applicable
A. VISUAL EXAMINATION (Acceptance Criteria Per Para. QW-194)
Coupon No: Results & Remarks (Per Coupon):
1 Visual Inspection performed on 25104/2013 with Acceptable results (Position 6G)
B. 1. TRANSVERSE-BEND TESTS Specimens Per Para. 161, Test Procedure Per Para. 162, Acceptance Criteria Per Para. QW-163)
Type of Test I Examination: Test Specimen according to: Specimen No: Results & Remarks
1. Guided Root Bend Tests QW-462.3 a
2. Guided Face Bend Tests QW-462.3 a)
3. Guided Side Bend Tests QW-462.2
B.2. Laboratory Test Records Attached:
Test Conducted By: Record No.: Issued On:
1.
2.
3.
C. 1. LONGITUDINAL-BEND TESTS (Specimens Per Para. 161, Test Procedure Per Para. 162, Acceptance Criteria Per Para. QW-163)
Type of Test I Examination: Test Specimen according to: Specimen No: Results & Remarks (Per Specimen):
1. Guided Root Bend Tests QW-462.3(b)
2. Guided Face Bend Tests QW-462.3(b)
C.2. Laboratory Test Records Attached:
Test Conducted By: Record No.: Issued On:
1.
2.
D. 1. FILLET WELD TESTS (Specimens Per Para 181, Test Procedure And Acceptance Criteria Per Para. QW-182 & 184)
Type of Test I Examination: Test Specimen according to: Specimen No: Results & Remarks (Per Specimen):
1. Macro QW-462.4(b)
2. Fracture QW-462.4(b)
3. Macro QW-462.4(c)
4.Fracture QW-462.4(c)
D.2. Laboratory Test Records Attached:
Test Conducted By: Record No.: Issued On:
1.
2.
3.
4.
E. 1. RADIOGRAPHIC EXAMINATION (Testing Per ASME BPV, Set. V, Art. 2, Acceptance Criteria Per Para. QW-191.2)
Coupon No: Results & Remarks (Per Coupon :
1 ACCEPTED
E.2. Laboratory Test Records Attached:
Test Conducted By: Record No.: Issued On:
1. ATOM DYNAMIC RT REPORT No.: WQ001 DOKOSl/13 29104/2013
2.
3.
4.
F. OTHER TESTS I EXAMINATION
We certify that the statements in this record are correct and that the test coupons were prepared, welded, and tested in cordance with
requirements of Section IX of the ASME Code.
Date: 29/04/2013
"EA.eyx~
Ap. fltctr.l03-3
Page 2 of3
MOODYS.A.
21, Elvetias Str, 153 42 Agia Paraskevi, tel..: 210-6009040, Fax: 210-6009091, E-mail: info@moody.gr
THE rNTERNATIONAL rNSPECTION, PROCUREMENT, EXPEDITrNG AND QUALITY ASSURANCE ENGrNEERS
WELDER/WELDING OPERATOR PERFORMANCE QUALIFICATION Eill-LJE-ll
ANA@. 04
Certificate No: 20568100.319.370
Notified Body Ref No.:0656
This Certificate remains valid for a period of six months only if the welder named overleaf has
been employed on the Class or type of welding, with satisfactory results, during the period of
six months since initial approval of that endorsement.
Prolongation of validity shall be subject to the MI Inspectors satisfaction with respect to the
welder's documented record and any specific Code requirements.
SIGNATURE OF INSPECTOR
DATE VALID VERIFING ACCEPTABLE
MI
SfAMP AND DATE OF ISSUE
WELDING PERFORMANCE
JL
25/10/2013 VI_ -~ ~ 25/04/2013
////1 /
/ fl_/
This report has been issued on verification ofthe successful implementation ofthe tests outlined above. Test reports form an i11tegral part ofthe
performance qualification certificate ofthe welder 11amed overleafand should be available on request.
=~~~~~~~~~~~~~~~~~---------------------------------------------------------------------
~
1 HIS INSPECTION HAS BEEN CARRIED OUT TO THE BEST OF OUR KNOWLEDGE AND ABILITY AND OUR RESPONSIBILITY IS LIMITED TO THE EXERCISE OF DUE CARE AND THE RESULTS CONCERN
'- T~ ONLY THE I TEMS INSPECTED. THIS CERTIFICATE IS NOT INTENDED TO RELIEVE THE PARTI ES CONCERNED FROM THEIR CONTRACTUAL OBLIGATIONS .
THE PRESENT REPORT CAN ONLY BE REPRODUCED IN ITS WHOLE ENTITY AND AE~ER THE APPROvru. OF THE INSPECTION BODY AND THE CLIENT
'E4:yxO<;
Ap. Otcrr.l03-3
Page 3 of3

More Related Content

What's hot

BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline HydrostaticScott Nunn
 
WPS & WPQ
WPS & WPQWPS & WPQ
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
Pratap Biswas
 
CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel) CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel)
CN Co., Ltd. (CNI)
 
Quality
QualityQuality
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
Tonni Bruce
 
Selection of a_completion_material_for_a
Selection of a_completion_material_for_aSelection of a_completion_material_for_a
Selection of a_completion_material_for_a
MohamedKanoun3
 
14033
1403314033
14033
mmkatta
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)Aravinth Jai
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVidris lawal
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi welding inspector
Wael Mahmoud alkilany
 
mohamed farouk portfolio
mohamed farouk portfoliomohamed farouk portfolio
mohamed farouk portfolioMohamed Farouk
 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
DixitJoshi5
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Sample rel assement a company -sov reliability assessment criteria
Sample rel assement   a company -sov reliability assessment criteriaSample rel assement   a company -sov reliability assessment criteria
Sample rel assement a company -sov reliability assessment criteria
Tom Jacyszyn
 
Updated cv
Updated cvUpdated cv
Itp
ItpItp

What's hot (17)

BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline Hydrostatic
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel) CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel)
 
Quality
QualityQuality
Quality
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
Selection of a_completion_material_for_a
Selection of a_completion_material_for_aSelection of a_completion_material_for_a
Selection of a_completion_material_for_a
 
14033
1403314033
14033
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 &amp; cwi welding inspector
 
mohamed farouk portfolio
mohamed farouk portfoliomohamed farouk portfolio
mohamed farouk portfolio
 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Sample rel assement a company -sov reliability assessment criteria
Sample rel assement   a company -sov reliability assessment criteriaSample rel assement   a company -sov reliability assessment criteria
Sample rel assement a company -sov reliability assessment criteria
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Itp
ItpItp
Itp
 

Viewers also liked

տետր
տետրտետր
տետր
3-1dasaran
 
Planificación de Educación física sexto bloque II
Planificación de  Educación física sexto bloque IIPlanificación de  Educación física sexto bloque II
Planificación de Educación física sexto bloque II
Alfredo Banda Jr.
 
METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022
METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022
METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022THEODORE AVRAMIDIS
 
Trabajo analisis economico
Trabajo analisis economicoTrabajo analisis economico
Trabajo analisis economico
oscar alejandro macias enriquez
 
Porquedômetro
PorquedômetroPorquedômetro
Porquedômetro
Naider Lara
 
իմ քաղաքը` թումոյի այգի
իմ քաղաքը` թումոյի այգիիմ քաղաքը` թումոյի այգի
իմ քաղաքը` թումոյի այգի
Ashkhen Grigoryan
 
Hiperplasia suprarrenal
Hiperplasia suprarrenalHiperplasia suprarrenal
Hiperplasia suprarrenal
joanalopez
 
Curriculum Vitae ing Juan Corral
Curriculum Vitae ing Juan CorralCurriculum Vitae ing Juan Corral
Curriculum Vitae ing Juan CorralJuan Corral
 
Mon parcours
Mon parcoursMon parcours
Mon parcours
Hassan AHMAIDOUCH
 
recursos administrativos
recursos administrativosrecursos administrativos
recursos administrativos
adriana perez
 
Perilaku tercela
Perilaku tercelaPerilaku tercela
Perilaku tercela
KhasbihMaslekhah
 
Communication for Social and Environmental Change: Using Film as a Communicat...
Communication for Social and Environmental Change: Using Film as a Communicat...Communication for Social and Environmental Change: Using Film as a Communicat...
Communication for Social and Environmental Change: Using Film as a Communicat...
CapacityDevelopment-Kate
 
Branding a School Why is it Important?
 Branding a School Why is it Important? Branding a School Why is it Important?
Branding a School Why is it Important?
drrosettawilliams
 
胃がんの原因は H.pylori 感染
胃がんの原因は H.pylori 感染胃がんの原因は H.pylori 感染
胃がんの原因は H.pylori 感染
yobolife
 
Industry slide share 1
Industry slide share 1Industry slide share 1
Industry slide share 1
Christopher Calcaterra
 
4 րդ դաս
4 րդ դաս4 րդ դաս
4 րդ դաս
Elina Simonyan
 

Viewers also liked (16)

տետր
տետրտետր
տետր
 
Planificación de Educación física sexto bloque II
Planificación de  Educación física sexto bloque IIPlanificación de  Educación física sexto bloque II
Planificación de Educación física sexto bloque II
 
METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022
METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022
METKA HRL-2 ΑΛΓΕΡΙΑ ΜΕΤ022
 
Trabajo analisis economico
Trabajo analisis economicoTrabajo analisis economico
Trabajo analisis economico
 
Porquedômetro
PorquedômetroPorquedômetro
Porquedômetro
 
իմ քաղաքը` թումոյի այգի
իմ քաղաքը` թումոյի այգիիմ քաղաքը` թումոյի այգի
իմ քաղաքը` թումոյի այգի
 
Hiperplasia suprarrenal
Hiperplasia suprarrenalHiperplasia suprarrenal
Hiperplasia suprarrenal
 
Curriculum Vitae ing Juan Corral
Curriculum Vitae ing Juan CorralCurriculum Vitae ing Juan Corral
Curriculum Vitae ing Juan Corral
 
Mon parcours
Mon parcoursMon parcours
Mon parcours
 
recursos administrativos
recursos administrativosrecursos administrativos
recursos administrativos
 
Perilaku tercela
Perilaku tercelaPerilaku tercela
Perilaku tercela
 
Communication for Social and Environmental Change: Using Film as a Communicat...
Communication for Social and Environmental Change: Using Film as a Communicat...Communication for Social and Environmental Change: Using Film as a Communicat...
Communication for Social and Environmental Change: Using Film as a Communicat...
 
Branding a School Why is it Important?
 Branding a School Why is it Important? Branding a School Why is it Important?
Branding a School Why is it Important?
 
胃がんの原因は H.pylori 感染
胃がんの原因は H.pylori 感染胃がんの原因は H.pylori 感染
胃がんの原因は H.pylori 感染
 
Industry slide share 1
Industry slide share 1Industry slide share 1
Industry slide share 1
 
4 րդ դաս
4 րդ դաս4 րդ դաս
4 րդ դաս
 

Similar to MOODY S.A GTW ER70S-6 SMW E7018

QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
Inspector ,ElectroMechanical engineer resume rev.01
Inspector ,ElectroMechanical  engineer resume rev.01Inspector ,ElectroMechanical  engineer resume rev.01
Inspector ,ElectroMechanical engineer resume rev.01yousef amrou
 
Presentation on Air Heater Inspection
Presentation on Air Heater Inspection Presentation on Air Heater Inspection
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
Sharad Naik
 
Certificado Bureau Veritas
Certificado Bureau Veritas  Certificado Bureau Veritas
Certificado Bureau Veritas
eduardocodior
 
L&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesL&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve Industries
Babu Kuriakose
 
Aproved QCP.pdf
Aproved QCP.pdfAproved QCP.pdf
Aproved QCP.pdf
hyperm2m
 
Txmer quality plan 2
Txmer quality plan 2Txmer quality plan 2
Txmer quality plan 2
Naresh Raju
 
MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)Muhammad Ullah
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
Metal Additive Manufacturing - part 3
Metal Additive Manufacturing - part 3Metal Additive Manufacturing - part 3
Metal Additive Manufacturing - part 3
Marco Preziosa
 

Similar to MOODY S.A GTW ER70S-6 SMW E7018 (20)

QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
Inspector ,ElectroMechanical engineer resume rev.01
Inspector ,ElectroMechanical  engineer resume rev.01Inspector ,ElectroMechanical  engineer resume rev.01
Inspector ,ElectroMechanical engineer resume rev.01
 
Amar Resume
Amar ResumeAmar Resume
Amar Resume
 
NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0
 
Presentation on Air Heater Inspection
Presentation on Air Heater Inspection Presentation on Air Heater Inspection
Presentation on Air Heater Inspection
 
Ahmed-Abdel-aziz-osman
Ahmed-Abdel-aziz-osmanAhmed-Abdel-aziz-osman
Ahmed-Abdel-aziz-osman
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Certificado Bureau Veritas
Certificado Bureau Veritas  Certificado Bureau Veritas
Certificado Bureau Veritas
 
Seaman_Kyle_NDT
Seaman_Kyle_NDTSeaman_Kyle_NDT
Seaman_Kyle_NDT
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
L&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesL&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve Industries
 
Aproved QCP.pdf
Aproved QCP.pdfAproved QCP.pdf
Aproved QCP.pdf
 
Txmer quality plan 2
Txmer quality plan 2Txmer quality plan 2
Txmer quality plan 2
 
MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
N.Sadhasivam_CV
N.Sadhasivam_CVN.Sadhasivam_CV
N.Sadhasivam_CV
 
N.Sadhasivam_CV
N.Sadhasivam_CVN.Sadhasivam_CV
N.Sadhasivam_CV
 
Metal Additive Manufacturing - part 3
Metal Additive Manufacturing - part 3Metal Additive Manufacturing - part 3
Metal Additive Manufacturing - part 3
 
AhMED ABOU HAMED CV
AhMED ABOU HAMED  CVAhMED ABOU HAMED  CV
AhMED ABOU HAMED CV
 
KASHIF MAQBOOL RESUME
KASHIF MAQBOOL RESUMEKASHIF MAQBOOL RESUME
KASHIF MAQBOOL RESUME
 

More from THEODORE AVRAMIDIS (20)

32
3232
32
 
31
3131
31
 
30
3030
30
 
29
2929
29
 
28
2828
28
 
27
2727
27
 
26
2626
26
 
25
2525
25
 
24
2424
24
 
23
2323
23
 
22
2222
22
 
21
2121
21
 
20
2020
20
 
19
1919
19
 
18
1818
18
 
17
1717
17
 
16
1616
16
 
15
1515
15
 
14
1414
14
 
13
1313
13
 

MOODY S.A GTW ER70S-6 SMW E7018

  • 1. MOODYS.A. 21, Elvetias Str, 153 42 Agia Paraskevi, tel..: 210-6009040, Fax: 210-6009091, E-mail : info@moody.gr THE INTERNATIONAL INSPECTION, PROCUREMENT, EXPEDITING AND QUALITY ASSURANCE ENGINEERS WELDER/WELDING OPERATOR PERFORMANCE QUALIFICATION Eill-/JE-11 ANAe. 04 Certificate No: 20568100.319.370 Notified Body Ref No.:0656 Issued to (Company Name): ANTONIADIS N. & SIA O.E. Test Conducted at: MEGALOPOLI-GREECE Welder's Name: AVRAMIDIS THEODOROS Stamp No I ID No: WR203 Welding Process(es) Used: GTAW+SMAW -PHOTO- Type(s) of Process(es) Involved: MANUAL Qualification Per: ASME IX: 2011 In Accordance With WPS No: MEK 1/12 of 08/01/2012 Supporting WPQR No: 18466/00.319.303 of 07/01/2012 TEST COUPON & WELDING DETAILS RANGE OF QUALIFICATION No of Test Coupons Made: 1 Joint Type of Test Coupon(s): SINGLE- V GROOVE Qualified for: GROOVE & FILLET Backing (Yes/No): NO (GTAW)/YES (SMAW) Qualified for: WITHOUT, WITH {GTAW) WITH(SMAW) Backing Material: SFA 5.18-05/ ER70S-6 Material Spec.: SA 106 Gr. B PNo.: 1 Qualified for: P Nos.: 1 + 15F + 34 + 41 + 49 Plate or Pipe: PIPE Qualified for: PLATE&PIPE Test Specimen(s) Thickness: 11,13mm Weld Deposit Thickness: 5,00mm (GTAW) Qualified for: Max. 10,00 mm (GTAW) (Per Welding Process) 6,13 mm (SMAW) Max. 12,26 mm (SMAW) Diameter Welded: 3" (88,9mm) Qualified for: O.D. 2!: 2 7/8" (73 mm) Filler Metal Designation: SFA5.18-05/ER70S-6 (GTAW) (Asme Spec. No/ Aws Class. No) SFA 5.1-04/ E 7018 (SMAW) FNo.: 6 (GTAW), 4 (SMAW) Qualified for: ALL F No 6 (GTAW) F No 1 UP TO 4 (SMAW) Filler Metal Product Form: BARE (SOLID) WIRE (GTAW) Qualified for: BARE OR METAL CORED (GTAW&PAW) WIRE (GTAW) Consumable Insert: N.A. Qualified for: WITHOUT Flux Type (SAlt?: N.A. Test Position(s): 6G Qualified for: ALL POSITIONS Welding Progress: UPHILL Qualified for: UPHILL Shielding Gas: ARGON (GTAW), N.A. (SMAW) Type ofGas: INERT (GTAW), N.A. (SMAW) Composition ofShielding Gas: 99,996% Ar (GTAW), N.A. (SMAW) Backing Gas (Back Purging): N.A. Type of Gas: N.A. Qualified for: WITH, WITHOUT Composition ofBacking Gas: N.A. Current: DC (GTAW & SMAW) Qualified for: DC (GTAW), ANY(SMAW) Polarity: EN (GTAW), EP(SMAW) Qualified for: EN (GTAW), ANY (SMAW) Transfer Mode: Qualified for: (GMAW &FCAW): - - Direct/Remote Visual Control: - Qualified for: - (Machine Welding) Automatic Voltage Control: - Qualified for: -(Machine Welru;g) Automatic Joint Tracking: - Qualified for: - 1)/(Machine Welding) ~THIS INSPECTION HAS BEEN CARRIED OUT TO THE BEST OF OUR KNOWLEDGE AND ABILITY AND OUR RESPONSIBILITY IS LIMITED TO THE EXERCISE OF DUE CARI(...rdiD THE RESULTS CONCERN 'EkrxO<; Ap. nurr.l03-3 ONLY THE ITEMS INSPECTED. THIS CERTIFICATE IS NOT INTENDED TO RELIEVE THE PARTIES CONCERNED FROM THEIR CONTRACTUAL OBLIGATIONS . THE PRESENT REPORT CAN ONLY BE REPRODUCED IN ITS WHOLE ENTITY AND AFTER THE APPROVAL OF THE INSPECTION BODY AND THE CLIENT Page 1 of3
  • 2. MOODYS.A. 21, Elvetias Str, 153 42 Agia Paraskevi, tel..: 210-6009040, Fax: 210-6009091, E-mail : info@moody.e:r THE INTERNATIONAL INSPECTION, PROCUREMENT, EXPEDITING AND QUALITY ASSURANCE ENGINEERS WELDER/WELDING OPERATOR PERFORMANCE QUALIFICATION EIII-L1E-ll ANA@. 04 Certificate No: 20568100.319.370 Notified Body Ref No.:0656 DESTRUCfiVE I NON-DESTRUCfiVE TESTS PERFORMED Please Cross Out Voids Where Not Applicable A. VISUAL EXAMINATION (Acceptance Criteria Per Para. QW-194) Coupon No: Results & Remarks (Per Coupon): 1 Visual Inspection performed on 25104/2013 with Acceptable results (Position 6G) B. 1. TRANSVERSE-BEND TESTS Specimens Per Para. 161, Test Procedure Per Para. 162, Acceptance Criteria Per Para. QW-163) Type of Test I Examination: Test Specimen according to: Specimen No: Results & Remarks 1. Guided Root Bend Tests QW-462.3 a 2. Guided Face Bend Tests QW-462.3 a) 3. Guided Side Bend Tests QW-462.2 B.2. Laboratory Test Records Attached: Test Conducted By: Record No.: Issued On: 1. 2. 3. C. 1. LONGITUDINAL-BEND TESTS (Specimens Per Para. 161, Test Procedure Per Para. 162, Acceptance Criteria Per Para. QW-163) Type of Test I Examination: Test Specimen according to: Specimen No: Results & Remarks (Per Specimen): 1. Guided Root Bend Tests QW-462.3(b) 2. Guided Face Bend Tests QW-462.3(b) C.2. Laboratory Test Records Attached: Test Conducted By: Record No.: Issued On: 1. 2. D. 1. FILLET WELD TESTS (Specimens Per Para 181, Test Procedure And Acceptance Criteria Per Para. QW-182 & 184) Type of Test I Examination: Test Specimen according to: Specimen No: Results & Remarks (Per Specimen): 1. Macro QW-462.4(b) 2. Fracture QW-462.4(b) 3. Macro QW-462.4(c) 4.Fracture QW-462.4(c) D.2. Laboratory Test Records Attached: Test Conducted By: Record No.: Issued On: 1. 2. 3. 4. E. 1. RADIOGRAPHIC EXAMINATION (Testing Per ASME BPV, Set. V, Art. 2, Acceptance Criteria Per Para. QW-191.2) Coupon No: Results & Remarks (Per Coupon : 1 ACCEPTED E.2. Laboratory Test Records Attached: Test Conducted By: Record No.: Issued On: 1. ATOM DYNAMIC RT REPORT No.: WQ001 DOKOSl/13 29104/2013 2. 3. 4. F. OTHER TESTS I EXAMINATION We certify that the statements in this record are correct and that the test coupons were prepared, welded, and tested in cordance with requirements of Section IX of the ASME Code. Date: 29/04/2013 "EA.eyx~ Ap. fltctr.l03-3 Page 2 of3
  • 3. MOODYS.A. 21, Elvetias Str, 153 42 Agia Paraskevi, tel..: 210-6009040, Fax: 210-6009091, E-mail: info@moody.gr THE rNTERNATIONAL rNSPECTION, PROCUREMENT, EXPEDITrNG AND QUALITY ASSURANCE ENGrNEERS WELDER/WELDING OPERATOR PERFORMANCE QUALIFICATION Eill-LJE-ll ANA@. 04 Certificate No: 20568100.319.370 Notified Body Ref No.:0656 This Certificate remains valid for a period of six months only if the welder named overleaf has been employed on the Class or type of welding, with satisfactory results, during the period of six months since initial approval of that endorsement. Prolongation of validity shall be subject to the MI Inspectors satisfaction with respect to the welder's documented record and any specific Code requirements. SIGNATURE OF INSPECTOR DATE VALID VERIFING ACCEPTABLE MI SfAMP AND DATE OF ISSUE WELDING PERFORMANCE JL 25/10/2013 VI_ -~ ~ 25/04/2013 ////1 / / fl_/ This report has been issued on verification ofthe successful implementation ofthe tests outlined above. Test reports form an i11tegral part ofthe performance qualification certificate ofthe welder 11amed overleafand should be available on request. =~~~~~~~~~~~~~~~~~--------------------------------------------------------------------- ~ 1 HIS INSPECTION HAS BEEN CARRIED OUT TO THE BEST OF OUR KNOWLEDGE AND ABILITY AND OUR RESPONSIBILITY IS LIMITED TO THE EXERCISE OF DUE CARE AND THE RESULTS CONCERN '- T~ ONLY THE I TEMS INSPECTED. THIS CERTIFICATE IS NOT INTENDED TO RELIEVE THE PARTI ES CONCERNED FROM THEIR CONTRACTUAL OBLIGATIONS . THE PRESENT REPORT CAN ONLY BE REPRODUCED IN ITS WHOLE ENTITY AND AE~ER THE APPROvru. OF THE INSPECTION BODY AND THE CLIENT 'E4:yxO<; Ap. Otcrr.l03-3 Page 3 of3