1. Kyle Seaman
843-504-6183
Kyleseaman8520@yahoo.com
4252 S 109th E Ave Apt 1418
Tulsa, OK 74146
OBJECTIVE: Seeking employment as a Nondestructive Testing Technician utilizing my
specialized training and skills.
EDUCATION: Spartan College of Aeronautics & Technology, Tulsa, OK Grad: 12/23/15
Nondestructive Testing Technology
Perfect Attendance Awards Dean’s List
Educational experience in compliance with: ASNT: SNT-TC-1A, NAS410, ASME, AWS,
ANSI/ASNT CP-189 Regulations ASM-MEI Certificate
Radiation Safety 180 hrs Magnetic Particle Testing 60 hrs
Radiography 180 hrs Liquid Dye Penetrant 60 hrs
Ultrasonic Inspection 180 hrs Eddy Current Testing 180 hrs
Introduction to Materials & Processes 60 hrs
Leak Testing, ASM-MEI Welding Inspection: Welding Codes & Standards 180 hrs
Welding Codes & Standards
The Welding Inspector
The Metric System, Welding Terms and Symbols
Basic Welding Metallurgy
Materials Control, Weld Joint Inspection and Temperature Control
Welding, Joining and Cutting Processes-I
Welding, Joining and Cutting Processes-II
Qualification of Welding Procedures, Welders and Welding Operation
Codes Governing Welding Inspection
Weldment Imperfections and Discontinuities
Chemical, Metallurgical and Mechanical Testing of Welds
Summary of Instruction for Quality Control:
Metrology/Blueprints: 180 Hrs (Precision Measuring Instruments, Drafting)
Statistical Quality Control: 180 Hrs (Statistical Process Control)
Manufacturing Processes: 180 Hrs (Metallurgy, Heat treating, Welding, Machining)
Total Quality Management: 180 Hrs (Six Sigma, Lean Mfg, ISO 9001/2001)
Familiar with the following methods and instruments:
Magnetic Particle Testing
Magna-Tech Wet Horizontal-Contactand Coil
TSI Porta-Mag MP1000 (prods)
Magna Flux (yokes)
Ultrasonic Testing
Sonic-136 Staveley Instruments
Straight Beam,Angle Beam
Dac Curve, and LinearityGraph
Visual and Liquid Penetrant Testing
Visual and Fluorescent
Water Washable and Solvent Removable
Radiography Testing
Manual Film Processing
Lorad LPX 160KV 5MA
ITE 300KV 5MA
Fuji Dynamix Series 5 CRT System
GE Nova Automatic processor
Eddy Current Testing
Nortec 1000 and 2000 Digital Readout
Nortec 23ST, Olympus 500
Conductivity Curve, Crack Detection,
Nonconductive Coating Using Liftoff, and
Aluminum Sorting
2. EMPLOYMENT HISTORY:
TRAFFIC AMERICAN PARKING 1/15-5/15
Driving customers, Valet, Ticket jams, Jumpingvehicles, Area observer.
OFFICERSECURITAS 3/14-9/14
Area Security, FootPatrol, PersonnelHandling.
MATERIAL HANDLERGOODWILL 9/13-3/14
SortingDonatedItems, Area Beatification, and CompactorOperator.
UNIT SUPPLY SPECALISTU.SARMY 6/10-10/13
Train Soldiers, Lateral Transfers, Turn-ins, andFile systemknowledge, Word, Excel, PowerPoint, andPEBUS.
REFERENCE AVAILABLE ON REQUEST