Monthly safety report 2012 12_december

  1. 1. C270 (HK BIODIESEL PLANT) Safety Report C270 Monthly Safety Report – December 2012
  2. 2. SAFETY STATISTICSMonth: Nov 2012 Dec 2012Accumulated man-hour: 413,541 445,951Days worked since project commenced: 387 418Accumulated man-day lost: 481 605Cumulative Accident Frequency Rate: 0.97 0.90Safety :Management SupportManagement Involvement C270 Monthly Safety Report – December 2012
  3. 3. SAFETY INSPECTION / MEETING Physical site safety walks C270 Monthly Safety Report – December 2012
  4. 4. SAFETY INSPECTION / MEETINGWeekly Safety Meetings with Safety Representatives of Subcontractors C270 Monthly Safety Report – December 2012
  5. 5. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Floor opening separated and fenced by reinforcement barrier + nettingFALL PREVENTIONFloor opening should be properlyseparated and fenced C270 Monthly Safety Report – December 2012
  6. 6. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Whip Check installed to functional postiionMACHINERY SAFETYWhip Check should be properlyinstalled C270 Monthly Safety Report – December 2012
  7. 7. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Diesel Drum site on Drip TrayENVIRONMENTAL PROTECTIONDiesel Drum should be located onDrip Tray C270 Monthly Safety Report – December 2012
  8. 8. POSITIVE SAFETY ATTITUDEPRE-WORK MEETINGCHEC –Management & HSESubcon –Site Management &Supervision C270 Monthly Safety Report – December 2012
  9. 9. POSITIVE SAFETY ATTITUDETASK SPECIFIC TOOLBOX TALK TRAININGSubcon –Site Operators C270 Monthly Safety Report – December 2012
  10. 10. POSITIVE SAFETY ATTITUDESafety Campaign – Throughout Checking of Electrical Installation C270 Monthly Safety Report – December 2012
  11. 11. POSITIVE SAFETY ATTITUDESafety Campaign – Throughout Checking of Electrical Installation C270 Monthly Safety Report – December 2012
  12. 12. POSITIVE SAFETY ATTITUDERegular Site Safety Inspection by Labour Department’s DistrictOccupational Officer C270 Monthly Safety Report – December 2012
  13. 13. SAFETY TRAINING INDUCTION TRAINING Site Specific Safety Accumulate Current Month Induction (Oct 2011 – Dec 2012) No. of class 21 297 No. of Attendee 70 1365 C270 Monthly Safety Report – December 2012
  14. 14. TOOL BOX TALKSAFETY TRAINING TRAINING Accumulated Total : 4,550 nos. Topic No. of attendee Task Specific Removal of Jetty Platform 11Occupational Safety General Duties 80Occupational Safety Prevent Slip & Trip 74Occupational Safety Housekeeping 61Occupational Safety Accident Reporting 100 Current Month Total 336 nos. C270 Monthly Safety Report – December 2012
  15. 15. SAFETY Promotion Safety Circulation 5 nos. Safety News Sharing 7 nos. Safety Reminder to Subcontractors 1 no. General Safety Advice on Construction Safety 1 no. Internal – BDI interface – Hygiene issue 1 no. Risk Assessment – Dismantle of Jetty Platform 3 nos. Cold Weather Warning 1 no. Safety Advice to CHEC colleague C270 Monthly Safety Report – December 2012
  16. 16. C270 Monthly Safety Report – December 2012

×