This document summarizes the monthly safety report for the C270 Hong Kong biodiesel plant project for August 2012. It provides statistics on man-hours worked, days since project commencement, and accidents. It also describes safety inspections, areas needing improvement, positive aspects, safety training conducted, government visits, and awards given for safety improvements.
2. SAFETY STATISTICS
Month:
Jul 2012
Aug 2012
Accumulated man-hour:
279,201
314,771
Days worked since project commenced: 265
296
Accumulated man-day lost: 51 113
Cumulative Accident Frequency Rate: 0.72 0.64
ALL are an important stakeholder !
C270 Monthly Safety Report – August 2012
3. SAFETY INSPECTION / MEETING
Physical site safety walks
C270 Monthly Safety Report – August 2012
5. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
Improvement – Floor opening covered
by plywood
FALL FROM HEIGHT
Floor opening should be covered
C270 Monthly Safety Report – August 2012
6. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
Improvement – Floor edge fencing
reinstalled in position
FALL FROM HEIGHT
Floor edge fencing should be
reinstalled immediately
C270 Monthly Safety Report – August 2012
7. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
Improvement – Construction waste
removed and disposed
HOUSEKEEPING
Construction waste should be removed
and disposed on time
C270 Monthly Safety Report – August 2012
8. POSITIVE POINTERS
Pre-work meeting with different level of
Meeting with client and subcontractors subcontractors prior to commencement
for promotion of positive climate of works
C270 Monthly Safety Report – August 2012
9. SAFETY AWARD
Commendations
Mr. Au Wai Chiu (Section Manager) presented
SAFETY IMPROVEMENT AWARD to subcontractor
Chung Kong
C270 Monthly Safety Report – August 2012
10. SAFETY TRAINING
INDUCTION
TRAINING
Site Specific Safety Accumulate
Current Month
Induction (Oct 2011 – Aug 2012)
No. of class 22 211
No. of Attendee 95 1020
C270 Monthly Safety Report – August 2012
11. TOOL BOX TALK
SAFETY TRAINING
TRAINING
Accumulated Total : 2,595 nos.
Topic No. of attendee
Occupational Safety Prevent Heatstroke 81 nos.
Occupational Safety Inclement Weather 81 nos.
Occupational Health General Duties 72 nos.
Occupational Safety Prevention of Slip & Trip 76 nos.
Current Month Total 310 nos.
C270 Monthly Safety Report – August 2012
12. SAFETY Promotion
Safety Circulation
12 days Very Hot Weather Warning
8 days Thunderstorm Warning
2 days Typhoon Warning
AECOME – BDI – Safety Alert – incompliance to statutory
6 nos.
requirement
4 nos. HSE news sharing
3 nos. Safety Warning to subcontractors
7 nos. Safety Comment to Method Statements
2 nos. General Safety Requirement Reminder
C270 Monthly Safety Report – August 2012
13. GOVERNMENT / AUTHORITIES VISIT
LD conducted site inspection to our site on 30/8/2012
C270 Monthly Safety Report – August 2012
14. GOVERNMENT / AUTHORITIES VISIT
SE of HyD visited our site for CCSA 2012 assessment
ICE conduct regular Environment Audit to the site
SE of HyD visit on 8/8/2012 ICE conduct Environment Audit on
23/8/2012
C270 Monthly Safety Report – August 2012
15. GOVERNMENT / AUTHORITIES VISIT
HKIE Technical Visit to our site on 18/8/2012
C270 Monthly Safety Report – August 2012
16. GOVERNMENT / AUTHORITIES VISIT
HKIE Technical Visit to our site on 18/8/2012
C270 Monthly Safety Report – August 2012