MK
PM Tutorial
4/29/13 1:00PM

Team Leadership: Telling Your
Testing Stories
Presented by:
Bob Galen
RGalen Consulting

Brought to you by:

340 Corporate Way, Suite 300, Orange Park, FL 32073
888-268-8770 ∙ 904-278-0524 ∙ sqeinfo@sqe.com ∙ www.sqe.com
Bob Galen
Bob Galen is an agile coach at RGalen Consulting and director of agile solutions at Zenergy
Technologies, a North Carolina-based firm specializing in agile testing and leading agile adoption
initiatives. Bob regularly speaks at international conferences and professional groups on topics related to
software development, project management, software testing, and team leadership. He is a Certified
Scrum Master Practicing (CSC), Certified Scrum Product Owner (CSPO), and an active member of the
Agile Alliance and Scrum Alliance. Bob published Scrum Product Ownership–Balancing Value from the
Inside Out, which addresses the gap in guidance toward effective agile product management. Contact Bob
at bob@rgalen.com or bob.galen@zenergytechnologies.com.
Team Leadership
Telling Your Testing Stories

Bob Galen
President & Principal Consultant
RGCG, LLC
bob@rgalen.com

Introduction
Bob Galen
Somewhere ‘north’ of 30 years experience ☺
Various lifecycles – Waterfall variants, RUP, Agile, Chaos
Various domains – SaaS, Medical, Financial Services, Computer
& Storage Systems, eCommerce, and Telecommunications
Developer first, then Project Management / Leadership, then
Testing
Leveraged ‘pieces’ of Scrum in late 90’s; before ‘agile’ was ‘Agile’
Agility @ Lucent in 2000 – 2001 using Extreme Programming
Formally using Scrum since 2000
Currently an independent Agile Coach (CSC – Certified Scrum
Coach, one of 50 world-wide; 20+ in North America)
at RGCG, LLC and Director of Agile Solutions at Zenergy Technologies

From Cary, North Carolina
Connect w/ me via LinkedIn and Twitter if you wish
Bias Disclaimer:
Agile is THE BEST Methodology for Software Development
However, NOT a Silver Bullet!

Copyright © 2013 RGCG, LLC

2

1
Outline
Intro
Elevator Pitch / 30 Second Commercial
The Story Factor – Annette Simmons
The Leader’s Guide to Storytelling – Stephen Denning
Tell to Win – Peter Guber
Techniques
Examples
Workshop Storytelling
Close

Copyright © 2013 RGCG, LLC

3

Stories
Elevator Pitch
You’re in the middle of a testing cycle for a business critical project.
You’re testing a single component of a large system - roughly 10
testers are on your team. The Vice President of Software
development walks up to you in the lab and asks you – “How’s it
going?”
What do you say?
He challenges you on several defects that you’ve entered –
disagreeing on priority and severity
How do you respond?
This is a great opportunity. You’re either ready for it and respond
well or you don’t which do your choose?

Copyright © 2013 RGCG, LLC

4

2
Another Situation
Same situation, although time has passed and the project has
missed several of it’s planned Beta dates and things are “dicey”.
You’re in the middle of the “last” testing cycle prior to going to Beta
test. You’ve found some regressions that you “suspect” will impact
the products ability to go to Beta. The Vice President of Marketing
walks up to you in the lab and asks you – “How’s it going?”
What do you say?
How do you say it?
Another, even more critical opportunity to make an impression

Copyright © 2013 RGCG, LLC

5

Stories
Elevator Pitch
We’re in communicating situations all of the time
As Test, QA and Process engineers We’re representing the product, it’s correctness, completeness
and overall quality
We’re representing our test team and ourselves
We’re the living embodiment of “how is it going?” And “is it ready
yet?”

I refer to these ongoing and ever present conversations
as a communications & PR effort
It’s all of our jobs and we do it anyway
So why not learn techniques for doing it often and well?

Copyright © 2013 RGCG, LLC

6

3
Stories
Elevator Pitch - Introduction
Break into groups of 2
Take a minute or two and introduce yourselves. Share
on:
Background information (Overall experience, where you work,
etc.)
Biggest challenge you face at work
Ideas for facing that challenge

I’ll time each exchange
Let’s debrief

how did you do?

Copyright © 2013 RGCG, LLC

7

30 Second “Commercial”
In job search circles, they refer to your developing and
delivering a “30 second commercial” for networking. It’s
aQuick introduction
Concise overview of your background
Includes your professional history
Delivered to fit the situation, allowed time and specific audience

You take the time to develop your “commercials” from
your resume, you should have at least a few – to many
of them. They’re targeted towards different audiences
and situations.
Copyright © 2013 RGCG, LLC

8

4
30 Second Testing “Commercials”
Current work status:
What are you working on, what are your recent successes and
your challenges. Very importantly - what’s next?
Do you need any help? (escalations, ideas, alternatives,
workarounds, etc.)
If you have one message to send for status – what would it be?
Make sure you communicate it!

Current product status:
Overall view to your area of testing responsibility
What is the overall product stability, feature set maturity and
performance?
High level defect trends, schedule status and work projections
Always practice your commercials - Preparation is the key!

Copyright © 2013 RGCG, LLC

9

Characteristics
Keys to Effective Communication
Concise communications – remember the “Top 1/3” rule
If you could only say 2-3 things, what would they be?
All forms matter – written, verbal, non-verbal, defects

Target your communications
Their functional role and level within the organization
Their point of view (adopt their POV - empathize)
What they want to hear and what they need to hear
What will they do with the information you give them
Can they “handle” the truth and how much of the truth

Copyright © 2013 RGCG, LLC

10

5
Story Models

Copyright © 2013 RGCG, LLC

11

Story Telling Model
Annette Simmons
The Story Factor, published in 2006
Six stories everyone needs to be able to tell
People don’t always want data, then want faith. Faith in
you. Stories help them to find that faith in you.
The importance of ‘connection’ of staying ‘Real’

Copyright © 2013 RGCG, LLC

12

6
“Who I Am”
Stories
This is your introduction.
If you’re new to a group or role, then it’s pure introduction
If you’re new to a situation, then explaining how you faced similar
situations might be appropriate

Make them personable
Try to inject some sort of humor
Show vulnerability—illustrate a mistake or a personal
flaw
Be honest and genuine

Copyright © 2013 RGCG, LLC

13

“Why Am I Here?”
Stories
This is the “What’s in it for you” story
Explain your career path—why are you particularly skilled to do
this?
Or explain a project path—what events have led to your getting
involved?
Share what are you trying to achieve, and why
Sometimes your very role, charter, or mandate on the part of your
company helps here

These last two are easy and hard—linking to you. They
might also blend together into a single story.

Copyright © 2013 RGCG, LLC

14

7
Vision
Stories
This is the “What’s in it for others?” story
At a leadership level—where are you proposing taking the
organization? Why? looking for alignment
At an agile level—what methods and path will be used? How will
we measure success?
At a project level—what is the purpose / goal of the project? And
how do you envision our supporting that goal?
Often its about sharing a high-level strategy
Connecting it so that others can ‘See’ it

Copyright © 2013 RGCG, LLC

15

Teaching
Stories
Sharing your experience
Learning from mistakes
Failing Forward
The Wisdom of the Crowd
Trusting each other; 5 Dysfunctions of a Team
Sharing ‘models’ for maturation and improvement

Patterns
Anti-patterns; often we can learning more from what didn’t work
Solving problems
Listen to our customers; take & accept feedback

Copyright © 2013 RGCG, LLC

16

8
5 Dysfunctions of a Team -- Lencioni
Inattention to

Results
Avoidance of

Accountability
Lack of

Commitment
Fear of

Conflict
Absence of

Trust
Copyright © 2013 RGCG, LLC

17

“Values-in-Action”
Stories
Playing back “actions” stories
Team members helping each other
Projects under ‘stress’ and how teams’ seemed to rise to the
occasion
Character checking / building events
Agile teams holding to their “quality commitments” and time-box
agreements
Persistence, patience, staying the course

Copyright © 2013 RGCG, LLC

18

9
“I Know What You’re Thinking”
Stories
This is your opportunity to address
Fear, Uncertainty, and Doubt
Dissention
Historical patterns
Trust in leadership vs. Trust in your teams
Undermining, lack of true support, waiting things out
We don’t address performance issues
Everyone treated the same
Nobody is ever fired or released based on poor performance

New ‘Sheriff’ in Town; new rules and a new spirit

Copyright © 2013 RGCG, LLC

19

Story Telling Model
Stephen Denning

The Leader’s Guide to Storytelling
published in 2005. Author of Squirrel Inc.
Similarities to The Story Factor, but with a leadership
and more in-depth focus.
Denning has gone onto become immersed in innovation,
leadership reinvention, and agile methods.
Copyright © 2013 RGCG, LLC

20

10
8 Narrative Patterns
Stephen Denning
1.

**Motivate Others to Action
Using narrative to ignite action and implement new ideas

2.

Build Trust in You
Using narrative to communicate who you are

3.

Build Trust in your Company
Using narrative to build your brand

4.

Transmit your Values
Using narrative to instill organizational values

Copyright © 2013 RGCG, LLC

21

8 Narrative Patterns
Stephen Denning
5.

**Getting Others Working Together
Using narrative to get things done collaboratively

6.

Share Knowledge
Using narrative to transmit knowledge and understanding

7.

Tame the Grapevine
Using narrative to neutralize gossip and rumor

8.

Create and Share Your Vision
Using narrative to lead people into the future

Copyright © 2013 RGCG, LLC

22

11
Tell to Win
Peter Guber
1.

Motivation
Your, be intentional, passion, engage

2.

Audience
Render an experience, connect, align with

3.

Goal
Purposeful, build an ongoing relationship (not a point
transaction)

4.

Interaction
For them to own, secret sauce

5.

Content
Its everywhere, your own experiences, what moves you

Copyright © 2013 RGCG, LLC

23

General
Techniques

Copyright © 2013 RGCG, LLC

24

12
Basic Framework
Still quite effective…
Tell them what you’re about to tell them
Tell them
Tell them what you just told them
Oreo Cookie Model (sandwich)
From a Planning and a Strategy perspective, consider:
Opening Moves
Middle Game
End Game

Copyright © 2013 RGCG, LLC

25

The “One Thing”

When it comes to risky, controversial, and emotional
conversations, skilled people find a way to get all
relevant information out into the open.
That’s it. At the core of every successful conversation lies
the free flow of relevant information. People openly and
honestly express their opinions, share their feelings, and
articulate their theories.
They willingly and capably share their views, even when
their ideas are controversial or unpopular.
Copyright © 2013 RGCG, LLC

26

13
The Pareto Principal
Crossing the Chasm
Communicate mostly to the 80%
Communicate mostly to the Early Adopters and the
Majority
Tailor your message to these folks; reach out to their
interests, connecting to them

Copyright © 2013 RGCG, LLC

27

Turning Points

Major shift points or nexus points can be useful in stories
A major shift or turning point in your life
A major external turning point to you personally, your group, your
organization; M&A activity
A major turning point in a project
A key player leaving your team

Example: I’ve often used lay-offs as transition points for
major shifts in my career. From the ashes rises another
chapter.
My two books have resulted from these transitions
Copyright © 2013 RGCG, LLC

28

14
Connecting to Your Audience
Reference their perspectives
Reference their context
What would you want to hear IF you were in their shoes
What sorts of history relates to your topic
Walk about, make eye contact
Talk about what you’d like to help the audience do, how
you’d like to serve them
Keep the Servant Leadership mindset in mind
throughout
Copyright © 2013 RGCG, LLC

29

Admiration
Someone you knew when you were growing up
Someone in the organization who has met a lot to you
The person you admire most in your organization
Someone who did better in the organization than anyone
expected
Someone who mentored you (showed you the ropes) in
the organization
Someone who handled adversity incredibly well in the
organization
Someone who is a humble servant leader

Copyright © 2013 RGCG, LLC

30

15
Goals & Objectives
You can’t force collaboration. You can encourage it
towards specific expectations surrounding Goals &
Objectives
Major initiative
Major project
Major new methodology
Challenging new
technology
Quarterly / Annual
goal-setting
Connecting alignment to the top-line strategies

We’re all being measured together
Copyright © 2013 RGCG, LLC

31

Clarifying & Listening

Were you listening?
Play it back to me what were the key points?
What do you think will be the most challenging parts of
the strategy?
Is this the right direction? Does anyone see crucial
adjustments that need to be made?

Copyright © 2013 RGCG, LLC

32

16
Humor

Self deprecating humor can be incredibly
powerful in stories— particularly as an introductory
device
Share internal stories that are commonly views as
humorous
Twist questions around, be playful with your audience
You don’t have to be a comedian; be yourself

Copyright © 2013 RGCG, LLC

33

Adding Context
Add appropriate breadth and depth to the context that
folks normally wouldn’t have—
Risk context
Organizational context
Impact context
Customer context
Dependency context
Quality context
Leadership context
Technical context
Revenue context

Copyright © 2013 RGCG, LLC

34

17
Power of Transparency
13 Behaviors that Foster &
Increase Trust
1.
2.
3.
4.
5.
6.
7.

Talk Straight
Demonstrate Respect
Create Transparency
Right Wrongs
Show Loyalty
Deliver Results
Get Better

8. Confront Reality
9. Clarify Expectations
10. Practice Accountability
11. Listen First
12. Keep Commitments
13. Extend Trust

Copyright © 2013 RGCG, LLC

35

Visualization

Try to paint a picture
Directionally committed – Burn the ships behind you

Let pictures do some of your talking for you
Mine the organization for supportive “pictures”
Defect reports, project failures, M&A intentions, success & failure
email, metrics, virtually anything that adds to the imagery

Copyright © 2013 RGCG, LLC

36

18
Group-based Stories
Engaging multiple story-tellers
Defining a strategy around a group with different
Perspectives
Stories
Audience Connections

For example, we’re “ Going Agile”
Engage Development + Quality + Product
Engage team member(s) from pilot team(s)
Engage leadership to speak to the core drivers

Copyright © 2013 RGCG, LLC

37

When trying to make a point…
Let it emerge
Don’t start with it:
This is a story about incredible courage. At the end, you will
aspire to be like me

Or end with:
And now I expect you all to be like me

Allow everyone to come to their own conclusions.
Of course, you can recount what it means to YOU

Copyright © 2013 RGCG, LLC

38

19
Safety
In order to get feedback the environment has to be
considered ‘Safe’
Commit to “What happens in Vegas ” for all story telling session
Don’t be afraid to disagree or debate, just don’t take follow-on
actions
Tell stories about how much you appreciate candor, feedback,
and truth-telling

It will take time to establish trust, but well worth it. Safety
needs to be 100%

Copyright © 2013 RGCG, LLC

39

What to try?
Find opportunities for stories
Keep a diary; remember key events
When in doubt or when there’s a ‘void’ start
Remember: we can all tell stories, think about your
interviews
When it feels like its time to stop stop
Walk around, make eye contact, take questions
Be yourself; don’t try to be someone else
It’s better to tell a story badly, than to not tell one at all
when the opportunity is there
Copyright © 2013 RGCG, LLC

40

20
What to avoid?
Ridicule
Lying or stretching the truth
Poking fun
Mean spiritedness
Getting personal
Complexity – multi-threaded stories
Making it about you
Negativity, pessimism, excessive realism

Copyright © 2013 RGCG, LLC

41

Group-based Workshop
Storytelling

Copyright © 2013 RGCG, LLC

42

21
Example Stories / Situations
I want to mine everyone for story examples
Situations where you told a story effectively
Situations where a story would have worked, but you
didn’t leverage it
Observations from your history that could be re-framed
into an effective story
This is NOT storytelling, but just brainstorming & mining
examples from each other

Copyright © 2013 RGCG, LLC

43

The notion of a Triad
I want you to break out into groups of three
We’ll rotate around 3 primary roles
Story-teller
Story audience
Story observer

We’ll explore each of you telling a story
One of you volunteers with a potential story
All three will strategize on the structure of the story
Tell the story
Debrief the story

Copyright © 2013 RGCG, LLC

44

22
Introductions
You have 6 minutes, two minutes each
Properly introduce yourselves to your Triad team
Professional introduction: work, how long, career path, current
title, current responsibilities, likes & dislikes
Personal introduction: family, children, where you live, vacation,
hobbies, volunteering, recent books you’ve read
In the last year, what are compelling truths you’ve discovered?
What do the next five years hold in store for you?

Copyright © 2013 RGCG, LLC

45

Story #1
Introduction
Imagine you’ve just joined your current group as a leader
or senior contributor
The group is tight-nit and tenure of quite long, so you
want to make a good first impression to
You decide to tell a story about yourself—as a means of
sharing some insights as a way of introduction
One that – shares more about who you are (either
professionally, personally, or both)
Also, one that sets the stage for some changes you plan
on making within the organization

Copyright © 2013 RGCG, LLC

46

23
Story #2
Confidence & Direction
Think of your toughest, most challenging projects that
you’ve encountered in your career
Think of what made it challenging, and more importantly,
what were the factors that you brought to bear to deliver
the project
Get down to the essence of that made it work out.
Now translate these lessons to a current project and
share a story relating the pervious to this
one connecting the dots and trying to inspire
confidence and direction

Copyright © 2013 RGCG, LLC

47

Story #3
Vision – “Going Agile”
Your current organization has decided to go agile
Leadership is basically driving it down from above, so
you and your team have little choice but to “get on
board”
You do feel it’s the right decision, but for your own
reasons. You also realize it will be a great cultural
challenge for your team. Many of whom have been
around for 20+ years
This is your first exposure to them of what's about to
happen, why, and how you expect it to evolve

Copyright © 2013 RGCG, LLC

48

24
Story #4
Interview
Your interviewing a new test manager for within your
team. She’s come wildly recommended and the interview
has proven the accolades to be understated. She’s
outstanding
You’ve been given the closing position on the interview
She asks you about the culture and why you get up in
the morning. What’s exciting about your job and why are
you there.
Here’s your chance to WOW her and close the deal

Copyright © 2013 RGCG, LLC

49

Story #5
Project Status
Quite frankly, you wish they would cancel this project.
It’s over schedule by 6 weeks and testers on it need to
move onto their next effort—so everyone is multi-tasking
and stretched
The software doesn’t meet the clients needs and the
development team doesn’t know what they’re doing
Each release has more defects than the last and your in
a death spiral of fix – test – refix
The VP of Product Development has asked you for an
assessment of the situation from a “QA perspective” for
himself and the rest of the leadership team—now
Copyright © 2013 RGCG, LLC

50

25
Story #6
Agile Automation Initiative
You’ve been on-board as a senior test manager for 3
months.
You were initially shocked that there was no automation
strategy in place and that only about 10% of the
regressions suite was automated
It’s a tremendous resource and time waste and you’ve
just sold management on your ideas for investing in
automation
You now want to share your vision with the testing team
and created a shared strategy that will quickly change
the dynamics
Copyright © 2013 RGCG, LLC

51

Wrap-up

•

Hope we challenged your existing
assumptions a bit
Inspire you to change your view towards Automation ROI
and investment
What did I miss?

•

Final questions or discussion?

•

•

Thank you!
Copyright © 2013 RGCG, LLC

52

26
Contact Info
Bob Galen
Principal Consultant,
RGalen Consulting Group, L.L.C.

Director of Agile Solutions,
Zenergy Technologies,

Blogs
Project Times http://www.projecttimes.com/robert-galen/
Business Analyst – BA Times http://www.batimes.com/robert-galen/
My Podcast on all things ‘agile’ http://www.meta-cast.com/

Experience-driven agile focused
training, coaching & consulting
Contact: (919) 272-0719
bob@rgalen.com
bob.galen@zenergytechnologies.com
www.rgalen.com

Copyright © 2013 RGCG, LLC

53

Story of Joe
Vulnerability & Patience
Facilitated, introduction to the Technology leadership
team. HR gathered questions
Joe was in the military in Germany and Special Forces.
During an “accident” he suffered a brain injury and was
essentially left for dead
He eventually was brought to hospital and recovered,
although to this day, he’s receiving operations
The team focused on these details instead of trying to
find out about his style and intentions
Point is: he graciously answered every question no
matter how personal or painful.
Copyright © 2013 RGCG, LLC

54

27
Story of Company A
Lack of Transparency & Honesty
External emphasis on growth, prosperity, stock option
worth, etc.
VC funded growth; deferring profitability
Behind closed doors:
Company doing poorly, strategies
Finances were obfuscated
Lay-offs
Projecting when we’d run out of VC funding

Surprise!
Lay-offs
Strategic move towards self-sufficiency & profitability
Copyright © 2013 RGCG, LLC

55

Story related to Dysfunctional Test Team
Improving Group Performance
In general, I used stories to re-frame expectations of the
testing team at Company E. They took the following
flavors:
Stories of performance that aligned with our new models; and
aligned with recognition
Stories of what performance we were looking to change at a
group level – examples of the future
1:1 stories in performance coaching; leveraging role models and
real examples
External stories related to the changes / efforts the team was
making in reshaping itself. This was very much ‘marketing’

Copyright © 2013 RGCG, LLC

56

28

Team Leadership: Telling Your Testing Stories

  • 1.
    MK PM Tutorial 4/29/13 1:00PM TeamLeadership: Telling Your Testing Stories Presented by: Bob Galen RGalen Consulting Brought to you by: 340 Corporate Way, Suite 300, Orange Park, FL 32073 888-268-8770 ∙ 904-278-0524 ∙ sqeinfo@sqe.com ∙ www.sqe.com
  • 2.
    Bob Galen Bob Galenis an agile coach at RGalen Consulting and director of agile solutions at Zenergy Technologies, a North Carolina-based firm specializing in agile testing and leading agile adoption initiatives. Bob regularly speaks at international conferences and professional groups on topics related to software development, project management, software testing, and team leadership. He is a Certified Scrum Master Practicing (CSC), Certified Scrum Product Owner (CSPO), and an active member of the Agile Alliance and Scrum Alliance. Bob published Scrum Product Ownership–Balancing Value from the Inside Out, which addresses the gap in guidance toward effective agile product management. Contact Bob at bob@rgalen.com or bob.galen@zenergytechnologies.com.
  • 3.
    Team Leadership Telling YourTesting Stories Bob Galen President & Principal Consultant RGCG, LLC bob@rgalen.com Introduction Bob Galen Somewhere ‘north’ of 30 years experience ☺ Various lifecycles – Waterfall variants, RUP, Agile, Chaos Various domains – SaaS, Medical, Financial Services, Computer & Storage Systems, eCommerce, and Telecommunications Developer first, then Project Management / Leadership, then Testing Leveraged ‘pieces’ of Scrum in late 90’s; before ‘agile’ was ‘Agile’ Agility @ Lucent in 2000 – 2001 using Extreme Programming Formally using Scrum since 2000 Currently an independent Agile Coach (CSC – Certified Scrum Coach, one of 50 world-wide; 20+ in North America) at RGCG, LLC and Director of Agile Solutions at Zenergy Technologies From Cary, North Carolina Connect w/ me via LinkedIn and Twitter if you wish Bias Disclaimer: Agile is THE BEST Methodology for Software Development However, NOT a Silver Bullet! Copyright © 2013 RGCG, LLC 2 1
  • 4.
    Outline Intro Elevator Pitch /30 Second Commercial The Story Factor – Annette Simmons The Leader’s Guide to Storytelling – Stephen Denning Tell to Win – Peter Guber Techniques Examples Workshop Storytelling Close Copyright © 2013 RGCG, LLC 3 Stories Elevator Pitch You’re in the middle of a testing cycle for a business critical project. You’re testing a single component of a large system - roughly 10 testers are on your team. The Vice President of Software development walks up to you in the lab and asks you – “How’s it going?” What do you say? He challenges you on several defects that you’ve entered – disagreeing on priority and severity How do you respond? This is a great opportunity. You’re either ready for it and respond well or you don’t which do your choose? Copyright © 2013 RGCG, LLC 4 2
  • 5.
    Another Situation Same situation,although time has passed and the project has missed several of it’s planned Beta dates and things are “dicey”. You’re in the middle of the “last” testing cycle prior to going to Beta test. You’ve found some regressions that you “suspect” will impact the products ability to go to Beta. The Vice President of Marketing walks up to you in the lab and asks you – “How’s it going?” What do you say? How do you say it? Another, even more critical opportunity to make an impression Copyright © 2013 RGCG, LLC 5 Stories Elevator Pitch We’re in communicating situations all of the time As Test, QA and Process engineers We’re representing the product, it’s correctness, completeness and overall quality We’re representing our test team and ourselves We’re the living embodiment of “how is it going?” And “is it ready yet?” I refer to these ongoing and ever present conversations as a communications & PR effort It’s all of our jobs and we do it anyway So why not learn techniques for doing it often and well? Copyright © 2013 RGCG, LLC 6 3
  • 6.
    Stories Elevator Pitch -Introduction Break into groups of 2 Take a minute or two and introduce yourselves. Share on: Background information (Overall experience, where you work, etc.) Biggest challenge you face at work Ideas for facing that challenge I’ll time each exchange Let’s debrief how did you do? Copyright © 2013 RGCG, LLC 7 30 Second “Commercial” In job search circles, they refer to your developing and delivering a “30 second commercial” for networking. It’s aQuick introduction Concise overview of your background Includes your professional history Delivered to fit the situation, allowed time and specific audience You take the time to develop your “commercials” from your resume, you should have at least a few – to many of them. They’re targeted towards different audiences and situations. Copyright © 2013 RGCG, LLC 8 4
  • 7.
    30 Second Testing“Commercials” Current work status: What are you working on, what are your recent successes and your challenges. Very importantly - what’s next? Do you need any help? (escalations, ideas, alternatives, workarounds, etc.) If you have one message to send for status – what would it be? Make sure you communicate it! Current product status: Overall view to your area of testing responsibility What is the overall product stability, feature set maturity and performance? High level defect trends, schedule status and work projections Always practice your commercials - Preparation is the key! Copyright © 2013 RGCG, LLC 9 Characteristics Keys to Effective Communication Concise communications – remember the “Top 1/3” rule If you could only say 2-3 things, what would they be? All forms matter – written, verbal, non-verbal, defects Target your communications Their functional role and level within the organization Their point of view (adopt their POV - empathize) What they want to hear and what they need to hear What will they do with the information you give them Can they “handle” the truth and how much of the truth Copyright © 2013 RGCG, LLC 10 5
  • 8.
    Story Models Copyright ©2013 RGCG, LLC 11 Story Telling Model Annette Simmons The Story Factor, published in 2006 Six stories everyone needs to be able to tell People don’t always want data, then want faith. Faith in you. Stories help them to find that faith in you. The importance of ‘connection’ of staying ‘Real’ Copyright © 2013 RGCG, LLC 12 6
  • 9.
    “Who I Am” Stories Thisis your introduction. If you’re new to a group or role, then it’s pure introduction If you’re new to a situation, then explaining how you faced similar situations might be appropriate Make them personable Try to inject some sort of humor Show vulnerability—illustrate a mistake or a personal flaw Be honest and genuine Copyright © 2013 RGCG, LLC 13 “Why Am I Here?” Stories This is the “What’s in it for you” story Explain your career path—why are you particularly skilled to do this? Or explain a project path—what events have led to your getting involved? Share what are you trying to achieve, and why Sometimes your very role, charter, or mandate on the part of your company helps here These last two are easy and hard—linking to you. They might also blend together into a single story. Copyright © 2013 RGCG, LLC 14 7
  • 10.
    Vision Stories This is the“What’s in it for others?” story At a leadership level—where are you proposing taking the organization? Why? looking for alignment At an agile level—what methods and path will be used? How will we measure success? At a project level—what is the purpose / goal of the project? And how do you envision our supporting that goal? Often its about sharing a high-level strategy Connecting it so that others can ‘See’ it Copyright © 2013 RGCG, LLC 15 Teaching Stories Sharing your experience Learning from mistakes Failing Forward The Wisdom of the Crowd Trusting each other; 5 Dysfunctions of a Team Sharing ‘models’ for maturation and improvement Patterns Anti-patterns; often we can learning more from what didn’t work Solving problems Listen to our customers; take & accept feedback Copyright © 2013 RGCG, LLC 16 8
  • 11.
    5 Dysfunctions ofa Team -- Lencioni Inattention to Results Avoidance of Accountability Lack of Commitment Fear of Conflict Absence of Trust Copyright © 2013 RGCG, LLC 17 “Values-in-Action” Stories Playing back “actions” stories Team members helping each other Projects under ‘stress’ and how teams’ seemed to rise to the occasion Character checking / building events Agile teams holding to their “quality commitments” and time-box agreements Persistence, patience, staying the course Copyright © 2013 RGCG, LLC 18 9
  • 12.
    “I Know WhatYou’re Thinking” Stories This is your opportunity to address Fear, Uncertainty, and Doubt Dissention Historical patterns Trust in leadership vs. Trust in your teams Undermining, lack of true support, waiting things out We don’t address performance issues Everyone treated the same Nobody is ever fired or released based on poor performance New ‘Sheriff’ in Town; new rules and a new spirit Copyright © 2013 RGCG, LLC 19 Story Telling Model Stephen Denning The Leader’s Guide to Storytelling published in 2005. Author of Squirrel Inc. Similarities to The Story Factor, but with a leadership and more in-depth focus. Denning has gone onto become immersed in innovation, leadership reinvention, and agile methods. Copyright © 2013 RGCG, LLC 20 10
  • 13.
    8 Narrative Patterns StephenDenning 1. **Motivate Others to Action Using narrative to ignite action and implement new ideas 2. Build Trust in You Using narrative to communicate who you are 3. Build Trust in your Company Using narrative to build your brand 4. Transmit your Values Using narrative to instill organizational values Copyright © 2013 RGCG, LLC 21 8 Narrative Patterns Stephen Denning 5. **Getting Others Working Together Using narrative to get things done collaboratively 6. Share Knowledge Using narrative to transmit knowledge and understanding 7. Tame the Grapevine Using narrative to neutralize gossip and rumor 8. Create and Share Your Vision Using narrative to lead people into the future Copyright © 2013 RGCG, LLC 22 11
  • 14.
    Tell to Win PeterGuber 1. Motivation Your, be intentional, passion, engage 2. Audience Render an experience, connect, align with 3. Goal Purposeful, build an ongoing relationship (not a point transaction) 4. Interaction For them to own, secret sauce 5. Content Its everywhere, your own experiences, what moves you Copyright © 2013 RGCG, LLC 23 General Techniques Copyright © 2013 RGCG, LLC 24 12
  • 15.
    Basic Framework Still quiteeffective… Tell them what you’re about to tell them Tell them Tell them what you just told them Oreo Cookie Model (sandwich) From a Planning and a Strategy perspective, consider: Opening Moves Middle Game End Game Copyright © 2013 RGCG, LLC 25 The “One Thing” When it comes to risky, controversial, and emotional conversations, skilled people find a way to get all relevant information out into the open. That’s it. At the core of every successful conversation lies the free flow of relevant information. People openly and honestly express their opinions, share their feelings, and articulate their theories. They willingly and capably share their views, even when their ideas are controversial or unpopular. Copyright © 2013 RGCG, LLC 26 13
  • 16.
    The Pareto Principal Crossingthe Chasm Communicate mostly to the 80% Communicate mostly to the Early Adopters and the Majority Tailor your message to these folks; reach out to their interests, connecting to them Copyright © 2013 RGCG, LLC 27 Turning Points Major shift points or nexus points can be useful in stories A major shift or turning point in your life A major external turning point to you personally, your group, your organization; M&A activity A major turning point in a project A key player leaving your team Example: I’ve often used lay-offs as transition points for major shifts in my career. From the ashes rises another chapter. My two books have resulted from these transitions Copyright © 2013 RGCG, LLC 28 14
  • 17.
    Connecting to YourAudience Reference their perspectives Reference their context What would you want to hear IF you were in their shoes What sorts of history relates to your topic Walk about, make eye contact Talk about what you’d like to help the audience do, how you’d like to serve them Keep the Servant Leadership mindset in mind throughout Copyright © 2013 RGCG, LLC 29 Admiration Someone you knew when you were growing up Someone in the organization who has met a lot to you The person you admire most in your organization Someone who did better in the organization than anyone expected Someone who mentored you (showed you the ropes) in the organization Someone who handled adversity incredibly well in the organization Someone who is a humble servant leader Copyright © 2013 RGCG, LLC 30 15
  • 18.
    Goals & Objectives Youcan’t force collaboration. You can encourage it towards specific expectations surrounding Goals & Objectives Major initiative Major project Major new methodology Challenging new technology Quarterly / Annual goal-setting Connecting alignment to the top-line strategies We’re all being measured together Copyright © 2013 RGCG, LLC 31 Clarifying & Listening Were you listening? Play it back to me what were the key points? What do you think will be the most challenging parts of the strategy? Is this the right direction? Does anyone see crucial adjustments that need to be made? Copyright © 2013 RGCG, LLC 32 16
  • 19.
    Humor Self deprecating humorcan be incredibly powerful in stories— particularly as an introductory device Share internal stories that are commonly views as humorous Twist questions around, be playful with your audience You don’t have to be a comedian; be yourself Copyright © 2013 RGCG, LLC 33 Adding Context Add appropriate breadth and depth to the context that folks normally wouldn’t have— Risk context Organizational context Impact context Customer context Dependency context Quality context Leadership context Technical context Revenue context Copyright © 2013 RGCG, LLC 34 17
  • 20.
    Power of Transparency 13Behaviors that Foster & Increase Trust 1. 2. 3. 4. 5. 6. 7. Talk Straight Demonstrate Respect Create Transparency Right Wrongs Show Loyalty Deliver Results Get Better 8. Confront Reality 9. Clarify Expectations 10. Practice Accountability 11. Listen First 12. Keep Commitments 13. Extend Trust Copyright © 2013 RGCG, LLC 35 Visualization Try to paint a picture Directionally committed – Burn the ships behind you Let pictures do some of your talking for you Mine the organization for supportive “pictures” Defect reports, project failures, M&A intentions, success & failure email, metrics, virtually anything that adds to the imagery Copyright © 2013 RGCG, LLC 36 18
  • 21.
    Group-based Stories Engaging multiplestory-tellers Defining a strategy around a group with different Perspectives Stories Audience Connections For example, we’re “ Going Agile” Engage Development + Quality + Product Engage team member(s) from pilot team(s) Engage leadership to speak to the core drivers Copyright © 2013 RGCG, LLC 37 When trying to make a point… Let it emerge Don’t start with it: This is a story about incredible courage. At the end, you will aspire to be like me Or end with: And now I expect you all to be like me Allow everyone to come to their own conclusions. Of course, you can recount what it means to YOU Copyright © 2013 RGCG, LLC 38 19
  • 22.
    Safety In order toget feedback the environment has to be considered ‘Safe’ Commit to “What happens in Vegas ” for all story telling session Don’t be afraid to disagree or debate, just don’t take follow-on actions Tell stories about how much you appreciate candor, feedback, and truth-telling It will take time to establish trust, but well worth it. Safety needs to be 100% Copyright © 2013 RGCG, LLC 39 What to try? Find opportunities for stories Keep a diary; remember key events When in doubt or when there’s a ‘void’ start Remember: we can all tell stories, think about your interviews When it feels like its time to stop stop Walk around, make eye contact, take questions Be yourself; don’t try to be someone else It’s better to tell a story badly, than to not tell one at all when the opportunity is there Copyright © 2013 RGCG, LLC 40 20
  • 23.
    What to avoid? Ridicule Lyingor stretching the truth Poking fun Mean spiritedness Getting personal Complexity – multi-threaded stories Making it about you Negativity, pessimism, excessive realism Copyright © 2013 RGCG, LLC 41 Group-based Workshop Storytelling Copyright © 2013 RGCG, LLC 42 21
  • 24.
    Example Stories /Situations I want to mine everyone for story examples Situations where you told a story effectively Situations where a story would have worked, but you didn’t leverage it Observations from your history that could be re-framed into an effective story This is NOT storytelling, but just brainstorming & mining examples from each other Copyright © 2013 RGCG, LLC 43 The notion of a Triad I want you to break out into groups of three We’ll rotate around 3 primary roles Story-teller Story audience Story observer We’ll explore each of you telling a story One of you volunteers with a potential story All three will strategize on the structure of the story Tell the story Debrief the story Copyright © 2013 RGCG, LLC 44 22
  • 25.
    Introductions You have 6minutes, two minutes each Properly introduce yourselves to your Triad team Professional introduction: work, how long, career path, current title, current responsibilities, likes & dislikes Personal introduction: family, children, where you live, vacation, hobbies, volunteering, recent books you’ve read In the last year, what are compelling truths you’ve discovered? What do the next five years hold in store for you? Copyright © 2013 RGCG, LLC 45 Story #1 Introduction Imagine you’ve just joined your current group as a leader or senior contributor The group is tight-nit and tenure of quite long, so you want to make a good first impression to You decide to tell a story about yourself—as a means of sharing some insights as a way of introduction One that – shares more about who you are (either professionally, personally, or both) Also, one that sets the stage for some changes you plan on making within the organization Copyright © 2013 RGCG, LLC 46 23
  • 26.
    Story #2 Confidence &Direction Think of your toughest, most challenging projects that you’ve encountered in your career Think of what made it challenging, and more importantly, what were the factors that you brought to bear to deliver the project Get down to the essence of that made it work out. Now translate these lessons to a current project and share a story relating the pervious to this one connecting the dots and trying to inspire confidence and direction Copyright © 2013 RGCG, LLC 47 Story #3 Vision – “Going Agile” Your current organization has decided to go agile Leadership is basically driving it down from above, so you and your team have little choice but to “get on board” You do feel it’s the right decision, but for your own reasons. You also realize it will be a great cultural challenge for your team. Many of whom have been around for 20+ years This is your first exposure to them of what's about to happen, why, and how you expect it to evolve Copyright © 2013 RGCG, LLC 48 24
  • 27.
    Story #4 Interview Your interviewinga new test manager for within your team. She’s come wildly recommended and the interview has proven the accolades to be understated. She’s outstanding You’ve been given the closing position on the interview She asks you about the culture and why you get up in the morning. What’s exciting about your job and why are you there. Here’s your chance to WOW her and close the deal Copyright © 2013 RGCG, LLC 49 Story #5 Project Status Quite frankly, you wish they would cancel this project. It’s over schedule by 6 weeks and testers on it need to move onto their next effort—so everyone is multi-tasking and stretched The software doesn’t meet the clients needs and the development team doesn’t know what they’re doing Each release has more defects than the last and your in a death spiral of fix – test – refix The VP of Product Development has asked you for an assessment of the situation from a “QA perspective” for himself and the rest of the leadership team—now Copyright © 2013 RGCG, LLC 50 25
  • 28.
    Story #6 Agile AutomationInitiative You’ve been on-board as a senior test manager for 3 months. You were initially shocked that there was no automation strategy in place and that only about 10% of the regressions suite was automated It’s a tremendous resource and time waste and you’ve just sold management on your ideas for investing in automation You now want to share your vision with the testing team and created a shared strategy that will quickly change the dynamics Copyright © 2013 RGCG, LLC 51 Wrap-up • Hope we challenged your existing assumptions a bit Inspire you to change your view towards Automation ROI and investment What did I miss? • Final questions or discussion? • • Thank you! Copyright © 2013 RGCG, LLC 52 26
  • 29.
    Contact Info Bob Galen PrincipalConsultant, RGalen Consulting Group, L.L.C. Director of Agile Solutions, Zenergy Technologies, Blogs Project Times http://www.projecttimes.com/robert-galen/ Business Analyst – BA Times http://www.batimes.com/robert-galen/ My Podcast on all things ‘agile’ http://www.meta-cast.com/ Experience-driven agile focused training, coaching & consulting Contact: (919) 272-0719 bob@rgalen.com bob.galen@zenergytechnologies.com www.rgalen.com Copyright © 2013 RGCG, LLC 53 Story of Joe Vulnerability & Patience Facilitated, introduction to the Technology leadership team. HR gathered questions Joe was in the military in Germany and Special Forces. During an “accident” he suffered a brain injury and was essentially left for dead He eventually was brought to hospital and recovered, although to this day, he’s receiving operations The team focused on these details instead of trying to find out about his style and intentions Point is: he graciously answered every question no matter how personal or painful. Copyright © 2013 RGCG, LLC 54 27
  • 30.
    Story of CompanyA Lack of Transparency & Honesty External emphasis on growth, prosperity, stock option worth, etc. VC funded growth; deferring profitability Behind closed doors: Company doing poorly, strategies Finances were obfuscated Lay-offs Projecting when we’d run out of VC funding Surprise! Lay-offs Strategic move towards self-sufficiency & profitability Copyright © 2013 RGCG, LLC 55 Story related to Dysfunctional Test Team Improving Group Performance In general, I used stories to re-frame expectations of the testing team at Company E. They took the following flavors: Stories of performance that aligned with our new models; and aligned with recognition Stories of what performance we were looking to change at a group level – examples of the future 1:1 stories in performance coaching; leveraging role models and real examples External stories related to the changes / efforts the team was making in reshaping itself. This was very much ‘marketing’ Copyright © 2013 RGCG, LLC 56 28